Executive Summaryecontent.tauranga.govt.nz/data/bigfiles/committee... · '^'^•^ 25 January 2016 ....
Transcript of Executive Summaryecontent.tauranga.govt.nz/data/bigfiles/committee... · '^'^•^ 25 January 2016 ....
4^ Council '^'^•^ 25 January 2016
Tauranga Airport - 2015-2035 Airport Masterplan and Associated Revenue and Expenses 2016/17
DC No: 14
Purpose 1. To approve the revised 2015-2035 Airport Masterplan.
2. To outline the financial implications of bringing forward and adding further capital expenditure in the 2016/17 Annual Plan.
Executive Summary 3. The revised 2015-2035 Airport Masterplan (Attachment A) shows no operational
restrictions for the Airport through to 2035 provided additional operational and public area, as indicated in the Masterplan, are developed as needed.
4. The Airport Masterplan should be reviewed again no later than 2020.
5. All depreciation and debt resulting from the additional capital expenditure proposed for 2016/17 can be funded by the associated additional revenue with no requirement for rate funding.
Recommendations That the Council:
(a) Receive Report (DC 14) Tauranga Airport - 2015-2035 Airport Masterplan and Associated Revenue and Expenses 2016/17.
(b) Approve the 2015-2035 Airport Masterplan.
(c) Approve operating revenue and expenses relating to $4.5m capex in 2016/17.
Discussion 6. The Airport Masterplan was due for a five yearly review in 2015. The review is timely
as there has been significant growth in recent years which is forecast to continue. A number of industry developments in the later part of 2015 will also affect the Airport's operational capabilities.
7. The review has looked at the Airport's ability to meet these demands by developing in accordance with the existing Masterplan.
8. The review has found increased terminal space is required for baggage, airline offices and passenger lounge areas as well as the provision of space for likely future security enhancements. Due to the globalisation of terrorism, the latter is required much sooner than previously planned. Additional and brought forward capex has
Objective ID: A6752024 -1 -
TauranqaOty 223 Council
25 January 2016
been included in the 2016/17 draft Annual Plan. The Tauranga Airport - 2015-2035 Master Plan is provided as Attachment A to this report.
9. The review also identified future expansion requirements other than those needed immediately such as car park, further terminal and apron area requirements.
10. The additional capex requirements in the 2016/17 draft Annual Plan has the financial implications as shown in the table below. All depreciation and debt resulting from the total capex of $4.5m (both brought forward and additional capex) can be funded by the additional revenues associated with the expansion with no requirement for rate funding.
Effect of $4 .5m Investment in Tauranga Airport
2015/16 LTP Budget $000's
2016/2017 LTP Budget
(inflated) $000's
Changes relating
to $4.5m $000's
Other Changes $000's
Draft AP 2016/2017
$000's
Operating Revenue 4,647 4,794 375 74 5,243
Other Operating Expenditure 1,919 2,052 301 117 2,470
Depreciation" 919 975 (25) 950
Finance Costs*'* 91 101 58 (17) 142
Total Operating Expenditure 2,929 3,128 359 75 3,562
Operating Surplus 1,718 1,666 16 (1) 1,681
Capital Expenditure 586 899 4,500 5,376
*Depreciation will not come into effect until 2018 (estimated depreciation$42k) ** 6 months debt servicing
Objective ID: A6752024
DC No: 14
^^^A. Council 224
^ ri. 25 January 2016 TauranqaOty '
Consideration strategic Context 11. The Airport Activity provides air transport services to connect Tauranga with the rest
of the country and the world. This activity makes a significant contribution to the community outcome of "A talented and innovative city full of opportunity."
Significance and Engagement 12. Under the Significance and Engagement Policv 2014. this decision is of medium
significance as it is likely to have moderate public interest and have moderate consequences for the city in terms of the future operation of the Airport Activity. Most of the capex funding is budgeted in the latter years of 2015/25 LTP.
Implementation 13. The revised Tauranga Airport Master Plan will be used for all Master planning going
forward.
14. The $4.5m capex planning and design will commence ASAP.
Attachments No. Title
Tauranga Airport Master Plan Update - Summary Report - 11 January 2016 Objective: ID: A6783381
Signatories Authors Ray Dumble: Manager Airport
Authoriser Jaine Lovell-Gadd: General Manager: City Transformation
Objective ID: A6752024
DC No: 14 . .
Attachment A
TAURANGA AIRPORT
MASTER PLAN UPDATE SUMMARY REPORT
11 JANUARY 2016
71
ro ro CP fi)
O
f 3
AIRPORT MASTER PLAN SUMMARY
Am 71 Tauranga Airport Master Plan Summary
1. INTRODUCTION
Airbiz was appointed by Tauranga Airport Authority to prepare an updated Airport Master Plan. The Airport Master Plan update was developed through a series of workshops with Airport Management and the Airport Committee. This report presents a summary of:
The updated Airport Master Plan Annual passenger forecasts Apron and terminal layout concepts.
2. AIRPORT MASTER PLAN
The updated Airport Master Plan is very similar to the previous Airport Master Plan. The most significant changes are the realignment of grass runways and the parallel taxiway of the main runway and the new locations fuel locations. This Airport Master Plan also shows revised apron and terminal reserves.
The updated Airport Master Plan is shown in Figure 1. ro ro m
11955r02a TRG MP Summary.docx
11/01/2016
r ~3
I' -it k » 1 0
0 t+0+ + 0
- .vV> •> «
O 870 X 45m Grass Runway strip
1825rTi X 45m Runway
Ls 0 220rT, Strip
DRAFT
• -
1 Passenger Terminal 2 Apron 3 Control Tower 4 Rescue Flre Station 5 Fuel 6 Aviation Education 7 Helicopter FATOn'ALO 8 Possible Future RESA 9 NDB/DME
10 Public Viewing Area 11 Car Rental 12 General Aviation Hangars 13 Gliding and Aviation Tourism 14 Unjpa (Burial Ground)
• Airfield • General Aviation • Roads
• Carparking • Commercial
Urupa Extension Reserve Green Space
ro ro
FIGURE 1 Airport Master Plan
mm ̂ Tauranga Airport Master Plan Summary
11955r02a TRG MP 5ummary.docx
11/01/2016
3. ANNUAL FORECASTS
There are three growth scenarios for which annual passengers were forecast. The three scenarios are presented in Table 2 and the annual passenger forecast is presented in Table 3 and Figure 4.
Scenario Jetstar Propensity to Travel
Low
Medium
High
No service
WLG service October 2016
WLG service October 2016
Unchanged
Increased
Further Increased
TABLE 2 Forecast Scenarios
Passengers FY2015 FY2020
Low
Medium
High
295,000
295,000
295,000
351,000
400,000
460,000
CAGR
Low
Medium
High
2015-2020
3.5%
6.3%
9.3%
FY2025
372,000
441,000
549,000
2020-2035
0.9%
1.5%
2.1%
FY2035
402,000
499,000
630,000
2015-2035
1.6%
2.7%
3.9%
TABLE 3 Annual Passenger Forecast ro ro on
mm ̂ Tauranga Airport Master Plan Summary
11955r02a TRG MP Summary.docx 11/01/2016
Annual Passenger Forecast
700,000
600,000
S 500,000 -c !2 400,000 - Z Historic n
Q.
™ 300,000
c < 200,000
100,000
High
Medium
Low
M I - > l - > l - > l - > N J N J N J N J N J M N ) N J M N J t > J r O K J N J t v J t v J N J | v j I D I O I D I D I D O O O O O O O O O O O O O O O O O O l 0 l D U 3 l D U 3 O O O O O I - > l - > l - » l - > h . » N J I V J I V J M N J U J U l < J J i - > U ) ( j i > j i D i - ' L o t n ^ t D M O i ) i / i ^ i f l i - > U ) i n v j i o i - i u ) L n
FIGURE 4 Annual Passenger Forecast
4. MASTER PLAN APRON LAYOUTS
The scheduled aircraft stand demand forecast for Fy2035 is given in Table 5 below: ro ro t o
Scenario FY2035 Stand Demand
Low
Medium
High
4
6
8
TABLE 5 FY2035 Aircraft Stand Demand
/IIRBIZ ^ Tauranga Airport Master Plan Summary
11955r02a TRG MP Summary.docx
11/01/2016
I Terminal Reserve
FIGURE 6 FY2035 Free Manoeuvring Apron Layout
ro w
/IlliUIZ ^ Tauranga Airport Master Plan Summary
11955r02a TRG MP Summary.docx 11/01/2016
931.» «
Terminal Reserve
FIGURE 7 Rr2035 Pushback Apron Layout
ro CO
Awmi. ^ Tauranga Airport Master Plan Summary
11955r02a TRG MP Summary.docx 11/01/2016
SHORT TERM TERMINAL CONCEPT
The requirement to expand the passenger terminal has been identified. This requirement is driven by the following factors:
Growth of Air New Zealand Introduction of Jetstar services Additional aircraft stands.
As part of the planning for a terminal expansion the potential for the introduction of additional security screening requirements for passengers, cabin and hold baggage have been considered.
A terminal expansion concept for FY2020 has been developed that accounts for current state of security screening as well as the potential introduction of passenger, cabin and hold baggage screening. The following terminal layout drawings are shown:
Existing ground floor Existing first floor 2020 ground floor without security screening 2020 ground floor with security screening 2020 first floor
Figure 8 Figure 9 Figure 10 Figure 11 Figure 12
ro CO
/IIRBIZ Tauranga Airport Master Plan Summary
11955r02a TRG MP Summary.docx
11/01/2016
t r r ICF"; a •—r
AIR NZ OFFICES 3 AIR NZ OFFICES BOH F&B
SEATING
AIR NZ CHECK-IN
BAGGAGE MAKE-UP
1.. BAGGAGE SECURITY
CLAIM
F= y - 1 LJ
1 ^
DEPARTURE LOUNGE
RETAIL r IB BBB
. . I ..laijl.^. •
NJ
I
I n i I
BOH
F™y—^ ro CO CO
DOM DEP PAX ^> DOM ARR PAX
FIGURE 8 Existmg Ground Floor
/IIRBIZ ^ Tauranga Airport Master Plan Summary
11955r02a TRG MP Summary.docx
11/01/2016
13—ET
AIRLINE LOUNGE
AIRPORT OFFICE
y V̂i
I
ro CO
DOM DEP PAX 'y DOM ARR PAX
FIGURE 9 Existing First Floor
11955r02a TRG MP Summary.docx
11/01/2016 /IIBBIZ ^ Tauranga Airport Master Plan Summary
TOILETS
CAR RENTAL
BAGGAGE MAKE-UP
r" BOH
BAGGAGE CLAIM
rr nn 2i 7
Y
DEPARTURE LOUNGE
F&B SEATING AIRLINE OFFICES
• a
r CHECK-IN F&B
RETAIL
r TOILETS CAR BOH RENTAL . I 4^1
t 1 Y ro
DOM DEP PAX > DOM ARR PAX
FIGURE 10 FY2020 Ground Floor without Security Screening
/IIRBIZ ^ Tauranga A i r p o r t
Mas te r Plan Summary 10 11955r02a TRG MP Summary.docx
11/01/2016
BAGGAGE MAKE-UP BOH H D
t 7 Y L m l 4
SCREENED BOARDIN
r FUR DEPARTURE I F&B UNSCREENED SEATING BOARDING
SECURITY >CREENIN( LOUNGE
) BOH 3 ' I l & O _ _ O O
BAGGAGE ' CLAIM I
I
AIRLINE OFFICES CHECK-IN
F&B RETAIL TOILETS
TOILETS CAR RENTAL
if I CAR RENTAL
t 1 Y ro CO
DOM DEP PAX > DOM ARR PAX
FIGURE 11 FY2020 Ground Floor w i th Security Screening
/IIRBIZ ^ Tauranga Airport Master Plan Summary
11 11955r02a TRG MP Summary.docx
11/01/2016
AIRLINE LOUNGE
AIRPORT OFFICE
TOILETS
3 ro CO
DOM DEP PAX • > DOM ARR PAX
FIGURE 12 Fy2020 First Fioor
/IIRBIZ ^ Tauranga Airport Master Plan Summary
12 11955r02a TRG MP Summary.docx 11/01/2016