CITY OF NORTH POLE Estimating Building Permit Fee Guide February 2020 edition City of North Pole 125 Snowman Lane North Pole, AK 99705 Tel.: 907-488-2288

Transcript of Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the...

Page 1: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

CITY OF NORTH POLE

Estimating Building Permit Fee Guide

February 2020 edition

City of North Pole 125 Snowman Lane

North Pole, AK 99705 Tel.: 907-488-2288

Page 2: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 1

Table of Contents Page

Introduction .............................................................................................................................. 2

Fee Calculation Worksheet ...................................................................................................... 3

Determining Value of a Project ............................................................................................... 4

Step 1: Determine the total value of your project ........................................................ 4

Step 2: Calculate Building Permit Fee and Plan Review Fee ...................................... 5

Step 3: Calculate Electrical, Mechanical and Plumbing Permit Fees .......................... 5

Step 4: Additional Permits ........................................................................................... 6

Step 4a: Strom Water Permit ........................................................................... 6

Step 4b: Water and Sewer Connection Permit ................................................. 6

Step 4c: Excavation of a City Right-of-Way Permit ....................................... 6

Appendix A: Building Groups List .......................................................................................... 7

Appendix B: Types of Construction ........................................................................................ 17

Table 1. Square Foot Construction Cost .................................................................................. 21

Table 2. Building Permit Fees ................................................................................................. 22

Table 3. Building Permit Fee Estimating Table ....................................................................... 23

Table 4. Electrical Permit Fees ................................................................................................ 51

Table 5. Mechanical Permit Fees ............................................................................................. 54

Table 6. Plumbing Permit Fees ................................................................................................ 56

Table 7. Storm Water Permit Fees ........................................................................................... 58

Table 8. Utility Tie-In Fees ...................................................................................................... 59

Table 9a. Excavation Permit Fees ............................................................................................ 60

Table 9b. Excavation Bond ...................................................................................................... 61

Page 3: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 2

Introduction The City of North Pole has adopted by reference the 1997 Uniform Administrative Code, including its methodology for calculating permit fees. According to the City of North Pole Municipal Code amendment to the Administrative Code: The determination of value or valuation under any of the provisions of these codes shall be made by the building official. The value to be used in computing the building permit and building plan review fees shall be the total value of all construction work for which the permit is issued as well as all finish work, painting, roofing, electrical, plumbing, heating, air-conditioning, elevators, fire-extinguishing systems and other permanent equipment. Valuation shall be determined in accordance with the latest edition of the Building Safety Journal data chart as published by the International Code Council or based on the final contract amount, whichever is greater. When calculating the valuation utilizing the building valuation data chart the regional modifier shall be (1.3). A copy of the bid award may be required by the building official. In any case the final determination of value or valuation under any of the provisions of these codes shall be made by the building official. (Title 15, Section 15.04.050) The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures you generate are only estimates and the Building Department makes the final determination of permit fees. A worksheet is included with this guide to help you estimate your permit fees. Each building project is unique and the permits required may vary. The permit fees for a project will depend upon the permits it requires. The total permit fees for a project may be a combination of one or more of the following: • Building Permit and Plan Review • Electrical Permit and Plan Review • Mechanical Permit and Plan Review • Plumbing Permit and Plan Review • Storm Water Permit and Plan Review • Utility Tie-In Permit and Utility Tie-In Inspection • Excavation Permit and Plan Review • Excavation Bond (returned if right-of-way restored) • Fire Marshal Permit1 The simplest way to estimate Building Permit and Plan Review fees is to use the Building Permit Fee Estimation Table. Using this method does not provide estimates for any other permits that the Building Department may require for your project. If you want to refine your cost estimate, you can find additional guidance and resources in this guide.

1 Multi-Family, Commercial, Industrial and Institutional projects may require a Fire Marshal’s Permit. The Building Department DOES NOT issue Fire Marshal Permits. Contact the Fire Marshal’s office at 907-451-5200 to determine if your project requires a Fire Marshal Permit.

Page 4: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 3

Permit Fee Calculation Worksheet Category Data Group ............................................................................................................. Type of Construction ..................................................................................... Square foot construction cost ......................................................................... Contractor’s bid price .................................................................................... Project valuation method (using Table 2) ...................................................... Construction contractor bid cost method (using Table 3) .............................. Fees Building Permit Fee ....................................................................................... $ Plan review fee (75% of Building Permit Fee) .............................................. $ Electrical Permit application fee ($23.50) ..................................................... $ Electrical Permit fee ....................................................................................... $ Electrical plan review fee ............................................................................... $ Mechanical Permit application fee ($23.50) .................................................. $ Mechanical Permit fee ................................................................................... $ Mechanical plan review fee ($23.50) ............................................................. $ Plumbing Permit application fee ($23.50) ..................................................... $ Plumbing Permit fee ...................................................................................... $ Plumbing plan review fee .............................................................................. $ Total Building Permit fees........................................................................... $ Storm Water Permit fee .............................................................................. $ Water tie-in fee .............................................................................................. $ Water tie-in inspection fee ($50.00) .............................................................. $ Sewer tie-in fee .............................................................................................. $ Sewer tie-in inspection fee ($50.00) .............................................................. $ Total Utility Permit Fees ............................................................................. $ Excavation Permit application fee ($50.00 ).................................................. $ Excavation Permit fee .................................................................................... $ Total Excavation Permit fees ...................................................................... $ Excavation bond (refundable upon satisfactory restoration or ROW) ......... $

Page 5: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 4

Determining Value of Project The complexity of your project and how good an estimate you want will affect the effort you will need to invest when estimating the permitting fees. Below are directions you can use to help you estimate the value of your project and to calculate permit fees. Step 1: Determine the total value of your project. There are two approaches to estimate the value of a project—square footage cost of the project or contractor’s bid price. The Building Department most frequently uses the square foot approach to estimate the value of projects like new construction of a building or an addition. The Building Department most frequently uses the contractor’s bid approach for projects like renovation of a building, a “small” project like replacing a roof, adding a deck or installation of new heating system. The contractor’s bid approach is also used for very large and complex projects where the square foot approach does not provide a reliable valuation. By City Code, the City uses the method that assigns the highest value to your project. The Building Department makes the final determination of the value of the improvement. Square Footage Approach First, identify what “Group” best describes your project. According to the 2009 International Building Code (IBC), Chapter 3: Use and Occupancy Classification, Section 302 Classification: Structures or portions of structures shall be classified with respect to occupancy in one or more of the groups listed below. A room or space that is intended to be occupied at different times for different purposes shall comply with all of the requirements that are applicable to each of the purposes for which the room or space will be occupied. Structures with multiple occupancies or uses shall comply with Section 508. Where a structure is proposed for a purpose that is not specifically provided for in this code, such structure shall be classified in the group that the occupancy most nearly resembles, according to the fire safety and relative hazard involved.

1. Assembly (see Section 303): Groups A-1, A-2, A-3, A-4 and A-5 2. Business (see Section 304): Group B 3. Educational (see Section 305): Group E 4. Factory and Industrial (see Section 306): Groups F-1 and F-2 5. High Hazard (see Section 307): Groups H-1, H-2, H-3, H-4 and H-5 6. Institutional (see Section 308): Groups I-1, I-2, I-3 and I-4 7. Mercantile (see Section 309): Group M 8. Residential (see Section 310): Groups R-1, R-2, R-3 and R-4 9. Storage (see Section 311): Groups S-1 and S-2 10. Utility and Miscellaneous (see Section 312): Group U

You can find summary descriptions of the different groups in Appendix A: Building Groups List. Review the Building Groups List to identify the group that most closely matches your project.

Page 6: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 5

Second, determine the Type of Construction you will use for your project. According to the 2009 International Building Code Council, Chapter 6, Section 602, Construction Classification: Buildings and structures erected or to be erected, altered or extended in height or area shall be classified in one of the five construction types defined in Sections 602.2 through 602.5. The building elements shall have a fire-resistance rating not less than that specified in Table 601 and exterior walls shall have a fire-resistance rating not less than that specified in Table 602. Where required to have a fire-resistance rating by Table 601, building elements shall comply with the applicable provisions of Section 703.2. The protection of openings, ducts and air transfer openings in building elements shall not be required unless required by other provisions of this code. There are five types identified by Roman numerals—I, II, III, IV and V. Most of these types have sub-types labeled A or B. Historically, most projects in the City of North Pole have been Type VB. You can use the IBC definitions to identify your Type of Construction. The sections of the IBC related to determining the building type can be found in Appendix B: Types of Construction. Third, use Table 1 Square Foot Construction Cost to determine square foot cost of your project. The Group is listed in the left-hand column and Type Construction is listed across the top of the table. Where the two categories intersect is the square foot cost of your project. Multiple the square footage of your project by the square foot cost to get an estimated value of the improvement. All tables are found at the back of the guide. Contractor’s Bid Approach Not all projects’ value can be easily determined with the Square Footage Approach. As described above. If you have a contractor’s bid you can use this value to estimate your project’s permit fees. The Building Department will require you to submit this bid if you want to use this approach to determine the value of your improvement. Step 2: Calculate Building Permit Fee and Plan Review Fee With the value of your project determined in Step 1, you can estimate your Building Permit Fee. The Building Department uses Table 2 Building Permit Fees to calculate a Building Permit Fee. You can do the math as described in Table 2 to estimate the value of your project. A simpler way to estimate the Building Permit Fee or your project, is to use Table 3 Building Permit Fee Estimation Table. In the right-hand column of Table 3, find the value that most closely matches the value of your project. Read across the table to find the estimated Building Permit Fee and Plan Review Fee. The Building Department calculates the Plan Review Fee as 75% of the Building Permit Fee. Step 3: Calculate Electrical, Mechanical and Plumbing Permit Fees The Building Department uses the 1997 Uniform Administrative Code tables to determine Electrical, Mechanical and Plumbing Permit Fees. The Building Department calculates the plan

Page 7: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 6

review fees for each of these permits as 25% of the individual permit fees. The tables the Building Department uses to calculate these fees are the following: Table 4. Electrical Permit Fees Table 5. Mechanical Permit Fees Table 6. Plumbing Permit Fees Step 4: Additional Permits Depending upon your project, other permitting fees may apply. Step 4a. If your project is privately funded; it will disturb a cumulative acre or more of ground; and storm water runoff from the project will flow into “waters of the United States” your project is likely to require a storm water permit. The North Pole Municipal Code, Title 15; Chapter 15.66 Construction Site Storm Water Runoff details storm water permitting requirements. In addition, if your project will discharge storm water runoff directly into “waters of the US” or the storm water conveyance system, it must comply with Title 15; Chapter 15.74 Post-Construction Storm Water Management. If your project requires a storm water permit, you will also be required to submit a storm water pollution prevention plan (SWPPP). Storm Water Permit Fees include SWPPP plan review and inspection fees. You can estimate these fees based upon Table 7 Storm Water Permit Fees. Step 4b. Water and/or Sewer Utility Connection Fees If your project includes connecting to the City of North Pole water and/or sewer system, you must get a Utility Tie-In Permit and have the work inspected by the Utility Department. According to the North Pole Municipal Code, any occupied structure within 200 feet of a water or sewer main must connect to the utility system; otherwise, the property owner will be charged monthly the flat utility rate. See the North Pole Municipal Code, Title 13, Chapter 13.12; Section 13.12.090 Compulsory connection to City water and sewer utility. Utility tie-in fees are presented in Table 8 Utility Tie-In Fees. Step 4c. Excavation of a City Right-of-Way Fees If your project includes excavation of a City-owned right-of-way (ROW), for example, road, sidewalk or alley, there are fees associated with the excavation. Excavation of a City ROW also requires submission of a bond to ensure that the ROW is reconstructed. You can estimate excavation permit fees using Table 9a Excavation Permit Fees and the required Excavation Bond using Table 9b.

Page 8: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 7

Appendix A: IBC Building Group Summary Descriptions

ASSEMBLY GROUP A Assembly Group A. Assembly Group A occupancy includes, among others, the use of a building or structure, or a portion thereof, for the gathering of persons for purposes such as civic, social or religious functions; recreation, food or drink consumption or awaiting transportation. A-1 Assembly uses, usually with fixed seating, intended for the production and viewing of the performing arts or motion pictures including, but not limited to: Motion picture theaters Symphony and concert halls

Television and radio studios admitting an audience Theaters

A-2 Assembly uses intended for food and/or drink consumption including, but not limited to: Banquet halls Night clubs

Restaurants Taverns and bars

A-3 Assembly uses intended for worship, recreation or amusement and other assembly uses not classified elsewhere in Group A including, but not limited to: Amusement arcades Art galleries Bowling alleys Community halls Courtrooms Dance halls (not including food or drink consumption) Exhibition halls Funeral parlors Gymnasiums (without spectator seating)

Indoor swimming pools (without spectator seating) Indoor tennis courts (without spectator seating) Lecture halls Libraries Museums Places of religious worship Pool and billiard parlors Waiting areas in transportation terminals

A-4 Assembly uses intended for viewing of indoor sporting events and activities with spectator seating including, but not limited to: Arenas Skating rinks

Swimming pools Tennis courts

A-5 Assembly uses intended for participation in or viewing outdoor activities including, but not limited to: Amusement park structures Bleachers

Grandstands Stadiums

Page 9: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 8

BUSINESS GROUP B Business Group B. Business Group B occupancy includes, among others, the use of a building or structure, or a portion thereof, for office, professional or service-type transactions, including storage of records and accounts. Business occupancies shall include, but not be limited to, the following: Airport traffic control towers Ambulatory health care facilities Animal hospitals, kennels and pounds Banks Barber and beauty shops Car wash Civic administration Clinic—outpatient Dry cleaning and laundries: pick-up and delivery stations and self-service Educational occupancies for students above the 12th grade

Electronic data processing Laboratories: testing and research Motor vehicle showrooms Post offices Print shops Professional services (architects, attorneys, dentists, physicians, engineers, etc.) Radio and television stations Telephone exchanges Training and skill development not within a school or academic program

Page 10: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 9

EDUCATIONAL GROUP E Educational Group E. Educational Group E occupancy includes, among others, the use of a building or structure, or a portion thereof, by six or more persons at any one time for educational purposes through the 12th grade. Religious educational rooms and religious auditoriums, which are accessory to places of religious worship and have occupant loads of less than 100, shall be classified as A-3 occupancies.

Page 11: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 10

FACTORY GROUP F Factory Industrial Group F. Factory Industrial Group F occupancy includes, among others, the use of a building or structure, or a portion thereof, for assembling, disassembling, fabricating, finishing, manufacturing, packaging, repair or processing operations that are not classified as a Group H hazardous or Group S storage occupancy. Factory Industrial F-1 Moderate-hazard Occupancy. Factory industrial uses which are not classified as Factory Industrial F-2 Low Hazard shall be classified as F-1 Moderate Hazard and shall include, but not be limited to, the following: Aircraft (manufacturing, not to include repair) Appliances Athletic equipment Automobiles and other motor vehicles Bakeries Beverages: over 16-percent alcohol content Bicycles Boats Brooms or brushes Business machines Cameras and photo equipment Canvas or similar fabric Carpets and rugs (includes cleaning) Clothing Construction and agricultural machinery Disinfectants Dry cleaning and dyeing Electric generation plants Electronics Engines (including rebuilding) Food processing Furniture Hemp products

Jute products Laundries Leather products Machinery Metals Millwork (sash and door) Motion pictures and television filming (without spectators) Musical instruments Optical goods Paper mills or products Photographic film Plastic products Printing or publishing Recreational vehicles Refuse incineration Shoes Soaps and detergents Textiles Tobacco Trailers Upholstering Wood; distillation Woodworking (cabinet)

Factory Industrial F-2 Low-hazard Occupancy. Factory industrial uses that involve the fabrication or manufacturing of noncombustible materials which during finishing, packing or processing do not involve a significant fire hazard shall be classified as F-2 occupancies and shall include, but not be limited to, the following: Beverages: up to and including 16-percent alcohol content Brick and masonry Ceramic products Foundries

Glass products Gypsum Ice Metal products (fabrication and assembly)

Page 12: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 11

HIGH-HAZARD GROUP H High-hazard Group H. High-hazard Group H occupancy includes, among others, the use of a building or structure, or a portion thereof, that involves the manufacturing, processing, generation or storage of materials that constitute a physical or health hazard. Hazardous occupancies are classified in Groups H-1, H-2, H-3, H-4 and H-5 the International Fire Code. Hazardous materials stored, or used on top of roofs or canopies shall be classified as outdoor storage or use and shall comply with the International Fire Code.

Page 13: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 12

INSTITUTIONAL GROUP I Institutional Group I. Institutional Group I occupancy includes, among others, the use of a building or structure, or a portion thereof, in which people are cared for or live in a supervised environment, having physical limitations because of health or age are harbored for medical treatment or other care or treatment, or in which people are detained for penal or correctional purposes or in which the liberty of the occupants is restricted. Institutional occupancies shall be classified as Group I-1, I-2, I-3 or I-4. Group I-1. This occupancy shall include buildings, structures or parts thereof housing more than 16 persons, on a 24-hour basis, who because of age, mental disability or other reasons, live in a supervised residential environment that provides personal care services. The occupants are capable of responding to an emergency situation without physical assistance from staff. This group shall include, but not be limited to, the following: Alcohol and drug centers Assisted living facilities Congregate care facilities Convalescent facilities

Group homes Halfway houses Residential board and care facilities Social rehabilitation facilities

A facility such as the above with five or fewer persons shall be classified as a Group R-3 or shall comply with the International Residential Code. A facility such as above, housing at least six and not more than 16 persons, shall be classified as Group R-4. Group I-2. This occupancy shall include buildings and structures used for medical, surgical, psychiatric, nursing or custodial care for persons who are not capable of self-preservation. This group shall include, but not be limited to, the following: Child care facilities Detoxification facilities Hospitals

Mental hospitals Nursing homes

Group I-3. This occupancy shall include buildings and structures that are inhabited by more than five persons who are under restraint or security. An I-3 facility is occupied by persons who are generally incapable of self-preservation due to security measures not under the occupants’ control. This group shall include, but not be limited to, the following: Correctional centers Detention centers Jails

Prerelease centers Prisons Reformatories

Page 14: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 13

MERCANTILE GROUP M 309.1 Mercantile Group M. Mercantile Group M occupancy includes, among others, the use of a building or structure or a portion thereof, for the display and sale of merchandise and involves stocks of goods, wares or merchandise incidental to such purposes and accessible to the public. Mercantile occupancies shall include, but not be limited to, the following: Department stores Drug stores Markets

Motor fuel-dispensing facilities Retail or wholesale stores Sales rooms

Page 15: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 14

RESIDENTIAL GROUP R 310.1 Residential Group R. Residential Group R includes, among others, the use of a building or structure, or a portion thereof, for sleeping purposes when not classified as an Institutional Group I or when not regulated by the International Residential Code in accordance with Section 101.2. Residential occupancies shall include the following: R-1 Residential occupancies containing sleeping units where the occupants are primarily transient in nature, including: Boarding houses (transient) Hotels (transient) Motels (transient) Congregate living facilities (transient) with 10 or fewer occupants are permitted to comply with the construction requirements for Group R-3. R-2 Residential occupancies containing sleeping units or more than two dwelling units where the occupants are primarily permanent in nature, including: Apartment houses Boarding houses (nontransient) Convents Dormitories Fraternities and sororities Hotels (nontransient) Live/work units

Monasteries Motels (nontransient) Vacation timeshare properties Congregate living facilities with 16 or fewer occupants are permitted to comply with the construction requirements for Group R-3.

R-3 Residential occupancies where the occupants are primarily permanent in nature and not classified as Group R-1, R-2, R-4 or I, including: Buildings that do not contain more than two dwelling units. Adult care facilities that provide accommodations for five or fewer persons of any age for less than 24 hours. Child care facilities that provide accommodations for five or fewer persons of any age for less than 24 hours. Congregate living facilities with 16 or fewer persons. Adult care and child care facilities that are within a single-family home are permitted to comply with the International Residential Code. R-4 Residential occupancies shall include buildings arranged for occupancy as residential care/assisted living facilities including more than five but not more than 16 occupants, excluding staff. Group R-4 occupancies shall meet the requirements for construction as defined for Group R-3, except as otherwise provided for in this code or shall comply with the International Residential Code provided the building is protected by an automatic sprinkler system.

Page 16: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 15

STORAGE GROUP S Storage Group S. Storage Group S occupancy includes, among others, the use of a building or structure, or a portion thereof, for storage that is not classified as a hazardous occupancy. Moderate-hazard storage, Group S-1. Buildings occupied for storage uses that are not classified as Group S-2, including, but not limited to, storage of the following: Aerosols, Levels 2 and 3 Aircraft hangar (storage and repair) Bags: cloth, burlap and paper Bamboos and rattan Baskets Belting: canvas and leather Books and paper in rolls or packs Boots and shoes Buttons, including cloth covered, pearl or bone Cardboard and cardboard boxes Clothing, woolen wearing apparel Cordage Dry boat storage (indoor) Furniture Furs

Glues, mucilage, pastes and size Grains Horns and combs, other than celluloid Leather Linoleum Lumber Motor vehicle repair garages Photo engravings Resilient flooring Silks Soaps Sugar Tires, bulk storage of Tobacco, cigars, cigarettes and snuff Upholstery and mattresses Wax candles

Low-hazard storage, Group S-2. Includes, among others, buildings used for the storage of noncombustible materials such as products on wood pallets or in paper cartons with or without single thickness divisions; or in paper wrappings. Such products are permitted to have a negligible amount of plastic trim, such as knobs, handles or film wrapping. Group S-2 storage uses shall include, but not be limited to, storage of the following: Asbestos Beverages up to and including 16-percent alcohol in metal, glass or ceramic containers Cement in bags Chalk and crayons Dairy products in nonwaxed coated paper containers Dry cell batteries Electrical coils Electrical motors Empty cans Food products Foods in noncombustible containers Fresh fruits and vegetables in nonplastic trays or containers Frozen foods Glass

Glass bottles, empty or filled with noncombustible liquids Gypsum board Inert pigments Ivory Meats Metal cabinets Metal desks with plastic tops and trim Metal parts Metals Mirrors Oil-filled and other types of distribution transformers Parking garages, open or enclosed Porcelain and pottery Stoves Talc and soapstones Washers and dryers

Page 17: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 16

UTILITY AND MISCELLANEOUS GROUP U General. Buildings and structures of an accessory character and miscellaneous structures not classified in any specific occupancy shall be constructed, equipped and maintained to conform to the requirements of this code commensurate with the fire and life hazard incidental to their occupancy. Group U shall include, but not be limited to, the following: Agricultural buildings Aircraft hangars, accessory to a one- or two-family residence Barns Carports Fences more than 6 feet (1829 mm) high Grain silos, accessory to a residential occupancy

Greenhouses Livestock shelters Private garages Retaining walls Sheds Stables Tanks Towers

Page 18: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 17

Appendix B: IBC Type of Construction Descriptions

Page 19: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 18

Page 20: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 19

Page 21: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 20

Page 22: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 21

Table 1 Building Valuation Data – February 2020 a, b, c, d ADJUSTED for Interior Alaska: 1.3 factor

Group IA IB IIA IIB IIIA IIIB IV VA VB A-1 Assembly, theaters, with stage 322.21 311.31 303.22 290.95 273.22 265.33 281.61 254.09 244.93 A-1 Assembly, theaters, without stage 295.23 284.32 276.24 263.97 246.24 238.34 254.62 227.11 217.94

A-2 Assembly, nightclubs 249.55 242.52 236.76 227.11 214.43 208.50 219.23 194.07 187.63 A-2 Assembly, restaurants, bars, banquet halls 248.25 241.22 234.16 225.81 211.83 207.20 217.93 191.47 186.33

A-3 Assembly, churches 298.59 287.69 279.60 267.33 250.08 243.45 257.99 230.95 221.79 A-3 Assembly, general, community halls, libraries, museums 249.86 238.95 229.57 218.60 199.57 192.97 209.25 180.44 172.57

A-4 Assembly, arenas 293.93 283.02 273.64 262.67 243.64 237.04 253.32 224.51 216.64

B Business 260.34 250.85 242.51 230.59 210.46 202.59 221.52 185.16 176.91

E Educational 272.87 263.44 255.87 244.84 228.14 216.58 236.42 199.48 193.38 F-1 Factory and industrial, moderate hazard 152.89 145.85 137.76 132.39 119.00 113.44 126.89 97.87 92.24 F-2 Factory and industrial, low hazard 151.59 144.55 137.76 131.09 119.00 112.14 125.59 97.87 90.94 H-1 High Hazard, explosives 142.99 135.95 129.16 122.49 110.69 103.83 116.99 89.56 0.00

H234 High Hazard 142.99 135.95 129.16 122.49 110.69 103.83 116.99 89.56 82.63

H-5 HPM 260.34 250.85 242.51 230.59 210.46 202.59 221.52 185.16 176.91 I-1 Institutional, supervised environment 257.18 248.37 240.66 231.29 212.27 206.45 231.48 191.07 185.03

I-2 Institutional, hospitals 436.19 426.70 418.36 406.45 385.39 0.00 397.37 360.08 0.00 I-2 Institutional, nursing homes 303.06 293.57 285.22 273.31 254.16 0.00 264.24 228.86 0.00

I-3 Institutional, restrained 296.03 286.54 278.19 266.28 248.09 238.91 257.21 222.78 211.93 I-4 Institutional, day care facilities 257.18 248.37 240.66 231.29 212.27 206.45 231.48 191.07 185.03

M Mercantile 185.83 178.80 171.74 163.39 150.00 145.38 155.51 129.65 124.50

R-1 Residential, hotels 259.61 250.80 243.09 233.72 214.38 208.56 233.91 193.18 187.14 R-2 Residential, multiple family 217.45 208.64 200.93 191.56 173.82 168.01 191.75 152.63 146.59 R-3 Residential, one- and two-family 202.59 197.09 192.18 187.32 180.62 175.85 184.24 169.05 159.20 R-4 Residential, care/assisted living facilities 257.18 248.37 240.66 231.29 212.27 206.45 231.48 191.07 185.03 S-1 Storage, moderate hazard 141.69 134.65 126.56 121.19 108.09 102.53 115.69 86.96 81.33

S-2 Storage, low hazard 140.39 133.35 126.56 119.89 108.09 101.23 114.39 86.96 80.03

U Utility, miscellaneous 110.06 103.76 97.05 92.68 83.21 77.74 88.45 65.90 62.79 a. Private Garages use Utility, miscellaneous

b. Unfinished basements (all use group) = $15.00 per sq. ft. c. For shell only buildings deduct 20 percent d. N.P. = not permitted

Page 23: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 22

Table 2: Building Permit Fee Calculator Total project valuation Fee calculation formula $1.00 to $500 $23.50 $501 to $2,000 $23.50 for the first $500 plus $3.05 for each additional $100, or

fraction thereof, to and including $2,000 $2,001 to $25,000 $69.25 for the first $2,000 plus $ 14.00 for each additional $1,000, or

fraction thereof, to and including $25,000 $25,001 to $50,000 $391.75 for the first $25,000 plus $10.10 for each additional $1,000,

or fraction thereof to and including $50,000 $50,001 to $100,000 $643.75 for the first $50,000 plus for each additional or fraction

thereof, to and including $100,000 $100,001 to $500,000 $993.75 for the first $100,000 plus $5.60 for each additional

$1,000.00, or fraction thereof, to and including $500,000 $500,001 to $1,000,000 $3,233.75 for the first $500,000 plus $4.75 for each additional

$1,000, or fraction thereof, to and including $1,000,000 $1,000,001 and up $5,608.75 for the first $1,000,000 plus $3.65 for each additional

$1,000, or fraction thereof Other Inspections Fees* 1. Inspections outside of normal business hours $330.00 for the first hour; $165.00 per hour

for each additional hour; charged in full-hour increments only

2. Re-inspection fees assessed under provisions of Section 305.8*

$165.00 per hour; charged in full-hour increments only

3. Inspections for which no fee is specifically indicated.

$165.00 per hour; minimum charge—one hour

4. Additional plan review required by changes, additions or revisions to plans

$165.00 per hour; minimum charge—one hour

5. For use of outside consultants for checking and inspections, or both.

Actual costs

*Fees represent City of North Pole consultant costs--$150/hour plus 10% administrative charge.

Page 24: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 23

Table 3. Building Permit Fee Estimation Table

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total 1 to $500.00 $23.50 $15.28 $38.78

$501.00 to $600.00 $26.55 $17.26 $43.81 $601.00 to $700.00 $29.60 $19.24 $48.84 $701.00 to $800.00 $32.65 $21.22 $53.87 $801.00 to $900.00 $35.70 $23.21 $58.91 $901.00 to $1,000.00 $38.75 $25.19 $63.94

$1,001.00 to $1,100.00 $41.80 $27.17 $68.97 $1,101.00 to $1,200.00 $44.85 $29.15 $74.00 $1,201.00 to $1,300.00 $47.90 $31.14 $79.04 $1,301.00 to $1,400.00 $50.95 $33.12 $84.07 $1,401.00 to $1,500.00 $54.00 $35.10 $89.10 $1,501.00 to $1,600.00 $57.05 $37.08 $94.13 $1,601.00 to $1,700.00 $60.10 $39.07 $99.17 $1,701.00 to $1,800.00 $63.15 $41.05 $104.20 $1,801.00 to $1,900.00 $66.20 $43.03 $109.23 $1,901.00 to $2,000.00 $69.25 $45.01 $114.26 $2,001.00 to $3,000.00 $83.25 $54.11 $137.36 $3,001.00 to $4,000.00 $97.25 $63.21 $160.46 $4,001.00 to $5,000.00 $111.25 $72.31 $183.56 $5,001.00 to $6,000.00 $125.25 $81.41 $206.66 $6,001.00 to $7,000.00 $139.25 $90.51 $229.76 $7,001.00 to $8,000.00 $153.25 $99.61 $252.86 $8,001.00 to $9,000.00 $167.25 $108.71 $275.96 $9,001.00 to $10,000.00 $181.25 $117.81 $299.06

$10,001.00 to $11,000.00 $195.25 $126.91 $322.16 $11,001.00 to $12,000.00 $209.25 $136.01 $345.26 $12,001.00 to $13,000.00 $223.25 $145.11 $368.36 $13,001.00 to $14,000.00 $237.25 $154.21 $391.46 $14,001.00 to $15,000.00 $251.25 $163.31 $414.56 $15,001.00 to $16,000.00 $265.25 $172.41 $437.66 $16,001.00 to $17,000.00 $279.25 $181.51 $460.76 $17,001.00 to $18,000.00 $293.25 $190.61 $483.86 $18,001.00 to $19,000.00 $307.25 $199.71 $506.96 $19,001.00 to $20,000.00 $321.25 $208.81 $530.06 $20,001.00 to $21,000.00 $335.25 $217.91 $553.16 $21,001.00 to $22,000.00 $349.25 $227.01 $576.26 $22,001.00 to $23,000.00 $363.25 $236.11 $599.36

Page 25: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 24

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $23,001.00 to $24,000.00 $377.25 $245.21 $622.46 $24,001.00 to $25,000.00 $391.25 $254.31 $645.56 $25,001.00 to $26,000.00 $401.85 $261.20 $663.05 $26,001.00 to $27,000.00 $411.95 $267.77 $679.72 $27,001.00 to $28,000.00 $422.05 $274.33 $696.38 $28,001.00 to $29,000.00 $432.15 $280.90 $713.05 $29,001.00 to $30,000.00 $442.25 $287.46 $729.71 $30,001.00 to $31,000.00 $452.35 $294.03 $746.38 $31,001.00 to $32,000.00 $462.45 $300.59 $763.04 $32,001.00 to $33,000.00 $472.55 $307.16 $779.71 $33,001.00 to $34,000.00 $482.65 $313.72 $796.37 $34,001.00 to $35,000.00 $492.75 $320.29 $813.04 $35,001.00 to $36,000.00 $502.85 $326.85 $829.70 $36,001.00 to $37,000.00 $512.95 $333.42 $846.37 $37,001.00 to $38,000.00 $523.05 $339.98 $863.03 $38,001.00 to $39,000.00 $533.15 $346.55 $879.70 $39,001.00 to $40,000.00 $543.25 $353.11 $896.36 $40,001.00 to $41,000.00 $553.35 $359.68 $913.03 $41,001.00 to $42,000.00 $563.45 $366.24 $929.69 $42,001.00 to $43,000.00 $573.55 $372.81 $946.36 $43,001.00 to $44,000.00 $583.65 $379.37 $963.02 $44,001.00 to $45,000.00 $593.75 $385.94 $979.69 $45,001.00 to $46,000.00 $603.85 $392.50 $996.35 $46,001.00 to $47,000.00 $613.95 $399.07 $1,013.02 $47,001.00 to $48,000.00 $624.05 $405.63 $1,029.68 $48,001.00 to $49,000.00 $634.15 $412.20 $1,046.35 $49,001.00 to $50,000.00 $644.25 $418.76 $1,063.01 $50,001.00 to $51,000.00 $650.75 $422.99 $1,073.74 $51,001.00 to $52,000.00 $657.75 $427.54 $1,085.29 $52,001.00 to $53,000.00 $664.75 $432.09 $1,096.84 $53,001.00 to $54,000.00 $671.75 $436.64 $1,108.39 $54,001.00 to $55,000.00 $678.75 $441.19 $1,119.94 $55,001.00 to $56,000.00 $685.75 $445.74 $1,131.49 $56,001.00 to $57,000.00 $692.75 $450.29 $1,143.04 $57,001.00 to $58,000.00 $699.75 $454.84 $1,154.59 $58,001.00 to $59,000.00 $706.75 $459.39 $1,166.14 $59,001.00 to $60,000.00 $713.75 $463.94 $1,177.69

Page 26: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 25

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $60,001.00 to $61,000.00 $720.75 $468.49 $1,189.24 $61,001.00 to $62,000.00 $727.75 $473.04 $1,200.79 $62,001.00 to $63,000.00 $734.75 $477.59 $1,212.34 $63,001.00 to $64,000.00 $741.75 $482.14 $1,223.89 $64,001.00 to $65,000.00 $748.75 $486.69 $1,235.44 $65,001.00 to $66,000.00 $755.75 $491.24 $1,246.99 $66,001.00 to $67,000.00 $762.75 $495.79 $1,258.54 $67,001.00 to $68,000.00 $769.75 $500.34 $1,270.09 $68,001.00 to $69,000.00 $776.75 $504.89 $1,281.64 $69,001.00 to $70,000.00 $783.75 $509.44 $1,293.19 $70,001.00 to $71,000.00 $790.75 $513.99 $1,304.74 $71,001.00 to $72,000.00 $797.75 $518.54 $1,316.29 $72,001.00 to $73,000.00 $804.75 $523.09 $1,327.84 $73,001.00 to $74,000.00 $811.75 $527.64 $1,339.39 $74,001.00 to $75,000.00 $818.75 $532.19 $1,350.94 $75,001.00 to $76,000.00 $825.75 $536.74 $1,362.49 $76,001.00 to $77,000.00 $832.75 $541.29 $1,374.04 $77,001.00 to $78,000.00 $839.75 $545.84 $1,385.59 $78,001.00 to $79,000.00 $846.75 $550.39 $1,397.14 $79,001.00 to $80,000.00 $853.75 $554.94 $1,408.69 $80,001.00 to $81,000.00 $860.75 $559.49 $1,420.24 $81,001.00 to $82,000.00 $867.75 $564.04 $1,431.79 $82,001.00 to $83,000.00 $874.75 $568.59 $1,443.34 $83,001.00 to $84,000.00 $881.75 $573.14 $1,454.89 $84,001.00 to $85,000.00 $888.75 $577.69 $1,466.44 $85,001.00 to $86,000.00 $895.75 $582.24 $1,477.99 $86,001.00 to $87,000.00 $902.75 $586.79 $1,489.54 $87,001.00 to $88,000.00 $909.75 $591.34 $1,501.09 $88,001.00 to $89,000.00 $916.75 $595.89 $1,512.64 $89,001.00 to $90,000.00 $923.75 $600.44 $1,524.19 $90,001.00 to $91,000.00 $930.75 $604.99 $1,535.74 $91,001.00 to $92,000.00 $937.75 $609.54 $1,547.29 $92,001.00 to $93,000.00 $944.75 $614.09 $1,558.84 $93,001.00 to $94,000.00 $951.75 $618.64 $1,570.39 $94,001.00 to $95,000.00 $958.75 $623.19 $1,581.94 $95,001.00 to $96,000.00 $965.75 $627.74 $1,593.49 $96,001.00 to $97,000.00 $972.75 $632.29 $1,605.04

Page 27: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 26

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $97,001.00 to $98,000.00 $979.75 $636.84 $1,616.59 $98,001.00 to $99,000.00 $986.75 $641.39 $1,628.14 $99,001.00 to $100,000.00 $993.75 $645.94 $1,639.69

$100,001.00 to $101,000.00 $999.35 $649.58 $1,648.93 $101,001.00 to $102,000.00 $1,004.95 $653.22 $1,658.17 $102,001.00 to $103,000.00 $1,010.55 $656.86 $1,667.41 $103,001.00 to $104,000.00 $1,016.15 $660.50 $1,676.65 $104,001.00 to $105,000.00 $1,021.75 $664.14 $1,685.89 $105,001.00 to $106,000.00 $1,027.35 $667.78 $1,695.13 $106,001.00 to $107,000.00 $1,032.95 $671.42 $1,704.37 $107,001.00 to $108,000.00 $1,038.55 $675.06 $1,713.61 $108,001.00 to $109,000.00 $1,044.15 $678.70 $1,722.85 $109,001.00 to $110,000.00 $1,049.75 $682.34 $1,732.09 $110,001.00 to $111,000.00 $1,055.35 $685.98 $1,741.33 $111,001.00 to $112,000.00 $1,060.95 $689.62 $1,750.57 $112,001.00 to $113,000.00 $1,066.55 $693.26 $1,759.81 $113,001.00 to $114,000.00 $1,072.15 $696.90 $1,769.05 $114,001.00 to $115,000.00 $1,077.75 $700.54 $1,778.29 $115,001.00 to $116,000.00 $1,083.35 $704.18 $1,787.53 $116,001.00 to $117,000.00 $1,088.95 $707.82 $1,796.77 $117,001.00 to $118,000.00 $1,094.55 $711.46 $1,806.01 $118,001.00 to $119,000.00 $1,100.15 $715.10 $1,815.25 $119,001.00 to $120,000.00 $1,105.75 $718.74 $1,824.49 $120,001.00 to $121,000.00 $1,111.35 $722.38 $1,833.73 $121,001.00 to $122,000.00 $1,116.95 $726.02 $1,842.97 $122,001.00 to $123,000.00 $1,122.55 $729.66 $1,852.21 $123,001.00 to $124,000.00 $1,128.15 $733.30 $1,861.45 $124,001.00 to $125,000.00 $1,133.75 $736.94 $1,870.69 $125,001.00 to $126,000.00 $1,139.35 $740.58 $1,879.93 $126,001.00 to $127,000.00 $1,144.95 $744.22 $1,889.17 $127,001.00 to $128,000.00 $1,150.55 $747.86 $1,898.41 $128,001.00 to $129,000.00 $1,156.15 $751.50 $1,907.65 $129,001.00 to $130,000.00 $1,161.75 $755.14 $1,916.89 $130,001.00 to $131,000.00 $1,167.35 $758.78 $1,926.13 $131,001.00 to $132,000.00 $1,172.95 $762.42 $1,935.37 $132,001.00 to $133,000.00 $1,178.55 $766.06 $1,944.61 $133,001.00 to $134,000.00 $1,184.15 $769.70 $1,953.85

Page 28: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 27

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $134,001.00 to $135,000.00 $1,189.75 $773.34 $1,963.09 $135,001.00 to $136,000.00 $1,195.35 $776.98 $1,972.33 $136,001.00 to $137,000.00 $1,200.95 $780.62 $1,981.57 $137,001.00 to $138,000.00 $1,206.55 $784.26 $1,990.81 $138,001.00 to $139,000.00 $1,212.15 $787.90 $2,000.05 $139,001.00 to $140,000.00 $1,217.75 $791.54 $2,009.29 $140,001.00 to $141,000.00 $1,223.35 $795.18 $2,018.53 $141,001.00 to $142,000.00 $1,228.95 $798.82 $2,027.77 $142,001.00 to $143,000.00 $1,234.55 $802.46 $2,037.01 $143,001.00 to $144,000.00 $1,240.15 $806.10 $2,046.25 $144,001.00 to $145,000.00 $1,245.75 $809.74 $2,055.49 $145,001.00 to $146,000.00 $1,251.35 $813.38 $2,064.73 $146,001.00 to $147,000.00 $1,256.95 $817.02 $2,073.97 $147,001.00 to $148,000.00 $1,262.55 $820.66 $2,083.21 $148,001.00 to $149,000.00 $1,268.15 $824.30 $2,092.45 $149,001.00 to $150,000.00 $1,273.75 $827.94 $2,101.69 $150,001.00 to $151,000.00 $1,279.35 $831.58 $2,110.93 $151,001.00 to $152,000.00 $1,284.95 $835.22 $2,120.17 $152,001.00 to $153,000.00 $1,290.55 $838.86 $2,129.41 $153,001.00 to $154,000.00 $1,296.15 $842.50 $2,138.65 $154,001.00 to $155,000.00 $1,301.75 $846.14 $2,147.89 $155,001.00 to $156,000.00 $1,307.35 $849.78 $2,157.13 $156,001.00 to $157,000.00 $1,312.95 $853.42 $2,166.37 $157,001.00 to $158,000.00 $1,318.55 $857.06 $2,175.61 $158,001.00 to $159,000.00 $1,324.15 $860.70 $2,184.85 $159,001.00 to $160,000.00 $1,329.75 $864.34 $2,194.09 $160,001.00 to $161,000.00 $1,335.35 $867.98 $2,203.33 $161,001.00 to $162,000.00 $1,340.95 $871.62 $2,212.57 $162,001.00 to $163,000.00 $1,346.55 $875.26 $2,221.81 $163,001.00 to $164,000.00 $1,352.15 $878.90 $2,231.05 $164,001.00 to $165,000.00 $1,357.75 $882.54 $2,240.29 $165,001.00 to $166,000.00 $1,363.35 $886.18 $2,249.53 $166,001.00 to $167,000.00 $1,368.95 $889.82 $2,258.77 $167,001.00 to $168,000.00 $1,374.55 $893.46 $2,268.01 $168,001.00 to $169,000.00 $1,380.15 $897.10 $2,277.25 $169,001.00 to $170,000.00 $1,385.75 $900.74 $2,286.49 $170,001.00 to $171,000.00 $1,391.35 $904.38 $2,295.73

Page 29: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 28

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $171,001.00 to $172,000.00 $1,396.95 $908.02 $2,304.97 $172,001.00 to $173,000.00 $1,402.55 $911.66 $2,314.21 $173,001.00 to $174,000.00 $1,408.15 $915.30 $2,323.45 $174,001.00 to $175,000.00 $1,413.75 $918.94 $2,332.69 $175,001.00 to $176,000.00 $1,419.35 $922.58 $2,341.93 $176,001.00 to $177,000.00 $1,424.95 $926.22 $2,351.17 $177,001.00 to $178,000.00 $1,430.55 $929.86 $2,360.41 $178,001.00 to $179,000.00 $1,436.15 $933.50 $2,369.65 $179,001.00 to $180,000.00 $1,441.75 $937.14 $2,378.89 $180,001.00 to $181,000.00 $1,447.35 $940.78 $2,388.13 $181,001.00 to $182,000.00 $1,452.95 $944.42 $2,397.37 $182,001.00 to $183,000.00 $1,458.55 $948.06 $2,406.61 $183,001.00 to $184,000.00 $1,464.15 $951.70 $2,415.85 $184,001.00 to $185,000.00 $1,469.75 $955.34 $2,425.09 $185,001.00 to $186,000.00 $1,475.35 $958.98 $2,434.33 $186,001.00 to $187,000.00 $1,480.95 $962.62 $2,443.57 $187,001.00 to $188,000.00 $1,486.55 $966.26 $2,452.81 $188,001.00 to $189,000.00 $1,492.15 $969.90 $2,462.05 $189,001.00 to $190,000.00 $1,497.75 $973.54 $2,471.29 $190,001.00 to $191,000.00 $1,503.35 $977.18 $2,480.53 $191,001.00 to $192,000.00 $1,508.95 $980.82 $2,489.77 $192,001.00 to $193,000.00 $1,514.55 $984.46 $2,499.01 $193,001.00 to $194,000.00 $1,520.15 $988.10 $2,508.25 $194,001.00 to $195,000.00 $1,525.75 $991.74 $2,517.49 $195,001.00 to $196,000.00 $1,531.35 $995.38 $2,526.73 $196,001.00 to $197,000.00 $1,536.95 $999.02 $2,535.97 $197,001.00 to $198,000.00 $1,542.55 $1,002.66 $2,545.21 $198,001.00 to $199,000.00 $1,548.15 $1,006.30 $2,554.45 $199,001.00 to $200,000.00 $1,553.75 $1,009.94 $2,563.69 $200,001.00 to $201,000.00 $1,559.35 $1,013.58 $2,572.93 $201,001.00 to $202,000.00 $1,564.95 $1,017.22 $2,582.17 $202,001.00 to $203,000.00 $1,570.55 $1,020.86 $2,591.41 $203,001.00 to $204,000.00 $1,576.15 $1,024.50 $2,600.65 $204,001.00 to $205,000.00 $1,581.75 $1,028.14 $2,609.89 $205,001.00 to $206,000.00 $1,587.35 $1,031.78 $2,619.13 $206,001.00 to $207,000.00 $1,592.95 $1,035.42 $2,628.37 $207,001.00 to $208,000.00 $1,598.55 $1,039.06 $2,637.61

Page 30: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 29

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $208,001.00 to $209,000.00 $1,604.15 $1,042.70 $2,646.85 $209,001.00 to $210,000.00 $1,609.75 $1,046.34 $2,656.09 $210,001.00 to $211,000.00 $1,615.35 $1,049.98 $2,665.33 $211,001.00 to $212,000.00 $1,620.95 $1,053.62 $2,674.57 $212,001.00 to $213,000.00 $1,626.55 $1,057.26 $2,683.81 $213,001.00 to $214,000.00 $1,632.15 $1,060.90 $2,693.05 $214,001.00 to $215,000.00 $1,637.75 $1,064.54 $2,702.29 $215,001.00 to $216,000.00 $1,643.35 $1,068.18 $2,711.53 $216,001.00 to $217,000.00 $1,648.95 $1,071.82 $2,720.77 $217,001.00 to $218,000.00 $1,654.55 $1,075.46 $2,730.01 $218,001.00 to $219,000.00 $1,660.15 $1,079.10 $2,739.25 $219,001.00 to $220,000.00 $1,665.75 $1,082.74 $2,748.49 $220,001.00 to $221,000.00 $1,671.35 $1,086.38 $2,757.73 $221,001.00 to $222,000.00 $1,676.95 $1,090.02 $2,766.97 $222,001.00 to $223,000.00 $1,682.55 $1,093.66 $2,776.21 $223,001.00 to $224,000.00 $1,688.15 $1,097.30 $2,785.45 $224,001.00 to $225,000.00 $1,693.75 $1,100.94 $2,794.69 $225,001.00 to $226,000.00 $1,699.35 $1,104.58 $2,803.93 $226,001.00 to $227,000.00 $1,704.95 $1,108.22 $2,813.17 $227,001.00 to $228,000.00 $1,710.55 $1,111.86 $2,822.41 $228,001.00 to $229,000.00 $1,716.15 $1,115.50 $2,831.65 $229,001.00 to $230,000.00 $1,721.75 $1,119.14 $2,840.89 $230,001.00 to $231,000.00 $1,727.35 $1,122.78 $2,850.13 $231,001.00 to $232,000.00 $1,732.95 $1,126.42 $2,859.37 $232,001.00 to $233,000.00 $1,738.55 $1,130.06 $2,868.61 $233,001.00 to $234,000.00 $1,744.15 $1,133.70 $2,877.85 $234,001.00 to $235,000.00 $1,749.75 $1,137.34 $2,887.09 $235,001.00 to $236,000.00 $1,755.35 $1,140.98 $2,896.33 $236,001.00 to $237,000.00 $1,760.95 $1,144.62 $2,905.57 $237,001.00 to $238,000.00 $1,766.55 $1,148.26 $2,914.81 $238,001.00 to $239,000.00 $1,772.15 $1,151.90 $2,924.05 $239,001.00 to $240,000.00 $1,777.75 $1,155.54 $2,933.29 $240,001.00 to $241,000.00 $1,783.35 $1,159.18 $2,942.53 $241,001.00 to $242,000.00 $1,788.95 $1,162.82 $2,951.77 $242,001.00 to $243,000.00 $1,794.55 $1,166.46 $2,961.01 $243,001.00 to $244,000.00 $1,800.15 $1,170.10 $2,970.25 $244,001.00 to $245,000.00 $1,805.75 $1,173.74 $2,979.49

Page 31: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 30

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $245,001.00 to $246,000.00 $1,811.35 $1,177.38 $2,988.73 $246,001.00 to $247,000.00 $1,816.95 $1,181.02 $2,997.97 $247,001.00 to $248,000.00 $1,822.55 $1,184.66 $3,007.21 $248,001.00 to $249,000.00 $1,828.15 $1,188.30 $3,016.45 $249,001.00 to $250,000.00 $1,833.75 $1,191.94 $3,025.69 $250,001.00 to $251,000.00 $1,839.35 $1,195.58 $3,034.93 $251,001.00 to $252,000.00 $1,844.95 $1,199.22 $3,044.17 $252,001.00 to $253,000.00 $1,850.55 $1,202.86 $3,053.41 $253,001.00 to $254,000.00 $1,856.15 $1,206.50 $3,062.65 $254,001.00 to $255,000.00 $1,861.75 $1,210.14 $3,071.89 $255,001.00 to $256,000.00 $1,867.35 $1,213.78 $3,081.13 $256,001.00 to $257,000.00 $1,872.95 $1,217.42 $3,090.37 $257,001.00 to $258,000.00 $1,878.55 $1,221.06 $3,099.61 $258,001.00 to $259,000.00 $1,884.15 $1,224.70 $3,108.85 $259,001.00 to $260,000.00 $1,889.75 $1,228.34 $3,118.09 $260,001.00 to $261,000.00 $1,895.35 $1,231.98 $3,127.33 $261,001.00 to $262,000.00 $1,900.95 $1,235.62 $3,136.57 $262,001.00 to $263,000.00 $1,906.55 $1,239.26 $3,145.81 $263,001.00 to $264,000.00 $1,912.15 $1,242.90 $3,155.05 $264,001.00 to $265,000.00 $1,917.75 $1,246.54 $3,164.29 $265,001.00 to $266,000.00 $1,923.35 $1,250.18 $3,173.53 $266,001.00 to $267,000.00 $1,928.95 $1,253.82 $3,182.77 $267,001.00 to $268,000.00 $1,934.55 $1,257.46 $3,192.01 $268,001.00 to $269,000.00 $1,940.15 $1,261.10 $3,201.25 $269,001.00 to $270,000.00 $1,945.75 $1,264.74 $3,210.49 $270,001.00 to $271,000.00 $1,951.35 $1,268.38 $3,219.73 $271,001.00 to $272,000.00 $1,956.95 $1,272.02 $3,228.97 $272,001.00 to $273,000.00 $1,962.55 $1,275.66 $3,238.21 $273,001.00 to $274,000.00 $1,968.15 $1,279.30 $3,247.45 $274,001.00 to $275,000.00 $1,973.75 $1,282.94 $3,256.69 $275,001.00 to $276,000.00 $1,979.35 $1,286.58 $3,265.93 $276,001.00 to $277,000.00 $1,984.95 $1,290.22 $3,275.17 $277,001.00 to $278,000.00 $1,990.55 $1,293.86 $3,284.41 $278,001.00 to $279,000.00 $1,996.15 $1,297.50 $3,293.65 $279,001.00 to $280,000.00 $2,001.75 $1,301.14 $3,302.89 $280,001.00 to $281,000.00 $2,007.35 $1,304.78 $3,312.13 $281,001.00 to $282,000.00 $2,012.95 $1,308.42 $3,321.37

Page 32: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 31

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $282,001.00 to $283,000.00 $2,018.55 $1,312.06 $3,330.61 $283,001.00 to $284,000.00 $2,024.15 $1,315.70 $3,339.85 $284,001.00 to $285,000.00 $2,029.75 $1,319.34 $3,349.09 $285,001.00 to $286,000.00 $2,035.35 $1,322.98 $3,358.33 $286,001.00 to $287,000.00 $2,040.95 $1,326.62 $3,367.57 $287,001.00 to $288,000.00 $2,046.55 $1,330.26 $3,376.81 $288,001.00 to $289,000.00 $2,052.15 $1,333.90 $3,386.05 $289,001.00 to $290,000.00 $2,057.75 $1,337.54 $3,395.29 $290,001.00 to $291,000.00 $2,063.35 $1,341.18 $3,404.53 $291,001.00 to $292,000.00 $2,068.95 $1,344.82 $3,413.77 $292,001.00 to $293,000.00 $2,074.55 $1,348.46 $3,423.01 $293,001.00 to $294,000.00 $2,080.15 $1,352.10 $3,432.25 $294,001.00 to $295,000.00 $2,085.75 $1,355.74 $3,441.49 $295,001.00 to $296,000.00 $2,091.35 $1,359.38 $3,450.73 $296,001.00 to $297,000.00 $2,096.95 $1,363.02 $3,459.97 $297,001.00 to $298,000.00 $2,102.55 $1,366.66 $3,469.21 $298,001.00 to $299,000.00 $2,108.15 $1,370.30 $3,478.45 $299,001.00 to $300,000.00 $2,113.75 $1,373.94 $3,487.69 $300,001.00 to $301,000.00 $2,119.35 $1,377.58 $3,496.93 $301,001.00 to $302,000.00 $2,124.95 $1,381.22 $3,506.17 $302,001.00 to $303,000.00 $2,130.55 $1,384.86 $3,515.41 $303,001.00 to $304,000.00 $2,136.15 $1,388.50 $3,524.65 $304,001.00 to $305,000.00 $2,141.75 $1,392.14 $3,533.89 $305,001.00 to $306,000.00 $2,147.35 $1,395.78 $3,543.13 $306,001.00 to $307,000.00 $2,152.95 $1,399.42 $3,552.37 $307,001.00 to $308,000.00 $2,158.55 $1,403.06 $3,561.61 $308,001.00 to $309,000.00 $2,164.15 $1,406.70 $3,570.85 $309,001.00 to $310,000.00 $2,169.75 $1,410.34 $3,580.09 $310,001.00 to $311,000.00 $2,175.35 $1,413.98 $3,589.33 $311,001.00 to $312,000.00 $2,180.95 $1,417.62 $3,598.57 $312,001.00 to $313,000.00 $2,186.55 $1,421.26 $3,607.81 $313,001.00 to $314,000.00 $2,192.15 $1,424.90 $3,617.05 $314,001.00 to $315,000.00 $2,197.75 $1,428.54 $3,626.29 $315,001.00 to $316,000.00 $2,203.35 $1,432.18 $3,635.53 $316,001.00 to $317,000.00 $2,208.95 $1,435.82 $3,644.77 $317,001.00 to $318,000.00 $2,214.55 $1,439.46 $3,654.01 $318,001.00 to $319,000.00 $2,220.15 $1,443.10 $3,663.25

Page 33: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 32

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $319,001.00 to $320,000.00 $2,225.75 $1,446.74 $3,672.49 $320,001.00 to $321,000.00 $2,231.35 $1,450.38 $3,681.73 $321,001.00 to $322,000.00 $2,236.95 $1,454.02 $3,690.97 $322,001.00 to $323,000.00 $2,242.55 $1,457.66 $3,700.21 $323,001.00 to $324,000.00 $2,248.15 $1,461.30 $3,709.45 $324,001.00 to $325,000.00 $2,253.75 $1,464.94 $3,718.69 $325,001.00 to $326,000.00 $2,259.35 $1,468.58 $3,727.93 $326,001.00 to $327,000.00 $2,264.95 $1,472.22 $3,737.17 $327,001.00 to $328,000.00 $2,270.55 $1,475.86 $3,746.41 $328,001.00 to $329,000.00 $2,276.15 $1,479.50 $3,755.65 $329,001.00 to $330,000.00 $2,281.75 $1,483.14 $3,764.89 $330,001.00 to $331,000.00 $2,287.35 $1,486.78 $3,774.13 $331,001.00 to $332,000.00 $2,292.95 $1,490.42 $3,783.37 $332,001.00 to $333,000.00 $2,298.55 $1,494.06 $3,792.61 $333,001.00 to $334,000.00 $2,304.15 $1,497.70 $3,801.85 $334,001.00 to $335,000.00 $2,309.75 $1,501.34 $3,811.09 $335,001.00 to $336,000.00 $2,315.35 $1,504.98 $3,820.33 $336,001.00 to $337,000.00 $2,320.95 $1,508.62 $3,829.57 $337,001.00 to $338,000.00 $2,326.55 $1,512.26 $3,838.81 $338,001.00 to $339,000.00 $2,332.15 $1,515.90 $3,848.05 $339,001.00 to $340,000.00 $2,337.75 $1,519.54 $3,857.29 $340,001.00 to $341,000.00 $2,343.35 $1,523.18 $3,866.53 $341,001.00 to $342,000.00 $2,348.95 $1,526.82 $3,875.77 $342,001.00 to $343,000.00 $2,354.55 $1,530.46 $3,885.01 $343,001.00 to $344,000.00 $2,360.15 $1,534.10 $3,894.25 $344,001.00 to $345,000.00 $2,365.75 $1,537.74 $3,903.49 $345,001.00 to $346,000.00 $2,371.35 $1,541.38 $3,912.73 $346,001.00 to $347,000.00 $2,376.95 $1,545.02 $3,921.97 $347,001.00 to $348,000.00 $2,382.55 $1,548.66 $3,931.21 $348,001.00 to $349,000.00 $2,388.15 $1,552.30 $3,940.45 $349,001.00 to $350,000.00 $2,393.75 $1,555.94 $3,949.69 $350,001.00 to $351,000.00 $2,399.35 $1,559.58 $3,958.93 $351,001.00 to $352,000.00 $2,404.95 $1,563.22 $3,968.17 $352,001.00 to $353,000.00 $2,410.55 $1,566.86 $3,977.41 $353,001.00 to $354,000.00 $2,416.15 $1,570.50 $3,986.65 $354,001.00 to $355,000.00 $2,421.75 $1,574.14 $3,995.89 $355,001.00 to $356,000.00 $2,427.35 $1,577.78 $4,005.13

Page 34: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 33

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $356,001.00 to $357,000.00 $2,432.95 $1,581.42 $4,014.37 $357,001.00 to $358,000.00 $2,438.55 $1,585.06 $4,023.61 $358,001.00 to $359,000.00 $2,444.15 $1,588.70 $4,032.85 $359,001.00 to $360,000.00 $2,449.75 $1,592.34 $4,042.09 $360,001.00 to $361,000.00 $2,455.35 $1,595.98 $4,051.33 $361,001.00 to $362,000.00 $2,460.95 $1,599.62 $4,060.57 $362,001.00 to $363,000.00 $2,466.55 $1,603.26 $4,069.81 $363,001.00 to $364,000.00 $2,472.15 $1,606.90 $4,079.05 $364,001.00 to $365,000.00 $2,477.75 $1,610.54 $4,088.29 $365,001.00 to $366,000.00 $2,483.35 $1,614.18 $4,097.53 $366,001.00 to $367,000.00 $2,488.95 $1,617.82 $4,106.77 $367,001.00 to $368,000.00 $2,494.55 $1,621.46 $4,116.01 $368,001.00 to $369,000.00 $2,500.15 $1,625.10 $4,125.25 $369,001.00 to $370,000.00 $2,505.75 $1,628.74 $4,134.49 $370,001.00 to $371,000.00 $2,511.35 $1,632.38 $4,143.73 $371,001.00 to $372,000.00 $2,516.95 $1,636.02 $4,152.97 $372,001.00 to $373,000.00 $2,522.55 $1,639.66 $4,162.21 $373,001.00 to $374,000.00 $2,528.15 $1,643.30 $4,171.45 $374,001.00 to $375,000.00 $2,533.75 $1,646.94 $4,180.69 $375,001.00 to $376,000.00 $2,539.35 $1,650.58 $4,189.93 $376,001.00 to $377,000.00 $2,544.95 $1,654.22 $4,199.17 $377,001.00 to $378,000.00 $2,550.55 $1,657.86 $4,208.41 $378,001.00 to $379,000.00 $2,556.15 $1,661.50 $4,217.65 $379,001.00 to $380,000.00 $2,561.75 $1,665.14 $4,226.89 $380,001.00 to $381,000.00 $2,567.35 $1,668.78 $4,236.13 $381,001.00 to $382,000.00 $2,572.95 $1,672.42 $4,245.37 $382,001.00 to $383,000.00 $2,578.55 $1,676.06 $4,254.61 $383,001.00 to $384,000.00 $2,584.15 $1,679.70 $4,263.85 $384,001.00 to $385,000.00 $2,589.75 $1,683.34 $4,273.09 $385,001.00 to $386,000.00 $2,595.35 $1,686.98 $4,282.33 $386,001.00 to $387,000.00 $2,600.95 $1,690.62 $4,291.57 $387,001.00 to $388,000.00 $2,606.55 $1,694.26 $4,300.81 $388,001.00 to $389,000.00 $2,612.15 $1,697.90 $4,310.05 $389,001.00 to $390,000.00 $2,617.75 $1,701.54 $4,319.29 $390,001.00 to $391,000.00 $2,623.35 $1,705.18 $4,328.53 $391,001.00 to $392,000.00 $2,628.95 $1,708.82 $4,337.77 $392,001.00 to $393,000.00 $2,634.55 $1,712.46 $4,347.01

Page 35: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 34

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $393,001.00 to $394,000.00 $2,640.15 $1,716.10 $4,356.25 $394,001.00 to $395,000.00 $2,645.75 $1,719.74 $4,365.49 $395,001.00 to $396,000.00 $2,651.35 $1,723.38 $4,374.73 $396,001.00 to $397,000.00 $2,656.95 $1,727.02 $4,383.97 $397,001.00 to $398,000.00 $2,662.55 $1,730.66 $4,393.21 $398,001.00 to $399,000.00 $2,668.15 $1,734.30 $4,402.45 $399,001.00 to $400,000.00 $2,673.75 $1,737.94 $4,411.69 $400,001.00 to $401,000.00 $2,679.35 $1,741.58 $4,420.93 $401,001.00 to $402,000.00 $2,684.95 $1,745.22 $4,430.17 $402,001.00 to $403,000.00 $2,690.55 $1,748.86 $4,439.41 $403,001.00 to $404,000.00 $2,696.15 $1,752.50 $4,448.65 $404,001.00 to $405,000.00 $2,701.75 $1,756.14 $4,457.89 $405,001.00 to $406,000.00 $2,707.35 $1,759.78 $4,467.13 $406,001.00 to $407,000.00 $2,712.95 $1,763.42 $4,476.37 $407,001.00 to $408,000.00 $2,718.55 $1,767.06 $4,485.61 $408,001.00 to $409,000.00 $2,724.15 $1,770.70 $4,494.85 $409,001.00 to $410,000.00 $2,729.75 $1,774.34 $4,504.09 $410,001.00 to $411,000.00 $2,735.35 $1,777.98 $4,513.33 $411,001.00 to $412,000.00 $2,740.95 $1,781.62 $4,522.57 $412,001.00 to $413,000.00 $2,746.55 $1,785.26 $4,531.81 $413,001.00 to $414,000.00 $2,752.15 $1,788.90 $4,541.05 $414,001.00 to $415,000.00 $2,757.75 $1,792.54 $4,550.29 $415,001.00 to $416,000.00 $2,763.35 $1,796.18 $4,559.53 $416,001.00 to $417,000.00 $2,768.95 $1,799.82 $4,568.77 $417,001.00 to $418,000.00 $2,774.55 $1,803.46 $4,578.01 $418,001.00 to $419,000.00 $2,780.15 $1,807.10 $4,587.25 $419,001.00 to $420,000.00 $2,785.75 $1,810.74 $4,596.49 $420,001.00 to $421,000.00 $2,791.35 $1,814.38 $4,605.73 $421,001.00 to $422,000.00 $2,796.95 $1,818.02 $4,614.97 $422,001.00 to $423,000.00 $2,802.55 $1,821.66 $4,624.21 $423,001.00 to $424,000.00 $2,808.15 $1,825.30 $4,633.45 $424,001.00 to $425,000.00 $2,813.75 $1,828.94 $4,642.69 $425,001.00 to $426,000.00 $2,819.35 $1,832.58 $4,651.93 $426,001.00 to $427,000.00 $2,824.95 $1,836.22 $4,661.17 $427,001.00 to $428,000.00 $2,830.55 $1,839.86 $4,670.41 $428,001.00 to $429,000.00 $2,836.15 $1,843.50 $4,679.65 $429,001.00 to $430,000.00 $2,841.75 $1,847.14 $4,688.89

Page 36: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 35

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $430,001.00 to $431,000.00 $2,847.35 $1,850.78 $4,698.13 $431,001.00 to $432,000.00 $2,852.95 $1,854.42 $4,707.37 $432,001.00 to $433,000.00 $2,858.55 $1,858.06 $4,716.61 $433,001.00 to $434,000.00 $2,864.15 $1,861.70 $4,725.85 $434,001.00 to $435,000.00 $2,869.75 $1,865.34 $4,735.09 $435,001.00 to $436,000.00 $2,875.35 $1,868.98 $4,744.33 $436,001.00 to $437,000.00 $2,880.95 $1,872.62 $4,753.57 $437,001.00 to $438,000.00 $2,886.55 $1,876.26 $4,762.81 $438,001.00 to $439,000.00 $2,892.15 $1,879.90 $4,772.05 $439,001.00 to $440,000.00 $2,897.75 $1,883.54 $4,781.29 $440,001.00 to $441,000.00 $2,903.35 $1,887.18 $4,790.53 $441,001.00 to $442,000.00 $2,908.95 $1,890.82 $4,799.77 $442,001.00 to $443,000.00 $2,914.55 $1,894.46 $4,809.01 $443,001.00 to $444,000.00 $2,920.15 $1,898.10 $4,818.25 $444,001.00 to $445,000.00 $2,925.75 $1,901.74 $4,827.49 $445,001.00 to $446,000.00 $2,931.35 $1,905.38 $4,836.73 $446,001.00 to $447,000.00 $2,936.95 $1,909.02 $4,845.97 $447,001.00 to $448,000.00 $2,942.55 $1,912.66 $4,855.21 $448,001.00 to $449,000.00 $2,948.15 $1,916.30 $4,864.45 $449,001.00 to $450,000.00 $2,953.75 $1,919.94 $4,873.69 $450,001.00 to $451,000.00 $2,959.35 $1,923.58 $4,882.93 $451,001.00 to $452,000.00 $2,964.95 $1,927.22 $4,892.17 $452,001.00 to $453,000.00 $2,970.55 $1,930.86 $4,901.41 $453,001.00 to $454,000.00 $2,976.15 $1,934.50 $4,910.65 $454,001.00 to $455,000.00 $2,981.75 $1,938.14 $4,919.89 $455,001.00 to $456,000.00 $2,987.35 $1,941.78 $4,929.13 $456,001.00 to $457,000.00 $2,992.95 $1,945.42 $4,938.37 $457,001.00 to $458,000.00 $2,998.55 $1,949.06 $4,947.61 $458,001.00 to $459,000.00 $3,004.15 $1,952.70 $4,956.85 $459,001.00 to $460,000.00 $3,009.75 $1,956.34 $4,966.09 $460,001.00 to $461,000.00 $3,015.35 $1,959.98 $4,975.33 $461,001.00 to $462,000.00 $3,020.95 $1,963.62 $4,984.57 $462,001.00 to $463,000.00 $3,026.55 $1,967.26 $4,993.81 $463,001.00 to $464,000.00 $3,032.15 $1,970.90 $5,003.05 $464,001.00 to $465,000.00 $3,037.75 $1,974.54 $5,012.29 $465,001.00 to $466,000.00 $3,043.35 $1,978.18 $5,021.53 $466,001.00 to $467,000.00 $3,048.95 $1,981.82 $5,030.77

Page 37: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 36

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $467,001.00 to $468,000.00 $3,054.55 $1,985.46 $5,040.01 $468,001.00 to $469,000.00 $3,060.15 $1,989.10 $5,049.25 $469,001.00 to $470,000.00 $3,065.75 $1,992.74 $5,058.49 $470,001.00 to $471,000.00 $3,071.35 $1,996.38 $5,067.73 $471,001.00 to $472,000.00 $3,076.95 $2,000.02 $5,076.97 $472,001.00 to $473,000.00 $3,082.55 $2,003.66 $5,086.21 $473,001.00 to $474,000.00 $3,088.15 $2,007.30 $5,095.45 $474,001.00 to $475,000.00 $3,093.75 $2,010.94 $5,104.69 $475,001.00 to $476,000.00 $3,099.35 $2,014.58 $5,113.93 $476,001.00 to $477,000.00 $3,104.95 $2,018.22 $5,123.17 $477,001.00 to $478,000.00 $3,110.55 $2,021.86 $5,132.41 $478,001.00 to $479,000.00 $3,116.15 $2,025.50 $5,141.65 $479,001.00 to $480,000.00 $3,121.75 $2,029.14 $5,150.89 $480,001.00 to $481,000.00 $3,127.35 $2,032.78 $5,160.13 $481,001.00 to $482,000.00 $3,132.95 $2,036.42 $5,169.37 $482,001.00 to $483,000.00 $3,138.55 $2,040.06 $5,178.61 $483,001.00 to $484,000.00 $3,144.15 $2,043.70 $5,187.85 $484,001.00 to $485,000.00 $3,149.75 $2,047.34 $5,197.09 $485,001.00 to $486,000.00 $3,155.35 $2,050.98 $5,206.33 $486,001.00 to $487,000.00 $3,160.95 $2,054.62 $5,215.57 $487,001.00 to $488,000.00 $3,166.55 $2,058.26 $5,224.81 $488,001.00 to $489,000.00 $3,172.15 $2,061.90 $5,234.05 $489,001.00 to $490,000.00 $3,177.75 $2,065.54 $5,243.29 $490,001.00 to $491,000.00 $3,183.35 $2,069.18 $5,252.53 $491,001.00 to $492,000.00 $3,188.95 $2,072.82 $5,261.77 $492,001.00 to $493,000.00 $3,194.55 $2,076.46 $5,271.01 $493,001.00 to $494,000.00 $3,200.15 $2,080.10 $5,280.25 $494,001.00 to $495,000.00 $3,205.75 $2,083.74 $5,289.49 $495,001.00 to $496,000.00 $3,211.35 $2,087.38 $5,298.73 $496,001.00 to $497,000.00 $3,216.95 $2,091.02 $5,307.97 $497,001.00 to $498,000.00 $3,222.55 $2,094.66 $5,317.21 $498,001.00 to $499,000.00 $3,228.15 $2,098.30 $5,326.45 $499,001.00 to $500,000.00 $3,233.75 $2,101.94 $5,335.69 $500,001.00 to $501,000.00 $3,238.50 $2,105.03 $5,343.53 $501,001.00 to $502,000.00 $3,243.25 $2,108.11 $5,351.36 $502,001.00 to $503,000.00 $3,248.00 $2,111.20 $5,359.20 $503,001.00 to $504,000.00 $3,252.75 $2,114.29 $5,367.04

Page 38: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 37

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $504,001.00 to $505,000.00 $3,257.50 $2,117.38 $5,374.88 $505,001.00 to $506,000.00 $3,262.25 $2,120.46 $5,382.71 $506,001.00 to $507,000.00 $3,267.00 $2,123.55 $5,390.55 $507,001.00 to $508,000.00 $3,271.75 $2,126.64 $5,398.39 $508,001.00 to $509,000.00 $3,276.50 $2,129.73 $5,406.23 $509,001.00 to $510,000.00 $3,281.25 $2,132.81 $5,414.06 $510,001.00 to $511,000.00 $3,286.00 $2,135.90 $5,421.90 $511,001.00 to $512,000.00 $3,290.75 $2,138.99 $5,429.74 $512,001.00 to $513,000.00 $3,295.50 $2,142.08 $5,437.58 $513,001.00 to $514,000.00 $3,300.25 $2,145.16 $5,445.41 $514,001.00 to $515,000.00 $3,305.00 $2,148.25 $5,453.25 $515,001.00 to $516,000.00 $3,309.75 $2,151.34 $5,461.09 $516,001.00 to $517,000.00 $3,314.50 $2,154.43 $5,468.93 $517,001.00 to $518,000.00 $3,319.25 $2,157.51 $5,476.76 $518,001.00 to $519,000.00 $3,324.00 $2,160.60 $5,484.60 $519,001.00 to $520,000.00 $3,328.75 $2,163.69 $5,492.44 $520,001.00 to $521,000.00 $3,333.50 $2,166.78 $5,500.28 $521,001.00 to $522,000.00 $3,338.25 $2,169.86 $5,508.11 $522,001.00 to $523,000.00 $3,343.00 $2,172.95 $5,515.95 $523,001.00 to $524,000.00 $3,347.75 $2,176.04 $5,523.79 $524,001.00 to $525,000.00 $3,352.50 $2,179.13 $5,531.63 $525,001.00 to $526,000.00 $3,357.25 $2,182.21 $5,539.46 $526,001.00 to $527,000.00 $3,362.00 $2,185.30 $5,547.30 $527,001.00 to $528,000.00 $3,366.75 $2,188.39 $5,555.14 $528,001.00 to $529,000.00 $3,371.50 $2,191.48 $5,562.98 $529,001.00 to $530,000.00 $3,376.25 $2,194.56 $5,570.81 $530,001.00 to $531,000.00 $3,381.00 $2,197.65 $5,578.65 $531,001.00 to $532,000.00 $3,385.75 $2,200.74 $5,586.49 $532,001.00 to $533,000.00 $3,390.50 $2,203.83 $5,594.33 $533,001.00 to $534,000.00 $3,395.25 $2,206.91 $5,602.16 $534,001.00 to $535,000.00 $3,400.00 $2,210.00 $5,610.00 $535,001.00 to $536,000.00 $3,404.75 $2,213.09 $5,617.84 $536,001.00 to $537,000.00 $3,409.50 $2,216.18 $5,625.68 $537,001.00 to $538,000.00 $3,414.25 $2,219.26 $5,633.51 $538,001.00 to $539,000.00 $3,419.00 $2,222.35 $5,641.35 $539,001.00 to $540,000.00 $3,423.75 $2,225.44 $5,649.19 $540,001.00 to $541,000.00 $3,428.50 $2,228.53 $5,657.03

Page 39: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 38

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $541,001.00 to $542,000.00 $3,433.25 $2,231.61 $5,664.86 $542,001.00 to $543,000.00 $3,438.00 $2,234.70 $5,672.70 $543,001.00 to $544,000.00 $3,442.75 $2,237.79 $5,680.54 $544,001.00 to $545,000.00 $3,447.50 $2,240.88 $5,688.38 $545,001.00 to $546,000.00 $3,452.25 $2,243.96 $5,696.21 $546,001.00 to $547,000.00 $3,457.00 $2,247.05 $5,704.05 $547,001.00 to $548,000.00 $3,461.75 $2,250.14 $5,711.89 $548,001.00 to $549,000.00 $3,466.50 $2,253.23 $5,719.73 $549,001.00 to $550,000.00 $3,471.25 $2,256.31 $5,727.56 $550,001.00 to $551,000.00 $3,476.00 $2,259.40 $5,735.40 $551,001.00 to $552,000.00 $3,480.75 $2,262.49 $5,743.24 $552,001.00 to $553,000.00 $3,485.50 $2,265.58 $5,751.08 $553,001.00 to $554,000.00 $3,490.25 $2,268.66 $5,758.91 $554,001.00 to $555,000.00 $3,495.00 $2,271.75 $5,766.75 $555,001.00 to $556,000.00 $3,499.75 $2,274.84 $5,774.59 $556,001.00 to $557,000.00 $3,504.50 $2,277.93 $5,782.43 $557,001.00 to $558,000.00 $3,509.25 $2,281.01 $5,790.26 $558,001.00 to $559,000.00 $3,514.00 $2,284.10 $5,798.10 $559,001.00 to $560,000.00 $3,518.75 $2,287.19 $5,805.94 $560,001.00 to $561,000.00 $3,523.50 $2,290.28 $5,813.78 $561,001.00 to $562,000.00 $3,528.25 $2,293.36 $5,821.61 $562,001.00 to $563,000.00 $3,533.00 $2,296.45 $5,829.45 $563,001.00 to $564,000.00 $3,537.75 $2,299.54 $5,837.29 $564,001.00 to $565,000.00 $3,542.50 $2,302.63 $5,845.13 $565,001.00 to $566,000.00 $3,547.25 $2,305.71 $5,852.96 $566,001.00 to $567,000.00 $3,552.00 $2,308.80 $5,860.80 $567,001.00 to $568,000.00 $3,556.75 $2,311.89 $5,868.64 $568,001.00 to $569,000.00 $3,561.50 $2,314.98 $5,876.48 $569,001.00 to $570,000.00 $3,566.25 $2,318.06 $5,884.31 $570,001.00 to $571,000.00 $3,571.00 $2,321.15 $5,892.15 $571,001.00 to $572,000.00 $3,575.75 $2,324.24 $5,899.99 $572,001.00 to $573,000.00 $3,580.50 $2,327.33 $5,907.83 $573,001.00 to $574,000.00 $3,585.25 $2,330.41 $5,915.66 $574,001.00 to $575,000.00 $3,590.00 $2,333.50 $5,923.50 $575,001.00 to $576,000.00 $3,594.75 $2,336.59 $5,931.34 $576,001.00 to $577,000.00 $3,599.50 $2,339.68 $5,939.18 $577,001.00 to $578,000.00 $3,604.25 $2,342.76 $5,947.01

Page 40: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 39

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $578,001.00 to $579,000.00 $3,609.00 $2,345.85 $5,954.85 $579,001.00 to $580,000.00 $3,613.75 $2,348.94 $5,962.69 $580,001.00 to $581,000.00 $3,618.50 $2,352.03 $5,970.53 $581,001.00 to $582,000.00 $3,623.25 $2,355.11 $5,978.36 $582,001.00 to $583,000.00 $3,628.00 $2,358.20 $5,986.20 $583,001.00 to $584,000.00 $3,632.75 $2,361.29 $5,994.04 $584,001.00 to $585,000.00 $3,637.50 $2,364.38 $6,001.88 $585,001.00 to $586,000.00 $3,642.25 $2,367.46 $6,009.71 $586,001.00 to $587,000.00 $3,647.00 $2,370.55 $6,017.55 $587,001.00 to $588,000.00 $3,651.75 $2,373.64 $6,025.39 $588,001.00 to $589,000.00 $3,656.50 $2,376.73 $6,033.23 $589,001.00 to $590,000.00 $3,661.25 $2,379.81 $6,041.06 $590,001.00 to $591,000.00 $3,666.00 $2,382.90 $6,048.90 $591,001.00 to $592,000.00 $3,670.75 $2,385.99 $6,056.74 $592,001.00 to $593,000.00 $3,675.50 $2,389.08 $6,064.58 $593,001.00 to $594,000.00 $3,680.25 $2,392.16 $6,072.41 $594,001.00 to $595,000.00 $3,685.00 $2,395.25 $6,080.25 $595,001.00 to $596,000.00 $3,689.75 $2,398.34 $6,088.09 $596,001.00 to $597,000.00 $3,694.50 $2,401.43 $6,095.93 $597,001.00 to $598,000.00 $3,699.25 $2,404.51 $6,103.76 $598,001.00 to $599,000.00 $3,704.00 $2,407.60 $6,111.60 $599,001.00 to $600,000.00 $3,708.75 $2,410.69 $6,119.44 $600,001.00 to $601,000.00 $3,713.50 $2,413.78 $6,127.28 $601,001.00 to $602,000.00 $3,718.25 $2,416.86 $6,135.11 $602,001.00 to $603,000.00 $3,723.00 $2,419.95 $6,142.95 $603,001.00 to $604,000.00 $3,727.75 $2,423.04 $6,150.79 $604,001.00 to $605,000.00 $3,732.50 $2,426.13 $6,158.63 $605,001.00 to $606,000.00 $3,737.25 $2,429.21 $6,166.46 $606,001.00 to $607,000.00 $3,742.00 $2,432.30 $6,174.30 $607,001.00 to $608,000.00 $3,746.75 $2,435.39 $6,182.14 $608,001.00 to $609,000.00 $3,751.50 $2,438.48 $6,189.98 $609,001.00 to $610,000.00 $3,756.25 $2,441.56 $6,197.81 $610,001.00 to $611,000.00 $3,761.00 $2,444.65 $6,205.65 $611,001.00 to $612,000.00 $3,765.75 $2,447.74 $6,213.49 $612,001.00 to $613,000.00 $3,770.50 $2,450.83 $6,221.33 $613,001.00 to $614,000.00 $3,775.25 $2,453.91 $6,229.16 $614,001.00 to $615,000.00 $3,780.00 $2,457.00 $6,237.00

Page 41: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 40

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $615,001.00 to $616,000.00 $3,784.75 $2,460.09 $6,244.84 $616,001.00 to $617,000.00 $3,789.50 $2,463.18 $6,252.68 $617,001.00 to $618,000.00 $3,794.25 $2,466.26 $6,260.51 $618,001.00 to $619,000.00 $3,799.00 $2,469.35 $6,268.35 $619,001.00 to $620,000.00 $3,803.75 $2,472.44 $6,276.19 $620,001.00 to $621,000.00 $3,808.50 $2,475.53 $6,284.03 $621,001.00 to $622,000.00 $3,813.25 $2,478.61 $6,291.86 $622,001.00 to $623,000.00 $3,818.00 $2,481.70 $6,299.70 $623,001.00 to $624,000.00 $3,822.75 $2,484.79 $6,307.54 $624,001.00 to $625,000.00 $3,827.50 $2,487.88 $6,315.38 $625,001.00 to $626,000.00 $3,832.25 $2,490.96 $6,323.21 $626,001.00 to $627,000.00 $3,837.00 $2,494.05 $6,331.05 $627,001.00 to $628,000.00 $3,841.75 $2,497.14 $6,338.89 $628,001.00 to $629,000.00 $3,846.50 $2,500.23 $6,346.73 $629,001.00 to $630,000.00 $3,851.25 $2,503.31 $6,354.56 $630,001.00 to $631,000.00 $3,856.00 $2,506.40 $6,362.40 $631,001.00 to $632,000.00 $3,860.75 $2,509.49 $6,370.24 $632,001.00 to $633,000.00 $3,865.50 $2,512.58 $6,378.08 $633,001.00 to $634,000.00 $3,870.25 $2,515.66 $6,385.91 $634,001.00 to $635,000.00 $3,875.00 $2,518.75 $6,393.75 $635,001.00 to $636,000.00 $3,879.75 $2,521.84 $6,401.59 $636,001.00 to $637,000.00 $3,884.50 $2,524.93 $6,409.43 $637,001.00 to $638,000.00 $3,889.25 $2,528.01 $6,417.26 $638,001.00 to $639,000.00 $3,894.00 $2,531.10 $6,425.10 $639,001.00 to $640,000.00 $3,898.75 $2,534.19 $6,432.94 $640,001.00 to $641,000.00 $3,903.50 $2,537.28 $6,440.78 $641,001.00 to $642,000.00 $3,908.25 $2,540.36 $6,448.61 $642,001.00 to $643,000.00 $3,913.00 $2,543.45 $6,456.45 $643,001.00 to $644,000.00 $3,917.75 $2,546.54 $6,464.29 $644,001.00 to $645,000.00 $3,922.50 $2,549.63 $6,472.13 $645,001.00 to $646,000.00 $3,927.25 $2,552.71 $6,479.96 $646,001.00 to $647,000.00 $3,932.00 $2,555.80 $6,487.80 $647,001.00 to $648,000.00 $3,936.75 $2,558.89 $6,495.64 $648,001.00 to $649,000.00 $3,941.50 $2,561.98 $6,503.48 $649,001.00 to $650,000.00 $3,946.25 $2,565.06 $6,511.31 $650,001.00 to $651,000.00 $3,951.00 $2,568.15 $6,519.15 $651,001.00 to $652,000.00 $3,955.75 $2,571.24 $6,526.99

Page 42: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 41

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $652,001.00 to $653,000.00 $3,960.50 $2,574.33 $6,534.83 $653,001.00 to $654,000.00 $3,965.25 $2,577.41 $6,542.66 $654,001.00 to $655,000.00 $3,970.00 $2,580.50 $6,550.50 $655,001.00 to $656,000.00 $3,974.75 $2,583.59 $6,558.34 $656,001.00 to $657,000.00 $3,979.50 $2,586.68 $6,566.18 $657,001.00 to $658,000.00 $3,984.25 $2,589.76 $6,574.01 $658,001.00 to $659,000.00 $3,989.00 $2,592.85 $6,581.85 $659,001.00 to $660,000.00 $3,993.75 $2,595.94 $6,589.69 $660,001.00 to $661,000.00 $3,998.50 $2,599.03 $6,597.53 $661,001.00 to $662,000.00 $4,003.25 $2,602.11 $6,605.36 $662,001.00 to $663,000.00 $4,008.00 $2,605.20 $6,613.20 $663,001.00 to $664,000.00 $4,012.75 $2,608.29 $6,621.04 $664,001.00 to $665,000.00 $4,017.50 $2,611.38 $6,628.88 $665,001.00 to $666,000.00 $4,022.25 $2,614.46 $6,636.71 $666,001.00 to $667,000.00 $4,027.00 $2,617.55 $6,644.55 $667,001.00 to $668,000.00 $4,031.75 $2,620.64 $6,652.39 $668,001.00 to $669,000.00 $4,036.50 $2,623.73 $6,660.23 $669,001.00 to $670,000.00 $4,041.25 $2,626.81 $6,668.06 $670,001.00 to $671,000.00 $4,046.00 $2,629.90 $6,675.90 $671,001.00 to $672,000.00 $4,050.75 $2,632.99 $6,683.74 $672,001.00 to $673,000.00 $4,055.50 $2,636.08 $6,691.58 $673,001.00 to $674,000.00 $4,060.25 $2,639.16 $6,699.41 $674,001.00 to $675,000.00 $4,065.00 $2,642.25 $6,707.25 $675,001.00 to $676,000.00 $4,069.75 $2,645.34 $6,715.09 $676,001.00 to $677,000.00 $4,074.50 $2,648.43 $6,722.93 $677,001.00 to $678,000.00 $4,079.25 $2,651.51 $6,730.76 $678,001.00 to $679,000.00 $4,084.00 $2,654.60 $6,738.60 $679,001.00 to $680,000.00 $4,088.75 $2,657.69 $6,746.44 $680,001.00 to $681,000.00 $4,093.50 $2,660.78 $6,754.28 $681,001.00 to $682,000.00 $4,098.25 $2,663.86 $6,762.11 $682,001.00 to $683,000.00 $4,103.00 $2,666.95 $6,769.95 $683,001.00 to $684,000.00 $4,107.75 $2,670.04 $6,777.79 $684,001.00 to $685,000.00 $4,112.50 $2,673.13 $6,785.63 $685,001.00 to $686,000.00 $4,117.25 $2,676.21 $6,793.46 $686,001.00 to $687,000.00 $4,122.00 $2,679.30 $6,801.30 $687,001.00 to $688,000.00 $4,126.75 $2,682.39 $6,809.14 $688,001.00 to $689,000.00 $4,131.50 $2,685.48 $6,816.98

Page 43: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 42

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $689,001.00 to $690,000.00 $4,136.25 $2,688.56 $6,824.81 $690,001.00 to $691,000.00 $4,141.00 $2,691.65 $6,832.65 $691,001.00 to $692,000.00 $4,145.75 $2,694.74 $6,840.49 $692,001.00 to $693,000.00 $4,150.50 $2,697.83 $6,848.33 $693,001.00 to $694,000.00 $4,155.25 $2,700.91 $6,856.16 $694,001.00 to $695,000.00 $4,160.00 $2,704.00 $6,864.00 $695,001.00 to $696,000.00 $4,164.75 $2,707.09 $6,871.84 $696,001.00 to $697,000.00 $4,169.50 $2,710.18 $6,879.68 $697,001.00 to $698,000.00 $4,174.25 $2,713.26 $6,887.51 $698,001.00 to $699,000.00 $4,179.00 $2,716.35 $6,895.35 $699,001.00 to $700,000.00 $4,183.75 $2,719.44 $6,903.19 $700,001.00 to $701,000.00 $4,188.50 $2,722.53 $6,911.03 $701,001.00 to $702,000.00 $4,193.25 $2,725.61 $6,918.86 $702,001.00 to $703,000.00 $4,198.00 $2,728.70 $6,926.70 $703,001.00 to $704,000.00 $4,202.75 $2,731.79 $6,934.54 $704,001.00 to $705,000.00 $4,207.50 $2,734.88 $6,942.38 $705,001.00 to $706,000.00 $4,212.25 $2,737.96 $6,950.21 $706,001.00 to $707,000.00 $4,217.00 $2,741.05 $6,958.05 $707,001.00 to $708,000.00 $4,221.75 $2,744.14 $6,965.89 $708,001.00 to $709,000.00 $4,226.50 $2,747.23 $6,973.73 $709,001.00 to $710,000.00 $4,231.25 $2,750.31 $6,981.56 $710,001.00 to $711,000.00 $4,236.00 $2,753.40 $6,989.40 $711,001.00 to $712,000.00 $4,240.75 $2,756.49 $6,997.24 $712,001.00 to $713,000.00 $4,245.50 $2,759.58 $7,005.08 $713,001.00 to $714,000.00 $4,250.25 $2,762.66 $7,012.91 $714,001.00 to $715,000.00 $4,255.00 $2,765.75 $7,020.75 $715,001.00 to $716,000.00 $4,259.75 $2,768.84 $7,028.59 $716,001.00 to $717,000.00 $4,264.50 $2,771.93 $7,036.43 $717,001.00 to $718,000.00 $4,269.25 $2,775.01 $7,044.26 $718,001.00 to $719,000.00 $4,274.00 $2,778.10 $7,052.10 $719,001.00 to $720,000.00 $4,278.75 $2,781.19 $7,059.94 $720,001.00 to $721,000.00 $4,283.50 $2,784.28 $7,067.78 $721,001.00 to $722,000.00 $4,288.25 $2,787.36 $7,075.61 $722,001.00 to $723,000.00 $4,293.00 $2,790.45 $7,083.45 $723,001.00 to $724,000.00 $4,297.75 $2,793.54 $7,091.29 $724,001.00 to $725,000.00 $4,302.50 $2,796.63 $7,099.13 $725,001.00 to $726,000.00 $4,307.25 $2,799.71 $7,106.96

Page 44: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 43

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $726,001.00 to $727,000.00 $4,312.00 $2,802.80 $7,114.80 $727,001.00 to $728,000.00 $4,316.75 $2,805.89 $7,122.64 $728,001.00 to $729,000.00 $4,321.50 $2,808.98 $7,130.48 $729,001.00 to $730,000.00 $4,326.25 $2,812.06 $7,138.31 $730,001.00 to $731,000.00 $4,331.00 $2,815.15 $7,146.15 $731,001.00 to $732,000.00 $4,335.75 $2,818.24 $7,153.99 $732,001.00 to $733,000.00 $4,340.50 $2,821.33 $7,161.83 $733,001.00 to $734,000.00 $4,345.25 $2,824.41 $7,169.66 $734,001.00 to $735,000.00 $4,350.00 $2,827.50 $7,177.50 $735,001.00 to $736,000.00 $4,354.75 $2,830.59 $7,185.34 $736,001.00 to $737,000.00 $4,359.50 $2,833.68 $7,193.18 $737,001.00 to $738,000.00 $4,364.25 $2,836.76 $7,201.01 $738,001.00 to $739,000.00 $4,369.00 $2,839.85 $7,208.85 $739,001.00 to $740,000.00 $4,373.75 $2,842.94 $7,216.69 $740,001.00 to $741,000.00 $4,378.50 $2,846.03 $7,224.53 $741,001.00 to $742,000.00 $4,383.25 $2,849.11 $7,232.36 $742,001.00 to $743,000.00 $4,388.00 $2,852.20 $7,240.20 $743,001.00 to $744,000.00 $4,392.75 $2,855.29 $7,248.04 $744,001.00 to $745,000.00 $4,397.50 $2,858.38 $7,255.88 $745,001.00 to $746,000.00 $4,402.25 $2,861.46 $7,263.71 $746,001.00 to $747,000.00 $4,407.00 $2,864.55 $7,271.55 $747,001.00 to $748,000.00 $4,411.75 $2,867.64 $7,279.39 $748,001.00 to $749,000.00 $4,416.50 $2,870.73 $7,287.23 $749,001.00 to $750,000.00 $4,421.25 $2,873.81 $7,295.06 $750,001.00 to $751,000.00 $4,426.00 $2,876.90 $7,302.90 $751,001.00 to $752,000.00 $4,430.75 $2,879.99 $7,310.74 $752,001.00 to $753,000.00 $4,435.50 $2,883.08 $7,318.58 $753,001.00 to $754,000.00 $4,440.25 $2,886.16 $7,326.41 $754,001.00 to $755,000.00 $4,445.00 $2,889.25 $7,334.25 $755,001.00 to $756,000.00 $4,449.75 $2,892.34 $7,342.09 $756,001.00 to $757,000.00 $4,454.50 $2,895.43 $7,349.93 $757,001.00 to $758,000.00 $4,459.25 $2,898.51 $7,357.76 $758,001.00 to $759,000.00 $4,464.00 $2,901.60 $7,365.60 $759,001.00 to $760,000.00 $4,468.75 $2,904.69 $7,373.44 $760,001.00 to $761,000.00 $4,473.50 $2,907.78 $7,381.28 $761,001.00 to $762,000.00 $4,478.25 $2,910.86 $7,389.11 $762,001.00 to $763,000.00 $4,483.00 $2,913.95 $7,396.95

Page 45: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 44

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $763,001.00 to $764,000.00 $4,487.75 $2,917.04 $7,404.79 $764,001.00 to $765,000.00 $4,492.50 $2,920.13 $7,412.63 $765,001.00 to $766,000.00 $4,497.25 $2,923.21 $7,420.46 $766,001.00 to $767,000.00 $4,502.00 $2,926.30 $7,428.30 $767,001.00 to $768,000.00 $4,506.75 $2,929.39 $7,436.14 $768,001.00 to $769,000.00 $4,511.50 $2,932.48 $7,443.98 $769,001.00 to $770,000.00 $4,516.25 $2,935.56 $7,451.81 $770,001.00 to $771,000.00 $4,521.00 $2,938.65 $7,459.65 $771,001.00 to $772,000.00 $4,525.75 $2,941.74 $7,467.49 $772,001.00 to $773,000.00 $4,530.50 $2,944.83 $7,475.33 $773,001.00 to $774,000.00 $4,535.25 $2,947.91 $7,483.16 $774,001.00 to $775,000.00 $4,540.00 $2,951.00 $7,491.00 $775,001.00 to $776,000.00 $4,544.75 $2,954.09 $7,498.84 $776,001.00 to $777,000.00 $4,549.50 $2,957.18 $7,506.68 $777,001.00 to $778,000.00 $4,554.25 $2,960.26 $7,514.51 $778,001.00 to $779,000.00 $4,559.00 $2,963.35 $7,522.35 $779,001.00 to $780,000.00 $4,563.75 $2,966.44 $7,530.19 $780,001.00 to $781,000.00 $4,568.50 $2,969.53 $7,538.03 $781,001.00 to $782,000.00 $4,573.25 $2,972.61 $7,545.86 $782,001.00 to $783,000.00 $4,578.00 $2,975.70 $7,553.70 $783,001.00 to $784,000.00 $4,582.75 $2,978.79 $7,561.54 $784,001.00 to $785,000.00 $4,587.50 $2,981.88 $7,569.38 $785,001.00 to $786,000.00 $4,592.25 $2,984.96 $7,577.21 $786,001.00 to $787,000.00 $4,597.00 $2,988.05 $7,585.05 $787,001.00 to $788,000.00 $4,601.75 $2,991.14 $7,592.89 $788,001.00 to $789,000.00 $4,606.50 $2,994.23 $7,600.73 $789,001.00 to $790,000.00 $4,611.25 $2,997.31 $7,608.56 $790,001.00 to $791,000.00 $4,616.00 $3,000.40 $7,616.40 $791,001.00 to $792,000.00 $4,620.75 $3,003.49 $7,624.24 $792,001.00 to $793,000.00 $4,625.50 $3,006.58 $7,632.08 $793,001.00 to $794,000.00 $4,630.25 $3,009.66 $7,639.91 $794,001.00 to $795,000.00 $4,635.00 $3,012.75 $7,647.75 $795,001.00 to $796,000.00 $4,639.75 $3,015.84 $7,655.59 $796,001.00 to $797,000.00 $4,644.50 $3,018.93 $7,663.43 $797,001.00 to $798,000.00 $4,649.25 $3,022.01 $7,671.26 $798,001.00 to $799,000.00 $4,654.00 $3,025.10 $7,679.10 $799,001.00 to $800,000.00 $4,658.75 $3,028.19 $7,686.94

Page 46: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 45

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $800,001.00 to $801,000.00 $4,663.50 $3,031.28 $7,694.78 $801,001.00 to $802,000.00 $4,668.25 $3,034.36 $7,702.61 $802,001.00 to $803,000.00 $4,673.00 $3,037.45 $7,710.45 $803,001.00 to $804,000.00 $4,677.75 $3,040.54 $7,718.29 $804,001.00 to $805,000.00 $4,682.50 $3,043.63 $7,726.13 $805,001.00 to $806,000.00 $4,687.25 $3,046.71 $7,733.96 $806,001.00 to $807,000.00 $4,692.00 $3,049.80 $7,741.80 $807,001.00 to $808,000.00 $4,696.75 $3,052.89 $7,749.64 $808,001.00 to $809,000.00 $4,701.50 $3,055.98 $7,757.48 $809,001.00 to $810,000.00 $4,706.25 $3,059.06 $7,765.31 $810,001.00 to $811,000.00 $4,711.00 $3,062.15 $7,773.15 $811,001.00 to $812,000.00 $4,715.75 $3,065.24 $7,780.99 $812,001.00 to $813,000.00 $4,720.50 $3,068.33 $7,788.83 $813,001.00 to $814,000.00 $4,725.25 $3,071.41 $7,796.66 $814,001.00 to $815,000.00 $4,730.00 $3,074.50 $7,804.50 $815,001.00 to $816,000.00 $4,734.75 $3,077.59 $7,812.34 $816,001.00 to $817,000.00 $4,739.50 $3,080.68 $7,820.18 $817,001.00 to $818,000.00 $4,744.25 $3,083.76 $7,828.01 $818,001.00 to $819,000.00 $4,749.00 $3,086.85 $7,835.85 $819,001.00 to $820,000.00 $4,753.75 $3,089.94 $7,843.69 $820,001.00 to $821,000.00 $4,758.50 $3,093.03 $7,851.53 $821,001.00 to $822,000.00 $4,763.25 $3,096.11 $7,859.36 $822,001.00 to $823,000.00 $4,768.00 $3,099.20 $7,867.20 $823,001.00 to $824,000.00 $4,772.75 $3,102.29 $7,875.04 $824,001.00 to $825,000.00 $4,777.50 $3,105.38 $7,882.88 $825,001.00 to $826,000.00 $4,782.25 $3,108.46 $7,890.71 $826,001.00 to $827,000.00 $4,787.00 $3,111.55 $7,898.55 $827,001.00 to $828,000.00 $4,791.75 $3,114.64 $7,906.39 $828,001.00 to $829,000.00 $4,796.50 $3,117.73 $7,914.23 $829,001.00 to $830,000.00 $4,801.25 $3,120.81 $7,922.06 $830,001.00 to $831,000.00 $4,806.00 $3,123.90 $7,929.90 $831,001.00 to $832,000.00 $4,810.75 $3,126.99 $7,937.74 $832,001.00 to $833,000.00 $4,815.50 $3,130.08 $7,945.58 $833,001.00 to $834,000.00 $4,820.25 $3,133.16 $7,953.41 $834,001.00 to $835,000.00 $4,825.00 $3,136.25 $7,961.25 $835,001.00 to $836,000.00 $4,829.75 $3,139.34 $7,969.09 $836,001.00 to $837,000.00 $4,834.50 $3,142.43 $7,976.93

Page 47: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 46

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $837,001.00 to $838,000.00 $4,839.25 $3,145.51 $7,984.76 $838,001.00 to $839,000.00 $4,844.00 $3,148.60 $7,992.60 $839,001.00 to $840,000.00 $4,848.75 $3,151.69 $8,000.44 $840,001.00 to $841,000.00 $4,853.50 $3,154.78 $8,008.28 $841,001.00 to $842,000.00 $4,858.25 $3,157.86 $8,016.11 $842,001.00 to $843,000.00 $4,863.00 $3,160.95 $8,023.95 $843,001.00 to $844,000.00 $4,867.75 $3,164.04 $8,031.79 $844,001.00 to $845,000.00 $4,872.50 $3,167.13 $8,039.63 $845,001.00 to $846,000.00 $4,877.25 $3,170.21 $8,047.46 $846,001.00 to $847,000.00 $4,882.00 $3,173.30 $8,055.30 $847,001.00 to $848,000.00 $4,886.75 $3,176.39 $8,063.14 $848,001.00 to $849,000.00 $4,891.50 $3,179.48 $8,070.98 $849,001.00 to $850,000.00 $4,896.25 $3,182.56 $8,078.81 $850,001.00 to $851,000.00 $4,901.00 $3,185.65 $8,086.65 $851,001.00 to $852,000.00 $4,905.75 $3,188.74 $8,094.49 $852,001.00 to $853,000.00 $4,910.50 $3,191.83 $8,102.33 $853,001.00 to $854,000.00 $4,915.25 $3,194.91 $8,110.16 $854,001.00 to $855,000.00 $4,920.00 $3,198.00 $8,118.00 $855,001.00 to $856,000.00 $4,924.75 $3,201.09 $8,125.84 $856,001.00 to $857,000.00 $4,929.50 $3,204.18 $8,133.68 $857,001.00 to $858,000.00 $4,934.25 $3,207.26 $8,141.51 $858,001.00 to $859,000.00 $4,939.00 $3,210.35 $8,149.35 $859,001.00 to $860,000.00 $4,943.75 $3,213.44 $8,157.19 $860,001.00 to $861,000.00 $4,948.50 $3,216.53 $8,165.03 $861,001.00 to $862,000.00 $4,953.25 $3,219.61 $8,172.86 $862,001.00 to $863,000.00 $4,958.00 $3,222.70 $8,180.70 $863,001.00 to $864,000.00 $4,962.75 $3,225.79 $8,188.54 $864,001.00 to $865,000.00 $4,967.50 $3,228.88 $8,196.38 $865,001.00 to $866,000.00 $4,972.25 $3,231.96 $8,204.21 $866,001.00 to $867,000.00 $4,977.00 $3,235.05 $8,212.05 $867,001.00 to $868,000.00 $4,981.75 $3,238.14 $8,219.89 $868,001.00 to $869,000.00 $4,986.50 $3,241.23 $8,227.73 $869,001.00 to $870,000.00 $4,991.25 $3,244.31 $8,235.56 $870,001.00 to $871,000.00 $4,996.00 $3,247.40 $8,243.40 $871,001.00 to $872,000.00 $5,000.75 $3,250.49 $8,251.24 $872,001.00 to $873,000.00 $5,005.50 $3,253.58 $8,259.08 $873,001.00 to $874,000.00 $5,010.25 $3,256.66 $8,266.91

Page 48: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 47

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $874,001.00 to $875,000.00 $5,015.00 $3,259.75 $8,274.75 $875,001.00 to $876,000.00 $5,019.75 $3,262.84 $8,282.59 $876,001.00 to $877,000.00 $5,024.50 $3,265.93 $8,290.43 $877,001.00 to $878,000.00 $5,029.25 $3,269.01 $8,298.26 $878,001.00 to $879,000.00 $5,034.00 $3,272.10 $8,306.10 $879,001.00 to $880,000.00 $5,038.75 $3,275.19 $8,313.94 $880,001.00 to $881,000.00 $5,043.50 $3,278.28 $8,321.78 $881,001.00 to $882,000.00 $5,048.25 $3,281.36 $8,329.61 $882,001.00 to $883,000.00 $5,053.00 $3,284.45 $8,337.45 $883,001.00 to $884,000.00 $5,057.75 $3,287.54 $8,345.29 $884,001.00 to $885,000.00 $5,062.50 $3,290.63 $8,353.13 $885,001.00 to $886,000.00 $5,067.25 $3,293.71 $8,360.96 $886,001.00 to $887,000.00 $5,072.00 $3,296.80 $8,368.80 $887,001.00 to $888,000.00 $5,076.75 $3,299.89 $8,376.64 $888,001.00 to $889,000.00 $5,081.50 $3,302.98 $8,384.48 $889,001.00 to $890,000.00 $5,086.25 $3,306.06 $8,392.31 $890,001.00 to $891,000.00 $5,091.00 $3,309.15 $8,400.15 $891,001.00 to $892,000.00 $5,095.75 $3,312.24 $8,407.99 $892,001.00 to $893,000.00 $5,100.50 $3,315.33 $8,415.83 $893,001.00 to $894,000.00 $5,105.25 $3,318.41 $8,423.66 $894,001.00 to $895,000.00 $5,110.00 $3,321.50 $8,431.50 $895,001.00 to $896,000.00 $5,114.75 $3,324.59 $8,439.34 $896,001.00 to $897,000.00 $5,119.50 $3,327.68 $8,447.18 $897,001.00 to $898,000.00 $5,124.25 $3,330.76 $8,455.01 $898,001.00 to $899,000.00 $5,129.00 $3,333.85 $8,462.85 $899,001.00 to $900,000.00 $5,133.75 $3,336.94 $8,470.69 $900,001.00 to $901,000.00 $5,138.50 $3,340.03 $8,478.53 $901,001.00 to $902,000.00 $5,143.25 $3,343.11 $8,486.36 $902,001.00 to $903,000.00 $5,148.00 $3,346.20 $8,494.20 $903,001.00 to $904,000.00 $5,152.75 $3,349.29 $8,502.04 $904,001.00 to $905,000.00 $5,157.50 $3,352.38 $8,509.88 $905,001.00 to $906,000.00 $5,162.25 $3,355.46 $8,517.71 $906,001.00 to $907,000.00 $5,167.00 $3,358.55 $8,525.55 $907,001.00 to $908,000.00 $5,171.75 $3,361.64 $8,533.39 $908,001.00 to $909,000.00 $5,176.50 $3,364.73 $8,541.23 $909,001.00 to $910,000.00 $5,181.25 $3,367.81 $8,549.06 $910,001.00 to $911,000.00 $5,186.00 $3,370.90 $8,556.90

Page 49: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 48

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $911,001.00 to $912,000.00 $5,190.75 $3,373.99 $8,564.74 $912,001.00 to $913,000.00 $5,195.50 $3,377.08 $8,572.58 $913,001.00 to $914,000.00 $5,200.25 $3,380.16 $8,580.41 $914,001.00 to $915,000.00 $5,205.00 $3,383.25 $8,588.25 $915,001.00 to $916,000.00 $5,209.75 $3,386.34 $8,596.09 $916,001.00 to $917,000.00 $5,214.50 $3,389.43 $8,603.93 $917,001.00 to $918,000.00 $5,219.25 $3,392.51 $8,611.76 $918,001.00 to $919,000.00 $5,224.00 $3,395.60 $8,619.60 $919,001.00 to $920,000.00 $5,228.75 $3,398.69 $8,627.44 $920,001.00 to $921,000.00 $5,233.50 $3,401.78 $8,635.28 $921,001.00 to $922,000.00 $5,238.25 $3,404.86 $8,643.11 $922,001.00 to $923,000.00 $5,243.00 $3,407.95 $8,650.95 $923,001.00 to $924,000.00 $5,247.75 $3,411.04 $8,658.79 $924,001.00 to $925,000.00 $5,252.50 $3,414.13 $8,666.63 $925,001.00 to $926,000.00 $5,257.25 $3,417.21 $8,674.46 $926,001.00 to $927,000.00 $5,262.00 $3,420.30 $8,682.30 $927,001.00 to $928,000.00 $5,266.75 $3,423.39 $8,690.14 $928,001.00 to $929,000.00 $5,271.50 $3,426.48 $8,697.98 $929,001.00 to $930,000.00 $5,276.25 $3,429.56 $8,705.81 $930,001.00 to $931,000.00 $5,281.00 $3,432.65 $8,713.65 $931,001.00 to $932,000.00 $5,285.75 $3,435.74 $8,721.49 $932,001.00 to $933,000.00 $5,290.50 $3,438.83 $8,729.33 $933,001.00 to $934,000.00 $5,295.25 $3,441.91 $8,737.16 $934,001.00 to $935,000.00 $5,300.00 $3,445.00 $8,745.00 $935,001.00 to $936,000.00 $5,304.75 $3,448.09 $8,752.84 $936,001.00 to $937,000.00 $5,309.50 $3,451.18 $8,760.68 $937,001.00 to $938,000.00 $5,314.25 $3,454.26 $8,768.51 $938,001.00 to $939,000.00 $5,319.00 $3,457.35 $8,776.35 $939,001.00 to $940,000.00 $5,323.75 $3,460.44 $8,784.19 $940,001.00 to $941,000.00 $5,328.50 $3,463.53 $8,792.03 $941,001.00 to $942,000.00 $5,333.25 $3,466.61 $8,799.86 $942,001.00 to $943,000.00 $5,338.00 $3,469.70 $8,807.70 $943,001.00 to $944,000.00 $5,342.75 $3,472.79 $8,815.54 $944,001.00 to $945,000.00 $5,347.50 $3,475.88 $8,823.38 $945,001.00 to $946,000.00 $5,352.25 $3,478.96 $8,831.21 $946,001.00 to $947,000.00 $5,357.00 $3,482.05 $8,839.05 $947,001.00 to $948,000.00 $5,361.75 $3,485.14 $8,846.89

Page 50: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 49

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $948,001.00 to $949,000.00 $5,366.50 $3,488.23 $8,854.73 $949,001.00 to $950,000.00 $5,371.25 $3,491.31 $8,862.56 $950,001.00 to $951,000.00 $5,376.00 $3,494.40 $8,870.40 $951,001.00 to $952,000.00 $5,380.75 $3,497.49 $8,878.24 $952,001.00 to $953,000.00 $5,385.50 $3,500.58 $8,886.08 $953,001.00 to $954,000.00 $5,390.25 $3,503.66 $8,893.91 $954,001.00 to $955,000.00 $5,395.00 $3,506.75 $8,901.75 $955,001.00 to $956,000.00 $5,399.75 $3,509.84 $8,909.59 $956,001.00 to $957,000.00 $5,404.50 $3,512.93 $8,917.43 $957,001.00 to $958,000.00 $5,409.25 $3,516.01 $8,925.26 $958,001.00 to $959,000.00 $5,414.00 $3,519.10 $8,933.10 $959,001.00 to $960,000.00 $5,418.75 $3,522.19 $8,940.94 $960,001.00 to $961,000.00 $5,423.50 $3,525.28 $8,948.78 $961,001.00 to $962,000.00 $5,428.25 $3,528.36 $8,956.61 $962,001.00 to $963,000.00 $5,433.00 $3,531.45 $8,964.45 $963,001.00 to $964,000.00 $5,437.75 $3,534.54 $8,972.29 $964,001.00 to $965,000.00 $5,442.50 $3,537.63 $8,980.13 $965,001.00 to $966,000.00 $5,447.25 $3,540.71 $8,987.96 $966,001.00 to $967,000.00 $5,452.00 $3,543.80 $8,995.80 $967,001.00 to $968,000.00 $5,456.75 $3,546.89 $9,003.64 $968,001.00 to $969,000.00 $5,461.50 $3,549.98 $9,011.48 $969,001.00 to $970,000.00 $5,466.25 $3,553.06 $9,019.31 $970,001.00 to $971,000.00 $5,471.00 $3,556.15 $9,027.15 $971,001.00 to $972,000.00 $5,475.75 $3,559.24 $9,034.99 $972,001.00 to $973,000.00 $5,480.50 $3,562.33 $9,042.83 $973,001.00 to $974,000.00 $5,485.25 $3,565.41 $9,050.66 $974,001.00 to $975,000.00 $5,490.00 $3,568.50 $9,058.50 $975,001.00 to $976,000.00 $5,494.75 $3,571.59 $9,066.34 $976,001.00 to $977,000.00 $5,499.50 $3,574.68 $9,074.18 $977,001.00 to $978,000.00 $5,504.25 $3,577.76 $9,082.01 $978,001.00 to $979,000.00 $5,509.00 $3,580.85 $9,089.85 $979,001.00 to $980,000.00 $5,513.75 $3,583.94 $9,097.69 $980,001.00 to $981,000.00 $5,518.50 $3,587.03 $9,105.53 $981,001.00 to $982,000.00 $5,523.25 $3,590.11 $9,113.36 $982,001.00 to $983,000.00 $5,528.00 $3,593.20 $9,121.20 $983,001.00 to $984,000.00 $5,532.75 $3,596.29 $9,129.04 $984,001.00 to $985,000.00 $5,537.50 $3,599.38 $9,136.88

Page 51: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 50

Estimated Project Value Range Estimated Permit Fee

Estimated Plan

Review Fee Estimated

Total $985,001.00 to $986,000.00 $5,542.25 $3,602.46 $9,144.71 $986,001.00 to $987,000.00 $5,547.00 $3,605.55 $9,152.55 $987,001.00 to $988,000.00 $5,551.75 $3,608.64 $9,160.39 $988,001.00 to $989,000.00 $5,556.50 $3,611.73 $9,168.23 $989,001.00 to $990,000.00 $5,561.25 $3,614.81 $9,176.06 $990,001.00 to $991,000.00 $5,566.00 $3,617.90 $9,183.90 $991,001.00 to $992,000.00 $5,570.75 $3,620.99 $9,191.74 $992,001.00 to $993,000.00 $5,575.50 $3,624.08 $9,199.58 $993,001.00 to $994,000.00 $5,580.25 $3,627.16 $9,207.41 $994,001.00 to $995,000.00 $5,585.00 $3,630.25 $9,215.25 $995,001.00 to $996,000.00 $5,589.75 $3,633.34 $9,223.09 $996,001.00 to $997,000.00 $5,594.50 $3,636.43 $9,230.93 $997,001.00 to $998,000.00 $5,599.25 $3,639.51 $9,238.76 $998,001.00 to $999,000.00 $5,604.00 $3,642.60 $9,246.60 $999,001.00 to $1,000,000.00 $5,608.75 $3,645.69 $9,254.44 Above $1,000,000 use formula

Page 52: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 51

Table 4. Electrical Permit Fees 1. For the issuance of each electrical permit ................................................................... $23.50 2. For the issuing of each supplemental permit for which the original permit has

not expired, been canceled, or finale ...........................................................................

$7.25 System Fee Schedule Note: The following do not include $23.50 permit-issuing fee. 1. New Residential Buildings

The following fees shall include all wiring and electrical equipment in or on each building, or other electrical equipment on the same premises constructed at the same time.

Multifamily. For new multifamily buildings (apartments and condominiums) having three or more dwelling units constructed at the same time, not including the area of garages, carports and accessory buildings, per square foot (0.09 m2) .......

$0.050 Single- and two-family. For new single- and two-family residential buildings constructed at the same time and not including the area of garages, carports and accessory buildings, per square foot (0.09 m2) ...........................................................

$0.056 For other types of residential occupancies and for alterations, additions and modifications to existing residential buildings, use the Unit Fee Schedule.

2. Private Swimming Pools

For new private. in-ground swimming pools for single··family and multi-family occupancies, including a complete system of necessary branch circuit wiring. bonding, grounding, underwater lighting, water pumping and other similar electrical equipment directly related to the operation of a swimming pool, each pool ..............................................................................................................................

$49.50 3. Carnivals and Circuses

Carnivals, circuses, or other traveling shows or exhibitions utilizing transportable-type rides, booths, displays and attractions

For electrical generators and electrically driven rides, each ....................................... $23.50 For mechanically driven rides and walk-through attractions or displays having electric lighting, each ..................................................................................................

$7.25

For a system of area and booth lighting, each ............................................................. $7.25 For permanently installed rides, booths, displays and attractions, use the Unit Fee Schedule.

4. Temporary Power Service

For a temporary service pole or pedestal, including all pole or pedestal-mounted receptacle outlets and appurtenances, each .................................................................

$23.50

For a temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative lights, Christmas tree sales lots, fireworks stands, ..........................................................................................................

$12.30

Page 53: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 52

Unit Fee Schedule Note: The following do not include $23.50 permit-issuing fee.

1. Receptacle, Switch and Light Outlets

For receptacle, switch, light or other outlets at which current is used or controlled, except services, feeders and meters:

First 20 fixtures, each .................................................................................................. $1.10 Additional fixtures, each ............................................................................................. $0.73 Note: For multi-outlet assemblies, each 5 feet (1524 mm) or fraction thereof may be considered as one outlet.

2. Lighting fixtures

For lighting fixtures, sockets or other lamp-holding devices: first 20 fixtures, each .............................................................................................................................

$1.10

Additional fixtures, each ............................................................................................. $0.73 For pole or platform-mounted lighting fixtures, each ................................................. $1.10 For theatrical-type lighting fixtures or assemblies, each ............................................ $1.10

3. Residential Appliances For fixed residential appliances or receptacle outlets for same, including wall-mounted electric ovens; counter-mounted cooking tops; electric ranges; self-contained room, console or through-wall air conditioners; space heaters; food waste grinders; dishwashers; washing machines; 10 water heaters; clothes dryers; or other motor-operated appliances not exceeding I horsepower (HP) (746 W) in rating, each................................................................................................

$4.75 Note: For other types of air conditioners and other motor-driven appliances having larger electrical ratings, see Power Apparatus.

4. Nonresidential Appliances

For nonresidential appliances and self-contained factory-wired, nonresidential appliances not exceeding l horsepower (HP), kilowatt (kW) or kilovolt-ampere (kVA), in rating, including medical and dental devices; food, beverage and ice cream cabinets; illuminated show cases; drinking fountains; vending machines; laundry machines; or other similar types of equipment, each .....................................

$4.75 Note: For other types of air conditioners and other motor-driven appliances having larger electrical ratings, see Power Apparatus.

5. Power Apparatus

For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heal pumps, cooking or baking equipment and other apparatus, as follows: Rating in horsepower (HP), kilowatts (kW), kilovolt-amperes (kVA) or kilovolt-amperes-reactive (kVAR):

Up to and including 1, each......................................................................................... $4.75 Over 1 and not over 10, each ...................................................................................... $12.30 Over 10 and not over 50, each .................................................................................... $24.60

Page 54: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 53

Over 50 and not over 100, each .................................................................................. $49.50 Over 100, each ............................................................................................................ $74.50 Notes:

1. For equipment or appliances having more than one motor, transformer, heater, etc., the sum of the combined ratings may be used. 2. These fees include all switches, circuit breakers, contactors, thermostats, relays and other directly related control equipment.

6. Busways

For trolley and plug-in-type busways, each 100 feet (30 480 mm) or fraction thereof .........................................................................................................................

$7.25

Note: An additional fee is required for lighting fixtures, motors and other appliances that are connected to trolley and plug-in-type busways. A fee is not required for portable tools.

7. Signs, Outline Lighting and Marquees

For signs, outline lighting systems or marquees supplied from one branch circuit, each .................................................................................................................

$24.60

For additional branch circuits within the same sign, outline lighting system or marquee, each ..............................................................................................................

$4.75

8. Services

For services of 600 volts or less and not over 200 amperes in rating, each ................ $30.50 For services of 600 volts or less and over 200 amperes to 1,000 amperes, each ........ $62.15 For services over 600 volts or over 1,000 amperes in rating, each ............................. $124.30

9. Miscellaneous Apparatus, Conduits and Conductors For electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth .......................................................................

$18.20

Note: This fee is not applicable when a fee is paid for one or more services, outlets, fixtures, appliances, power apparatus, busways, signs or other equipment.

10. Other Inspections and Fees

A. Inspections outside of normal business hours, per hour (minimum charge, two hours)* ........................................................................................................................

$330.00

B. Re-inspection fees assessed under provisions of Section 305.8, per inspection* .. $165.00 C. Inspections for which no fee is specifically indicated, per hour (minimum charge, one hour)* .......................................................................................................

$165.00

D. Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review has been completed (minimum charge--one hour)* ..........................................................................................................................

$165.00 *Reflects the Building Department’s actual cost for consultant costs plus a 10% administrative fee.

Page 55: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 54

Table 5. Mechanical Permit Fees Permit Issuance and Heaters 1. For the issuance of each mechanical permit ................................................................ $23.50 2. For the issuing of each supplemental permit for which the original permit has not

expired, been canceled, or finale .................................................................................

$7.25 Unit Fee Schedule Note: The following do not include $23.50 permit-issuing fee. 1. Furnaces For the installation or relocation of each forced-air or gravity-type furnace or

burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h (29.3 kW)

$14.80

For the installation or relocation of each forced-air or gravity-type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h (29.3 kW).....................................................................................................................

$8.20 For the installation or relocation of each floor furnace, including vent ............................ $14.80

For the installation or relocation of each suspended heater, recessed wall heater or floor-mounted unit heater ............................................................................................

$14.80

2. Appliance Vents For the installation, relocation or replacement of each appliance vent installed and

not included in an appliance permit ............................................................................

$7.25 3. Repairs or Additions

For the repair of, alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit, or each heating, cooling, absorption or evaporative cooling system, including installation of controls regulated by the Mechanical Code .........................................................................................................

$13.70

4. Boilers, Compressors and Absorption Systems For the installation or relocation of each boiler or compressor to and including 3 horsepower (10.6 kW), or each absorption system to and including 100,000 Btu/h (29.3 kW) .....................................................................................................................

$14.70 For the installation or relocation of each boiler or compressor over 3 horsepower (10.6 kW) to and including 15 horsepower (52.7 kW), or each absorption system over 100,000 Btu/h (29.3 kW) to and including 500,000 Btu/h (146.6 kW) ..............

$27.15 For the installation or relocation of each boiler or compressor over 15 horsepower (52.7 kW) to and including 30 horsepower (105.5 kW), or each absorption system over 500,000 Btu/h (146.6 kW) to and including 1,000,000 Btu/h (293.l kW) .........

$37.25 For the installation or relocation of each boiler or compressor over 30 horsepower (105.5 kW) to and including 50 horsepower (176 kW), or each absorption system over 1 ,000,000 Btu/h (293.1 kW) to and including 1,750,000 Btu/h (512.9 kW) .....

$55.45 For the installation or relocation of each boiler or compressor over 50 horsepower (176 kW), or each absorption system over 1,750,000 Btu/h (512.9 kW) ...................

$92.65

Page 56: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 55

5. Air Handlers

For each air-handling unit to and including 10,000 cubic feet per minute (cfm) (4719 L/s), including ducts attached thereto ...............................................................

$10.65

Note: This fee does not apply to an air-handling unit which is a portion of a factory-assembled appliance, cooling unit, evaporative cooler or absorption unit for which a permit is required elsewhere in the Mechanical Code.

For each air-handling unit over 10,000 cfm (4719 L/s) .............................................. $18.10 6. Evaporative Coolers For each evaporative cooler other than portable type ................................................. $10.65 7. Ventilation and Exhaust

For each ventilation fan connected to a single duct .................................................... $7.25 For each ventilation system which is not a portion of any heating or air-conditioning system authorized by a permit ................................................................

$10.65

For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood ................................................................................

$10.65

8. Incinerators

For the installation or relocation of each domestic-type incinerator ........................... $18.20 For the installation or relocation of each commercial or industrial-type incinerator .. $14.50

9. Miscellaneous For each appliance or piece of equipment regulated by the Mechanical Code but not classed in other appliance categories, or for which the fee is listed in the table ...

$10.65

10. Other Inspections and Fees

A. Inspections outside of normal business hours, per hour (minimum charge, two hours)* ........................................................................................................................

$330.00

B. Re-inspection fees assessed under provisions of Section 305.8, per inspection* .. $165.00 C. Inspections for which no fee is specifically indicated, per hour (minimum charge, one hour)* .......................................................................................................

$165.00

D. Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review has been completed (minimum charge--one hour)* ..........................................................................................................................

$165.00 *Reflects the Building Department’s actual cost for consultant costs plus a 10% administrative fee.

Page 57: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 56

Table 6. Plumbing Permit Fees Permit Issuance and Heaters 3. For the issuance of each plumbing permit ................................................................... $23.50 4. For the issuing of each supplemental permit for which the original permit has not

expired, been canceled, or finale .................................................................................

$7.25 Unit Fee Schedule Note: The following do not include $23.50 permit-issuing fee. 11. Fixtures and Vents

For each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping and backflow protection thereof) ......................................................

$9.80

For repair or alteration of drainage or vent piping, each fixture ................................. $4.75

12. Sewers, Disposal Systems and Interceptors For each building sewer and each trailer park sewer .................................................. $24.65 For each cesspool ........................................................................................................ $37.25 For each private sewage disposal system .................................................................... $74.50 For each industrial waste pretreatment interceptor, including its trap and vent, excepting kitchen-type grease interceptors functioning as fixture traps .....................

$19.90

Rainwater systems-per drain (inside building) .......................................................... $9.80

13. Water Piping and Water Heaters For installation, alteration, or repair of water piping or water-treating equipment, or both, each ................................................................................................................

$4.75

For each water heater including vent .......................................................................... $12.30 For vents only, see Table 3-C

14. Gas Piping Systems For each gas piping system of one to five outlets ....................................................... $6.15 For each additional outlet over five, each ................................................................... $1.10

15. Lawn Sprinklers, Vacuum Breakers and Backflow Protection Devices For each lawn sprinkler system on any one meter, including backflow protection devices thereof ............................................................................................................

$14.80

For atmospheric-type vacuum breakers or backflow protection devices not included in Item 1

1 to 5 devices ......................................................................................................... $12.30 Over 5 devices, each .............................................................................................. $2.25

For each backflow-protection device other than atmospheric-type vacuum breakers:

2 inches (50.8 mm) and smaller ............................................................................ $12.30 Over 2 inches (50.8 mm) ....................................................................................... $24.65

Page 58: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 57

16. Swimming Pools

For each swimming pool or spa: Public pool ............................................................................................................. $91.25 Public spa .............................................................................................................. $60.75 Private pool............................................................................................................ $60.75 Private spa ............................................................................................................. $30.25

17. Miscellaneous For each appliance or piece of equipment regulated by the Plumbing Code but not classed in other appliance categories, or for which no other fee is listed in this code .............................................................................................................................

$9.80 18. Other Inspections and Fees

A. Inspections outside of normal business hours, per hour (minimum charge, two hours)* ........................................................................................................................

$330.00

B. Re-inspection fees assessed under provisions of Section 305.8, per inspection* .. $165.00 C. Inspections for which no fee is specifically indicated, per hour (minimum charge, one hour)* .......................................................................................................

$165.00

D. Additional plan review required by changes, additions or revisions to plans or to plans for which an initial review has been completed (minimum charge--one hour)* ..........................................................................................................................

$165.00 *Reflects the Building Department’s actual cost for consultant costs plus a 10% administrative fee.

Page 59: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 58

Table 7. Storm Water Permit Fees Storm Water Fee Schedule Amount Land Disturbance SWPPP Plan Review $480 1 acre or greater SWPPP Site Inspection $240 1 to 5 acres SWPPP Site Inspection $480 5 to 10 acres SWPPP Site Inspection $720 10 to 20 acres SWPPP Site Inspection Actual Cost Over 20 acres Storm Water Treatment/Connection/ Discharge Plan Review

$300 Includes engineering plan review, developer agreement, and site inspection

Cooling Water Discharge and Connection to Storm Drain System

$500 Annual Fee

Page 60: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 59

Table 8. Utility Tie-In Fees Service Fee Water Connection Inspection Fee $50 Sewer Connection Inspection Fee $50 Residential and commercial properties water and sewer fees shall be the following

Water tie-in fee – water line 3/4 inches to 2 inches $200 Sewer tie-in fee – water line 3/4 inches to 2 inches $200 Water tie-in fee – water line greater than 2 inches up to 4 inches $250 Sewer tie-in fee – water line greater than 2 inches up to 4 inches $250 Water tie-in fee– water line greater than 4 inches $300 Sewer tie-in fee– water line greater than 4 inches $300

Page 61: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 60

Table 9a. Street Excavation and Work within the Public Rights-of-Way and Easements Permit Application Process

All contractors submitting plans for review are required to comply with the following procedures.

The administrative charge for a permit is $50.00.

Cost of a permit: When the City deems at its sole discretion that plan review and inspection of a construction project exceeds the expertise of the City to perform, the City shall retain external expertise to perform plan review and inspections services. When the City determines that a project requires the use of external expertise to conduct plan review and/or inspections, the City shall negotiate a Reimbursable Services Agreement (RSA) between the City and the construction contractor. The RSA shall fully cover the City’s costs plus a five (5) percent administrative charge. 1. Permits are valid for one hundred twenty (120) days, after which they automatically become

void and must be updated and re-approved by the City before any construction will be permitted.

2. The Contractor shall have one (1) copy of the approved permit, the approved construction plans, and the approved traffic control plan (if required) at the job site at all times.

3. Two (2) complete sets of prints of the project drawings or schematics shall be submitted to the City for review.

4. The following items shall be included on the plan: a. North arrow and scale b. Existing and proposed streets with names and widths c. Driveway locations with accurate width d. Easement and right-of-way information recorded with the Borough e. All existing utilities (type and location) f. Proposed utility location showing approximate dimensions in relation to right-of-way

and/or easement line g. Legend of symbols h. Minor construction notes indicating the type of excavation and or boring

under streets and driveways or other permanent structures. Additional information may be required by the City as necessary.

i. A traffic control plan will be required for all work that includes temporary lane reductions or closures. The traffic control plan shall be approved by the City of North Pole prior to any permit being issued.

Page 62: Estimating Building Permit Fee Guide - northpolealaska.com...The Building Department has made the Building Fee Guide to help customers estimate permit and plan review fees. Any figures

Page 61

Table 9b. Excavation Bond

Type of Work Square feet of

project

Total

Road, unpaved; $75/square foot ($1,000 minimum) sq. ft. $

Road, paved; $150/square foot ($5,000 minimum) sq. ft. $

Sidewalk, unpaved: $25/square foot ($500 minimum) sq. ft. $

Sidewalk, paved: $75/square foot ($2,000 minimum) sq. ft. $

Alley; $50/square foot ($1,000 minimum) sq. ft. $

Road shoulder: $10/square foot ($1,000 minimum) sq. ft. $

Other, e.g., City property, undeveloped right-of-way etc.; contact City

sq. ft. $

Total $