EQUIPMENT SELECTION
1
![Page 2: ESBD equipment selection ppt](https://reader036.fdocuments.net/reader036/viewer/2022082803/5453f234b1af9f61268b4aa6/html5/thumbnails/2.jpg)
CONTENTS:
INTRODUCTION
PURCHASE SPECIFICATIONS
EQUIPMENT SELECTION
CLEANING
MAINTENANCE
2
![Page 3: ESBD equipment selection ppt](https://reader036.fdocuments.net/reader036/viewer/2022082803/5453f234b1af9f61268b4aa6/html5/thumbnails/3.jpg)
INTRODUCTION:
CONCEPT OF 5 “M” MEN METHOD
MATERIAL MONEY MACHINERY
“EQUIPMENT USED IN MANUFACTURING, PROCESSING,PACKAGING OR HOLDING PRODUCT SHALL BE OF APPROPRIATE DESIGN, ADEQUATE SIZE & SUITABLY LOCATED TO FACILITATE OPERATION FOR IT’S INTENDED USE & FOR IT’S CLEANING & MAINTENANCE”
3
![Page 4: ESBD equipment selection ppt](https://reader036.fdocuments.net/reader036/viewer/2022082803/5453f234b1af9f61268b4aa6/html5/thumbnails/4.jpg)
PURCHASE SPECIFICATIONS:
i. OPERATING CRITERIA
ii. AVAILABILITY OF SPARES & SERVICING
iii. MAINTENANCE
iv. ENVIRONMENTAL ISSUES
v. CONSTRUCTION MATERIAL & DESIGN
vi. SPECIAL FEATURES
vii. COST
4
![Page 5: ESBD equipment selection ppt](https://reader036.fdocuments.net/reader036/viewer/2022082803/5453f234b1af9f61268b4aa6/html5/thumbnails/5.jpg)
EQUIPMENT SELECTION
HARDWARE REQUIREMENT
SOFTWARE REQUIREMENT
5
![Page 6: ESBD equipment selection ppt](https://reader036.fdocuments.net/reader036/viewer/2022082803/5453f234b1af9f61268b4aa6/html5/thumbnails/6.jpg)
HARDWARE REQUIREMENTS:
1. PRINCIPLE OF OPERATION
2. MATERIAL OF CONSTRUCTION
3. EQUIPMENT CONFIGURATION
4. BATTERY LIMITS
5. UTILITIES & SERVICES
6
![Page 7: ESBD equipment selection ppt](https://reader036.fdocuments.net/reader036/viewer/2022082803/5453f234b1af9f61268b4aa6/html5/thumbnails/7.jpg)
SOFTWARE REQUIREMENTS:
1.TRAINING
2.MAINTENANCE
3.VALIDATION & QUALIFICATION REQUIREMENTS
4.PERFORMANCE GURANTEE
5.DOCUMENTATION
7
![Page 8: ESBD equipment selection ppt](https://reader036.fdocuments.net/reader036/viewer/2022082803/5453f234b1af9f61268b4aa6/html5/thumbnails/8.jpg)
COMMON STEPS INVOLVED FOR CLEANING
REMOVE THE LABLESWITH THE HELP OFBRUSH & REMOVEPRODUCT RESIDUE
DISASSEMBLE & CLEANDISASSEMBLE PARTSWITH BRUSH
WASH WITH SOAP &CLEAN WATER
DRAIN OUT WATER &DRY IN CLEAN AREA
IF NECESSARY STERALIZE WITH70% ALCOHOL ORWITH SUITABLE DISINFECTANT
AFTER DRYING ASSENBLE THE EQUIPMENT
8
![Page 9: ESBD equipment selection ppt](https://reader036.fdocuments.net/reader036/viewer/2022082803/5453f234b1af9f61268b4aa6/html5/thumbnails/9.jpg)
MAINTENANCE:EQUIPMENTASSESSMENT
NEW EQUIPMENT INPUT TO SYSTEM
PREVENTIVE MAINTENANCE ORCORRECTIVE MAINTENANCE
ABNORMAL CONDITION
RECORD MAINTENANCE INFORMATIONAND ADD TO HISTORY
NOTIFICATION REPORT
YES
NO