EuroVelo Network and Ukraine
Ed Lancaster, [email protected] Velo Forum, Yevpatoria, Friday 12th October 2012
ECF gratefully acknowledges financial support from the European Commission.
![Page 2: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/2.jpg)
Content
1. Reintroduce EuroVelo 2. Developing a route3. Minimum requirements4. Next steps
![Page 3: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/3.jpg)
Introduction to EuroVeloThe 14 EuroVelo routes are:
North – South Routes:1 – Atlantic Coast Route3 – Pilgrims Route5 – Via Romea Francigena7 – Sun Route9 – Baltic - Adriatic11 – East Europe Route13 – Iron Curtain Trail15 – Rhine RouteWest – East Routes:2 – Capitals Route4 – Central Europe Route6 - Atlantic – Black Sea8 – Mediterranean RouteCircuits:10 – Baltic Sea Cycle Route12 – North Sea Cycle Route
Total network: Over 70,000 km
![Page 4: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/4.jpg)
4
Definition of a EuroVelo route
New and existing routes should fulfill the following basic criteria:• Are based on existing or
planned national or regional routes;
• Involve at least 2 countries;• Are at least 1,000 km in length;• Are easy to communicate
(marketing potential); and• Have action plans in place.
![Page 5: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/5.jpg)
EuroVelo 4
• Central Europe Route.• Roscoff, France to Kiev,
Ukraine.• Countries involved:
France, Belgium, Netherlands, Germany, Czech Republic, Poland and Ukraine.
• Total length: approximately 4,000 km.
• Signage installed in parts of France in 2012.
![Page 6: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/6.jpg)
Potential impact of EuroVelo
Once the network is completed (estimated to be 2020):• It could account for 60
million cycle tourism trips.
• Generating 7 billion Euro of direct revenue per year.
![Page 7: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/7.jpg)
Guidance on the route development process
• Manual prepared at the end of 2011
• Defines the minimum requirements of EuroVelo routes.
• Explains the actions for route development projects.
![Page 8: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/8.jpg)
The principles for route selection and development
• Safety• Attractiveness• Coherence and
directness• Comfort
![Page 9: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/9.jpg)
Route Development Process
Initial survey to include:• Attractions.• Existing and planned
national/regional routes.
• Existing and planned services.
• Marketing and promotion.
• Organisation, awareness raising and funding opportunities.
![Page 10: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/10.jpg)
Prepare an Action Plan
Once a route has been agreed, then need to prepare an action plan. This should cover:
• Target groups.• Evaluation of the
planned itinerary.
![Page 11: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/11.jpg)
The elements of EuroVelo routes
![Page 12: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/12.jpg)
Route infrastructure
• National standards must be respected.• Public roads: if speed is over 30km/h there
should be maximum 2,000 motor vehicles per day. Exceptionally up to 4,000 vehicle units per day.
• Cycle lanes separated from traffic / asphalted shoulders (less than 10,000 vehicle units per day).
• If cannot meet EuroVelo standards then alternatives should be provided (routes or public transport).
![Page 13: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/13.jpg)
The current status
![Page 14: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/14.jpg)
Route infrastructure
• The surface should be suitable for use by cyclists with any type of trekking or touring bike.
• High gradients (more than 6% on longer sections; more than 10% on shorter sections) should be avoided wherever possible.
• For daily sections that include more than a 1,000m elevation, alternative solutions should be provided.
![Page 15: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/15.jpg)
Signage
• Complete and consistent signing according the national standards.
• Integration of EuroVelo signs.
![Page 16: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/16.jpg)
Public transport connections• Public transport connections at
least at every 150 km and to substitute ‘problematic’ sections.
• Regular bike transportation with adequate capacity, comfort and safety.
• Detailed, regularly updated service information and booking facilities available online
• Safe bike storage and parking capacity at public transport interchanges.
![Page 17: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/17.jpg)
Cycling Friendly Services
• Basic accommodation should be available at the start and end of every daily section (every 30 – 90 km).
• A range of standards available. • Food and drink (at pubs,
restaurants etc.) in the middle of every daily section (every 15 – 45 km).
• Rest areas if food and drink not provided frequently enough.
• Bike repair stations at intervals no greater than 150 km.
![Page 18: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/18.jpg)
• Web communication within EuroVelo.com.
• Detailed information is mandatory in national level websites, or regional as a second priority.
• Smart phone applications, audio guides and social media.
• Printed promotional leaflets, guide books, detailed maps etc.
Information and promotional tools
![Page 19: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/19.jpg)
Prepare an Action Plan
Once a route has been agreed, then need to prepare an action plan. This should cover:
• Target groups.• Evaluation of the planned
itinerary.• Actions (including timings and
priorities).• Estimates of costs and
resources.• Delegation of tasks.
![Page 20: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/20.jpg)
Next steps: realisation of the route
• Lobbying and awareness raising.• Preparation of detailed plans.• Assembly of funding.• Implementation• Maintenance and Operation. • Usage monitoring.
![Page 21: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/21.jpg)
EuroVelo Organisation Overview
EuroVelo Council
ECF Board
EuroVelo Management
Team
NECC/C
Project Partners
Project Partners
NECC/C
Project Partners
Project Partners
NECC/C
Project Partners
Project Partners
Project Partners
![Page 22: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/22.jpg)
National EuroVelo Coordination Centres and Coordinators
![Page 23: EuroVelo and Ukraine](https://reader033.fdocuments.net/reader033/viewer/2022051609/547710d1b4af9f99458b4578/html5/thumbnails/23.jpg)
Manuals and Guides
www.eurovelo.org
European
certification
Web guidelin
es