Exhibit G.7 Alamitos Barrier Project Telemetry System ...

22

Transcript of Exhibit G.7 Alamitos Barrier Project Telemetry System ...

OCarrillo
Text Box
Exhibit G.7 Alamitos Barrier Project Telemetry System Upgrade Plans

CONTROL PANEL D.C. SIGNALS

CONTROL PANEL A.C. SIGNALS

ENCLOSURE WIRING

FIELD WIRING

CONDUCTORS NOT CONNECTED

CONDUCTORS CONNECTED

EQUIPMENT ENCLOSURE/ BOUNDARY

CARTRIDGE FUSE AND FUSEHOLDER

JUNCTION BOX

VOLTS ALTERNATING CURRENT

TERMINAL BOX, TERMINAL BLOCK

UNINTERRUPTIBLE POWER SUPPLY

Vdc or VDC

Vac or VAC

V

W

UPS

TSP

TB

VOLTS

VOLTS DIRECT CURRENT

WIRE

TWISTED SHIELDED PAIR

S.S.

PNL

PH

PANEL

STAINLESS STEEL

PHASE

GALVANIZED RIGID STEEL

LT, LIT

J

LEVEL TRANSMITTER, INDICATOR TRANSMITTER

JUNCTION BOX

GND

GRS

CKT

C

GROUND

CONDUIT

CIRCUIT

A, AMP

AWG

CB

AMPERE

CIRCUIT BREAKER

AMERICAN WIRE GAUGE

15A

CIRCUIT BREAKER: 15A CURRENT SENSOR OR TRIP

SETTING,

ONE-LINE

DIAGRAM

CONTROL

DIAGRAM

WORDABBREVIATIONDESCRIPTIONPLANDESCRIPTIONPLAN

LIGHT LINE INDICATED EXISTING ELECTRICAL OR EXISTING

EQUIPMENT. LIGHT LINE MAY ALSO BE USED FOR DETAIL

DRAWING CLARITY.

HEAVY LINE INDICATED NEW WORK

PSI POUNDS PER SQUARE INCH

CONDUIT, CONCEALED IN FINISHED AREAS, EXPOSED

IN UNFINISHED AREAS

CONDUIT BELOW GRADE

ANTENNA

(E) EXISTING

FT, FIT FLOW TRANSMITTER, INDICATOR TRANSMITTER

I/O INPUT/OUTPUT

LS, LSH, LSL, LSHH,

LSLL

LEVEL SWITCH, HIGH, LOW, HIGH HIGH, LOW LOW

PT, PIT PRESSURE TRANSMITTER, INDICATOR TRANSMITTER

ZIT POSITION INDICATION TRANSMITTER

CONDUIT CALLOUT. IF USED, SEE CONDUIT

SCHEDULE

15A

(N) NEW

IW INJECTION WELL

OW OBSERVATION WELL

MWD METROPOLITAN WATER DISTRICT OF SOUTHERN CALIFORNIA

A/R AS REQUIRED

AI ANALOG INPUT

CM COMMUNICATION MODULE

SM SIGNAL MODULE

mA MILLIAMPERES

Ø PHASE

kVA KILO VOLT AMPERES

PB PULL BOX

PB

NEW CONDUIT

EXISTING IN-GROUND PULL BOX

EXISTING INJECTION WELL

EXISTING OBSERVATION WELL

(N) S7-1200 PLC CONTROLLER

(N) RADIO MODEM TELEDESIGN TS400

EXISTING CONDUIT

OIT OPERATOR INTERFACE TERMINAL

X X XCOAXIAL COMMUNICATION CABLE

RS232 COMMUNICATION CABLE

ELECTRICAL NOTES

1. GENERAL AND ELECTRICAL CONTRACTOR TO SIZE

ALL WIRING NOT EXPLICITLY SHOWN ON

DRAWINGS ACCORDING TO THE REQUIREMENTS

OF NATIONAL ELECTRICAL CODE (NEC) FOR THE

SPECIFIC APPLICATION AND CONDITIONS.

2. ALL CONDUCTORS SHALL BE COPPER (MINIMUM

SIZE #12 AWG UNLESS SPECIFICALLY NOTED

OTHERWISE).

3. INSTRUMENT SIGNAL WIRES SHALL BE SIZE #16.

CONTROL SIGNAL WIRES SHALL BE SIZE #14.

4. PROVIDE AS INDICATED THE NUMBER OF

CONDUCTORS, EXCLUDING GREEN GROUND

CONDUCTOR, UNLESS OTHERWISE NOTED.

PROVIDE GREEN EQUIPMENT GROUNDING

CONDUCTOR SIZED ACCORDING TO THE CODE.

5. THE ELECTRICAL CONTRACTOR SHALL BE

RESPONSIBLE TO CONFORM TO ALL LOCAL CODES

AND ORDINANCES, THE STATE OF CALIFORNIA

ELECTRICAL SAFETY ORDERS, THE NATIONAL

ELECTRICAL CODE AND ANY ADDITIONAL

JURISDICTION RELATING TO THE WORK.

6. THE ELECTRICAL CONTRACTOR SHALL FURNISH

AND INSTALL ALL CONDUIT, WIRE, AND

RECEPTACLES REQUIRED FOR A COMPLETE AND

OPERATIONAL ELECTRICAL SYSTEM.

7. THE ELECTRICAL CONTRACTOR SHALL BE

RESPONSIBLE TO CONFIRM THAT PROPOSED NEW

EQUIPMENT ON THE CONTRACT WILL FIT

DIMENSIONALLY WITH EXISTING EQUIPMENT IN

LOCATION SHOWN ON DRAWINGS.

8. IN THE EVENT OF A CONFLICT OR INCONSISTENCY

BETWEEN ITEMS INDICATED ON THE PLANS

AND/OR SPECIFICATIONS, OR WITH CODE

REQUIREMENTS, THE NOTE, SPECIFICATION OR

CODE WHICH PRESCRIBES AND ESTABLISHES THE

MORE COMPLETE JOB OR HIGHER STANDARD

SHALL PREVAIL.

9. ALL ELECTRICAL EQUIPMENT EXPOSED TO THE

CLIMATE SHALL BE WEATHERPROOF.

10. ALL UNDERGROUND CONDUITS SHALL BE

INSTALLED AT 24" BELOW FINISHED GRADE

MINIMUM UNLESS NOTED OTHERWISE.

11. THE ELECTRICAL CONTRACTOR SHALL BE

RESPONSIBLE FOR LOCATING EXISTING

UNDERGROUND FACILITIES AND PROTECTING

THESE FACILITIES FROM DAMAGE.

12. THE ELECTRICAL CONTRACTOR SHALL ROUTE

CONDUITS AS REQUIRED PER FIELD CONDITIONS

AND N.E.C.

13. THE ELECTRICAL CONTRACTOR SHALL BE

RESPONSIBLE FOR REPAIRING ANY DAMAGE TO

EXISTING UNDERGROUND FACILITIES.

SYMBOLS AND ABBREVIATIONS

2

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

ALAMITOS

COMPUTER PC

ROUTER

ALAMITOS YARD

LEGEND

ROUTER

T1 LINE (NEW)

SERVER OR

WORK STATION

BLUE ROOM

COMPUTER PC

ROUTER

IP: ?????

PUBLIC WORK BUILDING

GRAY LINE - EXISTING

BLACK LINE - NEW DESIGN

NOTE

EXISTING GEOMATION TELEMETRY SYSTEM TO BE

REPLACED WITH NEW PLC.

NEW PLC PANEL TO BE INSTALLED.

USE CPU 1214C ON-BOARD DIGITAL INPUT FOR VAULT

FLOADED ALARM. CPU 1214C PROVIDES 8 DIGITAL INPUTS /

6 DIGITAL OUTPUTS.

2

1

OCWD PLANNED

ALM 9

ALM 10

ALM 11

34F 33U3

34S34V

PT B + 34D LVL

2

PROFIBUS (RS485) COMMUNICATION CABLE (EXISTING)

T1 LINE (EXISTING)

ROUTER

ABP ALM-6-2

CP

U 224

EM

231

EM

231

EM

231

TS

4000

ABP ALM-6-1

CP

U 224

EM

231

EM

231

EM

231

LIN

X

X

X

X

X

33J 33Q1

ABP ALM-7-2

CP

U 224

EM

231

EM

231

EM

231

TS

4000

ABP ALM-7-1

CP

U 224

EM

231

EM

231

EM

231

LIN

X

X

X

X

X

34Z

TS

4000

ABP ALM-8

CP

U 224

EM

231

EM

231

LIN

X

X

X

X

X

EM

231

TS

4000

ABP ALM-12

X

X

X

X

TS

4000

ABP ALM-13

X

X

X

X

TS

4000

ABP ALM-1

X

X

X

33T

TS

4000

ABP ALM-3

X

X

X

33Y

TS

4000

ABP ALM-2

X

X

X

33V

TS

4000

ABP ALM-4

X

X

X

TS

4000

ABP ALM-14

X

X

X

1 1 1 1 2

ABP ALM-16

PRV STATION

TS

4000

LIN

X

X

X

X

X

X

X

X

X

3

TS

4000

LIN

X

RS422/485 TO

RS232 CONVERTER

TELEDESIGN

TS4000

CPU 224

EM 231

CPU 314

CP 341

CP 343-1

SIMATIC S7-300 CPU 314 (EXISTING)

SIMATIC S7-300 POINT-TO-POINT RS422 / RS485

COMMUNICATION PROCESSOR CP 341(EXISTING)

SIMATIC S7-300 INDUSTRIAL ETHERNET COMMUNICATION

PROCESSOR CP 343-1(EXISTING)

SIMATIC S7-200 CPU 224 (EXISTING)

SIMATIC S7-200 ANALOG INPUT MODULE EM231, 4 INPUTS

(EXISTING)

UNMANAGED ETHERNET SWITCH SCALANCE X108

(EXISTING)

UNMANAGED ETHERNET SWITCH SCALANCE X108

6GK5108-0BA00-2AA3 (NEW)

S7 1200 CPU 1212C DC/DC/RELAY 6ES7 212-1HE40-0XB0

(OR NEWER)

S7-1200 SM 1231-8AI ANALOG INPUT MODULE, 8

CHANNELS 6ES7 231-4HF32-0XB0 (OR NEWER)

S7-1200 RS232 COMMUNICATION MODULE

6ES7-241-1AH32-0XB0 (OR NEWER)

S7 1200 CPU 1214C DC/DC/RELAY 6ES7 214-1HG40-0XB0

S7-300 ANALOG INPUT MODULE, 2AI, 6ES7331-7KB02-0AB0

RS232 COMMUNICATION CABLE

COAXIAL COMMUNICATION CABLE

CAT6 CABLE

X X X X X X X X

T1 LEASED LINE

T1

LEASED

LINE

3

CP

U 224

CPU 1212C

CM

1241

SM

1231

CM

1241

SM

1231

CM

1241

SM

1231

CM

1241

SM

1231

CM

1241

SM

1231

SM

1231

SM

1231

SM

1231

CP

U 1212C

CP

U 1212C

CP

U 1214C

CP

U 1212C

CP

U 1212C

CP

U 1212C

SCALANCE

X108

SC

ALA

NC

E

X108

CP

343-1

SM

1231

CPU 1214C

LIN

X

CP

341

CP

U 314

SM

331

SM 331

SC

ALA

NC

E

X108

SCALANCE

X108

CM

1241

SM

1231

CP

U 1212C

EM

231

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

ABP COMMUNICATION

NETWORK DIAGRAM

3

33S

33S1

33ST

33U

33UV

33W

33WX

33X

34DG

34F-I

33T 33V 33Y 34F-A 33U3

33XY

33YZ

33Z2

33Z

ALAMITOS YARD

LEGEND

INSTRUMENT CABLE

X X X X X

X

COAXIAL COMMUNICATION CABLEX X X X X X X X

ALM-1 ALM-2

ALM-3

ALM-4 ALM-14

ABP NETWORK INSTRUMENT CABLE DIAGRAM

4

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

OW-34DG

IW-33Z2

OW-33YZ

IW-33Y

OW-33XY

IW-33X

IW-33W

OW-33WX

OW-33UV

IW-33U3

IW-33U

IW-33T

OW-33ST

IW-33S1

IW-33S

IW-33Z

ALM-2

ALM-3

ALM-4

TANK

E

CIRCULATING WATER INTAKE CHANNEL

TANK

A

TANK

B

TANK

C

TANK

D

ALM-1

IW-34F-A

IW-34F-I

IW-33V

ALM-14

NOT TO SCALE

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

OVERALL SITE PLAN VIEW

LEGEND

EXISTING INJECTION WELL

EXISTING OBSERVATION WELL

(N) S7-1200 PLC CONTROLLER

(N) RADIO MODEM TELEDESIGN TS400

(E) EXISTING

(N) NEW

CHANNEL EMBANKMENT

5

IW-33W

IW-33V

OW-33UV

IW-33U

OW-33ST

IW-33S

ALM-2

ALM-1

PB-2

PB-3

PB-4

IW-33U3

(E) ABOVE GROUND

INJECTION WELL

ENCLOSURE

(E) ABOVE GROUND

INJECTION WELL

ENCLOSURE

(E) OBSERVATION WELL

(E) UTILITY POLE

W/ (N) SOLAR PANEL

AND (E) ANTENNA

(E) ABOVE GROUND

INJECTION WELL

ENCLOSURE

REPLACE (E) GEOMATION

CABINET WITH (N) S7-PLC

CABINET IN (E) WELL ENCLOSURE

(E) ABOVE GROUND

INJECTION WELL

ENCLOSURE

(E) OBSERVATION WELL

(E) UTILITY POLE

W/ (N) SOLAR PANEL

AND (E) ANTENNA

(E) ELECTRIC ENCLOSURE

(E) ELECTRIC ENCLOSURE

(E) POWER POLE

VALVE BOX

12" H

P G

AS

12" H

P G

AS

16" H

P G

AS

(E) ABOVE GROUND

INJECTION WELL

ENCLOSURE

REPLACE (E) GEOMATION

CABINET W (N) S7-PLC

CABINET IN (E) WELL ENCLOSURE

(E) 1"C

(E) 1"C

(E) 1-1/4"C

(E) 2, 1"C

PB-1

(E) 1"C

(E) 2, 1"C

ALM-14

IW-33T

(E) 2, 1"C

INSTALL (N) S7-PLC CABINET

AND (N) INSTRUMENT PANEL IN

(E) WELL ENCLOSURE

(N) UTILITY POLE WITH (N) SOLAR PANEL

AND (N) ANTENNA

(E) 1-1/4"C

(E) 2, 1"C

(E) ABOVE GROUND

INJECTION WELL

ENCLOSURE

(E) 1-1/4"C

RELOCATE (E) CASING PRESSURE

TRANSMITTER AND (E) FLOW

TRANSMITTER TO (N) INSTRUMENT

PANEL IN (E) WELL ENCLOSURE

RELOCATE (E) CASING PRESSURE

TRANSMITTER AND (E) FLOW

TRANSMITTER TO (N) INSTRUMENT

PANEL IN (E) WELL ENCLOSURE

RELOCATE (E) CASING PRESSURE

TRANSMITTER AND (E) FLOW

TRANSMITTER TO (N) INSTRUMENT

PANEL IN (E) WELL ENCLOSURE

RELOCATE (E) CASING PRESSURE

TRANSMITTER AND (E) FLOW

TRANSMITTER TO (N) INSTRUMENT

PANEL IN (E) WELL ENCLOSURE

RELOCATE (E) CASING PRESSURE

TRANSMITTER AND (E) FLOW

TRANSMITTER TO (N) INSTRUMENT

PANEL IN (E) WELL ENCLOSURE

S-401

P-101

P-104

P-103

RELOCATE (E) CASING PRESSURE

TRANSMITTER AND (E) FLOW

TRANSMITTER TO (N) INSTRUMENT

PANEL IN (E) WELL ENCLOSURE

(E) ABOVE GROUND

INJECTION WELL

ENCLOSURE

IW-33S1

INSTALL NEW GROUND ROD

NOT TO SCALE

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

SITE PLAN VIEW 1

N

FROM OW-33WX PB-1

ON NEXT SHEET

LEGEND

PB

NEW CONDUIT

EXISTING IN-GROUND PULL BOX

EXISTING INJECTION WELL

EXISTING OBSERVATION WELL

(N) S7-1200 PLC CONTROLLER

(N) RADIO MODEM TELEDESIGN TS400

(E) EXISTING

(N) NEW

6

CHANNEL EMBANKMENT

EXISTING CONDUIT

IW-33Z2

OW-33YZ

IW-33Y

OW-33XY

IW-33X

OW-33WX

IW-33Z

PB-1

PB-2 PB-3

PB-4

PB-5

PB-6

(E) OBSERVATION WELL

OW-33WX

(E) ABOVE GROUND

INJECTION WELL

ENCLOSURE

(E) OBSERVATION WELL

REPLACE (E) GEOMATION

CABINET W/ (N) S7-PLC

CABINET IN (E) WELL ENCLOSURE

(E) ABOVE GROUND

INJECTION WELL

ENCLOSURE

(E) UTILITY POLE

W/ (N) SOLAR PANEL

& (E) ANTENNA

(E) OBSERVATION

WELL

(E) 1-1/4"C,

(E) 1"C

(E) 1-1/4"C,

(E) 1"C

(E) 1-1/2"C,

(E) 1"C

(E) 2"C,

(E) 1"C

(E) 1-1/2"C,

(E) 1"C

(E) 2, 1"C

ALM-3

TO IW-33W

ON PREVIOUS SHEET

(E) 2, 1"C

(E) 1-1/4"C

RELOCATE (E) CASING PRESSURE

TRANSMITTER AND (E) FLOW

TRANSMITTER TO (N) INSTRUMENT

PANEL IN (E) WELL ENCLOSURE

RELOCATE (E) CASING PRESSURE

TRANSMITTER AND (E) FLOW

TRANSMITTER TO (N) INSTRUMENT

PANEL IN (E) WELL ENCLOSURE

RELOCATE (E) CASING PRESSURE

TRANSMITTERS AND (E) FLOW

TRANSMITTERS TO (N) INSTRUMENT

PANEL IN (E) WELL ENCLOSURE.

INSTALL (N) PACKER PRESSURE SENSOR.

P-105

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

SITE PLAN VIEW 2

NOT TO SCALE

N

LEGEND

PB

EXISTING CONDUIT

EXISTING IN-GROUND PULL BOX

EXISTING INJECTION WELL

EXISTING OBSERVATION WELL

(N) S7-1200 PLC CONTROLLER

(N) RADIO MODEM TELEDESIGN TS400

(E) EXISTING

(N) NEW

(E) ABOVE GROUND

INJECTION WELL

ENCLOSURE

(E) UNDERGROUND

INJECTION WELL

ENCLOSURE

CHANNEL EMBANKMENT

7

RELOCATE (E) CASING PRESSURE

TRANSMITTER AND (E) FLOW

TRANSMITTER TO (N) INSTRUMENT

PANEL IN (E) WELL ENCLOSURE.

INSTALL (N) VAULT FLOODED SWITCH.

IW-34F-A

OW-34DG

ALM-4

(E) UTILITY POLE

W/ (N) SOLAR PANEL

AND (E) ANTENNA

REPLACE (E) GEOMATION

CABINET W/ (N) S7-PLC

CABINET IN (E) WELL ENCLOSURE

(E) ABOVE GROUND

INJECTION WELL

ENCLOSURE

(E) OBSERVATION WELL

(E) 1"C

(E) 1-1/4"C

IW-34F-I

P-106

(E) ABOVE GROUND

INJECTION WELL

ENCLOSURE

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

SITE PLAN VIEW 3

NOT TO SCALE

LEGEND

PB

NEW CONDUIT

EXISTING IN-GROUND PULL BOX

EXISTING INJECTION WELL

EXISTING OBSERVATION WELL

(N) S7-1200 PLC CONTROLLER

(N) RADIO MODEM TELEDESIGN TS400

(E) EXISTING

(N) NEW

CHANNEL EMBANKMENT

8

EXISTING CONDUIT

RELOCATE (E) CASING PRESSURE

TRANSMITTER AND (E) FLOW

TRANSMITTER TO (N) INSTRUMENT

PANEL IN (E) WELL ENCLOSURE

RELOCATE (E) CASING PRESSURE

TRANSMITTER AND (E) FLOW

TRANSMITTER TO (N) INSTRUMENT

PANEL IN (E) WELL ENCLOSURE

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

WARDLOW RD

WO

OD

RU

FF

A

VE

FLOW

EXISTING MWD VAULT

AND FLOW METER

EXISTING 4'-6" X 5'-6"

EQUIPMENT HATCH

EXISTING STAIRWAY

HATCH

EXISTING PRESSURE

REDUCING STATION

(BELOW GRADE)

FLOW

N

PRV STATION SITE PLAN

LOCATION OF

PRESSURE REDUCING STATION

SCALE: NTS

9

CONSTRUCTION NOTES:

REPLACE EXISTING CHART RECORDER PANEL WITH ONE NEW PLC

CONTROL PANEL AND ONE NEW INSTRUMENT PANEL.

REMOVE DOWNSTREAM PRESSURE SWITCHES AND TIMERS PANEL

FROM THE INSIDE OF THE EXISTING CHART RECORDER PANEL

AND INSTALL THEM ON THE WALL.

PROVIDE TEE FITTINGS AND PRESSURE TRANSMITTERS FOR

UPSTREAM/DOWNSTREAM PRESSURE. INSTALL TEE FITTINGS INTO

EXISTING PRESSURE TUBES. INSTALL THESE ELEMENTS IN THE

NEW INSTRUMENT PANEL.

INSTALL NEW INSTRUMENT PANEL BELOW THE NEW PLC PANEL.

REPLACE SINGER X107 VISUAL POSITION INDICATOR WITH SINGER

VALVE POSITION TRANSMITTER X156. INSTALL NEW CONDUITS

FROM POSITION TRANSMITTERS TO THE NEW PLC PANEL.

CONSTRUCTION NOTES:

REPLACE EXISTING CHART RECORDER PANEL WITH ONE NEW PLC

CONTROL PANEL AND ONE NEW INSTRUMENT PANEL.

REMOVE DOWNSTREAM PRESSURE SWITCHES AND TIMERS PANEL

FROM THE INSIDE OF THE EXISTING CHART RECORDER PANEL

AND INSTALL THEM ON THE WALL.

PROVIDE TEE FITTINGS AND PRESSURE TRANSMITTERS FOR

UPSTREAM/DOWNSTREAM PRESSURE. INSTALL TEE FITTINGS INTO

EXISTING PRESSURE TUBES. INSTALL THESE ELEMENTS IN THE

NEW INSTRUMENT PANEL.

INSTALL NEW INSTRUMENT PANEL BELOW THE NEW PLC PANEL.

REPLACE SINGER X107 VISUAL POSITION INDICATOR WITH SINGER

VALVE POSITION TRANSMITTER X156. INSTALL NEW CONDUITS

FROM POSITION TRANSMITTERS TO THE NEW PLC PANEL.

PROVIDE POWER CONNECTION FOR NEW PLC PANEL FROM

EXISTING "PANEL P".

1

2

3

4

5

CITY OF LONG BEACH

6

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

CONDUIT SCHEDULE

10

1. REMOVE THE JUNCTION BOX INSIDE THE METAL SHED, IF EXISTING.

REPLACE THE EXISTING CONDUIT INSIDE THE METAL SHED WITH

THE NEW CONDUIT. CONNECT THE NEW CONDUIT TO THE EXISTING

CONDUIT BODY OUTSIDE THE SHED (IF NO EXISTING CONDUIT BODY

OUTSIDE THE SHED, CONTRACTOR SHALL INSTALL A CONDUIT

BODY). CONTRACTOR SHALL CONFIRM THE EXISTING

UNDERGROUND CONDUIT SIZE AND SHALL MATCH THE NEW

CONDUIT WITH THE EXISTING CONDUIT.

2. REPLACE THE EXISTING CONDUIT INSIDE THE METAL SHED WITH

THE NEW CONDUIT. CONNECT THE NEW CONDUIT TO THE EXISTING

CONDUIT BODY OUTSIDE THE SHED (IF NO EXISTING CONDUIT BODY

OUTSIDE THE SHED, CONTRACTOR SHALL INSTALL A CONDUIT

BODY). CONTRACTOR SHALL CONFIRM THE EXISTING

UNDERGROUND CONDUIT SIZE AND SHALL MATCH THE NEW

CONDUIT WITH THE EXISTING CONDUIT.

3. CONTRACTOR SHALL INSPECT THE EXISTING GROUND ROD. IF THE

GROUND ROD IS NOT IN A GOOD CONDITION OR DOES NOT EXIST,

INSTALL A NEW GROUND ROD. INSTALL A CONDUIT FROM THE NEW

PLC PANEL TO THE GROUND ROD. ALSO, CONNECT THE GROUND

ROD TO THE METAL SHED OR THE METAL STRUCTURE.

4. ALL ABOVE GROUND CONDUITS SHALL PVC COATED RIGID

GALVANIZED STEEL, BELOW GROUND CONDUITS SHALL BE

SCHEDULE 80 PVC.

NOTES:

CONDUIT AND WIRE SCHEDULENUMBER SIZE WIRE FROM TO NOTESP-101 1" 2#8, 1#10 GND (N) UTILITY POLE AT IW-33U3 IW-33U3 (N) PLC PANEL

P-103 1" 2#8, 1#10 GND (E) UTILITY POLE AT IW-33T IW-33T (N) PLC PANEL NEW CONDUIT FOR SOLAR POWERP-104 1" 2#8, 1#10 GND (E) UTILITY POLE AT IW-33V IW-33V (N) PLC PANEL NEW CONDUIT FOR SOLAR POWERP-105 1" 2#8, 1#10 GND (E) UTILITY POLE AT IW-33Y IW-33Y (N) PLC PANEL NEW CONDUIT FOR SOLAR POWERP-106 1" 2#8, 1#10 GND (E) UTILITY POLE AT IW-34F-A IW-34F-A (N) PLC PANEL NEW CONDUIT FOR SOLAR POWERP-107 3/4" 2#12, 1#12 GND (E) DISTRIBUTION PANEL, POWER PANEL P (N) PLC PANEL

S-401 1-1/2" COAX (N) UTILITY POLE AT IW-33U3 IW-33U3 (N) PLC PANEL USE TIMES MICROWAVE SYSTEMS LMR-600 OR APPROVED EQUAL

S-403 1-1/4" COAX IW-33T (N) PLC PANEL IW-33T (E) CONDUIT BODY A SEE NOTE 2S-404 1-1/4" COAX IW-33V (N) PLC PANEL IW-33V (E) CONDUIT BODY A SEE NOTE 2S-405 1-1/4" COAX IW-33Y (N) PLC PANEL IW-33Y (E) CONDUIT BODY A SEE NOTE 2S-406 1-1/4" COAX IW-34F-A (N) PLC PANEL IW-34F-A (E) CONDUIT BODY A SEE NOTE 2S-501 CAT 6 CABLE, 1 TSP (#16) ABOVE GROUND COMM PANEL AT PRV STATION PLC-PRS (N) PLC PANEL USE EXISTING CONDUIT BETWEEN VAULT AND GRADE ENCLOSURES-503 1" 1 Triad (#16) SINGER X156 VALVE POSITION TRANSMITTER (N) J1-BOX PRV STATION 24VDC EXCITATION VOLTAGE AND 4-20mA SIGNALS-504 1" 1 Triad (#16) SINGER X156 VALVE POSITION TRANSMITTER (N) J2-BOX PRV STATION 24VDC EXCITATION VOLTAGE AND 4-20mA SIGNALS-505 1" 1 Triad (#16) SINGER X156 VALVE POSITION TRANSMITTER (N) J3-BOX PRV STATION 24VDC EXCITATION VOLTAGE AND 4-20mA SIGNALS-506 1" 1 Triad (#16) (N) J1-BOX PRV STATION (N) J2-BOX PRV STATION

S-507 1" 2 Triad (#16) (N) J2-BOX PRV STATION (N) J3-BOX PRV STATION

S-508 1-1/2" 3 Triad (#16) (N) J3-BOX PRV STATION PLC-PRS (N) PLC PANEL

S-511 1" 2 TSP (#16), 1#12 GND IW-33S (N) INSTRUMENT PANEL IW-33S (E) CONDUIT BODY SEE NOTE 1S-512 1" 2 TSP (#16), 1#12 GND IW-33S1 (N) INSTRUMENT PANEL IW-33S1 (E) CONDUIT BODY SEE NOTE 1S-513 1-1/2" 2 TSP (#16), 1#12 GND IW-33T (N) INSTRUMENT PANEL IW-33T (N) PLC PANEL

S-514 1-1/4" 7 TSP (#16), 2#12 GND IW-33T (N) PLC PANEL IW-33T (E) CONDUIT BODY B SIGNALS FROM 33S, 33S1, 33ST; SEE NOTE 2

S-515 1" 2 TSP (#16), 1#12 GND IW-33U (N) INSTRUMENT PANEL IW-33U (E) CONDUIT BODY SEE NOTE 1S-516 1-1/2" 2 TSP (#16), 1#12 GND IW-33V (N) INSTRUMENT PANEL IW-33V (N) PLC PANEL

S-517 1" 4 TSP (#16), 1#12 GND IW-33V (N) PLC PANEL IW-33V (E) CONDUIT BODY B SEE NOTE 2S-518 1" 2 TSP (#16), 1#12 GND IW-33W (N) INSTRUMENT PANEL IW-33W (E) CONDUIT BODY SEE NOTE 1S-519 1" 2 TSP (#16), 1#12 GND IW-33X (N) INSTRUMENT PANEL IW-33X (E) CONDUIT BODY SEE NOTE 1S-520 1-1/2" 2 TSP (#16), 1#12 GND IW-33Y (N) INSTRUMENT PANEL IW-33Y (N) PLC PANEL

S-521 1"-1/2" 10 TSP (#16), 2#12 GND IW-33Y (N) PLC PANEL IW-33Y (E) CONDUIT BODY B SIGNALS FROM 33W, 33WX, 33X, 33XY; SEE NOTE 2

S-522 2" 11 TSP (#16), 2#14, 2#12 GND IW-33Y (N) PLC PANEL IW-33Y (E) CONDUIT BODY C SIGNALS FROM 33YZ, 33Z2, 33Z; SEE NOTE 2

S-523 1" 5 TSP (#16), 1#12 GND IW-33Z2 (N) INSTRUMENT PANEL IW-33Z2 (E) CONDUIT BODY SEE NOTE 1S-524 1" 2 TSP (#16), 2#14, 1#12 GND IW-33Z (N) INSTRUMENT PANEL IW-33Z (E) CONDUIT BODY SEE NOTE 1S-525 1-1/2" 2 TSP (#16), 1#12 GND IW-34F-A (N) INSTRUMENT PANEL IW-34F-A (N) PLC PANEL

S-526 1" 4 TSP (#16) IW-34F-A (N) PLC PANEL IW-34F-A (E) CONDUIT BODY B SIGNALS FROM 34DG; SEE NOTE 2

S-527 1" 2 TSP (#16), 1#12 GND IW-34F-A (N) PLC PANEL IW-34F-A (E) CONDUIT BODY C SIGNALS FROM 34F-I; SEE NOTE 2

S-528 1" 2 TSP (#16), 1#12 GND IW-34F-I (N) INSTRUMENT PANEL IW-34F-I (E) CONDUIT BODY SEE NOTE 1S-529 1-1/2" 2 TSP (#16), 1#12 GND IW-33U3 (N) INSTRUMENT PANEL IW-33U3 (N) PLC PANEL

G-601 1" 1#2 GND IW-33T (N) PLC PANEL GROUND ROD SEE NOTE 3G-602 1" 1#2 GND IW-33V (N) PLC PANEL GROUND ROD SEE NOTE 3G-603 1" 1#2 GND IW-33Y (N) PLC PANEL GROUND ROD SEE NOTE 3G-604 1" 1#2 GND IW-34F-A (N) PLC PANEL GROUND ROD SEE NOTE 3G-605 1" 1#2 GND IW-33U3 (N) PLC PANEL GROUND ROD SEE NOTE 3

ALAMITOS BARRIER PROJECT TELEMETRY SYSTEM UPGRADE INSTRUMENT SCHEDULE

SEGMENT CITY CABINET

WELL

NAME

SITE TYPE

WELL

TYPE

FCD

AQUIFER

INSTRUMENT

TAG NAME

DESCRIPTION INSTRUMENT TYPE SIGNAL TYPE

SUPPLY

VOLTAGE

ENGINEERING

UNIT RANGE

REF

POINT

ELEV (ft)

SENSOR

DEPTH

(ft)

CURRENTLY

INSTALLED

1 Long Beach PLC-ALM1

33S Injection Single 492BA A,IPIT-33S Injection Well 33S Casing Pressure Pressure Transmitter AI: 4-20 mA 9-30 VDC 0-50 psig N/A N/A Y

FIT-33S Injection Well 33S Flow Orifice PlateAI: 4-20 mA 9-30 VDC

0-50 psid(difference) N/A N/A Y

33S1 Injection Single 492CN C,BPIT-33S1 Injection Well 33S1 Casing Pressure Pressure Transmitter AI: 4-20 mA 9-30 VDC 0-50 psig N/A N/A Y

FIT-33S1 Injection Well 33S1 Flow Orifice PlateAI: 4-20 mA 9-30 VDC

0-50 psid(difference) N/A N/A Y

33ST Observation Multiple

492BK C,B LIT-33STc Observation Well 33ST Level Pressure TransmitterAI: 4-20 mA 9-30 VDC

0-30 psia(absolute) 15.3 40 Y

492BL A LIT-33STa Observation Well 33ST Level Pressure TransmitterAI: 4-20 mA 9-30 VDC

0-30 psia(absolute) 15.3 40 Y

492BM ILIT-33STi Observation Well 33ST Level Pressure Transmitter

AI: 4-20 mA 9-30 VDC0-30 psia

(absolute) 15.3 40 Y

33T Injection Single 492AZ A,IPIT-33T Injection Well 33T Casing Pressure Pressure Transmitter AI: 4-20 mA 9-30 VDC 0-50 psig N/A N/A Y

FIT-33T Injection Well 33T Flow Orifice PlateAI: 4-20 mA 9-30 VDC

0-50 psid(difference) N/A N/A Y

2 Long Beach PLC-ALM2

33U Injection Single 492AY A,IPIT-33U Injection Well 33U Casing Pressure Pressure Transmitter AI: 4-20 mA 9-30 VDC 0-50 psig N/A N/A Y

FIT-33U Injection Well 33U Flow Orifice PlateAI: 4-20 mA 9-30 VDC

0-50 psid(difference) N/A N/A Y

33UV Observation Multiple492BH A LIT-33UVa Observation Well 33UV Level Pressure Transmitter

AI: 4-20 mA 9-30 VDC0-30 psia

(absolute) 10.8 40 Y

492BJ I LIT-33UVi Observation Well 33UV Level Pressure TransmitterAI: 4-20 mA 9-30 VDC

0-30 psia(absolute) 10.8 40 Y

33V Injection Single 492AX A,IPIT-33V Injection Well 33V Casing Pressure Pressure Transmitter

AI: 4-20 mA 9-30 VDC 0-50 psig N/A N/A Y

FIT-33V Injection Well 33V Flow Orifice PlateAI: 4-20 mA 9-30 VDC

0-50 psid(difference) N/A N/A Y

3 Long Beach PLC-ALM3

33W Injection Single 492AW C,B,A,IPIT-33W Injection Well 33W Casing Pressure Pressure Transmitter

AI: 4-20 mA 9-30 VDC 0-50 psig N/A N/A Y

FIT-33W Injection Well 33W Flow Orifice PlateAI: 4-20 mA 9-30 VDC

0-50 psid(difference) N/A N/A Y

33WX Observation Multiple502AF A LIT-33WXa Observation Well 33WX Level Pressure Transmitter

AI: 4-20 mA 9-30 VDC0-30 psia

(absolute) 10.4 40 Y

502AG I LIT-33WXi Observation Well 33WX Level Pressure TransmitterAI: 4-20 mA 9-30 VDC

0-30 psia(absolute) 10.4 40 Y

33X Injection Single 502Q C,B,A,IPIT-33X Injection Well 33X Casing Pressure Pressure Transmitter

AI: 4-20 mA 9-30 VDC 0-50 psig N/A N/A Y

FIT-33X Injection Well 33X Flow Orifice PlateAI: 4-20 mA 9-30 VDC

0-50 psid(difference) N/A N/A Y

33XY Observation Multiple

502BL C LIT-33XYc Observation Well 33XY Level Pressure TransmitterAI: 4-20 mA 9-30 VDC

0-30 psia(absolute) 10 40 Y

502BM B LIT-33XYb Observation Well 33XY Level Pressure TransmitterAI: 4-20 mA 9-30 VDC

0-30 psia(absolute) 10 40 Y

502BN A LIT-33XYa Observation Well 33XY Level Pressure TransmitterAI: 4-20 mA 9-30 VDC

0-30 psia(absolute) 10 40 Y

502BP I LIT-33XYi Observation Well 33XY Level Pressure TransmitterAI: 4-20 mA 9-30 VDC

0-30 psia(absolute) 10 40 Y

33Y Injection Single 502P C,B,A,IPIT-33Y Injection Well 33Y Casing Pressure Pressure Transmitter

AI: 4-20 mA 9-30 VDC 0-50 psig N/A N/A Y

FIT-33Y Injection Well 33Y Flow Orifice PlateAI: 4-20 mA 9-30 VDC

0-50 psid(difference) N/A N/A Y

33YZ Observation Multiple

502AB C LIT-33YZc Observation Well 33YZ Level Pressure TransmitterAI: 4-20 mA 9-30 VDC

0-30 psia(absolute) 10.6 40 Y

502AC B LIT-33YZb Observation Well 33YZ Level Pressure TransmitterAI: 4-20 mA 9-30 VDC

0-30 psia(absolute) 10.6 40 Y

502AD A LIT-33YZa Observation Well 33YZ Level Pressure TransmitterAI: 4-20 mA 9-30 VDC

0-30 psia(absolute) 10.6 40 Y

502AE I LIT-33YZi Observation Well 33YZ Level Pressure TransmitterAI: 4-20 mA 9-30 VDC

0-30 psia(absolute) 10.6 40 Y

33Z2 Injection Double

502BJ APIT-33Z2a Injection Well 33Z2a Casing Pressure Pressure Transmitter

AI: 4-20 mA 9-30 VDC 0-50 psig N/A N/A Y

FIT-33Z2a Injection Well 33Z2a Flow Orifice PlateAI: 4-20 mA 9-30 VDC

0-50 psid(difference) N/A N/A Y

502BK I

PIT-33Z2i Injection Well 33Z2i Casing Pressure Pressure TransmitterAI: 4-20 mA 9-30 VDC 0-50 psig N/A N/A Y

FIT-33Z2i Injection Well 33Z2i Flow Orifice PlateAI: 4-20 mA 9-30 VDC

0-50 psid(difference) N/A N/A Y

PPIT-33Z2i Injection Well 33Z2i Packer Pressure Pressure TransmitterAI: 4-20 mA 9-30 VDC 0-350 psig N/A N/A N

33Z Injection Single 502M C,B,A,I

PIT-33Z Injection Well 33Z Casing Pressure Pressure Transmitter AI: 4-20 mA 9-30 VDC 0-50 psig N/A N/A Y

FIT-33Z Injection Well 33Z Flow Orifice PlateAI: 4-20 mA 9-30 VDC

0-50 psid(difference) N/A N/A Y

LSH-33Z Injection Well 33Z Vault Flooded Level Switch DI: DryContact 24 VDC N/A N/A N/A N

0-30 psia

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

2211

ALAMITOS BARRIER PROJECT TELEMETRY SYSTEM UPGRADE INSTRUMENT SCHEDULE

SEGMENT CITY CABINET

WELL

NAME

SITE TYPE

WELL

TYPE

FCD

AQUIFER

INSTRUMENT

TAG NAME

DESCRIPTION INSTRUMENT TYPE SIGNAL TYPE

SUPPLY

VOLTAGE

ENGINEERING

UNIT RANGE

REF

POINT

ELEV

(ft)

SENSOR

DEPTH

(ft)

CURRENTLY

INSTALLED

Injection Well 33S Casing Pressure Pressure Transmitter 0-50 psigInjection Well 33Z Vault Flooded

4 Long Beach PLC-ALM4

34DG Observation Multiple

502X C LIT-34DGc Observation Well 34DG Level Pressure Transmitter AI: 4-20 mA 9-30 VDC 0-30 psia (absolute) 10.8 40 Y502Y B LIT-34DGb Observation Well 34DG Level Pressure Transmitter AI: 4-20 mA 9-30 VDC 0-30 psia (absolute) 10.8 40 Y502Z A LIT-34DGa Observation Well 34DG Level Pressure Transmitter AI: 4-20 mA 9-30 VDC 0-30 psia (absolute) 10.8 40 Y

502AA I LIT-34DGi Observation Well 34DG Level Pressure Transmitter AI: 4-20 mA 9-30 VDC 0-30 psia (absolute) 10.8 40 Y

34F-A Injection Single 502BY APIT-34Fa Injection Well 34F-A Casing Pressure Pressure Transmitter AI: 4-20 mA 9-30 VDC 0-50 psig N/A N/A YFIT-34Fa Injection Well 34F-A Flow Orifice Plate AI: 4-20 mA 9-30 VDC 0-50 psid (difference) N/A N/A Y

34F-I Injection Single 502CE IPIT-34Fi Injection Well 34F-I Casing Pressure Pressure Transmitter AI: 4-20 mA 9-30 VDC 0-50 psig N/A N/A YFIT-34Fi Injection Well 34F-I Flow Orifice Plate AI: 4-20 mA 9-30 VDC 0-50 psid (difference) N/A N/A Y

5 Long Beach PLC-ALM14 33U3 Injection Single 492CP C,BPIT-33U3 Injection Well 33U3 Casing Pressure Pressure Transmitter AI: 4-20 mA 9-30 VDC 0-50 psig N/A N/A NFIT-33U3 Injection Well 33U3 Flow Orifice Plate AI: 4-20 mA 9-30 VDC 0-50 psid (difference) N/A N/A N

6 Long Beach PLC-ALM15 N/A PRS N/A N/A N/A

PIT-PRSU Pressure Reducing Station Upstream Pressure Pressure Transmitter AI: 4-20 mA 9-30 VDC 0-350 psig N/A N/A N

PIT-PRSD Pressure Reducing Station DownstreamPressure Pressure Transmitter AI: 4-20 mA 9-30 VDC 0-100 psig N/A N/A N

ZIT_PRS1 PRS Pressure Reducing Valve #1 Position PRV Positioner AI: 4-20 mA 9-30 VDC 0-100% N/A N/A NZIT_PRS2 PRS Pressure Reducing Valve #2 Position PRV Positioner AI: 4-20 mA 9-30 VDC 0-100% N/A N/A NZIT_PRS3 PRS Pressure Reducing Valve #3 Position PRV Positioner AI: 4-20 mA 9-30 VDC 0-100% N/A N/A N

FIT-PRSPressure Reducing Station Flow LB07-a (Signalprovided by MWD to above ground Quindarcabinet)

MWD 22"x20" VenturiMeter

AI: 4-20 mA, byMWD

provided byMWD TBD N/A N/A Y

7 Long Beach Alamitos Yard N/A N/A N/A N/A N/A PIT_BAR Barometric Pressure Pressure Transmitter AI: 4-20 mA 6-16 VDC 26-32 inHg N/A N/A NInstrument Schedule Notes

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

2212

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

5. ROUTE TUBING AND SENSOR CABLE ALONG PIPING ATTACHED WITH BLACK TY-RAP

WIRE TIES. DO NOT OBSTRUCT VALVE OPERATION.

2. EXISTING PIEZOMETER MUST BE VOID OF AIR POCKETS.

FOR PRESSURE TRANSDUCER TO WORK CORRECTLY.

NOTES

1. PLC AND INSTRUMENTATION ENCLOSURE MUST BE ATTACHED

TO THE GROUND TO ALLOW THE SHED TO BE REMOVED WHILE

LEAVING ALL EQUIPMENT IN PLACE.

6. STRAP WIRES AND TUBING TO AN APPROPRIATE SOLID SURFACE USING NYLON

CABLE CLAMPS APPROPRIATELY SIZED SO THAT AIR PRESSURE IN TUBING IS NOT

RESTRICTED. ATTACH CLAMPS TO AN APPROPRIATE SOLID SURFACE USING #12 X

1' (MIN.) SCREWS AND PLASTIC ANCHORS.

3. USE EXISTING NYLON TUBING WHERE POSSIBLE. CUT, AND

INSERT BRASS 'T'. RUN NEW NYLON TUBING TO THE

INSTRUMENT ENCLOSURE. WHERE ADDITIONAL TUBING

IS REQUIRED, MATCH SIZE AND MATERIAL.

4. DO NOT SPLICE TUBING EXCEPT FOR INSTALLATION OF THE HARDWARE

FOR THE REQUIRED CONNECTIONS.

MISCELLANEOUS

DETAILS - 1

13

7. CONTRACTOR SHALL INSPECT THE EXISTING GROUND ROD. IF THE GROUND ROD

IS NOT IN A GOOD CONDITION OR DOES NOT EXIST, INSTALL A NEW GROUND

ROD. INSTALL A CONDUIT FROM THE NEW PLC PANEL TO THE GROUND ROD.

ALSO, CONNECT THE GROUND ROD TO THE METAL SHED OR THE METAL

STRUCTURE.

PT

DPT

SIGNAL CABLES

1 5/8" STAINLESS

STEEL UNISTRUT

16"X16"X6" NEMA 4X

STAINLESS STEEL

ENCLOSURE

WATERTIGHT

CABLE GLANDS

SIGNAL CABLES

1/4" NYLON TUBING

DOWNSTREAM ORIFICE NEEDLE

VALVE PRESSURE PORT

UPSTREAM ORIFICE NEEDLE

VALVE PRESSURE PORT

CASING PRESSURE PORT

SEE NOTES 3 AND 9

SEE DETAIL "G"

SEE DETAIL "H"

PT

PT

SIGNAL CABLES

WALL MOUNTED

20"X20"X6" NEMA 4X

STAINLESS STEEL

ENCLOSURE

1-1/2" CONDUIT

TO PLC

PANEL

WATERTIGHT

CABLE GLANDS

SIGNAL CABLES

1/4" NYLON TUBING

DOWNSTREAM PRESSURE PORTUPSTREAM PRESSURE PORT

SEE DETAIL "G"

SEE DETAIL "H"

NAMEPLATE "UPSTREAM

PRESSURE"

NAMEPLATE

"DOWNSTREAM

PRESSURE"

ANALOG GAUGES ASHCROFT

TYPE 2008S STAINLESS CASE

63mm PANEL BUILDERS GAUGE

20"X20"X6" NEMA 4X

STAINLESS STEEL

ENCLOSURE

PT

PT

DPT

SIGNAL CABLES

1 5/8" STAINLESS

STEEL UNISTRUT

20"X20"X6" NEMA 4X

STAINLESS STEEL ENCLOSURE

TO (E) CONDUIT

SIGNAL CABLES

1/4" NYLON TUBING

USE STAINLESS STEEL

BULKHEAD UNIONS DK-LOK

DUB-4 1/4" CONNECTING

THE TUBINGS

DOWNSTREAM ORIFICE NEEDLE

VALVE PRESSURE PORT, WELL 1

UPSTREAM ORIFICE NEEDLE

VALVE PRESSURE PORT, WELL 1

CASING PRESSURE PORT, WELL 2

SEE DETAIL "G"

SEE DETAIL "H"

PT

DPT

SEE DETAIL "H"

SIGNAL CABLES

CASING PRESSURE PORT, WELL 1

UPSTREAM ORIFICE NEEDLE

VALVE PRESSURE PORT, WELL 2

DOWNSTREAM ORIFICE NEEDLE

VALVE PRESSURE PORT, WELL 2

TO SENSOR TUBING TEE FITTINGS,

SEE DETAIL "I" FOR NEW TEE INSTALLATION

TO SENSOR TUBING

TEE FITTINGS

USE STAINLESS STEEL

BULKHEAD UNIONS DK-LOK

DUB-4 1/4" CONNECTING

THE TUBINGS

USE STAINLESS STEEL

BULKHEAD UNIONS DK-LOK

DUB-4 1/4" CONNECTING

THE TUBINGS

SEE DETAIL "G"

DRAINAGE PORT

DRAINAGE PORTS

DRAINAGE PORTS

DRAINAGE PORTS

DRAINAGE PORT

DRAINAGE PORT

PT

SEE DETAIL "G"

TO DOOR MOUNTED ASHCROFT

TYPE 2008S PANEL BUILDERS GAUGES

DK-LOK TUBE TO MALE NPT

THREAD DTBF4-4N-FEMALE

BRANCH TEE CONNECTION

TO PRESSURE TRANSMITTER

ANALOG GAUGES ASHCROFT

TYPE 2008S STAINLESS CASE

63mm PANEL BUILDERS GAUGE

TO UPSTREAM

PRESSURE PROCESS

CONNECTION

TO PRESSURE TRANSMITTER

TO DOWNSTREAM

PRESSURE PROCESS

CONNECTION

PACKER PRESSURE PORT

TO (N) PLC PANEL

OR (E) CONDUIT AS

APPLICABLE

SEE NOTES 3 AND 9

SEE NOTES 3 AND 9

PROVIDE THREE (3) TERMINALS

PER SIGNAL CABLE (INCLUDING

ONE (1) GROUND TERMINAL)

PROVIDE THREE (3) TERMINALS

PER SIGNAL CABLE (INCLUDING

ONE (1) GROUND TERMINAL)

PROVIDE THREE (3) TERMINALS

PER SIGNAL CABLE (INCLUDING

ONE (1) GROUND TERMINAL)#12 GROUND WIRE

#12 GROUND WIRE

#12 GROUND WIRE

1. ALL THE TUBING CONNECTORS, CABLE GLANDS, AND CONDUITS

SHALL BE INSTALLED IN A MANNER THAT DOES NOT IMPAIR THE

NEMA RATING OF THE ENCLOSURE

2. CONTRACTORS SHALL PROVIDE PANEL, CONNECTORS, FITTINGS,

PRESSURE TRANSMITTERS, DIFFERENTIAL PRESSURE

TRANSMITTERS AND APPURTENANCES AS INDICATED IN THE

PROJECT SCOPE OF WORK.

3. PROVIDE WATER TIGHT FOAM SEALANT IN CONDUIT.

4. USE EXISTING NYLON TUBING WHERE POSSIBLE. WHERE

REQUIRED, CUT, AND INSERT BRASS 'T'. RUN NEW NYLON TUBING

TO THE INSTRUMENT ENCLOSURE. WHERE ADDITIONAL TUBING IS

REQUIRED, MATCH SIZE AND MATERIAL.

5. DO NOT SPLICE TUBING EXCEPT FOR INSTALLATION OF THE

HARDWARE FOR THE REQUIRED CONNECTIONS.

6. ROUTE TUBING AND SENSOR CABLE ALONG PIPING ATTACHED WITH

BLACK TY-RAP WIRE TIES. DO NOT OBSTRUCT VALVE OPERATION.

7. STRAP WIRES AND TUBING TO AN APPROPRIATE SOLID SURFACE

USING NYLON CABLE CLAMPS APPROPRIATELY SIZED SO THAT AIR

PRESSURE IN TUBING IS NOT RESTRICTED. ATTACH CLAMPS TO AN

APPROPRIATE SOLID SURFACE USING #12 X 1' (MIN.) SCREWS AND

PLASTIC ANCHORS.

8. FOR SEGMENTS 1 TO 4, RELOCATE THE EXISTING CASING

PRESSURE AND FLOW TRANSMITTERS INTO THE NEW INSTRUMENT

PANELS.

9. ALL ABOVE GROUND CONDUITS SHALL BE PVC COATED RIGID

GALVANIZED STEEL. WHERE (N) INSTRUMENT PANELS ARE

INSTALLED IN (E) ENCLOSURE ADJACENT TO (N) PLC PANEL

CONDUIT SIZE SHALL BE 1-1/2". FOR ALL OTHER WELLS MATCH

CONDUIT SIZE TO (E) UNDERGROUND CONDUIT SIZE. CONDUIT WILL

REST ABOVE GROUND ON CONCRETE SLAB WITHIN WELL SHED.

10. FOR UNDERGROUND INJECTION WELL IW-33Z PROVIDE WATERTIGHT

SPLICES INSTEAD OF TERMINAL BLOCKS. FOR IW-33Z, THE

CONTRACTOR SHALL USE MOISTURE RESISTANT GEL-FILLED

CONNECTORS. THE COMMUNICATION CONNECTORS SHALL BE 3M

SCOTCHLOK OR PUBLIC WORKS APPROVED EQUAL.

GENERAL NOTES:

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

MISCELLANEOUS

DETAILS - 2

14

NOTE:

1. ABOVE GROUND INSTRUMENTATION ENCLOSURES MUST BE

ATTACHED TO THE GROUND TO ALLOW THE SHED TO BE

REMOVED WHILE LEAVING ALL EQUIPMENT IN PLACE.

2. INSTRUMENT LOCATION SHALL BE DETERMINED UPON FIELD

INVESTIGATION AND SHALL BE APPROVED BY AGENCY.

NOTE:

1. INSTRUMENTATION ENCLOSURE MUST BE ATTACHED

TO THE GROUND TO ALLOW THE SHED TO BE REMOVED WHILE

LEAVING ALL EQUIPMENT IN PLACE.

2. INSTRUMENT LOCATION SHALL BE DETERMINED UPON FIELD

INVESTIGATION AND SHALL BE APPROVED BY AGENCY.

SIGNAL CABLES

DRAIN TUBES

NEEDLE VALVE 90 °

1/4" MALE POLYFLO

TYPE 312C-04x04

1/4" MALE

ADAPTER POLYFLO

TYPE 268P-04x04

BRASS 1/4"

NPT TEE

GE MODEL UNIK 5000

CASING PRESSURE

TRANSDUCER

18"

36"

24"

MIN

.

NEW

GROUND

SURFACE

15'

10'

NEW CONCRETE BASE

ONE (1) NEW 1" CONDUIT FOR

POWER FROM SOLAR PANEL AND

ONE (1) NEW 1-1/2" CONDUIT FOR

RADIO COMMUNICATION.

NEW WATERTIGHT

CONDUIT BODY

(TYPICAL)

NEW WOOD POLE LOCATED

A MINIMUM OF 10'

AWAY FROM ENCLOSURE

SUPPORT CONDUITS TO POLE

WITH S.S. STRAPS AT 4' INTERVAL

NEW 1" RGS (RIGID GALVANIZED STEEL)

NEW PVC COUPLERS

NEW OMNIDIRECTIONAL

ANTENNA AND BRACKET

4 NEW SOLAR PANELS

(SOLAR WORLD

165/175 MONO/P)

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

MISCELLANEOUS

DETAILS - 3

NOTES:

1. PROVIDE FASTENERS PER MANUFACTURER'S REQUIREMENTS.

2. ANTENNA LINE OF SIGHT MUST CLEAR OBSTRUCTIONS

BETWEEN WELL LOCATION AND ALAMITOS YARD.

15

EXIST GRADE

LOCATER TAPE

SEE NOTE 1

SCH 80 PVC CONDUIT

SEE NOTE 2

BACKFILL WITH NATIVE MATERIAL

TO 90% RELATIVE COMPACTION

PIPE ASSEMBLIES

EXISTING INJECTION

WELL VAULT

EXISTING INJECTION

NEEDLE VALVES

(EXISTING)

EXISTING 1" PVC RISERS

INSTALL NEW VAULT

FLOODED SWITCH

GEMS LS-270 2" FROM

VAULT FLOOR

FIELD MOUNTED INSTRUMENT

LEGEND

NOTES:

1. INSTALL NEW VAULT FLOODED LEVEL SWITCH AT WELL 33Z.

USE EXISTING WIRING BETWEEN WELL 33Z AND 33Y FOR

SIGNAL TRANSMISSION IF AVAILABLE. CONNECT SIGNAL TO DI

ON S7-1214C CPU.

2. INSTALL LEVEL SWITCH SO THAT CIRCUIT IS NORMALLY

CLOSED, AND OPENED WHEN LIQUID IS PRESENT IN THE WELL.

CONFIRM HEIGHT WITH AGENCY.

SIGNAL CABLESDRAIN TUBES

GE MODEL UNIK 5000

DIFFERENTIAL

PRESSURE

TRANSDUCER

NEEDLE VALVE 90 °

1/4" MALE POLYFLO

TYPE 312C-04x04

BRASS 1/4" NPT TEE

1/4" MALE

ADAPTER POLYFLO

TYPE 268P-04x04

1/4" NPT BRASS

CLOSE NIPPLE

FLEXIBLE 1/4"

POLYFLO MODEL

NO. 05-00115

TUBING

NEW DK-LOK-DT-4 TEE

FITTING:

BRASS CONSTRUCTION,

1/4" TUBE O.D.

TYPICAL

EACH

CONNECTION

NEW FLEXIBLE 1/4"

POLYFLO MODEL NO.

05-00115 TUBING

NEW FLEXIBLE 1/4"

POLYFLO MODEL NO.

05-00115 TUBING

INSTALL NEW INSTRUMENT

PANEL ON VAULT WALL

9"Ø MIN.

95% COMPACTION

BACKFILL

PRECAST CONCRETE

BOX

11"x17"x12"D

CAST IRON COVER

MARKED "GROUND ROD"

FINISH GRADE

UNDISTURBED SOIL

BACKFILL

EXOTHERMIC WELD

#2 INSULATED GROUND WIRE

PEA GRAVEL

UNDISTURBED SOIL

5/8" X 10'

COPPER-CLAD

STEEL GROUND ROD

GROUND

WELL

12"

12"

CONDUIT & WIRE PER

CONDUIT SCHEDULE

SCH 80 PVC

CONDUIT

CL T

RE

NC

H

JOIN (TYP)

FINISH GRADE

12"

24" M

IN

12"

NOTES:

1. 6" WIDE DETECTABLE LOCATOR TAPE MARKED "CAUTION BURIED

ELECTRIC LINE BELOW.

2. LOWER CONDUIT NOT INSTALLED IN SINGLE CONDUIT SEGMENTS.

UPPER AND LOWER CONDUIT INSTALLED AT WELL 33U3.

CONDUIT BODY

PVC COATED RIGID

METAL BEND

BACKFILL WITH NATIVE

MATERIAL TO 90%

RELATIVE COMPACTION

PVC TO METALLIC ADAPTOR

PVC

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

FIELD PLC PANEL ELEVATIONS

EXTERIOR ELEVATION INTERIOR BACK PANEL ELEVATION

1. FOR NUMBER OF REQUIRED ANALOG INPUT

MODULES, SEE NETWORK DIAGRAM AND

INSTRUMENT SCHEDULE.

2. REPLACE THE EXISTING GEOMATION PLC PANEL

WITH THE NEW S7 PANEL AT LOCATIONS 33T, 33V,

33Y AND 34F.

3. INSTALL THE NEW S7 PANEL INSIDE THE (E) METAL

SHED AT WELL 33U3.

4. FOR WELL 33Y ONLY, INSTALL A S7-1214C CPU AT

LOCATION 33Y INSTEAD OF THE S7-1212C CPU.

5. DIN RAIL SHALL BE AT LEAST 13" LONG IN ORDER

TO ACCOMMODATE ADDITIONAL SM1231 ANALOG

INPUT MODULES (UP TO FOUR AT WELL 33Y).

6. INSTALL NEW UNISTRUT SUPPORTS FOR PLC

ENCLOSURE. PLC ENCLOSURE MUST BE

ATTACHED TO THE GROUND TO ALLOW THE SHED

TO BE REMOVED WHILE LEAVING ALL EQUIPMENT

IN PLACE.

NOTES:

16

ITEM QTY DESCRIPTION MFR MODEL NO.

1 1 SINGLE DOOR NEMA 4X ENCLOSURE 42"H X 30"W X 10"D HOFFMAN A42H3010SS6LP2 1 BACK PANEL STEEL 39"H X 27"W HOFFMAN A42P30SS63 A/R GRAY TERMINAL BLOCKS PHOENIX CONTACT UK3N4 2 DIN RAIL ALLEN BRADLEY 199-DR15 A/R WIRE WAY6 1 SOLAR CHARGING CONTROLLER (10"H X 5"W X 2.5"D) XANTREX C407 1 LIGHTING ARRESTOR DELTA LA302DC8 1 CIRCUIT BREAKER, 15AMP OUTBACK OBB-159 A/R GROUND TERMINAL BLOCK PHOENIX CONTACT USLKG3

10 1 CIRCUIT BREAKER, 5AMP SIEMENS 5SJ4106-6HG40

11 1S7-1200 CPU 1212C DC/DC/Relay (3.93"H X 3.54"W X2.95"D) SIEMENS 6ES7 212-1HE40-0XB0

12 A/R SM1231 ANALOG MODULE (3.93"H X 1.77"W X 2.95"D) SIEMENS 6ES7231-4HF32-0XB0

13 1CM1241 RS232 COMMUNICATION MODULE (3.93"H X1.18"W X 2.95"D) SIEMENS 6ES7 241-1AH32-0XB0

14 A/R FUSED TERMINAL BLOCK PHOENIX CONTACT UK5HESI

15 1 POLYPHASER (2.45"H X 1.5"W) POLYPHASER IS-50NX-C216 A/R TERMINAL BLOCK FOR #4 WIRE PHOENIX CONTACT UK15N17 1 TELEDESIGN TS400 RADIO MODEM (1.8"H X 4.3"W X 3.1"D) TELEDESIGN TS400018 2 12VDC BATTERY (9.53"H X 19.1"W X 6.7"D) Power Sonic PG 12V 150 FR19 AR 12VDC BATTERY SUPPORT BRACKET

ITEMDESCRIPTION MFR MODEL NO.

POWERCONSUMPTION

[mA]QTY LOAD

[mA]

1 S7-1200 CPU 1212C DC/DC/Relay, CPU ONLY SIEMENS 6ES7 212-1HE40-0XB0 400 1 4002 SM1231 ANALOG MODULE SIEMENS 6ES7231-4HF32-0XB0 45 4 180

SM1231 CURRENT CONSUMPTION SM BUS 90 4 3603 CM1241 RS232 CURRENT CONSUMPTION CM BUS SIEMENS 6ES7 241-1AH32-0XB0 220 1 2204 TELEDESIGN TS400 RADIO MODEM (1.8"H X 4.3"W X 3.1"D) TELEDESIGN TS4000 1100 1 11005 INJECTION WELL CASING PRESSURE TRANSMITTER (ALM-3) GE PTX 520-8701 30 6 1806 INJECTION WELL FLOW TRANSMITTER (ALM-3) GE PTX 317-8702 30 6 1807 OBSERVATION WELL LEVEL TRANSMITTER (ALM-3) GE PTX 1830-8700 30 10 3008 INJECTION WELL PACKER PRESSURE TRANSMITTER GE UNIK 5000 30 1 30

9 VAULT FLOODED SWITCHGEMSSENSORS GEMS LS-270 130 1 130

SUM: 3080BATTERY SIZE CALCULATION: 3.08A * 48h = 147 AhNote: ALM-3 has max. amount of PLC cards and sensors

PANEL SCHEDULE

PANEL LOAD CALCULATION

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

FIELD PLC PANEL SCHEMATICS

17

FIELD PLC PANEL SCHEMATIC

ANALOG INPUT CARDS SCHEMATIC

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

FIELD PLC LOCATION - PV PANEL REPLACEMENT

AND GEOMATION PANEL REMOVAL

18

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

PRS PLC PANEL ELEVATIONS

19

ITEMDESCRIPTION MFR MODEL NO. POWER

CONSUMPTION [mA] QTY LOAD[mA]

1 S7-1200 CPU 1212C DC/DC/Relay, CPU ONLY SIEMENS 6ES7 212-1HE40-0XB0 400 1 4002 SM1231 ANALOG MODULE SIEMENS 6ES7231-4HF32-0XB0 45 1 45

SM1231 CURRENT CONSUMPTION SM BUS 90 1 903 SCALANCE X108 ETHERNET SWITCH SIEMENS 6GK5108-0BA00-2AA3 140 1 1404 PRESSURE TRANSMITTER GE UNIK 5000 30 2 605 VALVE POSITION TRANSMITTER SINGER X156 50 3 1506 SIEMENS HMI INTERFACE 7" (6.2"H x 8.2"W) SIEMENS KPT700 BASIC 230 1 230

SUM: 1115UPS SIZE CALCULATION: 1.115A * 120V = 132W loadAPC Smart-UPS XL 1000VA UPS with load of 132W delivershold up time of about 2 hours (see manufacturer's chartson manufacturer's website)

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

PRS PLC PANEL SCHEMATIC

20

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

QUINDAR PANEL

MODIFICATIONS

21

BY

COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS

PROJECT ENGINEER DATE

DATE DESCRIPTION

REVISIONS

DR

AF

TE

R

ALH

DE

SIG

NE

RC

AD

D P

AR

T N

UM

BE

RC

HE

CK

ER

RE

VIE

WE

D B

YD

AT

E

SHEET: OF

NH

MK

ALAMITOS BARRIER PROJECT

TELEMETRY SYSTEM UPGRADE

www.tetratech.com

17885 Von Karman Avenue, Suite 500

Irvine, California 92614

Phone: 949-809-5000

DWG 346-D36.1-22PCA HF01515001Project ID: WRDM000052

11/5/15

22

ALAMITOS YARD BAROMETRIC

MEASUREMENT INSTALLATION

22