Exhibition-Boards 25thApril 2

download Exhibition-Boards 25thApril 2

of 7

Transcript of Exhibition-Boards 25thApril 2

  • 7/30/2019 Exhibition-Boards 25thApril 2

    1/7

  • 7/30/2019 Exhibition-Boards 25thApril 2

    2/7

    Arboreld Garrison & Adjoining Land Exhibition of Planning Application Proposals

    25th April 2013

    land uSE ParaMETErS

    Proposed and existing primary routes

    Indicative route of proposed extension to

    Nine Mile Ride

    Existing development

    Watercourses and waterbodies

    Residential

    Public open space

    Primary school

    Secondary school

    Mixed-use district centre

    Mixed-use neighbourhood centre

    Elderly care

    Foodstore car park

    Market square

    Existing buildings to be retained

    This parameter plan illustrates the location and

    quantity of land proposed for the mix of uses to

    be provided.

    Key

    Land use parameters

  • 7/30/2019 Exhibition-Boards 25thApril 2

    3/7

    Arboreld Garrison & Adjoining Land Exhibition of Planning Application Proposals

    25th April 2013

    2. Princess Marina Avenue

    4. Home-Zone streets and private drives3. Neighbourhood and local streets

    5. Bridleways

    accESS & MoVEMEnT

    dISTrIcTcEnTrESTrEET

    MarkET SQuarE B

    B

    a

    a

    aVEnuE

    cYclEWaY

    c c

    local

    STrEET

    EE

    local

    STrEET

    dd

    oPEn SPacE

    PrIVaTEdrIVE

    bridleway 1.0m

    clearance1.0m

    verge0.5m cycle track

    footpathclearance

    clearanceclearanceclearanceclearanceclearance1.0m

    clearance 1.0m (min)

    cycle tr ack /foot path 0 .5m clear ance

    2.0m (min)

    3.0m (preferred)

    existing ground level

    SHarEd cYclE Track/fooTPaTH WITH adJoInIng BrIdlEWaY SHarEd cYclE Track/fooTPaTH WITH SEParaTE BrIdlEWaY

    Existing primary routes

    Mixed-use street

    Avenue

    Local street

    Neighbourhood street

    Home-zone street/mews

    Lane

    Bridleways

    Cycleways/footpaths

    1. Mixed-use street and village square

    1

    2

    22

    2

    3

    3 5

    5

    5

    4

    4

    4

    District Centre - Village Square

    District Centre - Mixed-use street

    Avenue with Swale - North

    Avenue - South

    Local Street Private Drive - serving up to 6 dewllings

    Local Street with Swale Private Drive: Interface with open space (serving up to 6 dwellings)

    Retail/Commercial onground oor

    2-3storeysapt./ofces

    above

    Parking and accessto rear

    FootpathFootpath Loadingbays

    Carriageway(Shared surfacebetweenplot

    frontages)

    Loadingbays

    Retail/Commercial onground oor2-3 storeysapartments/ofcesabove

    Retail/Commercial onground oor2-3 storeys

    apartments/ofcesabove

    Parking and accessto rear

    Footpath FootpathParking baysdenedby trees/bollards

    Carriageway(Shared surfacebetweenplot

    frontages)

    Parkingbays

    2-3 storeysaccommodationforseniorcitizens

    Parking offlocal accessstreets

    2-3 storey homes

    Parking offlocal accessstreets

    Setbackvaries

    Frontgarden

    Footpath

    Footpath

    Two-waycyclepath

    Two-waycyclepath

    S wa le Car ria gewa y

    Carriageway

    Grassvergewithparking

    Grassvergewithparking

    Footpath

    Grassvergewithparking

    Footpath

    Frontgarden

    Generally 2-3storey homes

    Parking to sideoron-street

    Mainly 2-2.5storey homes

    Parking to sideoron-street

    Generally 2-2.5storey homes

    Parking to side

    2-2.5storey homes

    Parking to sideoron-street

    2-3 storeyhomes

    Parking to sideoron-street

    2-3 storeyhomes

    Parking to sideoron-street

    Generally 2-3storey homes

    Parking to sideoron-street

    Frontgarden

    Front garden

    Front garden

    Front garden

    Frontgarden

    Frontgarden

    Footpath

    Footpath Footpath

    Parking/planting

    Carriageway

    Carriageway

    (reduced to4.8m when

    serving less

    than50homes)

    Treeplanting infront garden

    Footpath

    Swale

    Frontgarden

    Parking/ planting onalternatesidesofstreet

    Grassvergewith parking Verge

    Privatedrive

    PrivatedriveFoot-path

    Lowlevelbollard lighting

    Verge

    Possibleswaleorattenuationpond

  • 7/30/2019 Exhibition-Boards 25thApril 2

    4/7

    Arboreld Garrison & Adjoining Land Exhibition of Planning Application Proposals

    25th April 2013

    Hazebrouck

    Bis rie

    Rowcroft

    Sheerlands

    gte

    Princess Marina

    Drive

    Village

    centre

    cHaracTEr arEaS

    Six character areas are proposed. They are:

    The village centre;

    Hazebrouck (incorporating the neighbourhood centre);

    Biggs Ride;

    Princess Marina Drive;

    Rowcroft; and

    Sheerlands Gate.

    Each of these character areas will correspond to a new

    neighbourhood with its own distinct character and identity,

    and, in turn, to the existing landscape character areas identied

    in the Landscape, Open Space and Recreation Strategy which

    accompanies the planning application.

    HazEBrouck

    VisiThis character area is named after its current use by the military as

    Hazebrouck Barracks. The vision for Hazebrouck is of a compact and

    permeable network of pedestrian-friendly streets and open spaces. The

    existing axial arrangement of north-south and east-west roads will be

    incorporated and extended to create a grid of streets and squares enclosed

    by two and three storey homes, reecting its former miliitary use.

    The orthogonal arrangement of streets will facilitate retention of existing

    trees on these alignments as well as maximising the potential for south-facing

    roofs to avail of solar gain.

    THE VIllagE cEnTrE

    VisiThe village centre will be the hub of commercial, social, employment, and

    cultural activities for the existing and new communities. It will be a vibrant,

    bustling place with a scale and character reminiscent of the centres of

    traditional small market towns and villages.

    (clockwise from right):

    Farmers market;

    Market Square activities;

    Village Square and Village Green (indicative aerial view from south west)

    Left:Hazebrouck character area - safe and convenient play spacesoverlooked by homes

    Right: Pauls Malt, Wallingford

    Key to character areas

  • 7/30/2019 Exhibition-Boards 25thApril 2

    5/7

    Arboreld Garrison & Adjoining Land Exhibition of Planning Application Proposals

    25th April 2013

    roWcrofT

    VisiThis area is named after the military barracks which currently occupy

    the area. It extends from the village centre east wards along the existing

    alignment of Nufeld Road, and in a southerly direction along the alignment

    of Princess Marina Drive.

    Rowcroft is evisaged as a medium-density neighbourhood arranged around

    a semi-formal grid of quiet residential streets and spaces radiating from the

    east west axis of Nufeld Road. This reects its former military character

    and uses as well as the need to create walkable neighbourhood catchments

    with sufcient residential densities to support the district centre.

    cHaracTEr arEaS

    BIggS rIdE

    VisiBiggs Ride is conceived as a low-density (up to 25 net dwellings per hectare)

    neighbourhood of detached and semi-detached homes on relatively large

    plots with relatively large front gardens. It is named after Biggs Lane, which

    passes through the area.

    The organic-seeming arrangement of homes and streets in this character

    area reects its location surrounded by proposed informal open spaces to

    the east (including Suitable Alternative Natural G reenspace [SANG]) and

    the existing lake and brook corridor to the west and south-west respectively.

    PrIncESS MarIna drIVE

    VisiThe leafy and spacious character of the existing section of Princess Marina

    Drive will be retained and enhanced. Its existing avenue-like character will be

    further improved by new tree planting and pedestrian and cycle

    improvements, including a new two-way cyclepath. The character of the

    avenue itself is explained and illustrated in more detail in the

    following section.

    SHEErlandS gaTE

    VisiSheerlands Gate is the gateway to the new Arboreld from the west.

    Named after the nearby Sheerlands Road, which marks the eastern edge of

    the character area, it is conceived as an informal avenue set in a generous

    green corridor, and overlooked from higher ground by generously

    proportioned new homes. Westwood has also been suggested, after the

    nearby Grade II Listed Westwood Farmstead. The avenue will follow the

    north side of the existing brook before crossing to the south side of the

    brook and leading to the heart of the village.

    Above:Rowcroft Character Area - high quality public realm and green space

    Right:Homes overlooking shared open space, St Pauls Malt

    Above:Sheltered housing overlooking the avenue

    Right:Example of a leafy residential avenue

    Above:Sheerlands Gate character area - high quality homes overlooking the brook

    Right:Homes overlooking high quality landscaping, Watercolour, Surrey

    Above:Biggs Ride Character Area - high quality public realm and green space

    Right:Lake and open space at Broughton and Atterbury

  • 7/30/2019 Exhibition-Boards 25thApril 2

    6/7

  • 7/30/2019 Exhibition-Boards 25thApril 2

    7/7

    Arboreld Garrison & Adjoining Land Exhibition of Planning Application Proposals

    25th April 2013

    Proposed and existing primary routes

    Indicative route of proposed extension to

    Nine Mile Ride

    Phase 1

    Phase 2

    Phase 3

    Phase 4

    Phase 5

    Mixed-use centres

    Schools

    Existing development

    PHaSIng & IMPlEMEnTaTIon

    nExT STEPS

    Appointment of a development partner

    The MoD will formally announce the appointment of its new development

    partner late in April 2013. The company will work closely with Defence

    Infrastructure Organisation (DIO) and the other landowners as a member of

    AGLC, to ensure a seamless approach to consultation with the local community

    and delivery of the development. This will be a long term partnership with all

    stakeholders through to completion of the scheme in around 2028.

    The next opportunity for engagement

    Following this event, and in line with normal planning application procedures, the

    Council will consult with the local community and other stakeholders about the

    planning application. AGLC welcomes the opportunity to discuss its proposals

    further through the Community Forum and other appropriate community

    groups. In parallel, AGLC is also considering its plan for long-term engagementwith the local community over matters such as design of the proposed

    community facilities. Further details will be announced once the processing of

    the application has progressed sufficiently to avoid unnecessary confusion.

    PHASENO. OF

    DWELLINGS

    NO. OF AFFORDABLE UNITS AT

    35% POLICY COMPLIANT

    PHASED DELIVERY

    PERIODS4

    1a 337 118 2015 - 2017

    1b1 323 113 2017 - 2019

    22 4723 165 2018 - 2022

    3 436 153 2022 - 2025

    4 143 50 2025 - 2026

    5 289 101 2026 - 2028TOTAL 2000 700

    1 Phase 1c relates to the Northern (Rowcroft) SANG only2 Phase 2 includes the Southern (West Court) SANG3 This figure excludes the proposed 60-bed elderly care home4 Assumes an average of 150 dwellings delivered per year

    OCTOBER / NOVEMBER 2013

    Planning permission granted subject to legal agreement

    2014

    Disposal strategy drawn up.

    Marketing plots and disposal commences

    Reserved matters application(s) submitted for first phases of development and approved (1a, 1b and 1c)

    Detailed infrastructure planning and implementation of preliminary enabling works

    Pre-commencement conditions satisfied

    2015

    Start on s ite with phases 1(a) and 1(c) leading to delivery of new housing, Rowcroft SANGs and foodstore

    Plot marketing and disposal ongoing

    Reserved matter application(s) for phase 2 to be submitted

    Other phases to follow on sequential basis

    2028Development completed

    PHaSIng STraTEgYThe phasing diagram indicates the Consortiums approach to the sequencing of development. This reflects

    commercial, planning and infrastructure delivery considerations. The table below sets out the number of

    dwellings to be delivered over the development period:

    April

    - Planning Application submitted and validated

    - AGLC planning application exhibition

    April / May

    - WBC undertakes community consultation and consults with key

    stakeholders

    June / July

    - WBC and AGLC review responses and undertake technical

    assessments

    July / August

    - Dialogue over revisions to planning application. Local community

    kept informed of progress

    September / October

    - WBC Planning Committee to determine the application in principle

    October/ November

    - Subject to a favourable d ecision from WBC, the planning application

    legal agreement signed and planning permission granted

    The Planning Application Programme (April - November 2013)

    Process leading up to a start on site in 2014/15