ENVIRONMENTAL IMPACT ASSESSMENT...
Transcript of ENVIRONMENTAL IMPACT ASSESSMENT...
FOR
THE PROPOSED NEW PROJECT
“SYNTHETIC MANMADE FIBRES & POLYESTER GRANULES”
UNDER CATEGORY OF MANMADE FIBER- OTHER THAN
RAYON)
Activity: 5(d), Category-B (Considered at Central level due to General
Condition)
ENVIRONMENTAL IMPACT
ASSESSMENT REPORT
Located at:
Survey no. 287/1, 284P, 289/1/3, 289/1/2, 289/2; Village-Velugam, U.T. of Dadra and Nagar Haveli -396 240
EIA CONSULTANT ORGANIZATION UNISTAR ENVIRONMENT AND RESEARCH LABS PVT. LTD., VAPI – GUJARAT
(NABET Accredited Consultant Organization, Sr. No. 149 in the List of ACO/Rev.63/March. 05, 2018)
Doc. No. : U-EIA-R/201708/0 Rev. No. : 0
Release Date: 16/03/2018 Revision Date: -
For
The Proposed New Project
(Polyester POY/FDY/Staple Fibres & Granules @ 432000
TPA, Synthetic Filament Yarn @ 378000 TPA , Texturized
Yarn/Twisted Yarn/Acrylic Yarn /Covered Yarn/Spandex
Yarn etc. @288000TPA, Winding Of Yarn/Heat Setting Of
Yarn/Circular Knitting/Warping / Warp Knitting/Weaving
Fabrics/Carpet Weaving/ Narrow Fabrics @ 36000 TPA and
Color Master Batch Chips / granules@9000 TPA)
Under Category of Manmade Fiber- Other Than Rayon)
Activity: 5(d), Category-B but considered at Central level (Due to
applicability of GC interstate boundary with Maharashtra state & Eco
sensitive Zone falling within the 5 Km)
(Study Period: March ’16 to May ’16)
ENVIRONMENTAL IMPACT ASSESSMENT
REPORT
Located at:
Survey no. 287/1, 284P, 289/1/3, 289/1/2, 289/2;
Village-Velugam, Silvassa,
U.T. of Dadra and Nagar Haveli -396240
EIA CONSULTANT ORGANIZATION
UNISTAR ENVIRONMENT AND RESEARCH LABS PVT. LTD., VAPI – GUJARAT (NABET Accredited Consultant Organization, Sr. No. 149 in the List of ACO/Rev.63/ March. 05, 2018)
Page | I
PREFACE
The trend of the industrial development in India has shown the tremendous rise in its frequency and quantum. It has become the most essential phenomenon of the development of India. Because of the increasing industrialization many problems have shouted immediate attention towards the consequence of the problems. If attention to these problems is not given on priority basis, the future of our offspring will be horrible. To ensure better living on Earth, it has become essential to look deep in to the problems arising due to the industrialization & allied development. Each and every country facing the similar problem and hence it has become a Global issue. So, what is needed is, the clarity and presence of mind to be able to strike a proper balance between these developmental process and ecology; i.e. establishment or up-gradation of one should not lead to the degradation of other. To control the negative impact at the source is better, as Environmental problems have cumulative impact so, redemption at a later stage will lead to considerably high costs and irreversible damages. After all, there is only one world or mankind which if ruined poses a great threat to man’s continuing existence. Keeping in mind, MoEF, Delhi has published a notification vide SO 1533, dated 14th Sept 2006 regarding the necessity & applicability of Environmental Clearance for many industrial or developmental activity. This notification is intended to encourage productive and enjoyable harmony between man and his environment. The act has brought about a profound impact on actions affecting the environment by requiring environmental considerations to be included in decision making, process covering number of projects and activities. Specifically, MoEF requires each agency to prepare a detailed statement of Environmental impact before proceeding with any major action that may significantly affect the quality of the human Environment. Especially the project or activity covered under Schedule of the notification SO 1533 are required to prepare an EIA report to get Prior EC before implementation of the project activity. M/s. Beekaylon Synthetics Pvt. Ltd., Velugam has proposed to setup a new manufacturing unit for manufacturing of “synthetic manmade fibres & Polyester granules through continuous polymerisation of MEG & PTA and knitting & weaving for fabric production” at Survey No.: 287/1, 284P, 289/1/3, 289/1/2, 289/2; in the Notified Industrial Zone situated at Village-Velugam of U.T. of Dadra and Nagar Haveli. The present study of Environmental Impact Assessment has been conducted for the purpose of obtaining EC for proposed new project of M/s. Beekaylon Synthetics Pvt. Ltd., Velugam. and this report is being presented to depict the details of the environment, proposed new project and associated issues which are revealed during the study. Any error detected in the report is due to oversight and unintentional. All efforts will be made to cover-up the shortcomings and remove the errors from the report. In process of compiling this report, we were earnestly supported & helped by individuals of M/s. Beekaylon Synthetics Pvt. Ltd., Velugam & various departments of Government. We are grateful to all of them as well as our team members who have worked hard to successfully complete this EIA study.
Haresh P. Joshi MD & EIA Coordinator UniStar Environment & Research Labs Pvt. Ltd., Vapi Date: 16/03/2018 Place: Vapi
Page | II
EXECUTIVE SUMMARY
1. Introduction………………………………………………………………………………………………………………. 1 2. Description of Project……………………………………………………………………………………………….. 1 3. Description of the Environment………………………………………………………………………………… 2 4. Additional Studies……………………………………………………………………………………………………… 8 5. Environmental Monitoring & Management Plan……………………………………………………….. 8 6. Conclusion………………………………………………………………………………………………………………… 9
Page | III
INDEX
CHAPTER- 1: INTRODUCTION
1.1.General……………………………………………………………………………………………………………………… 1-1 1.1.1 About The Company…………………………………………………………………………………............... 1-1
1.1.2 About Proponent……………………………………………………………………………………………………. 1-1
1.2 Description of Project ………………………………………………………………………………………………. 1-2 1.2.1Nature & Type of Project………………………………………………………………………………………… 1-2 1.2.2 Products & Capacity of Project………………………………………………………………….……………. 1-2
1.2.3 Project Location……………………………………………………………………………………………………… 1-3
1.2.4 Regulatory Framework…………………………………………………………………………….….…………. 1-3
1.2.5 Need for the project and its importance to the country and or region…………………… 1-3 1.3 Terms Of Reference For Eia Study……………………………………………………………................... 1-4
1.4 Need & Scope of EIA Study………………………………………………………………………………………… 1-4 1.4.1 Need of EIA Study…………………………………………………………………………………………………… 1-4 1.4.2 Public Hearing………………………………………………………………………………………………………… 1-5 1.4.3 Scope & Objective of EIA Study………………………………………………………………………………. 1-5 1.5 Aprroach & Methodology of EIA Study……………………………………………………………………… 1-6 1.6 Structure of EIA Report……………………………………………………………………………………………… 1-7
CHAPTER -2: DESCRIPTION OF PROJECT
2.1 Highilight of Project……………………………………………………………………………………….………….. 2-1 2.1.1Existing & Proposed Products…………………………………………………………….……................. 2-2
2.1.2 Justification of Project……………………………………………………………………………………………. 2-2
2.1.3 Project site……………………………………………………………………………………………………………… 2-3 2.2 Resource Requirement …………………………………………………………………………………………….. 2-5
2.2.1 Land & Buildings………………………………………………………………………………………….…………. 2-5
2.2.2 Water…………………………………………………………………………………………………………….......... 2-6
2.2.3 Energy, Fuell & Power………………………………………………………………………………..………….. 2-6
2.2.4 Human Resource……………………………………………………………………………………………………. 2-7
2.2.5 Capital……………………………………………………………………………………………………………………. 2-7
2.3 Description Of Process & Allied Details……………………………………………………………………. 2-7
2.3.1 Raw materials ……………………………………………………………………………………………………….. 2-7
2.3.2 Process Details………………………………………………………………………………………………………. 2-8
2.4 Pollution Potentials & Control Measures…………………………………………………………………… 2-15
2.4.1 Air Pollution Sources & Control………………………………………………………………………......... 2-15
2.4.1.1 Fugitive Emission Control……………………………………………………………………………………. 2-15 2.4.2 Wastewater Generation &Management………………………………………………………………… 2-15
2.4.3 Solid & Hazardous Waste Generation & Management…………………………..………………. 2-18
2.4.4 Noise & Vibration Generation & Control………………………………………………………………… 2-19
2.4.5 Greenbelt Development ………………………………………………………………………………………… 2-19
2.5 Occupationall Health & Safety…………............................................................................ 2-19
2.5.1 Hazardous Materials & Their Management………………………………………………..………….. 2-19
2.5.2 Occupational Health Management………………………………………………………………..………. 2-20
CHEPTER-3: DESCRIPTION OF THE ENVIONMENT
Page | IV
3.1 General…………………………………………………………………………………………………..…….…………… 3-1 3.1.1 Study Area…………………………………………………....……………………………………………………….. 3-1
3.1.1.1 Environmental Baseline Data Collection………………………………………………………………. 3-4 3.1.1.1 Sampling & Montoring Locations………………………………………………………………………… 3-4 3.2 Meteorology………………………………………….………………………………………………………………….. 3-8
3.2.1 Methodology……………………………………………………………………………………………………….…. 3-8
3.2.2 Site specific metrological data…………………………………………………………………………..…… 3-8
3.2.3 Primary survey……………………………………………………………………………………………………….. 3-8 3.2.4.1 Wind Pattern for the study period………………………………………………………………………. 3-9 3.2.4.2. Temperature………………………………………………………………………………………………………. 3-9 3.2.4.3 Relative humidity………………………………………………………………………………………………… 3-9 3.3 Ambient Air Quality………….…………………………………………………………………………………....... 3-11
3.3.1 Methodology Adopted for Air Quality Survey…………………………………………..……………. 3-11
3.3.1.1 Selection of Sampling Locations…………………………………………………………………………… 3-11 3.3.2. Frequency and parameters for sampling……………………………………………………………….. 3-11
3.3.3 Instruments used for sampling……………………………………………………………….................. 3-11
3.3.4. Sampling and Analytical techniques……………………………………………………….……………… 3-11
3.3.5 Sampling locations…………………………………………………………………………………………………. 3-12 3.3.5 Ambient air monitoring………………………………………………………………………………………….. 3-12 3.3.6 Observations…………………………………………………………………………………………………….……. 3-12
3.4 Ambient Noise Survey………………………………………………………………………………………………. 3-15
3.4.1. Methodology…………………………………………………………………………………………………….…… 3-15
3.4.2 Parameter Measured during Monitoring………………………………………………………………… 3-15
3.4.4 Results and discussion……………………………………………………………………………………………. 3-16
3.4.5 Observations ………………………………………………………………………….……………………………… 3-16
3.4.5.1 Residential Zone………………………………………………………………………………………………….. 3-16 3.4.5.2. Commercial Zone……………………………………………………………………………………………….. 3-16 3.4.5.3 Industrial Zone…………………………………………………………………………………………………….. 3-16 3.5 Water Quality……………………………………………………………………………………………………………. 3-17
3.5.1 Methodology………………………………………...................................................................... 3-17
3.5.2 Results of water quality……………………………………………………………………………….…………. 3-18
3.5.3 Results and Discussion …………………………………………………………………………………..……… 3-20
3.5.3.1. Primary data………………………………………………………………………………………………………. 3-20 3.6 Hydrogeology, Geology & Topography……………………………………………….…………………….. 3-21
3.6.1 Ground water levels in the U.T of Dadra and Nagar Haveli ……………………………………. 3-22 3.6.1.1 Pre-monsoon water levels…………………………………………………………………………………… 3-23 3.6.1.2 Post-monsoon water levels…………………………………………………………………………………. 3-23 3.6.1.2 Water level fluctuation……………………………………………………………………………………….. 3-23 3.6.2 Geological Features………………………………………………………………………………………………… 3-25 3.6.2 Topographical Features………………………………………………………………………………………….. 3-25 3.7 Soil characteristics….………………………………………………………………………………………………… 3-26 3.7.1 Introduction………………………………………....................................................................... 3-26 3.7.2 Methodology ……………………………………………………………………………………………………...... 3-28 3.7.3 Results and discussion……………………………………………………………………………………......... 3-30 3.8 Ecology and Biodiversity ………………………………………………………………………………………….. 3-30 3.8.1 Objectives of the Terrestrial and Aquatic Ecology Survey………………………………………. 3-30 3.8.2 Methodology…………………………………………………………………………………….……………….…… 3-30
Page | V
3.8.2.1. Study Area Details……………………………………………………………………………………………… 3-30 3.8.3 . Floral Diversity of the study area………………………………………………………………………… 3-30 3.8.4 Faunal Diversiry of the study area………………………………………………………………..……….. 3-34 3.8.5 Scheduled Fauna of the study area………………………………………………………………………. 3-37 3.9 Landuse/ Landcover (LU/LC) …………………………………………………………………………………….. 3-38 3.9.1.1 Methodology of Land use Pattern Studies …………………………………………………………. 3-39 3.10 Socio-Economic Environment………………………………………………………………………………….. 3-44 3.10.Out Comes ………………………………………………………………….………………………………………….. 3-45
CHAPTER-4: ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
4.1General……………………………………………………………………………………………………………………… 4-1 4.2 Phases of Impacts Assessment Study ………………………………………………………………………. 4-1
4.3 Identification of impacts……………………………….………………………………………………………….. 4-2
4.3.1 Project Activities, Probable Impacts ………………………………………………….………………….. 4-2
4.3.2 Types, Nature & Significance of Impacts…………………………………………………………………. 4-5 4.4 Description Of Anticipated Impacts & Mitigations….……………………….………................... 4-7
4.4.1 Impact on Ambient Environment…………………………………………………….……………………… 4-7
4.4.2 Impacts on Water Environment ……………………………………………………………..…………….. 4-16 4.4.3 Impacts On Land Environment………………………………................................................... 4-19 4.4.4 Impact on Ecology and Biodiversity ………………………………………………………………………. 4-21 4.4.5 Socio- Economics …………………………………………………………………………………………………… 4-23
4.4.6 Impacts On Work Environment………………………………………………………………………………. 4-25
4.4.7 Impacts due to Hazardous/Non Hazardous Waste Management …………………………… 4-27
CHAPTER-5: ANALYSIS OF ALTERNATIES (TECHNOLOGY & SITE)
5.1 General……………………………………………………………………………………………………………………… 5-1 5.2 Site Selection…………………………………………………………………………………………………………….. 5-1
5.3 Alternative Technologies………………………………………………………………………………………….. 5-2
CHAPTER-6: ENVIRONMENTAL MONITORING PROGRAM
6.1 General……………………………………………………………………..…………………………….……………..... 6-1 6.1.1 Objective of Environmental Monitoring Program……………………………………………........ 6-1 6.2 Environmental Monitoring Program…………………………….………………………………………..... 6-2
6.3 Documentation & Reporting……………………………………………………………………………………… 6-4
CHAPTER-7: ADDITIONAL STUDIES
7.1 General……………………………………………………………………………………………………..……………… 7-1 7.2 Public Consultation………………………………………………………………………..……………..………….. 7-1
7.3 Risk Assesment & Disaster management…………………………………………………………………… 7-1
7.4 Social Study And R & R Action Plan……………………………………………………………………………. 7-1
CHAPTER-8: PROJECT BENEFITS
8.1 Imporovement In Infrastructures………………………………………………………………………………. 8-1 8.2 Employment Potential…………………………………………………………………………………….………… 8-1
8.3 Other Tangible & Intangible Benifits…………………………………………………………………..…….. 8-1
CHAPTER-9: ENVIRONMENTAL COST BENEFIT ANALYSIS
9.1 Environmental Cost Benefit Analysis…………………………………………………………….…………… 9-1
Page | VI
CHAPTER-10: ENVIRONMENTAL MANAGEMENT PLAN
10.1 General…………………………………………………………………………………………………………………………...... 10-1 10.1.1 Environmental Policy……………………………………………………………………….…………………… 10-1
10.1.2 Objective……………………………………………………………………………………………………………… 10-1 10.1.3 Purpose………………………………………………………………………………………………………………… 10-2 10.1.4 Scope………………………………………………………………………………………………………………...... 10-2 10.2 Budgetary Provision for EMS…………………………………………………………………………………… 10-2
10.3 Environmental management Cell……………………………………………………………………………. 10-3
10.4 Environmental management Plan……………………………………………………………………………. 10-7 10.4.1 Air Quality and Air Pollution Control……………………………………………………………………. 10-7
10.4.2 Water Pollution prevention & control………………………………………………………………….. 10-10
10.4.3 Hydrology, Groundwater & Water Conservation………………………………………………….. 10-13
10.4.4 Land use…………………..…………………………………………………………………………………..……… 10-15 10.4.5 Soil Conservation……………………………………………………………………………….…………........ 10-15 10.4.6 Noise & Vibration prevention & Control………………………………………………………..……. 10-17
10.4.7 Hazardous waste & Industrial solid waste Management…………………………………...... 10-20
10.5 Occupational Health and Safety………………………………………………………………………………. 10-23 10.6 Ecological Conservation & Protection……………………………………………………………..……… 10-26 10.7 Greenbelt Devlopment Plan…………………………………………………………………………………… 10-29
10.8 Management of Socio- Economics issue……………………………………………………….……….. 10-30
10.9 Energy Conservation…………………………………………………………………………………..………….. 10-33 10.10 Rainwater Harvesting Plan……………………………………………………………………………………. 10-33 10.11 Administrative Measures………………………………………………………………………………………. 10-34
CHAPTER-11: SUMMARY & CONCLUSION
11.1 Introduction About Project……………………………………………………………………………………… 11-1 11.2 Description of Project …………………………………………………………………………………………….. 11-1 11.3 Anticipated Impacts & Mitigations …………………………………………………………………………. 11-2 11.4 Conclusion ……………………………………………………………………………………………………………… 11-6
CHAPTER-12: DISCLOSURE OF CONSULTANT ENGAGED
12.1. ABOUT UNISTAR ENVIRONMENT & RESEARCH LABS PVT. LTD…………………………….. 12-1
Page | VII
LIST OF ANNEXURE
ANNEXURE - I Awarded TOR & its compliance status…………………………………………………………… ANNEXURE - II Environmental Methods ………………………………………………………………………………. ANNEXURE - III CSR Activity Plan …………………………………………………………………………………………… ANNEXURE - IV Plant & machineries ……………………………………………………………………………………… ANNEXURE - V Risk Assessment study report of the proposed project………………………………….. ANNEXURE - VI List of Flora Fauna of Study area …………………………………………………………………… ANNEXURE -VII Wildlife Conservation Plan…………………………………………………………………. ANNEXURE - VIII Additional Documents …………………………………………………………………………………… A. Land Document
B. DNH-PDA C. Damanganga Canal Authority …………………..……. D. List of Major Industries E. Wildlife distance map application
Page | VIII
LIST OF FIGURES
Figure 1.1 Approach & Methodology of EIA Study……………………………….……………………………. 1-7 Figure 2.1 Map Of Project Site…………………………………………………………………………………………. 2-4 Figure 2.2 Plant Layout…………………………………………………………………………………………………….. 2-5 Figure 2.3 Flow Diagram of Propose ETP……………………………………………………………………………. 2-18 Figure 2.4 Water Balance Diagram……………………………………………………………….…………………. 2-18 Figure 3.1 Base Map of Study Area Locations………………………………………………………………….. 3-3 Figure 3.2 Sampling & Monitoring Locations (Study area-10 km)…………………………………….. 3-7 Figure 3.3 Site specific wind rose for the study period (Wind Blowing to)……………………….. 3-10 Figure 3.4 Hydro geological Features……………………………………………………………………………….. 3-22 Figure 3.5(a) Depth to water level map May 2012………………………………………………………………. 3-24 Figure 3.5(b) Water level Fluctuation map November 2012………………………………………………… 3-24 Figure 3.6 Topographic Map……………………………………………………………………………………………. 3-26 Figure 3.7 Soil map of D & NH………………………………………………………………………………………… 3-28 Figure 3.8 Reserved Forest and Wild life sanctuary map of D&NH…………………………………… 3-32 Figure 3.9 Study Area as captured in 2017 Winter Season (Source –RS LISS4-FMX)…………. 3-39 Figure 3.10 Graphical Representation of Land covers………………………………………………………… 3-41 Figure 3.11 Land use Map of Study Area……………………………………………………………………………. 3-42 Figure 4.1 Probable Impacts & Mitigation (Operation Phase)…………………………………………. 4-5 Figure 4.2 Contour of Predicted 24 Hourly Incremental GLC of PM25………………………………. 4-12 Figure 4.3 Contour of Predicted 24 Hourly Incremental GLC of PM10 …………………………….. 4-13 Figure 4.4 Contour of Predicted 24 Hourly Incremental GLC of SOx................................. 4-13 Figure 4.5 Contour of Predicted 24 Hourly Incremental GLC of NOx................................. 4-14 Figure 4.6 Contour of Predicted 1 Hourly Incremental GLC of CO...................................... 4-14 Figure 10.1 Environment & Safety Management Cell………………………………………………………… 10-4
Page | IX
LIST OF TABLE Table 1.1 List Of Directors ……………………………………………………………………………………………. 1-1 Table 1.2 List of Products………………………………………………………………………………………………. 1-1 Table 2.1 Highlight of project………………………………………………………………………………………… 2-1 Table 2.2 List of Proposed products with capacity………………………………………………………… 2-2 Table 2.3 Area Statement for the Plant Premises………………………………………………………….. 2-5 Table 2.4 Breakup of Water Requirement and Waste water Generation& disposal …….. 2-6 Table 2.5 Energy, fuel & power requirement………………………………………………………………… 2-6 Table 2.6 Human resource requirement……………………………………………………………………….. 2-7 Table 2.7 Capital cost …………………………………………………………………………………………………… 2-7 Table 2.8 List of Raw Material and its Consumption per Month……………………………………. 2-7 Table 2.9 Details of Raw materials their source, Storage and Mode of transport………….. 2-8 Table 2.10 Details of Utility Emission & Control Measures……………………………………………… 2-15 Table 2.11 Details of Waste water Generation……………………………………………………………….. 2-16 Table 2.12 Characteristics of Wastewater for ETP Design……………………………………………….. 2-16 Table 2.13 Details of Proposed ETP…………………………………………………………………………………. 2-16 Table 2.14 Details of solid waste generation & management………………………………………….. 2-18 Table 3.1 Salient Features of Project Area (10 Km)……………………………………………………….. 3-2 Table 3.2 Primary data collection………………………………………………………………………………….. 3-4 Table 3.3 Sampling & monitoring Locations (study area-10 Km)…………………………………… 3-5 Table 3.4 Metrological Parameters Monitored at site………………………………………............. 3-8 Table 3.5 Site Specific Meteorological Data (October’17 to December’17)…………………… 3-9 Table 3.6 Techniques Used for Ambient Air Quality Monitoring………………………………..... 3-11 Table 3.7 Ambient Air Quality of study Area……………………………………………………………….. 3-13 Table 3.8 Ambient Noise Level in Study Area…………………………………………………………........ 3-16
Table 3.9 Frequency of Environmental Monitoring………………………………………………………. 3-17 Table 3.10(a) Surface water Quality of Study Area……………………………………………………….…….. 3-18 Table3.10(b) Ground water Quality of Study Area……………………………………………………..………. 3-20 Table 3.11 Soil Quality Of Study Area……………………………………………………………………………… 3-29 Table 3.12(a) Plant Family Richness of the region……………………………………………………………….. 3-33 Table 3.12(b) Wildly occurring Plant species in the region…………………………………………………… 3-33 Table 3.13 List of Flora the study area……………………………………………………………………….……. 3-35 Table 3.14 24 Hourly Traffic Study of Surangi – Velugam Road……………………………………….. 3-46 Table 4.1 Details of Project Activities and probability of Impacts……………….…………………. 4-3 Table 4.2 Details of Source Input…………………………………………………………………………………… 4-9 Table 4.3 Details of Emission Input…………………………….………………………………………..……….. 4-9 Table 4.4 Details of Receptors Input……………………………………………………………………………… 4-10 Table 4.5 Outcome of Model: Predicted Incremental GLC…..……………………………….……….. 4-11 Table 4.6 Predicted Ambient Air Quality……………………………………………………………………….. 4-11 Table 5.1 Analysis of Alternative Industrial Area considered…………………………………………. 5-2 Table 6.1 Details of the Environmental Monitoring program………………………………………… 6-2
Table 10.1 Budgetary provision for EMS…………………………………………………………………………. 10-2
EXECUTIVE SUMMARY OF
ENVIRONMENTAL IMPACT ASSESSMENT REPORT
FOR
PROPOSED NEW UNIT
OF
M/s. Beekaylon Synthetics Pvt. Ltd.
Located at:
Plot no. -287/1, 284P, 289/1/3, 289/1/2, 289/2;
Village-Velugam, U.T. of Dadra and Nagar Haveli -396 240
EIA CONSULTANT ORGANIZATION
UNISTAR ENVIRONMENT AND RESEARCH LABS PVT. LTD., VAPI – GUJARAT (NABET Accredited Consultant Organization, Sr. No. 149 in the List of ACO/Rev. 63)/March. 05, 2018)
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT)
UniStar Environment & Research Labs Pvt. Ltd. Executive Summary (QCI-NABET Accredited) 1
EXECUTIVE SUMMARY
1 Introduction
M/s. Beekaylon Synthetics Pvt. Ltd., Velugam has proposed to setup a new manufacturing unit at Survey No.:
287/1, 284P, 289/1/3, 289/1/2, 289/2; in the Notified Industrial Zone situated at Village-Velugam of U.T. of
Dadra and Nagar Haveli. The proposed new project involves the production of “Various types & grades of
Synthetic Polyester Yarns through continuous polymerization of MEG & PTA and various kinds of Fabrics”.
As per the EIA notification‐ 2006 as amended time to time, the proposed project for the production of
Synthetic filament yarn falls under Category “B” (Considered at central level due to applicability of GC).
Proponent had applied for approval of Terms of Reference for EIA study for proposed project on 03th
October 2017 to EAC New Delhi. EAC vide letter no. J-11011/493/2017-IA II (I). Dated 16th November 2017
issued approved/awarded TORs. The MOEF had earmarked the area covering 10 km radial area from site
proposed EIA study and exempted Public Hearing / Consultation as the project is to be developed in the
notified industrial Zone established before 2006.
2 Description of Project
The proposed project involves the production of Polyester POY/FDY/Staple Fibres & Granules @ 432000 TPA,
various types of Synthetic Filament Yarn @ 378000 TPA and various other types of manmade fibres like
Texturized Yarn/Twisted Yarn/Acrylic Yarn /Covered Yarn/Spandex Yarn etc. @288000TPA. The proposed
product line also includes Winding Of Yarn/Heat Setting Of Yarn/Circular Knitting/Warping / Warp
Knitting/Weaving Fabrics/Carpet Weaving/ Narrow Fabrics @ 36000 TPA and Colour Master Batch Chips /
granules@9000 TPA for manufacturing of synthetic manmade fibres & Polyester granules through
continuous polymerisation of MEG & PTA and knitting & weaving for fabric production at Survey No.: 287/1,
284P, 289/1/3, 289/1/2, 289/2 in the Notified Industrial Zone situated at Village-Velugam of D & NH-396 240
(U.T. of Dadra and Nagar Haveli). (20° 8'15.46"N and 72°59'32.41"E). The capital cost of the proposed project
is Rs. 443 Crore. The project site is well connected with State & National Highway network and the nearest
National Highway (NH48) is about 7.8 km W away from project site. The nearest interstate boundary is
Gujarat (7.5 Km E) and Maharashtra (0.3Km E) away from the project site. Nearest wildlife sanctuary- 1.30 E
(D & NH Wild Life Sanctuary), Vasona Lion safari 9.37 km NW(Approx.) & Dapada, Satmaliya Deer Park 5.3
Km NE (Approx.).
The proposed project will require Land –77800.00 Sq. m., Water-3740 KL/day Fresh water (source: Irrigation
Canal/Ground water canal with required permission from CGWA), Power- 27 MW (supply from DNH Power
distribution corporation Ltd.).
In proposed unit HSD @3750 L/Hr will be used as fuel for DG sets (1 No. of 1000 KVA & 2 Nos. of 2500 KVA).
LSHS/ Furnace Oil 60 KLD for Boiler (1 No., 10 TPH, 2 Nos., 1 TPH) and Thermic Fluid Heater (3 Nos, 10 M
Kcal/Hr). Total employment of the project will be 1353 persons.
For the production of afore said products, company will require 7 raw materials out of which 1 chemical
(Mono Ethylene glycol) is hazardous in nature as per MSIHC rules (as amended), 2000. This hazardous
material will be received in tanker load by road tanker and stored in tanks provided in designated areas of
storage. All safety measures will be provided at design level with all required safety system for the specific
chemicals to prevent the associated hazards & risks.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT)
UniStar Environment & Research Labs Pvt. Ltd. Executive Summary (QCI-NABET Accredited) 2
The details of the major pollution potential/identified sources of impacts are presented below. A. Wastewater:
For Proposed project Domestic waste water generation will be 80 KLD whereas total industrial effluent generation will be 800.00 KLD. Sewage will be disposed off through septic tanks & STP. The industrial effluent will be treated in full-fledged in-house ETPs equipped with all required Primary, Secondary & Tertiary Treatment units. The treated effluent will be reused in cooling and gardening.
B. Emissions:
For the proposed project the stationary sources are Boilers (Stack: 30 m Ht. & 0.5 m Dia. (Common Stack)) , DG sets (Stack: 30 m Ht. &0.15 m Dia. (Each)), and Thermic Fluid Heater (Stack: 30 m Ht. &0.5 m Dia. (Common Stack)) the emission quality from stationary sources will be below the applicable norms for the parameters.
C. Solid/Hazardous wastes:
Total ETP Waste from proposed project will be 60.00 MT/Month and will be sent to GEPIL site, Silvassa. Total used oil will be 1. KL and sold to registered refiners. Total empty drums will be 50000 Nos and reused for packing /sold to authorized scrap vendor. Total Process waste will be 15.00 MT/ Month and Sell to authorized recycler or for co-incineration or to Common Incineration Facility. Yarn waste & Lumps will be 750.00 MT/Month and it will be sell to actual users.
3 Description of the Environment
Base line study has been conducted falling within 10 km radial area from project site situated in Velugam
U.T. of Dadra & Nagar Haveli, considering the draft TOR proposed during TOR application, then continued &
verified according to the conditions of awarded TORs from MoEF, New Delhi. Baseline study has been
conducted during the period of October 2017 to December 2017 of winter season.
Total 8 locations were selected for Ambient Air Quality, Ground Water, and Noise whereas for surface Water
five samples were selected from available surface water resources within the study area. For AAQM one
location was project site itself whereas one location was in downwind direction and one locations was in
upwind direction. Meteorological Data has been collected by installing weather station at White House, Near
GIDC office, Vapi.
The frequency of the environmental sampling & analysis was determined following the guidelines provided
by MoEF in online EIA Manual. Meteorological Data has been done hourly continuous for study period,
Ambient Air Quality done 24 hourly twice a week during study period. Sampling of Noise, Ground Water,
Surface Water, and Soil Quality has been done once in study period.
Collection of Geological data, Geohydrology data, Ecological Data, Socioeconomic data and mapping of Land
Use -Land Cover, & Topography has been done for study covering 10km radial area from project site.
METEOROLOGY: The temperature ranged from a minimum of 16.50°C to a maximum of 38.20°C while the
average was found to be 27.20°C. The relative humidity ranged from a minimum of 19.40% to a maximum of
100.40% while the average was computed to be 65.40%.The wind predominant wind direction was from the
South East to North West direction. The wind frequency class distribution reflects that the calms prevailed
for 3.67 % of the total period during the study and the wind speed between 0.0 m/sec-15 m/sec.
AIR QUALITY: The concentration of PM10was found to be between 49 μg/m3 (Bindrabin Village) to 90μg/m3.
(Pati Village). The average concentration was in the range of 68.75 to 82.54 μg/m3.The concentration of
PM2.5 was between 12μg/m3 (Bindrabin Village) to 44μg/m3 (Pati Village) and the average concentrations
were observed in the range of 16.58 to 31.08 μg/m3. The SO2 concentrations were between 12.00μg/m3
(Surangi, Luheri, Bindrabin and Kurze Village) to 24.50μg/m3 (Project Site). The average concentrations were
observed in the range between 15.71μg/m3to 20.17μg/m3. The NOx concentrations were between
15.00μg/m3 (Pati Village) to 28.00 μg/m3 (Project Site) with average values observed in the range of
20.71μg/m3to 23.42μg/m3. The Maximum CO concentration was found to be 1.19mg/m3 (Kurze).In Project
Site, Surangiand Karachgam the maximum concentration found to be 1.05 to 1.14. Mg/m3. In all other
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT)
UniStar Environment & Research Labs Pvt. Ltd. Executive Summary (QCI-NABET Accredited) 3
locations it found to be below detectable limit. The O3 concentrations were between 5.02 μg/m3 (Project
Site & Pati) to 9.83 μg/m3 (Kurze) with average values observed in the range of 5.84 μg/m3to 8.53 μg/m3.
The NH3concentrations were found to be 5.57 μg/m3 (Bindrabin) to 13.96 μg/m3 (Kurze). With
average values observed in the range of 8.10 μg/m3 to 12.45 μg/m3. The concentrations of all the air quality
parameters as monitored during the baseline study are within the permissible limits as per the NAAQ
Standards as prescribed by MoEF&CC.
NOISE LEVEL: The average hourly Leq (day) for the residential zone was observed to be in the range of 48.8
dB (A) (Luhari) to 62.0 dB (A) (Bindrabin). The average hourly Leq (night) for the residential zone was
observed to be in the range of 33.8 dB (A) (Kurze) to 43.0 dB (A) (Bindrabin). The ambient noise levels in the
villages are under the influence of local environment only and the Leq values are within permissible limits in
all the villages. The average hourly Leq (day) for the commercial zone at Surangi was found to be 60.1 dB (A)
while the average hourly Leq (night) was found to be 37.2 dB (A) and were found towill within the CPCB
limits for the commercial zone –for the day time and the night time. The average hourly Leq (Day) for the
industrial zone at project site was found to be 49.2 dB(A) while the average hourly Leq (night) was found to
be 33.7 dB (A), which were found to be well within the CPCB limits for the Industrial zone –both for the day
time and the night time.
WATER QUALITY: Ground Water- In 3 locations of study area Total hardness level exceed the acceptable
limit as per IS 10500.Exceeding level of total hardness lead to hard water which is not a health risk, but a
nuisance because of mineral buildup on fixtures and poor soap and/or detergent performance. TDS value
not exceeding the permissible limit in all locations of the study area. Magnesium level exceeds the
acceptable limit as per IS 10500 at 3 locations. Calcium value exceeds the acceptable limit as per IS 10500 at
5 locations. Total Alkalinity value exceeds the acceptable limit as per IS 10500 at 3 locations in the study
area. The very high alkalinity water cause digestive malfunction, cardiovascular problems and metabolic
abnormalities etc. Chloride value was not exceeds the acceptable limit as per IS 10500 at all location. Total
Coliforms and E.coli were<1CFU/100 ml and present in one locations in the study area. Values for all other
parameters were found well within the acceptable limit as per IS 10500. Surface Water Samples- Five
surface water resources were studied. SW1, SW2 and SW3 were found to be confirming Class-D of CPCB
Criteria (Fish culture and wild life propagation). As the BOD level is greater than 3mg/l. SW4 was found to be
confirming Class-A of CPCB Criteria (Drinking water source without conventional treatment but after
disinfection
GEO-HYDROLOGY: Physiographically the UT forms part of Deccan Plateau. The UT of D&NH is divided into
three physiographic units i.e. Residual Plateaus, Denudational Slopes and Valley Plains. The soils occurring on
the Deccan plateau are generally black cotton soils. Within this broad categorisation, there are significant
variations depending upon topography. Three major type of soil occurs in the UT i.e., lateritic soils, shallow
black cotton soils deep black soils. The estimation of ground water resources of UT of Dadra & Nagar Haveli
by Central Ground Water Board, during the year 2012 indicate that the total annual ground water potential
in the Territory is 59.37 MCM and the Net annual ground water availability is 56.40 MCM. The occurrence of
ground water under confined conditions is observed in the western part of the area around Naroli and
Dadra. The potential confined aquifers occur at an attitude of 20 m below the mean sea level and with
compact, amygdular and massive basalt of about 25 m thickness acting as a confining layer. : In the project
site, no out crops are seen. The area belongs to deccan trap age. The litho logically, the area covered with
soil which has 3-5 m thickness. Below the soil the hard rock’s present. The overall topography of the site is
flat with a gentle slope from southeast towards southwest. The overall topography of the area is marked by
alluvial plains.
SOIL QUALITY: The texture of the soil in the study area is Clay. The colour of the soil is light to dark brownish
black in the study area. The soil is having high water and moisture retention capacity due to clay content.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT)
UniStar Environment & Research Labs Pvt. Ltd. Executive Summary (QCI-NABET Accredited) 4
The water holding capacity of the study area ranges between 51 to 58 mg/100 g and these being clayey soils
are capable of retaining sufficient water which facilitate in plant growth. The pH of the soil samples from the
study area is found to mostly normal (i.e., between 6.5 and 8.2). Hence a good range of micronutrients are
available in soil, making the soil good for agricultural uses. The EC of the soil of the study area ranges
between 134.17 to 310.10 µSm/cm). The percentage of Organic Carbon of the study area ranges in medium
(i.e., Medium 0.5-0.75). The soil of the project site is found to be free from any contaminant.
ECOLOGY: During the study period, about 51 important floral species are noted in the study area. The
vulnerable species (Bombax ceiba and Dalbergia latifolia) as per IUCN Red list 2016-2 are found in the
region. In addition to these important species of plantation area of the region, about 203 wild species of
flora are observed in the forest and open unused area of the region.
There are four listed animals included in schedule-I, 8 listed numbers animals included in schedule-II, 79
listed animals included in schedule-IV and 7 listed animals included in schedule-V.
Two endemic amphibian species (Indirana leithii and Pseudo philautus amboli) are found in the region. Both
are endemic to Western ghat region. These endemic species are not covered in Indian Wild Life (Protection)
Act, 1972 but are included in IUCN Red list 2016-2 (vide-IUCN Red List Categories and Criteria, version 2.3)
LANDUSE & LAND COVER: Based on the satellite image (RS LISS 4- FMX 2017)& ground truthing of various
area, the land use and land cover map of the area was generated. The eleven land use categories were
delineated in this area viz. the Crop land, Rock out crop, Forest, Land without Scrub, land with Scrub,
Mudflat, Sea, River, Water body, Industry and Settlement (Figure 3.11). Major portion in the study area is
covered by Crop land. The area statistics of these classes prepared from analysis shows that the major
portion of the study region is covered by forest land and agricultural land i.e. 55.94% & 26.45% areas
respectively. Around 1.39% of the area is of Scrub. Water bodies are covering around 4.20 % of the area. The
settlement of area is 7.27% and industrial area is 1.86%. The remaining categories cover 0.67 per cent of the
area. As per the satellite image and ground trothing the settlement area, industrial area and land without
scrub were slightly increased and crop land is slightly decreased.
SOCIOECONOMICS:
A Baseline data/information on socio‐economic front has been collected with the help of 2011 census data,
discussion with Tahsildars, Sarpanchs, various Government officials, local heads, etc. As well as by suitable
field surveys. There are several villages around its periphery but the study will include the villages coming
under 05 kms radius in all villages but 10 km radius in 14 villages are some villages include the study area.
The name of the villages are (velugam, Apti, Surangi, Karachgam, Kodad, Khadoli, Sutrakar, Vasona, Dapada,
Chikhali, Khanvel, Kherdi, Udhawa, Kurze, Kochai, Luhari, Mondgaon).Total populations have been all villages
241916. In which male 106451 and female 107912, in the study area. All villages are not available PHC,
private Hospital in the study area, but Government and private hospital nearby at Silavssa and Vapi. And
health issues that skin problems, goiter, fever etc., Problem of clean water and health issue is found in Apti,
Kurze and Udhawa village.
ANTICIPATED IMPACTS& MITIGATIONS
The present environmental impact assessment study has been conducted for the proposed project. All
necessary details of proposed project has been studied & referred carefully to determine the anticipated
impacts of the proposed project. The baseline environment status established during the study has also been
considered for determination and assessment of anticipated impact of the project. After impact assessment
study necessary mitigations measures to minimise and/or eliminate the identified impacts of the project.
The summary of the Impacts Assessment study as well as planning of mitigation measures for anticipated
impacts are described in subsequent paragraphs under respective headings.
Anticipated Impacts
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT)
UniStar Environment & Research Labs Pvt. Ltd. Executive Summary (QCI-NABET Accredited) 5
A. Ambient environment The identified main sources of impacts of the project are utilities (Boiler, TFH & DG set) emission. The
pollutants emitted from these sources are PM, SOx, NOx and CO. The effect of the pollutants on human and
fauna may occur in form of respiratory problem, asthma, bronchitis, allergic condition, effects on vision etc.
Severity of these effects varies according to the level of increase of the pollutant in the ambient air.
Detailed modelling for air quality change has been done to ascertain the level of change of these pollutants.
It has been found that Maximum Resultant GLC from the proposed project would be 1.74 for PM2.5, 1.76 for
PM10, 17.96 for SOx, 33.48 for NOx, 0.10 for CO. This values are under the permissible limit by CPCB.
B. Noise & vibration The main sources of noise pollutions from the projects are machineries like Extruders, Spindle Driven
Turrets and dryer etc. In work place exposure to these sources will be high due to continuous operation of
manufacturing process. Head ache is most likely to occur in employee engaged in this area. Also up on long
time, such regular exposure may result in hearing impairment of the employee engaged in this area.
Transportation of raw material and products will increase the movements of truck which in turn will
increase the noise level. The increased noise level in such way will have effects on sleeping of people as well
as fauna of the transport route.
C. Water environment: During operation & commissioning phase, major impacts are noticed in case of transportation activities,
materials storage & handling, manufacturing process, wastewater& hazardous/solid waste management
activities and Breakdown & maintenance of control equipment. The major impacts of these activities will
occur only due to water pollution and negligible on hydrology (Surface water & groundwater). Due to such
contamination of water resources, increase in pollutant levels & toxicity of water resources due to mixing of
toxic chemical is most likely to occur and some water quality parameters like the pH, TDS, Hardness,
Alkalinity & Acidity, Sodium, Chloride, Sulfate, BOD, COD, TOC and Phenolic compounds are likely to increase
to a greater extent depending up on the quantity of chemicals spilled/leak causing the impact. As a result of
such increased toxicity of affected water bodies, considerable toxic effects on aquatic organism, as well any
other animal consuming the water and flora irrigated with the contaminated water can be occur.
D. Land Environment: The identified major impact of soil due to pollutant load on soil, such impacts would occur mainly due to
from materials storage & handling activities and manufacturing process due to malfunctioning or major
hazard occurred in storage & process area. The intensity and quantum of such impact may vary depending
on the contents of wastewater & solid/hazardous waste causing the impacts. Due to the above said impacts,
it will affect the soil quality, soil fertility and depletion/reduction of soil organisms (biotic factor of soil). As a
result of such impacts, soil quality parameters like the pH, soluble salt, inorganic elements, SAR, Nutrient
level, Total Carbon, Carbon to Nitrogen Ratio and Biological organisms are likely to be affected to a greater
extent depending up on the quantity & nature of chemicals spilled/leak causing the impact. The toxicant in
soil may also affect the flora of the region and up on use of such flora toxic effects may occur on the
consumer of the affected flora. Irrigation of soil may contaminate/pollute water. Minor beneficial impacts of
the operation phase of the project is identified in terms of improvement in plantation status of vicinity area
due to greenbelt development.
E. Ecology & Biodiversity Long term or short term Negative impact because of materials storage & handling, manufacturing process,
utility emission and Breakdown & maintenance of control equipment, release/spill/leak of toxic materials
from project will occur on ecological environment. Such environmental contamination caused by emissions
& toxic chemicals may lead to heavy toxic load on ecological components (biotic & abiotic) which may have
very adverse effects on flora, fauna and ecological habitat depending up on the toxicity type & level of the
contaminant. The above said impacts due to the toxicity of contaminants released may also occur in the
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT)
UniStar Environment & Research Labs Pvt. Ltd. Executive Summary (QCI-NABET Accredited) 6
distant fauna due to the interaction & migration of the fauna between micro habitats of the region. The
eventual toxic effects of the said impacts may increase as a result of bio-magnification in food chain and
food web. The heat radiated from fire site during Major Fire Hazard may cause burning and drying of flora of
nearby area (Especially greenbelt) which in turn may result in adverse impacts on micro habitat of the local
area and thus may result in considerable adverse impacts on ecology.
F. Socio-Economic Environment About 1353 people will be directly employed and many other will be indirectly employed due to the project,
which will result in economic improvement. It will result in major positive impacts in terms of improvement
in status of employment & economy of the area. Such improvement will also lead to the improvement in
other social indicators like lifestyle, education & health etc. Fire & explosion in material storage area and
manufacturing area may result in considerable Major negative impact on socioeconomic environment, which
may cause the problem of health of local people and domestic animals of the affected area. Due to such
hazards, loss or damage of crop of nearby agricultural fields may occur and also will result in very serious
health issues like respiratory problem, cancer, irritation to eye & nose, skin problem etc.
G. Work Environment Major negative short term impacts on health & safety are anticipated due to the injury, health effects due to
unfavorable work place conditions and ergonomic issues related with material handling & transportation,
manufacturing process, maintenance works. Such impacts will occur mainly in terms of MSD and other injury
(cut, burn, irritation eye & respiratory tract etc.) are likely to occur due to lifting or shifting of heavy goods
and equipment. Rotating machineries & sharp edged tools/machinery can cause serious injury (like cut,
fracture of bone, crushing of hand etc.) to the employee engaged in operation of the machinery. Due to
release of toxic materials in air of workplace during handling & transfer of materials, process and
catastrophic incident may occur in terms of major health effects like saponification fat of cell, necrosis, lung
injury & burns of the upper airway, burn of oropharynx/ oesophagus/ stomach, development of blisters,
ulcerations, dyspnoea, pleuritic chest pain, cough and bronchospasm, conjunctival irritation and chemosis,
corneal epithelial defects, limbal ischemia, permanent vision loss etc.
Mitigation Measures:
A. Ambient Environment
CPCB approved DG Set, only to be used during power failure.
Adequate height of the stacks shall be attached to Boilers , TFHs and DG Sets
Regular Monitoring as per monitoring plan
B. Noise & vibration
Proper non-vibrating foundation, rubber padding and Regular maintenance of the equipment
& machineries including static /dynamic balancing & lubrication for rotating/vibrating
equipment/machinery
Housing in closed area and/or acoustic enclosures & silencers for high noise generating
equipment/machinery. Barriers wherever required/possible.
C. Water Environment
Adequate effluent treatment plant for wastewater.
Treated waste water is reused again in gardening & cooling tower.
Maximum possible recycling of water in process& gardening
Impervious lining of floor of chemical storage and production area with all necessary
arrangement of prevention of spread up and collection of spilled/leaked materials
Hazardous waste storage area with leachate collection line connected with ETP and disposal as
per the regulatory guideline/provisions.
Domestic effluent disposal through adequate soak pit and septic tank.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT)
UniStar Environment & Research Labs Pvt. Ltd. Executive Summary (QCI-NABET Accredited) 7
D. Landuse
Greenbelt development in and around premises.
Measures for protection of vegetation area from fire hazards.
E. Soil Quality
Connection of storage & production area with ETP or waste collection facility for collection of
toxic material accidentally spilled/leaked.
No disposal of Effluent outside the company premises as the treated effluent will be reused for
gardening & cooling tower.
Hazardous waste disposal as per regulatory provision
Domestic waste water should be disposed off only through adequate septic tank and then
soaks pit.
Proper impervious lining in material storage area as well as production area
Proper air pollution control system to control the gaseous pollutant &dust emission of the
project.
All mitigation measures as suggested by respective FAEs (of AP, AQ, WP, RH)
Transportation activities shall be done with provision of all necessary safety measures
F. Ecology & Diversity
All necessary control & measures for prevention of release of toxic contaminants from project
as well as for prevention of pollution due to emissions of the project
Safety measures & action plan for prevention of spreading of toxic materials being transported
Creation &Maintenance of dense greenbelt in and around the company premises.
No disposal of effluent and solid & hazardous waste on land and in water bodies.
G. Socioeconomics
Mitigation and control/ prevention measures for prevention & control of environmental
pollution and hazards & risk
Prevention of contaminated runoff
Regular medical check-up and Proper public relation to prevent conflicts with local people
Regular CSR activity for Social welfare &upliftment of local people
Work Environment
Non-slippery Floor of plant & storage and be ensured that there is no liquid spilled on floor.
Safety measures like safety guard around rotating part for all rotating equipment/machineries
Proper ergonomic condition to ensure safe & non-tiring work place conditions
Lifting & shifting of all heavy materials shall be done using trolley or fork lift.
Chemical safety plan shall be prepared & implemented before commissioning & routine
operation of the plant.
RA study for the proposed project shall be conducted & all necessary hazard/risk
control/prevention measures shall be implemented before erection & commissioning of plant.
(RA Study is conducted for proposed project, Refer Annexure V)
Proper storage shall be provided for all hazardous materials and there shall be adequate
isolation between two materials as required for safe storage condition.
All fittings in area having flammable materials shall be flameproof and all necessary fire-
fighting facilities shall be ensured in this area.
In all area first aid kit shall be available.
All necessary PPEs, Safety & emergency equipment shall be provided for all concern employee
in all areas
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT)
UniStar Environment & Research Labs Pvt. Ltd. Executive Summary (QCI-NABET Accredited) 8
Disaster management plan shall be prepared & all necessary arrangement for emergency
action plan shall be provided well before commissioning of plant.
Regular occupational health check program shall be conducted. Pre-employment & Annual
post-employment health check-up of all employee shall be done. Health check of affected
employee shall be done when any employee is significantly exposed to hazardous material.
4 ADDITIONAL STUDIES
As per the applicability of provision for Public Hearing of SO 1533 and other order &O.M. No. J-
11013/36/2014-IA-I dated 10th Dec. 2014 under the SO 1533, category ‘A’ and category ‘B1’ projects or
activities situated in notified industrial area/estate (established before 2006) are exempted from public
consultation. Considering this, public hearing is not required to be conducted for the proposed unit of M/s.
Beekaylon Synthetics Pvt. Ltd. Hence in additional study, the Risk Assessment Study for the proposed project
has been conducted by functional area expert of EIA Team. The risk assessment has been carried out with
consideration of probable worst case scenarios of toxic dispersion. Thus with such probabilities &
considerations of hazards & risk, “Risk Assessment Study” has been carried out by proponent as pre-project
conceptual RA study. The major hazards has been identified due to flammability of diesel and LSHS.
Consequence analysis has been done for these fuels. The maximum hazards distance of10 m for 10 kw/m2,
14 m for 5 kw/m2 and 20 m for 2 kw/m2 has been found in case of pool fire (worst case) due to storage of
diesel. Considering this hazards distances fire safety measures has been proposed. In addition to this
Disaster & Onsite Emergency Management plan has also been prepared as a part of RA study assignment. All
necessary chemical safety details have been covered in RA report to ensure the safety of public & employee
as well as surrounding industries. Also many recommendations for safety including the fire fighting and
emergency action facilities have been made in RA reports with necessary details of requirements. The Risk
Assessment Report is provided with EIA report Annexure-V
5 ENVIRONMENTAL MONITORING & MANAGEMENT PLAN
After delineation of necessary mitigation measures for major impacts, an Environmental Monitoring &
Management Plan has been formulated with all necessary component and description of action required to
ensure efficient & adequate implementation of planned/recommended mitigation measures. A five Tire EMC
with assigned responsibility has been formulated for management of environmental & safety aspects of the
projects. Considering the probable impacts and their potential to cause pollution with respect to change in
particular environmental parameters, a detailed monitoring plan has been framed with required schedule,
recommended parameters and frequency etc. In addition, a detailed action plan for EMP for all
environmental attributes have been formulated and presented in the prepared EMP. Some additional
environmental conservation & protection activities like Greenbelt Development & Energy Conservation have
also been considered and included in EMP. A capital provision of 1000 Lakhs has been made for environment
& safety requirements whereas a recurring cost provision of Rs: 166 Lakhs/Annum has been made for
various environmental & safety operations & actions mentioned under Environmental Management plan.
Following are the post monitoring plan for the proposed new project
Ambient Air: Location- 2 place within the plant premises , Parameters- PM2.5, PM10, SO2, NOX, CO
Work Place Monitoring: Location- Production Block, Store rooms, Parameters- PM2.5, PM10, SO2, NOX, Temperature, Humidity, Light & Noise
Stationary Emission: Location- D.G Set, TFH & Boiles, Parameters-: PM, SO2, NOX, CO
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT)
UniStar Environment & Research Labs Pvt. Ltd. Executive Summary (QCI-NABET Accredited) 9
Ambient Noise: Location- At all sources (DG set, Boilers, Production machineries in spinning-weaving-texturizing, other machineries, Blowers, Compressors etc) and at different areas within premises (Spinning area, texturizing area & weaving area Production, Storage & transportation area, Administrative & security area, STP, ETP etc.)
Surface Soil: Location: 2 locations from storage & greenbelt area, In case of accidental spillage/leak , soil of the affected area, Parameters: pH, EC, Moisture, Organic matter, Nitrate, Nitrite, Total N, P, K, SO4-2, Cl-, Ca+2, Mg+2 & Na+
Greenbelt/ Vegetation Cover: Location- Greenbelt Area at Boundary & Garden, Parameters- Number of plantation (Units), Number of Survived Plants/Trees, Number of Poor Plant/Trees
Employee Medical/Health Check-up: As per statutory provision & requirement
6 CONCLUSION
As described above, the proposed new project will be operated for manufacturing of synthetic organic yarns,
which will have some major impacts on various environmental attributes. As noted, the major impacts will
occur only in case of incident of major hazard occurred during operations phase of the project. Beside this,
major impacts may also occur vary occasionally due to the other sources of pollution of proposed new
project. All the identified major impacts are controllable and can be minimised by efficient implementation
of the mitigation measures and EMP planned. Hence, the project will be an action of sustainable
development and highly acceptable for the development of the local area as well as our state & country.
However, strict implementation, monitoring & timely updates of the planned mitigations & EMP is required
to ensure the safeguard of environment.
Content
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-01: Introduction (QCI-NABET Accredited) 1-1
CHAPTER: 01 INTRODUCTION
1.1. GENERAL
1.1.1. About The Company
M/s. Beekaylon Synthetics Pvt. Ltd. proposed to set up a new unit at Survey No.: 287/1, 284P, 289/1/3,
289/1/2, 289/2; in the Notified Industrial Zone situated at Village-Velugam of U.T. of Dadra and Nagar Haveli.
this unit is proposed to manufacture “various kinds of synthetic yarns like Polyester Filament Yarns (POY,
FDY, staple fibres) through continuous polymerisations, Texturized & Twisted Yarn using using Ready Yarn Of
Polyester/Nylon/Acrylic, Synthetic filament yarn (polyester, nylon 6&66, Polypropylene etc.) by Melt
Spinning Using Ready Polyester/Nylon Chip /Polyamide Chips/ Polypropylene Chips As Raw Materials as well
as various types of Fabrics. Company will also manufacture polyester granules as intermediate products
generated from continuous polymerisation of MEG & PTA for manufacturing of POY /FDY/Staple Fibres. The
company has also proposed to setup unit of knitting & weaving for fabrics production”. The company is
already in the business of synthetic manmade fibers and operating manufacturing operation at its other unit
in Masat, UT of D&NH.
The company has a wider customer base and to cater to the increased market demand and company needs
to set up a new unit to cater the demand of the synthetic manmade fiber. Considering the need of additional
production, Company proposes to set up a new unit for manufacturing Polyester POY/FDY/Staple Fibres &
Granulesthrough continuous polymerisations @ 432000 TPA, various types of Synthetic Filament Yarn @
378000 TPA and various other types of manmade fibres like Texturized Yarn/Twisted Yarn/Acrylic Yarn
/Covered Yarn/Spandex Yarn etc. @288000TPA. The proposed product line also includes Winding Of
Yarn/Heat Setting Of Yarn/Circular Knitting/Warping / Warp Knitting/Weaving Fabrics/Carpet Weaving/
Narrow Fabrics @ 36000 TPA and Color Master Batch Chips / granules@9000 TPA.
As the company is intended to provide high quality yarns to its clients, company has decided to set up this
unit with backward integration by producing synthetic polyester yarn through continuous polymerization of
MEG & PTA.
More details about the proposed project and the present EIA study are presented in subsequent paragraphs
of this chapter and other chapters of the present EIA report prepared by UniStar Environment & Research
Labs Pvt. Ltd. (NABET Accredited EIA consultant).
1.1.2. About Proponent
M/s. Beekaylon Synthetics Pvt. Ltd. is an existing company engaged in manufacturing of various types of
synthetic yarns since 1975. Beekaylon Synthetics Pvt. Ltd is a registered company having its registered office
at Office Nos. 15,16 & 17, Maker Chamber-3, Jamnalal Bajaj Road, Nariman Point, Mumbai – 400 021.
The company has been promoted by, well experienced Khemani family, having sound financial strength and
demonstrated track record in the Textiles business. The senior members of the family have been active in
textile industry for more than Three decades. Khemani family is well known amongst the textile industrialist
for their commitments towards quality and customer relationship. The family is also known for philanthropic
works in society. The Company is a registered Private Limited company and is promoted by five Directors.
Details related to them are given below:
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-01: Introduction (QCI-NABET Accredited) 1-2
Table 1.1: List of Directors
Sr. No. Name of Directors Residential Address
1. Mr. Nand K. Khemani 32, Elcid, 13, Ridge Road, Malabar Hill, Mumbai – 400 006.
2. Mr. Ashok K. Khemani 32, Elcid, 13, Ridge Road, Malabar Hill, Mumbai – 400 006.
3. Mr. Rahul A. Khemani 32, Elcid, 13, Ridge Road, Malabar Hill, Mumbai – 06
4. Mr. Shahin N. Khemani 32, Elcid, 13, Ridge Road, Malabar Hill, Mumbai – 06
5. Mr. Mahesh Lakhwani Beekaylon Bungalow, Kalvani Road, Silvassa, D & NH.
1.2. DESCRIPTION OF PROJECT
1.2.1. Nature & Type of Project
M/s. Beekaylon Synthetics Pvt. Ltd. proposes to setup a new Textile Unit for production various kinds of
yarns and fabrics at Survey No.: 287/1, 284P, 289/1/3, 289/1/2, 289/2 in the Notified Industrial Zone
situated at Village-Velugam of D & NH-396 240 (U.T. of Dadra and Nagar Haveli).
The proposed new project involves the production of “Various types & grades of Synthetic Polyester Yarns
through continuous polymerization of MEG & PTA and various kinds of Fabrics”.
As per the EIA notification- 2006 as amended, the proposed products –Various kinds of Polyester yarns are
covered under the Category-5(d) – “Manmade fiber other than Rayon”. Manufacturing of “Manmade fiber
other than Rayon ” is covered under Category –B, but due to the applicability of General Conditions (Eco
Sensitive Zone with in 5 Km distance and Interstate Boundary ) this project is categorized is appraised at
central level and hence application for TOR & EC is to be done to MoEF&CC, Delhi for obtaining
Environmental Clearance.
1.2.2. Products & Capacity of Project
The proposed unit is to be setup for manufacturing Manmade Fiber other than Rayon and various kinds of
fabric using the produced manmade fiber by Knitting & Weaving. The details of products are presented
below.
Table 1.2: List of Products
Sr. No.
Product Description QUANTITY
TPA
1. Polyester Filament Yarn (POY/FDY) / Staple Fiber/Polyester Granules By Continuous Polymerization & melt spinning process using PTA and MEG as raw material
432000
2.
Synthetic Filament Yarn : Bulk Continuous Filament Yarn(BCF)/Partially Oriented Yarn(POY)/Fully Drawn Yarn(FDY)/Dope Dyed Yarn(DD)/Low Oriented Yarn(LOY)/Highly Oriented Yarn(HOY)/ Nylon Yarn(N6 & N66)/ Polypropylene Yarn(PP) By Melt Spinning Using Ready Polyester/Nylon Chip /Polyamide Chips/ Polypropylene Chips As Raw Materials.
378000
3.
Polyester Texturised Yarn/Draw Texturised Yarn/Air Texturised Yarn/ Polyester Twisted Yarn/Cable Yarn/Double Yarn/ Draw Twisted Yarn/Acrylic Yarn /Covered Yarn/Spandex Yarn By Using Ready Yarn Of Polyester/Nylon/Acrylic
288000
4. Winding Of Yarn/Heat Setting Of Yarn/Circular Knitting/Warping / Warp Knitting/Weaving Fabrics/Carpet Weaving/ Narrow Fabrics
36000
5. Color Master Batch Chips / granules 9000
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-01: Introduction (QCI-NABET Accredited) 1-3
1.2.3. Project Location
The proposed new unit of M/s.Beekaylon Synthetics Pvt. Ltd. isto be setup at Survey No.: 287/1, 284P,
289/1/3, 289/1/2, 289/2 in the Notified Industrial Zone situated at Village-Velugam of D & NH-396 240 (U.T.
of Dadra and Nagar Haveli). The Arabian Sea is situated in west direction, which is about 29.7 Km (W) away
from the site. Madhuban Dam the ultimate source of water requirement of the proposed unit is situated at
about 8.41 kms (NE) The nearest railway station – Sanjan is about 18.90kms (W) away from project site. The
project site is well connected with state & national Highway network and the nearest National Highway -8 is
about 7.8kms (SW) away from project site. The nearest UT-state boundaries of Gujarat & Maharashtra are at
about 7.5km (W) &0.3 km (S) respectively. Nearest Eco-sensitive Zone & D & NH Wild Life Sanctuary Wildlife
Sanctuary is located at about 1.30 km (E) & 2.30 (W). Besides Vasona Lion safari and Satmaliya Deer Park are
located at distance about 9.37km (NE) and 5.3Km (NE) respectively.
1.2.4. Regulatory Framework
The proposed project of M/s. Beekaylon Synthetics Pvt. Ltd.is a unit of manufacturing of synthetic manmade
fibre through continuous polymerisation & fabrics using the produced manmade fibre. The unit will have
significant potential of pollution, probability of chemical hazards and also attracts the provisions of EIA
notifications 2006- SO 1533 (as amended time to time). Thus, the proposed project may be required to
comply with many regulatory provisions. The proponent shall follow the applicable regulatory framework as
listed below and additional applicable provision shall also be referred timely as cited as mandatory provision
for proposed project. In any case, proponent shall comply with the regulatory provision as directed through
particular regulatory provision. The major regulatory provisions applicable to the proposed project area
listed below.
1 Air (Prevention and Control of Pollution) Act, 1981 amended 1987 and rules there under
2 Water (Prevention and Control of Pollution) Act, 1974 amended 1988 & rules there under
3 The Environment (Protection) Act, 1986, amended 1991 and rules there under
4 Hazardous Waste (Management, Handling and Transboundary Movement) Rules-2016.
5 The Manufacture, Storage &Import of Hazardous Chemical Rule, 2000 as amended timely
6 Chemical Accidents (Emergency Planning, Preparedness and Response) Rules, 1996
7 EIA Notification, 2006 as amended timely
8 Public Liability Insurance Act, 1991 amended 1992 and rules there under
9 Factories Act, 1948 & rules there under
10 The Motor Vehicle Act, 1988 & rules there under
The proposed unit is being a new unit will obtain NOC and CC&A for its proposed project after obtaining the
EC. The company will always ensure that the proposed unit complies with all statutory requirements as
timely issued in form of EC, NOC, CC&A, Other order & circular from the concern authorities. The CC&A and
EC compliance report of the proposed unit will be submitted regularly as required by statutory provisions.
1.2.5. Need for the project and its importance to the country and or region
The growth of textile industrial sector in the past few years has become drastically dynamic with increase &
development in readymade garment industries as well as demand of textile materials from overseas. Also
these industries have been influenced by the globalization trend which has boosted the demand of
manmade fibres as well as the fabrics for Garment & Apparel and home furnishing Industries. Considering
these M/s. Beekaylon Synthetics Pvt. Ltd. have identified the potential demand & market from its customers
for the proposed products. With focus of acquiring significant role of supplying the high quality manmade
fibres& fabrics to these industries company has planned to setup a new manufacturing unit in line with the
outcome of the continuous R&D study to cater the captive requirement of yarns as well as acquire domestic
as well as foreign markets. Company has also decided to setup the unit of manmade fibre manufacturing
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-01: Introduction (QCI-NABET Accredited) 1-4
through continuous polymerisation, which will reduce the traffic on local road networks as well will ensure
availability of high quality yarns for captive consumption & sells. The proposed project provides a potential
growth opportunity for the already running business of the company. Also the new manufacturing unit of
the proponent will significantly increase Government revenue through the applicable Taxes and other levies.
The proposed project will also be helpful for the local area development and increase in employment status
of the region as significant direct & indirect employment will be generated with the proposed project. The
company is already engaged in the business of manufacturing of “Synthetic Filaments Yarn” and the
proposed new project would increase the overall export and also increase the foreign revenue. Products are
now well established and acceptable in the international markets.
1.3. TERMS OF REFERENCE FOR EIA STUDY
In line with the sequential proceeding for Prior EC described in EIA Notification SO 1533 (as amended),
proponent had applied in Form-I along with pre-feasibility report for approval of Terms of Reference for
proposed project. The application was made to the EAC, New Delhi on03rd October2017 due to the
applicability of General Condition. Public hearing is exempted as the project is to be developed in the
notified industrial zone. In this regard, under the provision of the EIA Notification 2006 as amended, the
standard TOR for the purpose of preparing environment impact assessment report and environment plan for
obtaining prior environment clearance is prescribed MoEF&CC vide letter no. J-11011/493/2017-IA II
(I).Dated: 16 Nov 2017, Committee had noticed that the proposed project is falling under category 5(d) – i.e.
manmade fiber manufacturing – other than rayon under the category B (Project site is located in Govt.
Industrial Zone) as per the SO 1533 (as amended)but due to the applicability of General Condition of Eco
sensitive Zone falling within the 5 Km radial distance from the project site and interstate boundary between
Dadra and Nagar Haveli and Maharashtra, the project is considered at central level from MoEF&CC, New
Delhi for appraisalas per SO 1533 its subsequent amendments as well as OMs/Orders issued for EC. After
consideration of the proposal EAC (Ind-II) had issued the letter for approved/awarded TORs.
The EAC had earmarked the area covering 10 km radial area from site for monitoring & sampling as well as
for preparation of some maps for proposed EIA study. With respect to the awarded /Approved TOR, the
present EIA study has been conducted for the proposed EIA study in area covering &10 km radial distance
from site. All points of TORs issued by EAC has been addressed in the study and covered in the present EIA
report under respective heading. The details of Terms of Reference including the copy of letter for TOR
issued by EAC and the tabular compliance report for the issued TOR are presented in Annexure-II.
1.4. NEED & SCOPE OF EIA STUDY
1.4.1. Need Of EIA Study
The proposed project involves manufacturing of products ‘Synthetic Filaments Yarns’, which fall under item
no. 5(d) i.e. man-made fibre (other than rayon), under Category B (to be considered at central level due to
General Condition of Eco sensitive zone with in 5 km and Interstate Boundary), as per the SO 1533, 14
September 2006 (as amended). Considering these, an application for approval of TOR for EIA for prior
environmental clearance had been made in Form 1 to the EAC, MoEF&CC, Delhi for approval of draft TORs as
well as to obtained the awarded TOR for preparation of an Environmental Impact Assessment (EIA) for
project appraisal to obtain environmental clearance for proposed new project depending upon the nature
and location specificity of the project. The EAC has cited many requirements for environmental studies and
has issued the awarded TORs, which mentions that a detailed EIA study has to be conducted as per the
applicability of SO 1533 (as amended). Hence, the present EIA study has been conducted as it is mandatory
requirement as per applicability of EIA Notification SO 1533 (as amended).
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-01: Introduction (QCI-NABET Accredited) 1-5
1.4.2. Public Hearing
The proposed new project is to be located in the Notified Industrial Zone of Dadra and Haveli which was
established before 2006. And as per the recent O.M. No. J-11013/36/2014-IA-I Dated- 10/12/2014, public
hearing is exempted in our proposed project.
1.4.3. Scope & Objective of EIA Study
M/s. Beekaylon Synthetics Pvt. Ltd., Velugam has appointed NABET Accredited EIA Consultant- M/s.
Unistar Environment & Research Labs Pvt. Ltd, Vapi as Environmental Consultants to carry out the
Environment Impact Assessment for the upcoming new project for manufacturing of Synthetic Filaments
Yarns & fabrics within the acquired industrial land situated at Survey No.: 287/1, 284P, 289/1/3, 289/1/2,
289/2, 286/1/P, 287/2; , Govt. Industrial Estate, Village: Velugam, U.T. of Dadra & Nagar Haveli.
The major objective of the present EIA study is to determine the change in impact due to the proposed
new project. The present report is outcome of EIA study conducted during October 2017 to
December2017 as per awarded TORs by EAC, MoEF&CC, Delhi. The area of study is a radial coverage of 10
Km around the proposed site. The scope of this study is to receive approval of EAC, MoEF& CC, Delhi for
Environmental Clearance by studying probable impacts of the proposed new project and preparing EIA
Report including Environmental Management Plan. The scope of study also includes the study of probable
hazards & risks associated with the proposed project. Besides, the report will have scope of utilization for
approval from other government authorities like PCC.
While deciding the objective of the EIA study, the awarded TOR as presented in Annexure-I has been
referred to comply with all conditions provided therein for EIA study. The objectives of the present EIA
conducted for the development of a proposed project are:
To collect& study details regarding the activities, operations, processes, utilities, machineries,
equipment, and other materials & requisites related to construction and operation phase of
Proposed unit.
Characterization and benchmarking of existing environmental status of a study area - 10 km radial
area from proposed site situated in Notified Industrial Zone –Velugam, Dadra and Nagar Haveli.
To collect meteorological data like humidity, wind speed, wind direction etc.
To prepare necessary maps of project area- 10 km radial area from proposed site situated in Notified
Industrial Zone – Velugam, Dadra and Nagar Haveli to comply with awarded TOR and to improve EIA
quality.
To identify potential sources of impacts of proposed unit, which includes impacts due to emission,
water consumption & wastewater disposal, hazardous & solid waste generation & disposal, noise
generation, contamination of environment by chemicals, toxic effects of raw materials & products,
hazards & risk of various operations and employment & other social aspects of projects.
To predict and evaluate the major impact on environment along with pollution control measures
taken especially for emission as well as various probable hazards like fire, explosion & toxic
dispersion.
Preparation of an environmental monitoring & management plan to minimize the adverse impacts
due to the project(s) and formulation of a post – operational monitoring scheme.
To ensure that there will not be considerable impacts on air quality, water quality & quantity, human
health and flora & fauna of the surrounding area through preparing adequate EMP & EM Plans
Preparation of a Risk Assessment report as well as disaster management plan to meet the safety and
emergency requirements during probable hazards & disasters.
To ensure that all necessary action plan are prepared for implementation to avoid any critical
environmental & safety issue in the surrounding area due to proposed project operation
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-01: Introduction (QCI-NABET Accredited) 1-6
To prepare an EIA Study report with efficient environment management plan.
To utilize any content or whole report of present EIA study for applicable statutory clearances for
proposed project and/or any other management purpose.
1.5. APPROACH & METHODOLOGY OF EIA STUDY
The EIA study for the proposed new project has been conducted with respect to the process cycle of EIA as
suggested by MoEF& CC vide SO 1533 as well as provided in TGM issued by MoEF& CC.
The study was conducted in six phases are below:
Phase - I: Reconnaissance Survey and Screening & Scoping
Phase- II: Baseline Environmental Study
Phase-III: Identification, prediction & assessment of Environmental Impacts and Mitigation measures
Phase-IV: Additional Tasks like preparation of Environmental Monitoring & Management Plan, Risk
Assessment study, preparation of RA Report and Disaster & Emergency management plan
Phase-V: Compilation of Draft EIA Report, PH if applicable & Review of Draft EIA report for finalisation
Phase- VI: Finalisation of EIA Report & Application for EC
The stages of approaches & methodology of EIA study has been presented in illustrative form in the figure 1.1
Figure 1.1: Approach & Methodology of EIA Study
1.6. STRUCTURE OF EIA REPORT
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-01: Introduction (QCI-NABET Accredited) 1-7
The report has been suitably structured covering various aspects like project description, baseline
conditions, environmental impacts, mitigation measures, environmental management plan. The EIA report
has been prepared chapter wise in accordance with generic structure suggested by MoEF&CC in EIA
notification 2006.
Chapter 1 Introduction: This chapter includes details like Identification of project & project proponent, Brief
description of nature, size, location of the project and its importance, Scope of the study – details of
regulatory scoping carried out (As per Terms of Reference)
Chapter 2 Project description: Description of the project (based on project feasibility study), Details are
provided to give clear picture of the following:
Type & Need of project and Size or magnitude of operation
Maps showing Project Location, plant layout & study area.
Technology and process description
Description of facilities, infrastructure, resource requirement, pollution potentials & mitigation
measures implemented for control of pollution
Chapter 3 Description of the Environment: This chapter includes the baseline environmental information of
the project area and related details as mentioned below.
Study area & period, components & methodology of study
Establishment of baseline for valued environmental parameters, as identified in scope
Base maps of necessary environmental Components/Features
Chapter 4 Anticipated Environmental Impacts & Mitigation Measures: This chapter comprises Details of
Investigated Environmental impacts due to project establishment, possible accidents, project design, regular
operations, final commissioning of project. The details covered in chapter are tabulated below.
Assessment of significance of impacts (Criteria for determining significance, Assigning significance)
Measures for minimizing and / or offsetting adverse impacts identified.
Chapter 5Analysis of Alternative (Technology & Site): Detailed description of alternative analysis for
selection of site &technology for proposed project (as required).
Chapter 6 Environmental Monitoring Program: Technical aspects of monitoring the effectiveness of
mitigation measures (incl. Measurement methodologies, frequency, location, data analysis, reporting
schedules, emergency procedures, detailed budget & procurement schedules)
Chapter 7 Additional Studies: Risk Assessment & Disaster Management Plan
Chapter 8 Project Benefits: Improvements in the physical & social infrastructure, Employment & Other
tangible benefits
Chapter 9 Environmental Cost Benefit Analysis: A systematic process for calculating and
comparing benefits and costs of a project. Broadly, CBA has two purposes: To determine if it is a sound
investment/decision (justification/feasibility), and to provide a basis for comparing projects.(If
recommended at the scoping stage).
Chapter 10 Environmental Management Plan: Description of the administrative & managerial aspects of
ensuring that mitigation measures are implemented and their effectiveness monitored, after approval of the
EC, NOC and CC&A
Chapter 11 Summary & Conclusion: Overall justification for implementation of the project, Explanation of
how, adverse effects have been mitigated
Chapter 12 Disclosure of Consultants Engaged: The introduction & description of the consultants engaged
and nature of consultancy rendered.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-1
CHAPTER: 02 DESCRIPTION OF PROJECT
2.1. HIGHLIGHT OF PROJECT
M/s. Beekaylon Synthetics Pvt. Ltd., Velugam has proposed to setup a new manufacturing unit for
manufacturing of synthetic manmade fibres & Polyester granules through continuous polymerisation of MEG
& PTA and knitting & weaving for fabric production. The proposed project involves the production of Polyester
POY/FDY/Staple Fibres & Granules @ 432000 TPA, various types of Synthetic Filament Yarn @ 378000 TPA and
various other types of manmade fibres like Texturized Yarn/Twisted Yarn/Acrylic Yarn /Covered Yarn/Spandex
Yarn etc. @288000TPA. The proposed product line also includes Winding Of Yarn/Heat Setting Of Yarn/Circular
Knitting/Warping / Warp Knitting/Weaving Fabrics/Carpet Weaving/ Narrow Fabrics @ 36000 TPA and Colour
Master Batch Chips / granules@9000 TPA.
As per the EIA notification‐ 2006 as amended, proposed products are covered under Activity 5(d) Category-B
and hence required Prior Environmental Clearance.
The details of the proposed project are summarized as highlights of the project in the following table.
Table 2.1: Highlights of the project
Sr. No.
Particulates Description
1. Project Location M/s. Beekaylon Synthetics Pvt. Ltd.
287/1, 284P, 289/1/3, 289/1/2, 289/2 Village: Velugam, Dadra & Nagar Haveli
2. Project Activity, Category as per amendments
Project Activity: 5(d)-“MANMADE FIBER (OTHER THAN RAYON)”, Category: B, but considered as cat.-A (Due to applicability of GC interstate boundary with Maharastra state and Eco sensitivity zone within 5 Km)
3. Project Cost Rs. 443 Crore
4. Total area of Project 77800.00 Sq. m.
5. Area for Green Belt 25890.00 Sq. m. (@ 33.3 % of the total plot area)
6. Products with capacity As mentioned in table no. 2.2
7. Power Requirement Power –Electricity requirement: 27000 KVA Source: DNH Power distribution corporation Ltd.
8. Utilities Requirement (Boilers, Thermic Fluid Heater and D.G. Sets)
Steam Boiler: 03 nos. (10TPH x 1, 1TPH X 2) Thermic Fluid Heaters: 03 nos. ( 10 M Kcal/Hr.) Stand by D. G. Set: 03 Nos. (1 X 1000 KVA, 2 X 2500 KVA)
9. Fuel Requirements LSHS/ FO: 60 KL/DAY High Speed Diesel : 1250 liters/Hr.
10. Man Power 1353
11. Air pollution Control Measures Adequate stack height will be provided to all the stacks
12. Water requirement Industrial Total: 4390 KL/day (Fresh: 3640, Recycled: 750).
Domestic : 100.00 KL/Day
13. waste water generation with mode of disposal
Industrial: 800.00 KL/Day treated in ETP/RO/MEE-reuse.
Domestic: 80.00 KL/Day treated in STP- use for plantation.
14. Solid / Hazardous waste Generation
Management as per Hazardous Waste (Management, Handling And Transboundary Movement) Rules-2016.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-2
15. Nearest Highway NH-8: 7.8 km W
16. Nearest Railway Station Sanjan - 18.90 Km W
17. Nearest Airport Daman, 36 Km NW (Approx.)
18. Nearest Forest/ Sanctuary/Eco-sensitive zone.
Patches of Reserved forests - 2.59 km W
Vasona Lion safari - 9.37 km NW
Satmalia Deer Park - 5.3 km NE
DNH Wildlife sanctuary -1.30 km E & 2.30 W
River Daman Ganga - 8.74 km N
River Dongar Khadi (1.40 km N)
River Sakartod (3.45 km NE)
Darotha River (5.23 Km NW)
2.1.1. PROPOSED PRODUCTS
The proposed products with capacity are presented in below tabular formTable 2.2: List of Proposed Products with capacity
Sr. No.
Product Description Capacity (TPA)
1. Polyester Filament Yarn (POY/FDY) / Staple Fiber/Polyester Granules By Continuous Polymerization & melt spinning process using PTA and MEG as raw material
432000
2.
Synthetic Filament Yarn : Bulk Continuous Filament Yarn(BCF)/Partially Oriented Yarn(POY)/Fully Drawn Yarn(FDY)/Dope Dyed Yarn(DD)/Low Oriented Yarn(LOY)/Highly Oriented Yarn(HOY)/ Nylon Yarn(N6 & N66)/ Polypropylene Yarn(PP) By Melt Spinning Using Ready Polyester/Nylon Chip /Polyamide Chips/ Polypropylene Chips As Raw Materials.
378000
3.
Polyester Texturised Yarn/Draw Texturised Yarn/Air Texturised Yarn/ Polyester Twisted Yarn/Cable Yarn/Double Yarn/ Draw Twisted Yarn/Acrylic Yarn /Covered Yarn/Spandex Yarn By Using Ready Yarn Of Polyester/Nylon/Acrylic
288000
4. Winding Of Yarn/Heat Setting Of Yarn/Circular Knitting/Warping / Warp Knitting/Weaving Fabrics/Carpet Weaving/ Narrow Fabrics
36000
5. Color Master Batch Chips / granules 9000
2.1.2. JUSTIFICATION OF PROJECT
The proponent company falls under Large Scale category and having an operational unit at Masat, UT of D&NH
for manufacturing of Synthetic Filament Yarns including Nylon (i.e. Polyester Texturised& Twisted Yarn,
Polyester Oriented Yarn (POY) / Fully Drawn Yarn (FDY), Bulk Continuous Filament Yarn/ Nylon Filament
Yarn). Now company is proposing to setup a new unit at Velugam, UT of D&NH which will be manufacturing
Polyester POY/FDY/Staple Fibres& Granulesthrough continuous polymerisations @ 432000 TPA, various types
of Synthetic Filament Yarn @ 378000 TPA and various other types of manmade fibres like Texturized
Yarn/Twisted Yarn/Acrylic Yarn /Covered Yarn/Spandex Yarn etc. @288000TPA. The proposed product line
also includes Winding Of Yarn/Heat Setting Of Yarn/Circular Knitting/Warping / Warp Knitting/Weaving
Fabrics/Carpet Weaving/ Narrow Fabrics @ 36000 TPA and Color Master Batch Chips / granules@9000
TPA.The proponent started its operation for producing Synthetic filaments yarn using most efficient & feasible
technology available at time of the establishment of its other operational unit. Since its beginning the company
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-3
is performing greatly in the local as well as other open market. It has got very good customers through delivery
of quality products. As a result of these, the company is experiencing considerable increase in demand of their
proposed products. In order to meet the demand of the customers, the company is now proposing a new unit
for manufacturing the aforesaid products. The proposed project is envisaged as growth multiplier project for
the company and the company has got very good opportunity in recent time to execute the operation in
feasible manner for extreme rewarding growth of the already running business of the company. The proposed
product range is required as the company expect significant growth of business in local market as well as
overseas market in very near future.
Beside the benefits to the company, proposed project will have significant opportunity of direct & indirect
employment generation and development of local area through its increased CSR activities conducted as per
regulatory provisions. For the proposed project, there will be huge requirement of Human Resource for
throughout its operational phase. To meet these human resources requirement company will employ about
150 to 200 people in construction phase whereas to fulfil its need to handle the plant operation approximately
1500-2000local people will be directly employed. It is also expected that more than 1000 to 1200 people will
be indirectly employed in form of human resources required for transport works, development of hotel &
other business in local area, contract works etc.
Thus looking to afore said details it is envisaged that the proposed project will be very good opportunity and
key for significant development of the company. Also the new manufacturing unit of the proponent will
significantly increase Government revenue through the applicable Taxes and other levies. Besides, the
proposed project will also be helpful for the local area development and increase in employment status of the
region as significant direct & indirect employment will be generated with the proposed project.
2.1.3. PROJECT SITE
The proposed new Textile Unit for production various kinds of yarns and fabrics of the M/s. Beekaylon
Synthetics Pvt. Ltd. will be setup at Survey No.: 287/1, 284P, 289/1/3, 289/1/2, 289/2 in the Notified Industrial
Zone situated at Village-Velugam of D & NH-396 240 (U.T. of Dadra and Nagar Haveli).
As the project is to be developed the notified industrial zone, no alternative site has been considered for the
proposed project.
The key development plan of town planning department of UT of Dadra & Nagar Haveli indicating proposed
site & map covering the project area is shown in subsequent figures. The map showing general location,
specific location and project boundary and project site layout of M/s. Beekaylon Synthetics Pvt. Ltd. located
at Survey No.: 287/1, 284P, 289/1/3, 289/1/2, 289/2 in the Notified Industrial Zone situated at Village-Velugam
of U.T. of Dadra and Nagar Haveli.The latitude and longitude of the project site is 20° 8'15.46"N and
72°59'32.41"E. Plot plan of the project site is presented in subsequent figure.
The map of project area showing the project site and surrounding area is presented below.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-4
Fig.2.1: Map of Project Site
Fig. 2.2: Plant Layout
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-5
2.2. RESOURCE REQUIREMENT
2.2.1. LAND & BUILDINGS
Earlier company had planned for purchasing 7 plots admeasuring 98200 m2 Area. After detailed technical
assessment for land Requirement Company has decided to procure 5 plots admeasuring 7780m2.
Initial procuring land with plots Final procuring land with plots
1. 287/1- 5.30 Ha. (53000) 1. 287/1- 5.30 Ha. (53000)
2. 287/2- 1.64 Ha. (16400) 2. 284P- 0.89 Ha. (8900)
3. 284P- 0.89 Ha. (8900) 3. 289/1/2- 1.00 Ha. (10000)
4. 286/1/P- 0.40 Ha. (4000) 4. 289/1/3- 0.54 Ha. (5400)
5. 289/1/2- 1.00 Ha. (10000) 5. 289/2- 0.05 Ha. (500)
6. 289/1/3- 0.54 Ha. (5400)
7. 289/2- 0.05 Ha. (500)
Total Area- 9.82 Ha (98200 m2) Total Area- 7.78 Ha (77800 m2)
The key plan and the site layout map showing the project site is given in the Figure no. 2.2.
The total plot area of the proposed unit is 77800.00 m2, out of which Green belt area comprises of 25890 m2.
The total land to be used for construction is about 32805.00 m2. The details breakup of land requirement is as
given below table no. 2.3. The layout of project premises /site showing the buildings & infrastructures
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-6
including raw materials storage area, production area, utility area, office area, greenbelt area, internal roads
and parking area etc. is shown in earlier figure of plant layout.
Table 2.3: Area Statement for the Plant Premises
Area Statement Area (in m2)
Total Area 77800.00
Construction Area 32805.00
Open Land / Internal Road Area 19105.00
Greenbelt Area 25890.00
Plot no of 287/1 land acquisition has done and the land document is given in the Annexure VIII(A) remaining
plots no of 284P, 289/1/2, 289/1/3, and 289/2 acquisition is under process.
2.2.2. WATER
The unit will require total 4490.00 KLD water out of which 3740.00 KLD will be fresh water sourced from
irrigation canal (Surface water source)/Ground water with required permission from CGWA and 750.00 KLD
recycled water. The authorized permission letter for drawl of water from irrigation canal of Damanganga Canal
is provided as Annexure VIII(C).The industrial operation of the unit will require 4390.00 KLD, whereas the
domestic activities will require 100.00 KLD. In addition to these, 80KLD water requirement for irrigation of
greenbelt will be met by treated domestic wastewater from STP. The details with necessary breakup for water
requirement of proposed unit are presented in subsequent table.
Table 2.4: Breakup of Water Requirement and Waste water Generation& disposal
Sr. No.
Particulars
Water Requirement (KLD) Wastewater Generation (KLD)
Proposed (Total)
Fresh water
Recycled water
Quantity Treatment Disposal/ Reuse
1. Domestic 100.00 100.00 0.00 80.00 To in-house STP
Reuse for plantation within premises
2. Gardening 80.00 0.00 80.00 0.00 -- --
3. Industrial
Process 0.00 0.00 0.00 224.00 To
ETP+RO+MEE Reuse in Cooling Washing 75.00 75.00 0.00 70.00
Boiler 100.00 100.00 0.00 6.00
Cooling 4215.00 3465.00 750.00 500.00 To RO + MEE Recycle to Cooling
Sub Total (Industrial)
4390.00 3640.00 750.00 800.00 -- --
Total 4490.00 3740.00 750.00 880.00 -- --
Note: KLD = Kilo Litter per Day; TPD = Tone per Day; Evaporation loss @ 44.50 KLD & Residue @ 0.5 TPD to TSDF
2.2.3. ENERGY, FUEL & POWER
The production of proposed products will require significant quantum of steam & heat. To meet the steam &
heat requirement of the proposed project three boilers (2 x 1TPH & 1 X 10 TPH) and Thermic fluid Heaters (3
x 10 M KCal/Hr.) will be used. LSHS/Furnace Oil (FO) will be used as fuel for proposed Boilers & TFHs. Power
requirement of the proposed unit will be around 27 MW, which will be met from DNH Power Distribution
Corporation Ltd. To meet the power requirement of project during failure of power form the primary source,
company has also proposed to install three DG sets (1 x 1000 KVA & 2 X 2500 KVA). Diesel/HSD will be used as
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-7
fuel for proposed DG Sets. The details of Fuel & Power requirement is presented in tabular form in subsequent
table.
Table 2.5: Energy, Fuel & Power Requirement
Sr.
No. Particulars Total Source
1. Steam Requirement 12 Tons/Hr. In House Boilers (2 X 1 TPH & 10 TPH)
2. Heat Requirement 30 M Kcal/Hr. In house TFHs (3 X 10 M Kcal/Hr.)
2. Power 27 MW DNH Power Distri. Corp. Ltd. & D.G.
Sets-6000 KVA (Standby Power Source)
4. Furnace Oil/LSHS (For Boilers &
TFHs) 60 KLD
Local Trader
5. HSD (For DG Sets) 3750 Lit/Hr.
2.2.4. PLANT & MACHINERY
Plant and machineries details are presented in Annexure: IV of EIA report
2.2.5. HUMAN RESOURCE
The company will provide employment to 1353 people in different categories for operation of proposed
project. The details of the proposed employment structure are presented below in tabular form.
Table 2.6: Human Resource Requirement
Sr. No. General 1st Shift 2nd Shift 3rd Shift Total
Skilled 40 105 105 105 355
Semi-
Skilled 140 140 140 420
Un-Skilled 190 190 190 570
Managerial 8 8
Total 48 435 435 435 1353
2.2.6. CAPITAL
The capital of proposed project has been estimated & budgeted to be around Rs. 443.00 crores. The details of
proposed estimation capital costs for land, buildings, plant machineries & equipment, environmental
protection measures etc. is presented below in tabulated form.
Table 2.7: Capital Cost
Sr. No. Purpose Cost (Rs. in Cr.)
1. Land 18.00
2. Building and Civil Works 50.00
3. Plant & Machinery and other fittings 360.00
4. Environmental protection measures 10.00
5. Green Belt Development 5.00
TOTAL : 443.00
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-8
2.3. DESCRIPTION OF PROCESS & ALLIED DETAILS
The details of Raw Materials & production process of all products are described in subsequent paragraphs
under respective headings.
2.3.1. RAW MATERIALS
All raw materials required for manufacturing of proposed products are easily available indigenously in local
market, which will be transported through road. The details of the raw material requirement are presented
below.
Table- 2.8: List of Raw Material and its Consumption per Month
Sr. No
.
Name of the product Raw Materials
Consumption Quantity
MT/MT MT/Year
1. Polyester Filament Yarn (POY/FDY) / Staple Fiber/Polyester Granules By Continuous Polymerization process using PTA and MEG @ 432000 TPA
Purified Terepthalic Acid 0.858 370656
Mono Ethylene glycol 0.334 144288
Antimony trioxide 0.003 1296
Titanium Dioxide 0.030 12960
Spin Finish oil 0.008 3456
2. Synthetic Filament Yarn : Bulk Continuous Filament Yarn(BCF)/Partially Yarn(POY)/Fully Drawn Yarn(FDY)/Dope Dyed Yarn(DD)/Low Oriented Yarn(LOY)/Highly Oriented Yarn(HOY)/ Nylon Yarn(N6 & N66)/ Polypropylene Yarn(PP) @ 378000 TPA
Polyester/Nylon/ Polyamide/ Polypropylene/Color master batch Chips/Granules
1.050 396900
Spin Finish oil 0.008 3024
3. Polyester Texturized Yarn/Draw Texturized Yarn/Air Texturized Yarn/ Polyester Twisted Yarn/Cable Yarn/Double Yarn/ Draw Twisted Yarn/Acrylic Yarn /Covered Yarn/Spandex Yarn @ 288000 TPA
Yarn Polyester / Nylon / Acrylic
0.960 276480
Antistatic oil 0.004 1152
4. Winding Of Yarn/Heat Setting Of Yarn/Circular Knitting/Warping / Warp Knitting/Weaving Fabrics/Carpet Weaving/ Narrow Fabrics @ 36000 TPA
Texturized Yarn/BCF/FDY
1.00 36000
5. Color Master Batch Chips @ 9000 TPA Colour Pigment 0.30 2700
Waxes 0.10 900
Polypropylene/Polyamide 6/ Polyethelene terephthalate(PET) / Polybutylene Terepthalate
0.60 5400
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-9
Table 2.9: Details of Raw Materials, their Source, Storage and Mode of transport
Sr.
No
Raw Material Storage Quantity
State of RM
Means of storage
Mode of transportation
1 PTA 5000 MT Powder Jumbo Bags in
Warehouse/Silo
Truck
2 MEG 4000 MT Liquid Tank Tanker
3 Spin Finish Oil 200 MT Liquid Tank Tanker/Truck
4 Antistatic oil 25 MT Liquid Drum Tanker/Truck
5 Antimony trioxide 20 MT Solid Bags Truck
6 Titanium Dioxide 40 MT Solid Bags Truck
7 Polyester/ PP/Nylon Chips 500 MT Granules Jumbo
Bag/Warehouse
Truck
PTA & MEG will be procured from manufacturer or Distributors where as other raw materials will be procured
from distributors or local traders. All transportation will be done through Road.
2.3.2. PROCESS DETAILS
The products of proposed project are described in earlier section with required raw materials. The company
shall use the latest available process technology for the production. This section includes the manufacturing
process of the product, chemical reactions, and mass balance of each product.
PRODUCT: 1- POLYESTER FILAMENT YARN (POY/FDY) / POLYESTER STAPLE FIBER/POLYESTER GRANULES
BY CONTINUOUS POLYMERIZATION PROCESS USING PTA AND MEG @ 432000 TPA.
A. Process Description
The manufacturing process consists of three stages, polycondensation, spinning and processing. There are
primarily two raw materials namely; Purified terephthalic acid (PTA) and Mono Ethylene Glycol (MEG). The
manufacturing process is explained in the subsequent sections.
The two main raw materials PTA (Purified Terephthalic Acid - powder form) and MEG (Mono Ethylene Glycol
– Liquid form) are fed through metering system to Paste Preparation Tank in desired mole ratio. The mixing of
PTA & MEG is a continuous process and Slurry thus formed is supplied to the Esterification reactor-ES1. The
reaction of PTA and MEG is accomplished in a set of two Esterification reactors – ES1 & ES2 under required
heating conditions. The Heat is provided through low pressure Heat Transfer Media (HTM) in closed circuit.
Excess glycol and water formed during the reaction, in vapour form, are taken from the top of the Esterification
reactors to a column for necessary separation. Water from the top is condensed in a Heat Exchanger and sent
to Stripping column system for further purification. From here Water is pumped for final treatment to ETP.
Separated glycol is pumped back to the Esterification reactors. Antimony Trioxide (Sb2O3), a catalyst used for
Polymerization reaction is added in EG solution to ES-1. Delustrant Agent – Titanium Dioxide (TiO2) and
Diethylene Glycol is added to ES-2.
The Oligomer or pre-polymer formed in the Esterification reactors is fed to continuous polymerization reaction
vessels consisting of Pre-polymeriser and Finisher. Here Oligomer further reacts to form Polyester of the
desired viscosity under specified and controlled temperature and vacuum conditions.
These reactors are also heated using HTM in closed circuit. The reaction links polymer chains with the
evolution of glycol. Excess glycol vapours are removed, condensed and taken to Esterification Reactors. The
polymer from the final reactor is then pumped through Gear Pump to polymer transfer lines, filtered in
Continuous Polymer Filter and distributed to Filament Yarn Spinning machines continuously.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-10
Polyester Filament yarn (POY):
Molten Polymer from CP is passed through polymer coolers and after pressure boosting polymer is further
processed in POY.
Molten Polymer from CP is fed to individual machines. Here the Molten Polymer is pumped through various
Gear Pumps. Polymer passes through a Filtration Pack. Polymer from the Pack of specific number of holes in
the form of Filaments is exposed to the Quenching Zone (air of specific quality) and then transported through
the inter floor tube. Spin Finish application is done on Oiling guides. This yarn is then passed through special
pre intermingling guides where with the help of air, the applied spin finish is properly migrated between all
the filaments in a uniform way. Filaments pass from Feed Roller to let down roller. Here the post Intermingling
air is applied. The Filaments are taken on to the Paper tubes to form Bobbins. POY Bobbins are then packed in
the pallets and also on trolley to be sent to DTY department for texturising purpose.
Filament yarn (FDY):
Molten polymer from CP is fed to the individual machines in the same way as described for POY. Here the yarn
is taken over a set of Hot godets with 6-7 wraps on the godets and then over another set of hot godets with
6-7 wraps. This set of hot godets and separator roll runs at speeds of 4500 to 5200 mpm (so called the yarn is
hot drawn) and then it is intermingled with high pressure air so as to impart intermingling knots @ 25 to 35
per meters in the FDY yarn. This FDY yarn is then wound on the special designed paper tubes at speeds of 4500
to 5200 mpm depending on the FDY yarn and FDY packages are formed of approx 7 kgs net wt. of yarn.
Staple Fiber (SF):
In making polyester staple fiber, polymerization, drying, and melt spinning are the same as in the manufacture
of filament yarn. However, in the melt spinning process, the spinneret has many more holes when the product
is staple fiber. The rope-like bundles of polyester that emerge are called tow.
Drawing tow: Newly-formed tow is quickly cooled in cans that gather the thick fibers. Several lengths of tow
are gathered and then drawn on heated rollers to three or four times their original length.
Crimping: Drawn tow is then fed into compression boxes, which force the fibers to fold like an accordion, at a
rate of 9-15 crimps per inch (3-6 per cm). This process helps the fiber hold together during the later
manufacturing stages.
Setting: After the tow is crimped, it is heated at 212-302°F (100-150°C) to completely dry the fibers and set
the crimp. Some of the crimp will unavoidably be pulled out of the fibers during the following processes.
Cutting: Following heat setting, tow is cut into shorter lengths. Polyester that will be blended with cotton is
cut in 1.25-1.50 inch (3.2-3.8 cm) pieces; for rayon blends, 2 inch (5 cm) lengths are cut. For heavier fabrics,
such as carpet, polyester filaments are cut into 6 inch (15 cm) lengths.
B. Chemical Reaction for Continuous Polymerization:
The proposed project is of manufacturing of manmade fibers through continuous polymerization involving
following two main reactions.
i) Esterification Process
1n HOOC-C6H4-COOH+2n HO-C2H4-OH1nHO-C2H4-OH-OOC-C6H4-COO-C2H4-OH + 2n H2O
(PTA) (MEG) BHET WATER
Using PTA, MEG and the catalyst, the first reaction takes place via the production of Bis-(Beta hydroxyethyl)-
terephthalate (BHET). More than 96% of the -COOH end groups react with EG in this first step; water as side
product of this reaction has to be removed via the process column to shift the equilibrium to the right side.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-11
The water removed from the Esterification cannot interfere with this process and complete Esterification can
take place.
ii) Polycondensation Process
1nHO-C2H4-OH-OOC-C6H4-COO-C2H4-OH + 1nHO-C2H4-OH-OOC-C6H4-COO-C2H4-OH
(BHET) (BHET)
HO-C2H4-(OOC-C6H4-COO-C2H4)n-OH + (n-1) HO-C2H4-OH
(PET) (MEG)
During the Polycondensation reaction, BHET is reacted further leading to polyester (Polyethylene
Terephthalate-PET) with MEG being split off. In these steps MEG has to be continuously removed by different
vacuum steps to shift the equilibrium to the polymer side. The final product is an amorphous polyester melt
which goes for spinning to POY and FDY products. The degree of polymerisation is of the order of 80 to 100.
C. Materials Balance:
The complete representation of material balance with respect to the above chemistry has been illustrated in
the following figure as diagrammatic presentation of process & material balance.
Process flow diagram of Continuous Polymerization with Mass Balance
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-12
PRODUCT: 2 - SYNTHETIC FILAMENT YARN : BULK CONTINUOUS FILAMENT YARN(BCF)/PARTIALLY
ORIENTED YARN (POY) /FULLY DRAWN YARN(FDY)/DOPE DYED YARN(DD)/LOW ORIENTED
YARN(LOY)/HIGHLY ORIENTED YARN(HOY)/ NYLON YARN(N6 & N66)/ POLYPROPYLENE YARN(PP) BY MELT
SPINNING @ 378000 TPA.
PRODUCT: 3- POLYESTER TEXTURISED YARN/DRAW TEXTURISED YARN/AIR TEXTURISED YARN/ POLYESTER
TWISTED YARN/CABLE YARN/DOUBLE YARN/ DRAW TWISTED YARN/ACRYLIC YARN /COVERED
YARN/SPANDEX YARN @ 288000 TPA.
Manufacturing process for all the products are similar, physical properties are varies as per requirement of
the product.
A. Process Description:
Manufacturing process for all the products are similar, only their physical properties vary as per requirement
of the finished product. Partially oriented yarn (POY),Fully Drawn Yarn (FDY) and Bulk Continuous Filament
(BCF) will be made from Polyester chips (granule).
Polyester/Nylon chips & granules are procured from the open market. Spin finish oil is used during the
spinning stage to avoid the adhesion of yarns and antistatic coning oil is used during texturization stage for
better quality of products.
Step wise process is as follows:
Unloading and storage of polyester/Nylon chips & Granules is done by Conveying pneumatically by dense
phase conveying system. In Fluidized bed crystallizer cum dryer Moisture level of chips is brought to
0.003%.Dried chips are fed into extruder for melting, compression and mixing (homogenization by a moving
spiral barrier type screw. Screw barrel is treated in five different constant temperature zones. Melt is filtered
up to 20 micron through C.P.F (Continuous Polymer Filter) and fed to various pumps.
Metering: Positive displacement pump of different capacity speed controlled by inverter, decides. Melt comes
to pack contains various filters and spinneret which decides number of filament in yarn.
Quenching: Melt in yarn shape is quenched in cold air (23oC) in quench chamber were air is equally distributed
by honey combs. Spin finish oil is applied to the yarn for better binding & reduction& static charge generation
by positive displacement pump. Speed controlled by inverter. Yarn is given “S” wrap by two Godet rollers for
controlling tension. Additional three HOT godet are used for FDY in same process.
Winding: Yarn is wrapped on paper tube by high speed spindle driven auto turret winder 2800-3400 mt per
min for FDY 4500 to 5200 mt per Min. Inspection & Testing and Grading (POY/FDY/NFY/PPFY) can be sale
directly or further processed. Bobbins are sent for further processing i. e. Texturising to get texturized yarn
Texturized Yarn is sent to Twisting to get twisted Yarn. Packing and dispatch for further processing to make
fabrics.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-13
B. Process Flow Diagram:
PRODUCT: 4- WINDING OF YARN/HEAT SETTING OF YARN/CIRCULAR KNITTING/WARPING / WARP
KNITTING/ WEAVING FABRICS/CARPET WEAVING/ NARROW FABRICS @36000 TPA.
A. Process Description:
Manufacturing of Winding of Yarn/Heat Setting of Yarn/Circular Knitting/Warping / Warp Knitting/ Weaving
Fabrics/Carpet Weaving/ Narrow Fabrics will be carried out on required automatic machines as pre required
properties of products.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-14
B. Process Flow Diagram:
PRODUCT: 5- COLOR MASTER BATCH CHIPS @ 9000 TPA
A. Manufacturing Process
Manufacturing of color master batches is a simple mixing of pigment, polymer (polyester) and waxes. Mixture
of all the ingredients is passed through twin screw extruder, melt mixing extruder and cooling of stand in water
bath and pelletizing of master batches, packing and dispatch for further utilization.
B. Process Flow Diagram:
Cooling of stand in water bath &Pelletizing
Charging of premix in Twin screw extruder and melt mixing extruder
Pre-mixing in mixer
Colour Pigment + Polymer (polyester) + waxes
Packing and dispatch
Quality Control/Assurance
Winding/Heat Setting/Cir. Knitting/Warping/Knitting/Weaving/ Carpet
Weaving/Narrowing on applicable machines as per requirement
Yarn of required product
Packing and dispatch
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-15
2.4. POLLUTION POTENTIALS & CONTROL MEASURES
2.4.1. Air Pollution Sources & Control
There will be nine sources of stationary emissions which are Boilers (1 x 10 TPH &2 x 2 TPH), Thermic Fluid
Heaters (3 x 10 M Kcal/Hr.) and DG sets (1 x 1000 KVA and 2 x 2500 KVA). The fuel for Boilers & TFHs will be
LSHS/FO whereas the Diesel will be operated using HSD as fuel. Company has planned to provide stacks having
adequate height & internal diameter at top and necessary pollution control measures. The summarized details
of the stationary/utility emissions are presented in tabular form below.
Table 2.10: Details of Utility Emission & Control Measure
Sr. No.
Item Capacity & no. of units
Fuel & Fuel consumption
Stack Ht.& Dia. Emission
1. Steam Boiler 1 No., 10 TPH 2 Nos., 1 TPH
LSHS/ Furnace Oil: 60.00 KLD
30 m Ht. & 0.5 m Dia. (Common Stack)
PM<150 mg/Nm3
SO2< 100 ppm NOx< 50 ppm 2. Thermic Fluid
Heater 3 Nos, 10 M
Kcal/Hr. 30 m Ht. &0.5 m Dia. (Common Stack)
3. D. G. Set 1 No. of 1000 KVA & 2 Nos. of 2500 KVA
Diesel 3750 lit/hr.
30 m Ht. &0.15 m Dia. (Each)
2.4.1.1 Fugitive Emission Control
Fugitive emission could occur from the storage yard of raw materials and finished products. Emissions from
transport of vehicles would occur to a certain extent. The emissions from traffic movements will be controlled
by proper planning of the transport of raw materials and finished products to and from the factory premises.
All the roads inside the plant will be concreted to reduce any dust emissions. Proper planning and maintenance
will control the extent of fugitive emissions. During the production, the industry will carry out regular
monitoring of fugitive emissions as per the factories Act. Following Measures will be taken for control the
above said fugitive emission:
Proper storage of raw materials, products and fuels.
Ensuring closed feeding and sampling.
Establishing SOPs for start-up, shut down and maintenance operational procedures.
Regular work place monitoring and ambient air quality monitoring as per post project monitoring plan.
2.4.2. Wastewater Generation & Management
The industrial effluent generation will be @ 800.00 KLD (224 KLD from process, 70 KLD washings and 6 KLD
Boiler blow down and 500 KLD cooling blow down. Domestic effluent (80.00 KLD) will be treated in STP with
primary, secondary & tertiary treatment units. Industrial waste water @300 KLD from Process, washing
&boiler tower blow down will treated in the Effluent Treatment Plants with Primary, Secondary & Tertiary
units and treated effluent will be sent to RO. 500 KLD effluent from cooling tower blow down will be directly
sent to RO. The permeate @750 KLD will be reused to meet the water requirement of the project whereas the
RO reject will be evaporated in MEE. Thus, there will be no discharge of any kind of treated wastewater outside
the company premises to achieving Zero Liquid Discharge.
The details of wastewater generation are tabulated below whereas the water balance diagram is shown in
subsequent figure.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-16
Table 2.11: Details of Waste Water Generation
Sr. No.
Particulars Quantity
(KDL ) Treatment
Facility Reuse Details
1. Domestic 80.00 STP Reuse for Irrigation of Greenbelt
2. Industrial Total 800.00 ETP-RO-MEE Reuse for cooling
a) Process 224.00 ETP-RO-MEE
b) Washing 70.00 ETP-RO-MEE
c) Boiler Blow down 6.00 ETP-RO-MEE
d) Cooling Tower Blow down 500.00 RO-MEE
Design Criteria of ETP:
Product : Polyester through Continuous Polymerization
Source of Effluent : Process effluent, Washing & Utilities.
Design Flow of Effluent : 300 KL/day Max.
Design Parameters : as under
Table 2.12: Characteristics of Wastewater for ETP Design
Sr. No. Parameter Unit Raw Effluent Quality/Value
Treated effluent Quality/Value
1. Flow M3/ Day 300 Max. 300 Max.
2. pH -- 4.0 to 8.0 6.5 to 7.5
3. Suspended Solids mg/lit 250 to 350 <100 mg/lit
4. Biochemical Oxygen Demand mg/lit 1500 to 2000 <100 mg/lit
5. Chemical Oxygen Demand mg/lit 5000 to 7000 <250 mg/lit
6. Oil & Grease mg/lit 40 to 50 <10 mg/lit
7. Total Dissolved Solids mg/lit 1500 to 2000 <2100 mg/lit
Based on the above criteria you have to install Effluent Treatment Plant as mentioned in the proposal
with required capacity.
The details of various unit & components of the proposed ETP units with MOC to be design are as
below.
Table 2.13: Details of Proposed ETP
No. Particulates MOC No. Particulates MOC
1. Oil & Grease Removal Tanks RCC 14. Activated Carbon Filter MS Epoxy
2. Collection/ Reaction Tank RCC 15. Treated Water Tank RCC
3. Flash Mixer RCC 16. Sludge Drying Beds Brick Masonry
4. Primary Clarifier RCC 17. Sludge Storage Area Brick Masonry
5. 1st Stage Aeration Tank RCC 18. Transfer Pumps C.I.
6. 1st Stage Secondary Clarifier RCC 19. Filter feed Pumps C.I.
7. 2nd Stage Aeration Tank RCC 20. Treated Water Pumps C.I.
8. 2nd Stage Secondary Clarifier RCC 21. Air Blower for Collection tank
C.I.
9. Holding Tank RCC 22. Air Blower for Aeration tanks
C.I.
10. Flash Mixer MS FRP 23. Course diffuser for Equalization tank
HDPE / PVC
11. Primary Clarifier Mechanism MS FRP 24. Fine diffuser for Aeration tanks
EPDM
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-17
12. Secondary Clarifier Mechanism
MS FRP 25. Piping, Valves Fittings etc. Standard
13. Pressure Sand Filter MS Epoxy 26. Electrical Panel with Energy Meter
Standard
Fig 2.3: Flow Diagram of Proposed ETP
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-18
Fig 2.4: Water Balance Diagram
2.4.3. Solid & Hazardous Waste Generation & Management
The hazardous waste will be generated from process, ETP, STP, machinery and raw material consumption.
All the wastes will be stored separately in a designated storage area safely and properly. The company will
send its ETP waste to GEPIL Site, Silvassa for final disposal. Yarn waste from process will be sold to actual
users or recycled in process. Used oil from machinery will be sold to registered recycler/re-processor. Empty
drums and bags will be sold to authorized re-conditioner & authorized scrap vendor. The process residue
from polymerisation will be sent for Co-incineration of common incineration facility for final disposal. The
details of all wastes & their management are tabulated below.
Table 2.14: Details of Solid Waste Generation & Management
Types of Waste & Category
Source of Generation
Quantity per Month
Method of Disposal
Hazardous Wastes
ETP waste(35.3) ETP, STP& MEE 60.00 MT To TSDF of GEPIL site, Silvassa
Used oil(5.1) Utility & Machineries
1.00 KL Reuse or Sell to registered refiners
Empty drums(33.1) Raw material 50000 Nos. Reused or Sell to authorized scrap vendor
Process Waste (22.2 ) From process 15.00 MT
Sell to authorized recycler or for co-incineration or to Common Incineration Facility
Non-Hazardous Solid Wastes
Yarn waste& Lumps From process 750.00 MT Recycled or Sell to actual users.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-19
2.4.4. Noise & Vibration Generation & Control
Noise & Vibration generation is anticipated in utility & production area as well as from operation of pumps,
motor & compressors etc. installed at different location within premises. Mainly the high noise & vibration
is likely to be generated in Production area (Spinning, weaving, Twisting), utility area from Air Dryer and
Boilers, TFHs, DG Sets. The noise level in building of manmade fibre & fabric manufacturing (Texturizing,
weaving & spinning) will be ranging from 80 to 100 dB (A) whereas outside the building the noise level in
premises will range from 75dB (A) to 80 dB (A) depending up on the distance from the noise sources. Noise
level outside of premises will never cross the permissible limit for industrial unit as mostly remains below
75 dB(A). All noises will be managed by provision of proper PPEs for working people in the respective areas.
Vibrations will be managed by provision of proper fitting, shunting and sturdy non-vibrating foundation with
rubber pads.
2.4.5. Greenbelt Development
Company has acquired plot admeasuring 77800.00 Sq. Mt. The adequate greenbelt has been / will be
developed at the periphery of plant premises as well as in some open area within the premises which
admeasures 25890.00 Sq. Mt. (33.3% of total plot area). Additional Plantation for additional greenbelt
within premises on side of road building (approx. 1-1.5 Mt belt) will be done which will significantly increase
the total effective greenbelt area. Greenbelt will be maintained by regular fertilization, irrigation &
replantation to give thick pasture view considering the guideline of CPCB for three tiers greenbelt
development.
2.5. Occupational Health & Safety
2.5.1. Hazardous Materials & Their Management
There will be only one hazardous material in the proposed new project. This material is identified as hazardous
as per MSIHC Rules (2000).
Table 2.15: Hazardous Raw materials identified as per MSIHC Rule 2000
Above mentioned hazardous material is being/will be managed in accordance with national & state
regulations. Detailed RA study will be conducted for storage and handling of the hazardous materials will be
conducted and all necessary measures as suggested in RA report will be implemented for prevention of
hazards associated with the hazardous chemicals of the project.
Primarily proponent has implemented the following general risk reduction measures for Handling, Storage of
Hazardous Materials (Bags, Drums & Tanks) in existing unit to maintain safe work place & hazard free areas in
the proposed unit. Similar risk reduction measures will be implemented for proposed project in addition to
the measures suggested in RA report.
Adequate ventilation in godown & production area to prevent toxic chemical vapour exposure builtup
in workplace and to maintained area below PEL/TLV limits. Air change ratio in these areas will be
managed around 1.
Proper label and identification board /stickers in storage & production area for all chemicals
Conductive drum pallets will be provided.
Trolley / stackers/fork lift for heavy goods/drum/bag handling.
Sr. No. Name Physical state Storage Cap. In MT
Threshold Storage Limit as per MSIHC
Rule
MSIHC Applicability
1. Monoethylene Glycol Liquid 4000 NA Sh-I,Part-II,267
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-02: Description of Project (QCI-NABET Accredited) 2-20
Storage of Materials as per compatibility
Separate storage area for flammable, corrosive and toxic chemical storage.
Prohibition/restriction on smoking and other spark/ flame generating item.
Lower level ventilation exhaust system will be provided in drum storage area.
Material safety data sheets at storage as well as process and chemical handling area.
Fire hydrant system & fire fighting equipment in unit as per TAC/NFPA Norms.
Plant should meet provisions of the Manufacture, storage & Import of Hazardous Chemicals Rules, 1986
& the factories Act, 1948 and The Chemical Accidents (Emergency Planning, Preparedness and
Response) Rules, 1996 (As amended timely).
Static grounding to all process vessels and equipment
Caution note board for all hazardous chemicals
Safety valve provision to be made on reactor.
Periodic On Site Emergency, Mock Drills in order to train the staff and make them mentally prepared
to tackle any emergency
Safety devices and control instruments should be calibrated once in a year.
Proper coloring as per IS 2379 in plant to pipeline network, tank and equipment to protect it from
corrosion.
Preventive maintenance schedule for all the equipment and colour code or tagging
Permit to work system on 100 % basis for hazardous work to be carried out in the plant
Automated Fire detection system &/or manual call points for fire location identification in storage area
as well as plant area
Compulsory Induction safety course and training of all new employees
Empty drums & bags will be stored in separate dedicated empty drum & bag storage area. All drums &
bags will be neutralized/decontaminated before send it to recyclers.
2.5.2. Occupational Health Management
The company is concerned about the occupational health and safety among its work force as the man power
is the biggest asset to the industry. The On-site Emergency Plan is prepared and implemented for existing
activities and will be modified as per proposed change in product mix and will be implemented. The Off-site
Emergency Plan is available with the District Collector Office, Silvassa. The following safety measures are
implemented and will be followed:
Safety Training will be provided to the employees.
Safety Alarm Systems are installed for use, in case of emergency.
Emergency Control Room with emergency sirens is established.
Assembly point is provided.
Fire Hydrant System is installed.
Fire Extinguishers are provided.
Mock drills are periodically conducted and factors like response time are evaluated.
Fire squad team is formed for handling any emergency situation & regular training of squad team will
be conducted.
First Aid Facility and training is provided.
Personal protective gears and equipment are provided to the employees.
Health check-ups are organized at regular intervals.
Safety / Health records and MSDS will be maintained.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-1
CHAPTER: 03
DESCRIPTION OF THE ENVIRONMENT 3.1. GENERAL
A comprehensive understanding of the physical, chemical and biological environment provides the
foundation to a well-executed Environmental Assessment. The detailed baseline characterization is used as
input to model possible project impact, which allows specialists to provide timely input to project designs to
reduce potentially adverse environmental impacts. This in turn produces a more socially and
environmentally sustainable project and enhances the efficiency of the project permitting process.
The baseline study for the M/s. Beekaylon Synthetics Pvt. Ltd. was carried out within the 10 Km radius taken
from the project boundary which is considered as the study area for executing the environmental impact
Assessment study as per awarded TORs from EAC (Ind.-II), MoEF, New Delhi.
In order to assess the impacts of proposed project on existing physical, biological and social environment, it
is necessary to study the present scenario of the area by collecting information on the following
environmental attributes:
Land Environment
Meteorology
Air Environment
Noise Environment
Water Environment
Soil Environment
Biological Environment
Socio-economic Environment
The relevant information and data (both primary & secondary) were collected in 10 km distance from the
project boundary during the post monsoon season 2017 (October ’17 to December’17) in accordance with
the guidelines for preparation of EIA studies.To establish the existing environmental scenario, field studies
and monitoring were carried out for the winter season.
The baseline study started with site visits and reconnaissance survey in the study area and monitoring/
sampling locations were fixed for the primary data on the basis of potential impacts of the proposed project.
For obtaining relevant secondary data, various Government agencies were approached.
3.1.1. STUDY AREA
EIA study was conducted in the area falling within 10 km radius (Arial Distance) from the project site,
considering the conditions of awarded TORs from EAC (Ind.-II), MoEF, New Delhi. The baseline information is
collected for the identified study area. The study area fallsin notified industrial zone of Velugam at Survey
Nos.: 287/1, 284P, 289/1/3, 289/1/2, 289/2; Village Velugam, UT of Dadra & Nagar Haveli.
The project area is located at Govt. Industrial Estate of U.T. of Dadra and Nagar Haveli having geographical
potion at 20° 8'15.46"N and 72°59'32.41"E. The Arabian Sea is situated in west direction, which is about 29.
Km (W) away from the notified industrial zone. The nearest railway station – Sanjan is about 18.90 Km (W)
away from project site. The project site is well connected with state & national Highway network and the
nearest National Highway (NH48) is about 7.8 Km(W) and State Highway (SH 29)is about 4.75 km (NE) away
from project site. The nearest interstate boundary, Gujarat about 7.5 km &Maharashtra about 0.3 km.
Nearest Eco-sensitive Zone- wildlife sanctuary -D & NH Wild Life Sanctuary-1.30 km E & 2.30 km W, Vasona
Lion safari 9.37 km NW (Approx.) &Dapada, Satmaliya Deer Park 5.3 Km NE (Approx.) are situated. The major
reservoirs of the area-Madhuban Dam is situated at 8.41 Km (N) whereas Kurze Reservoir is situated at 6.24
km (NE).
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-2
The map of the study area & sampling locations is illustrated below in Fig. 3.1 and Fig. 3.2, whereas the
salient features of the project area are tabulated in subsequent Table 3.1.
Table 3.1: Salient Features of Project Area (10 Km)
Sr. No. Nearest Infrastructure Feature Distance from Project Site
1 Geographical Position 20° 8'15.46"N and 72°59'32.41"E
2 Elevation above Sea Level 72 Meters (Approx.)
3 Nearest Village Velugam-1.9 km SW
4 Nearest Town Silvassa - 13.00 km N
5 Nearest National Highway NH-48- 7.8 km W
6 Nearest State Highway SH29-5.02 km S
8 Nearer RW Station Sanjan- 18.90 Km W
9 Nearest Airport Daman: 37.00 Km NW (of Coast Guard only), Surat : 112.00 Km N & Mumbai- 117.00 Km S
10 Nearest Surface water Resource/Reservoir
Arabian Sea (29.7 Km W) Damanganga Reservoir(8.41 Km N) Kurze Reservoir (6.24 km NE)
11 Forest Patches 2.59 km W
12 Surface Water Resources
Madhuban Dam(8.41 km NE)
Kurze Dam (6.24 kmNE)
Damanganga River (8.22 Km NE)
Dongar Khadi River (1.40 km N)
Sakartod River (3.45 km NE)
Darotha River (5.23 Km NW)
13 National Park/Sanctuary/Ecologically sensitive Area
Patches of Reserved forests - 2.59 km W
Vasona Lion safari - 9.37 km NW
Satmalia Deer Park - 5.3 km NE
DNH Wildlife sanctuary -1.30 km E & 2.30 km W
14 National or State Boundary Gujarat – 7.5 Km E
Maharashtra– 0.3 Km E
15 Tourist Places Gardens & monuments- within 15 Km N Madhuban Dam - 8.41 km NE
16 Selection of project Site and Detail of alternate Site.
Proposed new project is in the Industrial area having proper industrial infrastructure hence alternate site consideration is not envisaged.
17 Size or Magnitude of Operation Large Scale
18 Seismic Zone Zone- III
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-3
Fig.3.1: Base Map of Study Area Locations
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-4
3.1.1.1. Environmental Baseline Data Collection
A. Primary Data & Authenticity of Primary Data
Primary data was collected by monitoring & surveying of various environmental components/ parameters in
10 km distance from the project boundary during the study period (i.e. winter season 2017; October to
December); details of which are given in Table: 3.1.& 3.2
Table- 3.2: Primary data collection
Sr. No. Description
1 Land use Pattern: Landuse survey, once in a season for 10 km radius (aerial distance) from the project site.
2 Meteorology: Meteorological parameters on hourly basis at project site. Parameters: Temperature, Relative humidity, Wind Speed & Wind Direction.
3 Ambient Air Quality: Ambient air quality monitoring (24 hourly), twice a week. Parameters: All 12 Parameters as per NAAQS 2009 No. of Locations: 8 locations in 10 km radial area from project site.
4 Ambient Noise: Noise level monitoring (day & night time), once in a season. No. of Locations: 8 locations in core and buffer zone of plant site.
5 Water Quality: Ground water sampling: once in a season&8 locations in 10 km radial area from project site. Surface water sampling, once in a season&5 locations in 10 km radial area from project site.
6 Soil Quality: Soil sampling: once in a season&8 locations in 10 km radial area from project site.
7 Geo-Hydrology, Geology: Geo-hydrology and Geology survey, once in a season for 10 km radius (aerial distance) from the project site.
8 Biological Environment: Biodiversity survey: once in a season for 10 km radial area from the project site.
9 Socio-economic Environment: Socio-economic survey: once in a season for 10 km radial area from project site.
Unistar Environment and Research Labs Pvt. Ltd. at Vapi had conducted the field & laboratory studies for
primary data collection with respect to meteorology, air, water, soil and noise quality. The laboratory is
certified to National Accreditation Board for Laboratories (NABL) and is a gazetted laboratory under the
Environment Protection Act. The laboratory follows an auditable quality plan including sampling, analysis,
reporting and calibration and participates in inter-laboratory quality control practices
B. Secondary Data Collection Secondary data collected includes:
Socio-economic conditions from census data
Sensitive areas such as forests, sanctuaries, places of historical, archeological and tourist importance
Meteorological data from Indian Meteorology Department 3.1.1.2. Sampling & Monitoring Locations
The locations for sampling & monitoring were selected within 10 km radial area from site as per the
requirements of awarded TOR from MoEF. The locations are selected based on probable effects in project
study area considering various guidelines from CPCB. One location of AAQM is selected in downwind
direction. Total eight locations were selected from the study area falling within 10 km radial distance for
sampling and monitoring of air, noise, soil and groundwater as per terms of reference. The surface water
samples were also collected from the water bodies falling within the study area. The details of selected
sampling & monitoring locations are presented in table 3.3
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-5
Table 3.3: Sampling & monitoring Locations (Study Area - 10 Km)
Sr. No.
Name of Location Approx. Aerial
Distance from Site (in Km)
Approx. Elevation (in meter)
Details of Sampling & Monitoring
1 Project Site, 20.138901°, 72.991861° 20.138107°, 72.992780° 20.138120°, 72.992070° 20.137613°, 72.989460°
0.0 km Centre of
Study Area
67 69 70 64
Ambient Air Quality (AQ1) Ambient Noise (N1) Ground water (GW1) Surface Soil (SS1)
2 Surangi 20.154431°, 73.005729° 20.155306°, 73.004578° 20.154670°, 73.006110° 20.160680°, 73.006870°
2.32 km (NE) 2.33 km (NE) 2.37 km (NE) 2.97 km (NE)
63 62 61 58
Ambient Air Quality (AQ2) Ambient Noise (N2) Groundwater (GW2) Surface Soil (SS2)
3 Pati 20.181949°, 73.046252° 20.181321°, 73.047224° 20.192160°, 73.052510° 20.192730°, 73.052240°
7.47 km (NE) 7.50 km (NE) 8.72 km (NE) 8.74 km (NE)
65 68 58 56
Ambient Air Quality(AQ3) Ambient Noise(N3) Groundwater (GW3) Surface Soil (SS3)
4 Karachgam 20.115289°, 73.003991° 20.115220°, 73.004965° 20.123110°, 73.013500° 20.123300°, 73.013150°
2.76 km (SE) 2.73 km (SE) 2.73 km (SE) 2.69 km (SE)
85 84 64 63
Ambient Air Quality(AQ4) Ambient Noise (N4) Groundwater (GW4) Surface Soil(SS4)
5 Bindrabin 20.145962°, 73.040724° 20.144207°, 73.042166° 20.141420°, 73.055530° 20.141090°, 73.056590°
5.14 km (E) 6.83 km (E) 6.62 km (E) 6.73 km (E)
68 81 79 75
Ambient Air Quality (AQ5) Ambient Noise (N5) Groundwater (GW5) Surface Soil (SS5)
6 Luhari 20.201048°,72.977404° 20.201891°, 72.977583° 20.205710°, 72.969840° 20.205610°, 72.969990°
7.18 km (N) 7.28 km (N) 7.89 km (N) 7.88 km (N)
65 65 87 88
Ambient Air Quality, (AQ6) Ambient Noise, (N6) Groundwater, (GW6) Surface Soil.(SS6)
7 Kurze 20.119346°, 72.962112° 20.119757°, 72.961790° 20.113970°, 72.952730° 20.114030°, 72.952640°
3.75 km (SW) 3.63 km (SW) 4.90 km (SW) 4.91 Km (SW)
77 78 63 63
Ambient Air Quality(AQ7) Ambient Noise, (N7) Ground Water, (GW7) Surface soil, (SS7)
8 Apti 20.155382°, 72.983829° 20.154470°, 72.992042° 20.154327°, 72.990947° 20.153552°, 72.992550°
2.19 km (NW) 1.98 km (NW) 1.89 km (NW) 1.75 km (NW)
55 56 56 56
Ambient Air Quality(AQ8) Ambient Noise (N8) Ground Water (GW8) Surface Soil (SS8)
10 Dongar Khadi River 20.137610°N, 73.004272°E Sakartod River 20.153910°N, 73.021133°E Damanganga River 20.19300°N, 73.05584°E Darotha River 20.179819°°, 72.943161°°
3 km (N)
5.78 km (NE)
9.04 km (SE)
8.91 km (NW)
Surface Water(SW1) Surface Water(SW2) Surface Water(SW3) Surface Water(SW4)
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-6
Sr. No.
Name of Location Approx. Aerial
Distance from Site (in Km)
Approx. Elevation (in meter)
Details of Sampling & Monitoring
Kurze Dam 20.095550°, 72.954820°
6.09(SW)
Surface Water(SW5)
Fig 3.2: Sampling & monitoring Locations (Study Area - 10 Km)
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-7
3.2. Meteorology
Micro- meteorology plays a pivotal role in understanding of the weather phenomena and the climatology
which in turn affect the dispersion pattern of the pollutants. Thus the micro-meteorological studies are in
integral part of the air pollution studies which not only help in interpretation of the extant baseline for air
quality dispersion studies.
Meteorological conditions at the site regulate the transport and diffusion of air-pollutants released into the
atmosphere. Ambient temperature, wind speed, wind direction and atmospheric stability are called primary
or basic meteorological parameters because the dispersion and diffusion of pollutants depend mainly on
these parameters.
3.2.1 Methodology
The methodology adopted for monitoring surface observation was as per the standard norms laid down by
Bureau of Indian Standards, and the India Meteorological Department (IMD). On site monitoring was
undertaken for various meteorological variables in order to generate the site-specific data.
3.2.2. Site specific meteorological data
Humidity, Precipitation, Pressure and visibility are secondary meteorological parameters as this control the
dispersion of pollutants indirectly by affecting primary parameters. Details of primary meteorological data
and secondary meteorological data with respect to proposed project are discussed here.
An automatic weather monitoring station was installed at a height of approx. 15 meters from the ground
level at Vapi - M/s. UniStar Environment and Research Labs Pvt Ltd. to monitor parameters of wind speed
and wind direction, temperature& relative humidity. The data is recorded as the maximum, minimum,
instantaneous value and average value of all the readings collected during the preceding hour. Monitoring
was done as per IS: 8829: Micro-meteorological Techniques in Air Pollution.
The details of parameters monitored, equipment used and the frequency of monitoring are given in the
following table
Table 3.4: Meteorological Parameters Monitored at Site
Sr.
No.
Parameters Instruments Frequency
1. Weather Monitoring Weather Monitoring Station Model Enviro WM271
Hourly / Continuous
2. Wind speed Counter Cup Anemometer Hourly / Continuous
3. Wind direction Wind vane Hourly / Continuous
4. Temperature Thermo sensor Hourly / Continuous
5. Relative humidity Thermo –hygrosensor Hourly / Continuous
3.2.3 Primary survey
Meteorological survey was undertaken for monitoring of site specific meteorological data as per IS: 8829-
1978 and CPCB Guidelines, weather station was set-up at the terrace of admin building of the project site
from October- 2017 to December - 2017.The site specific meteorological data including the parameters viz.,
wind direction, wind speed, relative humidity and ambient temperature were recorded using automatic
weather station installed at Vapi and the same are presented in Table 3-5.
Automated Weather stations are located at Vapi at nearest site of Vapi. The details of micro- meteorological
data from these locations are provided in the below table
Table 3.5: Site Specific Meteorological Data (October’17 to December’17)
Location Wind Speed (m/sec) Temperature (°C) Humidity (%)
Max. Min. Avg. Max. Min. Avg. Max. Min. Avg.
Vapi 15.00 0.00 2.69 38.20 16.50 27.20 100.40 19.40 65.40
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-8
Source:-Primary Data collected by Unistar environment & research Labs Pvt. Ltd., Vapi
3.2.4.1. Wind pattern for the study period
The wind pattern during the study period is depicted in the form of wind rose in the Figure-3-3. The wind
rose depicts that the predominant wind direction was SE to NW during October to December 2017. The wind
frequency class distribution reflects that the calms prevailed for 3.67% of the total period during the study.
3.2.4.2. Temperature
The temperature ranged from a minimum of 16.50°C to a maximum of 38.20°C while the average was found
to be 27.20°C.
3.2.4.3. Relative humidity
The relative humidity ranged from a minimum of 19.40% to a maximum of 100.40% while the average was
computed to be 65.40%.
Figure 3-3: Site specific wind rose for the study period (Wind Blowing to)
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-9
3.3. Ambient Air Quality
The prime objective of the baseline ambient air monitoring was to evaluate the existing air quality of the
area while the secondary objective was to establish the baseline levels of air quality on which the predicted
ground level concentrations based on air quality modelling exercise would be superimposed. This would also
be useful for assessing the conformity to standards of the ambient air quality during the operation of the
proposed project. The ambient air quality for PM10 (<10 microns), PM2.5 (<2.5 microns), SO2, NO2, O3,
NH3, Pb, As, Ni, Benzene, CO and BaP was monitored at eight (8) locations in the study area.
3.3.1. Methodology adopted for Air Quality Survey
3.3.1.1. Selection of Sampling Locations
The baseline status of the air quality in the study area has been assessed through a scientifically designed
ambient air quality monitoring network. The design of monitoring network in the air quality surveillance
program has been based on the following considerations:
Meteorological conditions on synoptic scale such as the predominant wind direction in the study
area / project site; the study shows the predominant wind direction is from south east, to North
West one location namely AAQ8 is located in the downwind side and one location namely AAO4 is
located in the upwind side.
Selection of sampling locations has been done as per the guidelines given in the EIA manual of the
MoEF&CC and the CPCB guidelines;
The Ambient air quality samples were analyzed as per standard methods specified by Central
Pollution Control Board (CPCB) and Indian Standard as Per IS: 5182/APHA methods.
Sensitive receptors in study area (i.e. School, Hospitals, Forest and Agricultural & Residential area)
are covered in the air quality monitoring network.
3.3.2. Frequency and Parameters for Sampling
Ambient air quality monitoring for all selected parameters has been carried out at frequency of two days per
week at eight (8) locations during the study period. This was carried out in accordance with the guidelines of
Central Pollution Control Board (CPCB), Scientific Manual of GPCB and National Ambient Air Quality Standard
(NAAQS) of CPCB.
3.3.3. Instruments used for Sampling
Respirable dust samplers of Enviro tech make were used for monitoring PM10 (<10 microns), PM2.5 (<2.5
microns) and gaseous pollutants like SO2, NO2, O3, NH3, Pb, As, Ni, Benzene and Bap. Gas Analyser has been
used for the estimation of CO.
3.3.4. Sampling and Analytical Techniques
The techniques used for ambient air quality monitoring and its minimum detectable levels are given in Table
3-6.
Table3.6: Techniques Used for Ambient Air Quality Monitoring
Sr. No.
Parameter Technique Technical protocol Minimum Detectable Limits
1. PM10 Respirable Dust Sampler (Gravimetric method)
IS-5182(Part-23) 10µg/m3
2. PM2.5 fine particular Sampler (Gravimetric method)
- 4.0µg/m3
3. Sulphur Dioxide Modified West and Gaeke IS-5182(Part-II) 4.0µg/m3
4. Nitrogen Oxide Jacob & Hochheiser IS-5182(Part-VI) 6.0µg/m3
5. CO Gas Analyser (CO) IS 5182 (Part 10) 1.0 mg/m3
6. O3 UV Spectrophotometer IS 5182 (Part 9) 5.0µg/m3
7. NH3 Titrimetric Method - 20µg/m3
8. Pb AAS Method IS 5182(Part 22) 0.50µg/m3
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-10
Sr. No.
Parameter Technique Technical protocol Minimum Detectable Limits
9. As AAS Method IS 5182(Part 22) 1.0ng/m3
10. Ni AAS Method IS 5182(Part 22) 1.0ng/m3
11. Benzene GC Method IS 5182(Part 11) 1.0µg/m3
12. BaP GC Method IS 5182(Part 12) 0.1ng/m3
3.3.5. Sampling locations
Sampling locations were selected for AAQ Monitoring keeping in view the pre-dominant wind direction
prevailing in the area during the study period. It can be observed from the wind rose diagram (Figure: 3.3)
that the predominant downwind wind direction during the study period was from 282 Degree (SW). Villages/
locations have been selected in the downwind direction as well as in the upwind direction for AAQ
monitoring from the project site. Monitoring stations selected for Ambient Air Quality Monitoring during the
study period are given in Table: 3.3. Satellite image showing locations of AAQ Monitoring Stations are
depicted in Figure 3.2.
3.3.6. Ambient air monitoring
The following Table-3.7 shows the max. and min. concentrations of the air pollutants monitored at different
locations (as mentioned in above table) during the study period.
3.3.5. Observations
The concentration of PM10was found to be between 49 μg/m3 (Bindrabin Village) to 90μg/m3. (Pati Village). The average concentration was in the range of 68.75 to 82.54 μg/m3.
The concentration of PM2.5 was between 12μg/m3 (Bindrabin Village) to 44μg/m3 (Pati Village) and the average concentrations were observed in the range of 16.58 to 31.08 μg/m3
The SO2 concentrations were between 12.00μg/m3 (Surangi, Luheri, Bindrabin and Kurze Village) to 24.50μg/m3 (Project Site). The average concentrations were observed in the range between 15.71μg/m3to 20.17μg/m3.
The NOx concentrations were between 15.00μg/m3 (Pati Village) to 28.00 μg/m3 (Project Site) with average values observed in the range of 20.71μg/m3to 23.42μg/m3.
The Maximum CO concentration was found to be 1.19mg/m3(Kurze).In Project Site, Surangi and Karachgam the maximum concentration found to be 1.05 to 1.14. mg/m3In all other locations it found to be below detectable limit.
The O3 concentrations were between 5.02 μg/m3 (Project Site & Pati) to 9.83 μg/m3 (Kurze) with average values observed in the range of 5.84 μg/m3to 8.53 μg/m3.
The NH3concentrations were found to be 5.57 μg/m3 (Bindrabin)to 13.96 μg/m3 (Kurze). with average values observed in the range of 8.10 μg/m3 to 12.45 μg/m3.
The concentrations of all the air quality parameters as monitored during the baseline study are within the permissible limits as per the NAAQ Standards as prescribed by MoEF&CC.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-11
Table- 3.7: Ambient Air Quality of Study Area
AAQM Location
Particular PM10
µg/m3 PM2.5 µg/m3
SO2 µg/m3
NO2 µg/m3
O3, µg/m3
Pb, µg/m3
CO, mg/m3
NH3, µg/m3
As, ng/m3
Ni, ng/m3
C6H6 ,
µg/m3 Ba(a)p, ng/m3
VOC, µg/m3
Project Site
Min 68.00 20.00 15.00 16.00 5.02 BDL BDL 8.62 BDL BDL BDL BDL BDL
Max 81.00 31.00 24.00 28.00 6.89 BDL 1.05 11.56 BDL BDL BDL BDL BDL
Average 75.67 25.46 20.17 23.08 6.21 BDL BDL 9.96 BDL BDL BDL BDL BDL
98 Perc. 81.00 30.54 24.00 27.54 6.87 BDL BDL 11.42 BDL BDL BDL BDL BDL
Surangi
Min 68.00 20.00 12.00 18.00 6.24 BDL BDL 9.06 BDL BDL BDL BDL BDL
Max 82.00 31.00 22.00 28.00 8.54 BDL 1.14 11.89 BDL BDL BDL BDL BDL
Average 74.50 25.46 17.92 23.42 7.03 BDL BDL 10.42 BDL BDL BDL BDL BDL
98 Perc. 81.54 30.54 21.54 28.00 8.38 BDL BDL 11.73 BDL BDL BDL BDL BDL
Pati
Min 64.00 17.00 15.00 15.00 5.02 BDL BDL 7.94 BDL BDL BDL BDL BDL
Max 90.00 44.00 24.00 25.00 7.46 BDL BDL 11.90 BDL BDL BDL BDL BDL
Average 82.54 27.25 20.17 20.71 6.29 BDL BDL 9.46 BDL BDL BDL BDL BDL
98 Perc. 90.00 40.32 24.00 24.54 7.39 BDL BDL 11.10 BDL BDL BDL BDL BDL
Karachgam
Min 67.00 20.00 13.00 19.00 5.15 BDL BDL 9.01 BDL BDL BDL BDL BDL
Max 81.00 43.00 21.00 27.00 6.84 BDL 1.10 12.24 BDL BDL BDL BDL BDL
Average 75.08 31.08 16.67 22.54 5.84 BDL BDL 10.28 BDL BDL BDL BDL BDL
98 Perc. 81.00 41.62 20.54 26.54 6.82 BDL BDL 12.00 BDL BDL BDL BDL BDL
Bindrabin
Min 49.00 12.00 12.00 19.00 BDL BDL BDL 5.57 BDL BDL BDL BDL BDL
Max 86.00 24.00 19.00 26.00 BDL BDL BDL 10.01 BDL BDL BDL BDL BDL
Average 68.75 16.58 15.71 23.13 BDL BDL BDL 8.10 BDL BDL BDL BDL BDL
98 Perc. 84.62 23.54 19.00 26.00 BDL BDL BDL 9.46 BDL BDL BDL BDL BDL
Luhari
Min 74.00 20.00 12.00 17.00 BDL BDL BDL 8.42 BDL BDL BDL BDL BDL
Max 86.00 39.00 21.00 26.00 BDL BDL BDL 11.53 BDL BDL BDL BDL BDL
Average 79.92 30.54 16.88 21.33 BDL BDL BDL 9.60 BDL BDL BDL BDL BDL
98 Perc. 85.54 38.54 21.00 25.54 BDL BDL BDL 11.42 BDL BDL BDL BDL BDL
Kurze
Min 68.00 20.00 12.00 19.00 6.74 BDL BDL 10.25 BDL BDL BDL BDL BDL
Max 84.00 31.00 21.00 27.00 9.83 BDL 1.19 13.96 BDL BDL BDL BDL BDL
Average 76.88 25.33 16.79 22.54 8.53 BDL BDL 12.45 BDL BDL BDL BDL BDL
98 Perc. 83.08 30.54 21.00 26.54 9.81 BDL BDL 13.86 BDL BDL BDL BDL BDL
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-12
AAQM Location
Particular PM10
µg/m3 PM2.5 µg/m3
SO2 µg/m3
NO2 µg/m3
O3, µg/m3
Pb, µg/m3
CO, mg/m3
NH3, µg/m3
As, ng/m3
Ni, ng/m3
C6H6 ,
µg/m3 Ba(a)p, ng/m3
VOC, µg/m3
Apti
Min 68.00 20.00 13.00 19.00 5.37 BDL BDL 8.70 BDL BDL BDL BDL BDL
Max 84.00 33.00 21.00 26.00 7.90 BDL 1.05 10.37 BDL BDL BDL BDL BDL
Average 77.13 27.96 17.25 23.08 6.34 BDL BDL 9.66 BDL BDL BDL BDL BDL
98 Perc. 84.00 32.54 21.00 26.00 7.73 BDL BDL 10.31 BDL BDL BDL BDL BDL
NAAQS (2009)
24 Hr 100.00 60.00 80.00 80.00 -- 1.0 -- 400 -- -- -- -- --
1 hour -- -- -- -- 180 -- 04 -- -- -- -- -- --
Annual -- -- -- -- -- -- -- -- 06 20 05 01 --
Source: Source : UERL Laboratory division, Vapi
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-13
3.4. Ambient Noise Survey
The physical description of sound concerns its loudness as a function of frequency. Noise in general is sound,
which is composed of many frequencies, components of various loudness is distributed over the audible
frequency range. Various noise scales have been introduced to describe, in a single number, the response of
an average human to a complex sound made up of various frequencies at different loudness levels. The most
common and universally accepted scale which is measured in dB(A). This is more suitable for audible range of
20 to 20,000Hz and weighs the components according to the response of a human ear.
The impact of noise sources on surrounding community depends on:
Characteristics of noise sources (instantaneous, intermittent or continuous in nature.)
The time of day at which noise occurs, for example high noise levels at night in residential areas are not
acceptable because of disturbance in sleep.
The location of the noise source, with respect to noise sensitive land use, which determines the loudness
and period of exposure.
The environmental impact of noise can have several effects varying from Noise Induced Hearing Loss
(NIHL) to annoyance; depending on loudness of noise levels.
The main objective of noise monitoring in the study area is to establish the baseline noise levels, and
assess the impact of the likely noise expected due to construction and operation of New Capital City.
Noise survey has been conducted in the study area covering three zones viz., Residential, Industrial and
commercial .The noise monitoring has been undertaken for 24 hrs at each location.
3.4.1. Methodology
• A preliminary reconnaissance survey has been undertaken to identify the major noise generating sources in the area. The monitoring has been conducted at 8 locations in the study area.
• Noise levels were measured using an Integrating Sound Level Meter manufactured by Envirotech (model no. SLM-100). Noise levels were recorded continuously over 24 hour’s period. The noise sampling locations are provided in subsequent figure.
• Each measurement was taken for 15 seconds. All measurements were carried out when the wind speeds were approximately 1 - 2 m/sec and no unusual activities were being carried out at the monitoring locations.
• Equivalent sound levels or Equivalent continuous equal energy level (Leq) were then calculated from the recorded values separately for day-time as well as night time. Equivalent sound levels or Equivalent continuous equal energy level (Leq) is a statistical value of sound pressure level that can be equated to any fluctuating noise level and forms a useful measure of noise exposure and forms basis of several of the noise indices used presently. Leq is defined as the constant noise level, which over a given time, expands the same amount of energy, as is expanded by the fluctuating level over the same time. This value is expressed by the following equation.
(Where, n = Total number of sound sample; Li = The noise level of any ith, sample and ti = Time duration
of ith sample, Expressed as fraction of total sample time)
• Leq is used widely as a scale for the measurement of long term noise exposure. • The Leq values of noise levels are then compared with the stipulated standards of CPCB for residential
and industrial areas within the impact zone. 3.4.2. Parameters Measured during Monitoring
The Leq is the equivalent continuous sound level which is equivalent to the same sound energy as the actual
fluctuating sound measured in the same period. This is necessary because sound from noise source often
fluctuates widely during a given period of time.
The instrument internally performs the statistics of frequency distribution for the set time period (in this case
one-hour) and hourly Leq are obtained at each location. These hourly Leq is added logarithmically to obtain
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-14
24 hours Leq as well as Lday and Lnight levels. Lday is defined as the equivalent noise level measured over a
period of time during day (6 am to 10 pm). The Leq value measured for each individual hour and then
averaged for 10 am to 6 pm and is known as Lday. Lnight is defined as the equivalent noise level measured
over a period of time during night (10 pm to 6 am). The Leq value measured for each individual hour and then
averaged for 10 pm to 6 am and is known as Lnight.
3.4.4. Results and discussion
The ambient noise levels measured and analysed for equivalent noise levels viz. Leq(24hrly), Leqday, Leqnight
at all the noise monitoring locations for the study period are presented in table. 3.8.
Table 3.8: Ambient Noise Level in Study Area
Loc. Code
Location Day Time Night Time
Min dB (A)
Max dB (A)
Average dB(A)
Min dB (A)
Max dB (A)
Average dB(A)
Industrial
N1 Project Site 49.0 49.4 49.2 33.6 33.8 33.7
CPCB Standard - - 75 - - 70
Commercial
N2 Surangi 58.2 62.0 60.1 35.9 38.4 37.2
CPCB Standard - - 75 - - 45
Residential
N3 Pati 48.0 54.0 51.0 36.5 41.7 39.1
N4 Karachgam 49.6 53.0 51.3 33.3 34.5 33.9
N5 Bindrabin 60.9 63.1 62.0 42.6 43.4 43.0
N6 Luahri 46.0 51.7 48.8 34.8 37.8 36.3
N7 Kruze 49.7 50.1 49.9 33.7 33.9 33.8
N8 Apti 49.8 54.7 52.2 32.8 35.3 34.1
CPCB Standards - - 65 - - 55
Source : UERL Laboratory division, Vapi
3.4.5. Observations
3.4.5.1. Residential Zone: The average hourly Leq (day) for the residential zone was observed to be in the
range of 48.8 dB (A) (Luhari) to 62.0 dB (A) (Bindrabin). The average hourly Leq (night) for the residential zone
was observed to be in the range of 33.8 dB (A) (Kurze) to 43.0 dB (A) (Bindrabin). The ambient noise levels in
the villages are under the influence of local environment only and the Leq values are within permissible limits
in all the villages.
3.4.5.2. Commercial Zone: The average hourly Leq (day) for the commercial zone at Surangi was found to be
60.1 dB (A) while the average hourly Leq (night) was found to be 37.2 dB (A) and were found to will within
the CPCB limits for the commercial zone –for the day time and the night time.
3.4.5.3. Industrial Zone: The average hourly Leq (Day) for the industrial zone at project site was found to be
49.2 dB(A) while the average hourly Leq (night) was found to be 33.7 dB (A), which were found to be well
within the CPCB limits for the Industrial zone –both for the day time and the night time.
3.5. Water Quality
Water quality (ground and surface) was studied with special reference to the parameters mentioned in the IS
10500. A total of 8 locations were selected to study the ground and surface water quality within the 10km
radius of the project boundary.
The purpose of this study is to:
Assess the water quality characteristics for critical parameters;
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-15
Evaluate the impacts on agricultural productivity, habitat conditions, recreational resources and
aesthetics in the vicinity; and
Predict the likely impacts of water quality due to the project and related activities.
3.5.1. Methodology
Reconnaissance survey was undertaken and monitoring locations were finalized based on:
Drainage pattern;
Likely areas which can represent baseline conditions.
Likely areas representing different activities/likely impact areas
With reference to the guidelines of CPCB & EIA Manual of MoEF, methods of sampling & analysis of
environmental samples have been selected/ adopted. The method adopted for environmental sampling &
analysis are illustrated in following table 3.9.
Physico-chemical and microbiological parameters relevant for different water uses have been
analyzed.
The SOP (Standard Operating Procedures) for sampling prepared based on sampling protocol specified
in the “Guidelines for Water Quality Management”, January 2008 of CPCB was followed for sampling,
preservation, and transport of samples to the laboratory.
o Quantity of sample for General Analysis: 5 liter(non-acidified).
o Quantity of sample for Bacteriological Analysis: 250 ml in sterilized bottles.
o Quantity of sample for Metals Analysis: 1000 ml acidified sample for metal analysis.
Samples were analyzed at the laboratory of Unistar Environment and Research Labs Pvt. Ltd. as per
STPs (Standard Testing Procedures) based on IS and APHA methods.Details of method are given in the
enclosed Annexure-II.
Table 3.9: Frequency of Environmental Monitoring
Attributes Sampling
Locations Frequency
Ground Water Grab samples from 8 Locations from Study Area (10 KMs) Once in Study Period
Surface Water Grab samples from 5 Locations from Study Area (10 KMs) Once in Study Period
SURFACE WATER
The water quality of the study area was studied for ground water as well as surface water by collecting the
samples from selected locations within the study area. The area is falling under basin of Rivers of North –
western Ghat (basin Code-B), which covers about 58935.97 Sq. Kms. and perimeter of the basin is measuring
about 2982.34 Kms. The samples were collected & analyzed as per the guidelines of CPCB/MoEF. Surface
water sample was collected from Four Rivers which are the important resources of the area.
The Damanganga River falls within study area. Damanganga River meets Arabian Sea near Nani Daman
Village. It serves many villages as source of drinking water, domestic activities and irrigation water source.
The samples of Daman Ganga River were collected from the point near Pati Village. A major multipurpose
irrigation project exist near the area in village Madhuban in Dharampur taluka of valasd district .It has
irrigation capacity of about 7044 ha and it supplies water to the tune of 12.75 MGPD to industry and
domestic use in the Union Territory.
Two tributaries namely, Sakartod and Dongar Khadi join Damanganga. Sakartod River (Tributary of Daman
Ganga River) flows from Shindoni to Damanganga River at Chinchpada village. It flows through the South side
of Project site. Minor irrigation schemes through lift irrigation on rivers and check dams/percolation tank
have been constructed in Surangi village. The samples of Sakertod River were collected from the point near
Bindrabin Village. Dongar khadi (Tributary of Daman Ganga River) flows from Raipur (Maharashtra) to
Damanganga River Chinchpada village. Both revers flows through the South side of Project site. The samples
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-16
of Dongar Khadi were collected from the point near Surangi Village. The lift irrigation scheme on rivers
Dongarkhadi, irrigates about 42 ha of area of village. A check dam/percolation tank of width about 30m and
length about 500m, having storage capacity of about 5.0 ham, exist in the South side of the industry site. The
canal system in the area irrigates about 340 ha of land in the village (Source-Revenue Records). One small
reservoir the Kurze Dam (also known as Dhapcheri Dam) is covered in study area. The Kurze Dam is an earth
fill dam on local River named Viroli near Dahanu- Maharashtra. The height of the dam above lowest
foundation is 22.96 m (75.3 ft) while the length is 2,507.76 m (8,227.6 ft). The volume content is
846.12 km3 (202.99 cu mi) and gross storage capacity is 39,050.00 km3 (9,368.59 cu mi). The purpose of this
to irrigation and water supply. One sample is taken from the reservoir.
3.5.2 Results of water quality
Four surface water and eight ground water samples were collected as grab samples and analysed for various
parameters. The results of groundwater were compared with the standards for drinking water as per IS
10500 and the results of surface water were compared CPCB surface water standard. The water sampling
locations are shown in Figure 3.2. The water quality result for surface water and ground water sampling
locations are given in Table 3.10 (a).3.10(b)
Code Location Date of sampling SW-01 Dongar Khadi 27/12/2017 SW-02 Sakartod River 27/12/2017 SW-03 Damanganga River 28/12/2017 SW-04 Darotha River 27/12/2017 SW-05 Kurze Dam 27/12/2017
Table 3.10(a): Surface water Quality of Study Area
S.No. Parameters Unit SW01 SW02 SW03 SW04 SW05
1. Colour Pt. Co. Scale
<5 <5 <5 22 <5
2. Odour -- Agreeable
3. Turbidity NTU 0.1 0.1 0.1 0.1 0.1
4. pH -- 7.14 7.87 7.69 8.12 7.31
5. Temperature 0C 29 30 30 30 29
6. Total Hardness as CaCO3
mg/L 237.6 134.6 99 253.4 124.7
7. Total Dissolved Solids mg/L 316 180 120 416 164
8. Calcium as Ca mg/L 47.6 38.1 19.8 69.8 26.2
9. Magnesium as Mg mg/L 28.8 9.6 12.0 19.2 14.4
10. Total Alkalinity mg/L 216.6 136.8 85.5 229.0 114
11. Chloride as Cl- mg/L 22.2 12.1 7.9 71.3 7.9
12. Sulphate as SO4-2 mg/L 20.7 14.7 10.1 37.1 8.2
13. Nitrate as NO3 mg/L <0.1 <0.1 0.1 1.1 <0.1
14. Fluoride as F mg/L 0.17 <0.15 0.16 0.44 <0.15
15. Sodium as Na mg/L 16.8 12.3 7.7 47.9 7.3
16. Potassium as K mg/L <1.0 <1.0 <1.0 1.3 <1.0
17. Total Phosphorous mg/L 0.06 0.07 0.19 0.17 0.12
18. Dissolved Oxygen mg/L 5.5 4.8 6.3 4.5 5.7
19. Bio-Chemical Oxygen mg/L <5.0* <5.0$ <5.0# <5.0 <5.0
20. Chemical Oxygen Demand
mg/L 8.1 <5.0 <5.0 16.0 8.1
21. Phenolic Compound mg/L <0.01
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-17
S.No. Parameters Unit SW01 SW02 SW03 SW04 SW05
22. Lead as Pb mg/L <0.003
23. Arsenic as Pb mg/L <0.01
24. Cadmium as Cd mg/L <0.001
Microbiological Test
25. Total Coliform
MPN/100 ml
24 30
32 40 20
26. E. Coli
MPN/100 ml
12 18
12 22 06
Note: *Measured value of BOD is 3.4 mg/L,$ Measured value of BOD is 3.5 mg/L, #Measured value of BOD is
3.5 mg/L
Classification of river water as per their intended use is described in below:
Sr No. Class Designated Best- Use and Criteria
1. A Drinking water source without conventional treatment but after disinfection; Total
Coliforms ≤ 50MPN/100ml, pH 6.5 -8.5, DO ≥ 6mg/l, BOD 5 days 20°C ≤ 2mg/l
2. B Outdoor bathing; Total Coliforms≤ 500MPN/100ml,pH 6.5 - 8.5,DO ≥ 5mg/l, BOD 5 days
20°C≤ 3mg/l
3. C Drinking water source with conventional treatment followed by disinfection; Total
Coliforms ≤5000MPN/100ml, pH 6 – 9,DO≥ 4mg/l, BOD 5 days 20°C ≤ 3mg/l
4. D Fish culture and wild life propagation; pH 6.5 - 8.5,DO ≥ 4mg/l, Free Ammonia (as N) ≤
1.2 mg/l
5. E Irrigation, industrial cooling or controlled waste disposal; pH 6.0 - 8.5, EC at 25°C micro
mhos/cm Max.2250, SAR Max. 26, Boron Max. 2mg/l
(Source: Water Quality Criteria CPCB)
Sampling of Ground water
The groundwater sampling locations were selected from the area fall within 10 Kms radius from project site
for water quality study. The details of the hydrological features of the area are presented in earlier section.
The selected locations / villages for groundwater sampling are listed below:
Code Location Source Date of sampling GW-01 Project Site Bore well 27/12/2017 GW-02 Surangi Bore Well 27/12/2017 GW-03 Pati Bore well 28/12/2017 GW-04 Karachgam Bore Well 27/12/2017 GW-05 Bindrabin Bore well 27/12/2017 GW-06 Luhari Bore well 28/12/2017 GW-07 Kurze Bore well 27/12/2017 GW-08 Apti Bore well 28/12/2017
Table 3.10(b): Ground water Quality of Study Area:
Sr. No.
Parameters Unit GW-01 GW-02 GW-03 GW-04 GW-05 GW-06 GW-07 GW-08
1. Colour (Pt-Co Scale) Unit <5 <5 10 <5 10 <5 <5 <5
2. Odour -- Agreeable
3. Turbidity NTU <0.1 0.1 0.1 <0.1 <0.1 0.1 0.1 0.1
4. pH -- 7.53 7.10 7.37 7.48 7.30 7.05 6.92 7.39
5. Temperature 0C 30 30 29 29 29 29 30 29
6. Total Hardness as CaCO3
mg/lit. 180.2 146.5 138.6 316.8 119.8 213.8 247.5 198
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-18
Sr. No.
Parameters Unit GW-01 GW-02 GW-03 GW-04 GW-05 GW-06 GW-07 GW-08
7. Total Dissolved Solid mg/lit. 454 298 272 406 248 272 356 348
8. Calcium as Ca mg/lit. 60.3 38.9 43.6 75.4 39.7 65.9 67.4 67.4
9. Magnesium as Mg mg/lit. 7.2 12.0 7.2 31.3 5.0 12.0 19.2 7.2
10. Total Alkalinity mg/lit. 102.6 125.4 108.3 285 79.8 205.2 210.9 179.5
11. Chloride as Cl- mg/lit. 178.0 50.7 21.6 33.3 70.2 30.1 28.0 29.0
12. Sulphate as SO4-2 mg/lit. 44.3 27.7 23.3 24.2 32.2 24.1 22.1 24.4
13. Nitrate as NO3 mg/lit. <0.1 1.1 0.3 2.6 <0.1 1.6 <0.1 3.2
14. Fluoride as F mg/lit. 0.17 0.42 0.24 0.24 0.16 0.50 0.34 0.15
15. Sodium mg/lit. 107.8 34.0 12.8 19.2 49 22.5 18.9 26.8
16. Potassium mg/lit. <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0
17. Total Nitrogen mg/lit. <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0 <5.0
18. Total Phosphorous mg/lit. 0.03 0.05 0.13 0.02 0.03 0.08 0.02 0.08
19. Phenolic Compound mg/lit. <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01
20. Lead as Pb mg/lit. <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003
21. Arsenic mg/lit. <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01
22. Cadmium mg/lit. <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001
Microbiological Test
23. Total Coliform CFU/ 100 ml
<1 <1 <1 <1 <1 3 <1 <1
24. E. Coli Absent Absent Absent Absent Absent Absent Absent Absent
3.5.3. Results and Discussion
3.5.3.1. Primary data
Ground water samples
In 3 locations of study area Total hardness level exceed the acceptable limit as per IS 10500.Exceeding
level of total hardness lead to hard water which is not a health risk, but a nuisance because of mineral
buildup on fixtures and poor soap and/or detergent performance.
TDS value not exceeding the permissible limit in all locations of the study area.
Magnesium level exceeds the acceptable limit as per IS 10500 at3locations.
Calcium value exceeds the acceptable limit as per IS 10500 at 5 locations
Total Alkalinity value exceeds the acceptable limit as per IS 10500 at 3 locations in the study area. The
very high alkalinity water cause digestive malfunction, cardiovascular problems and metabolic
abnormalities etc...
Chloride value was not exceeds the acceptable limit as per IS 10500 at all location.
Total Coliforms and E.coli were<1CFU/100 ml and present in one locations in the study area.
Values for all other parameters were found well within the acceptable limit as per IS 10500.
Surface Water Samples
Five surface water resources were studied
SW1 , SW2 and SW3 were found to be confirming Class-D of CPCB Criteria (Fish culture and wild life
propagation). As the BOD level is greater than 3mg/l
SW4 was found to be confirming Class-A of CPCB Criteria (Drinking water source without conventional
treatment but after disinfection.
3.6. Hydrogeology, Geology &Topography
Physiographically the UT forms part of Deccan Plateau. The UT of D&NH is divided into three physiographic
units i.e. Residual Plateaus, Denudational Slopes and Valley Plains and their description is as follows.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-19
1) Residual Plateau’s, these are flat-topped crests surrounded by steep scarps. These residual plateaus occur
in the western fringe, the south-eastern part of and in the isolated patches in the northeastern part of
the Territory. The elevation in this category ranges between 100-300 m amsl the elevation more than 200
m amsl is seen in north eastern and south-eastern part of the Territory.
2) Denudational Slopes, these form the scarp zone between plateaus and plains and comprises of moderate
to steep slopes. The major area under this category lies almost in the eastern part in north south
alignment in dissected form ranging roughly between 50 and 100 m above MSL.
3) Valley Plains, the valley plains form the flat topography with gentle slope of SE-NW forming the
Damanganga River and its tributaries and it ranges in elevation below 50 m above m amsl. It comprises of
weathered rock fragments and soils. The rock fragments are various sizes and mixed with soils.
The soils occurring on the Deccan plateau are generally black cotton soils. Within this broad categorization,
there are significant variations depending upon topography. Three major type of soil occurs in the UT i.e.,
lateritic soils, shallow black cotton soils deep black soils and their description is as follows:
1. Lateritic Soil, these soils are well stabilized and have good porosity leading to good permeability and
aeration and are non-calcareous soils and have low pH.
2. Shallow Black Cotton Soil, are medium textured soils with 8 gravels and pebbles and hard rock is met
early below the soil restricting free movement of water and air. Though the soils are permeable enough,
but have low moisture holding capacity and thus call for specific moisture management for sustainable
land use under cultivation.
3. Deep Black Soil, are very deep soils having very high fertility and are capable of supporting a variable
number of crops.
The major water bearing formation in the UT of DNH is Deccan Trap Basalt. A map depicting the
hydrogeological features show in figure. 3.4
Figure 3.4: Hydrogeological Features
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-20
3.6.1. Ground water levels in the U.T of Dadra and Nagar Haveli
GROUND WATER
The total study area is 314 Sq.m. and its population is about 49764. The drinking water supply to the village is
through surface water as well as through ground water schemes. There are about 42 bore wells including
hand pumps and open well in village for drinking water supply and domestic purpose to villagers. The
irrigation from ground water is negligible.
The estimation of ground water resources of UT of Dadra & Nagar Haveli by Central Ground Water Board,
during the year 2012 indicate that the total annual ground water potential in the Territory is 59.37 MCM and
the Net annual ground water availability is 56.40 MCM. The allocation for domestic and industrial
requirement up to next 25 years is 8.66 MCM and the Net annual ground water availability for future
irrigation development is 46.62 MCM. The stage of ground water development is 15.25 percent and water
table trend during pre and post-monsoon period shows rising trend. Hence, the entire UT area has been
categorized under ‘Safe’ category as far as ground water development is concerned. However, to assess the
local level ground water potential an estimation of Ground Water Resource of village Mast and Samarvani (a
micro level unit) has been carried out, based on the norms laid down by GEC 1997 Methodology which is as
below; that net utilizable recharge is to the tune of 4.18 MCM and net annual draft is 0.40 MCM. The stage of
development is 9.6 %.
Secondary data was inferred from the Central Ground Water Board publication titled “Status of Ground
water Quality” of Dadra and Nagar Haveli.
Pre-monsoon and Post Monsoon water levels
Water level fluctuation
3.6.1.1. Pre-monsoon water levels
The figure 3.6 (a) shows The depth to water levels in the UT of DNH during premonsoon ranges between 3.80
m bgl (Chinsda) and 10.61 m bgl (Dapada) near the project site. Depth to water level during premonsoon has
been depicted in Figure-3.5 (a). Very shallow water levels in the range of 2 to 5 m bgl are seen in south
eastern part of UT of DNH. In major part of the UT of DNH water levels are observed between 5 and10 m bgl,
whereas moderately deep water levels ranging between 10 and 20 m bgl are observed in small central part of
the UT of DNH.
3.6.1.2. Post-monsoon water levels
The depth to water levels during post monsoon ranges between 1.75 m 10 bgl (Chinsda) and 7.96 m bgl
(Dapada) area near the project site. Spatial variation in post monsoon depth to water levels is shown in
Figure-3.5(b). Very shallow water levels in the below 2 m bgl are seen in south eastern part of UT of DNH. In
major part of the UT of DNH water levels are observed between 2 and 5 m bgl, whereas moderate water
levels ranging between 5 and 10 m bgl are observed in central part of the UT of DNH.
3.6.1.3. Water level fluctuation
The seasonal fluctuations in water levels have been observed in the range of 1.80 m (Samarvarni) to 6.92 m
(Umarkui (Hathpada)). Rise in water levels in the range of 2 to 4 m is observed in major parts, whereas rise of
more than 4 m is mainly observed in north parts of the UT of DNH.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-21
Figure-3.5 (a): Depth to water level map May 2012
Figure-3.5(b): Water level Fluctuation map November 2012
(Source: Ground water Information –U.T. of D&NH by CGWB)
Project Site
Project Site
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-22
3.6.2. Geological Features
Hard Rock Formations
Deccan Trap Basalt
The basaltic lava flows are massive and fine grained with negligible primary porosity and transmissivity. The
area occurs in the vicinity of western coast, which have witnessed many tectonic disturbances. These have
caused development of joints and fractures in the basaltic strata. Also weathered zones of about 10-20 m
thickness have developed in plains and depressions. Thus the weathered, jointed and fractured zones of
vesicular and massive units of a flow constitute the main water bearing horizons. However, these zones are
not continuous and uniformly developed laterally or vertically and this factor plays an important role in the
success and failure of wells in the area.
On the basis of hydrogeological data collected from dug wells and results of pumping tests on wells it is
revealed that ground water occurs under both water table and semi-confined to confined conditions in the
various lava flows consisting of vesicular and massive units. The occurrence of ground water under confined
conditions is observed in the western part of the area around Naroli and Dadra. The potential confined
aquifers occur at an attitude of 20 m below the mean sea level and with compact, amygdular and massive
basalt of about 25 m thickness acting as a confining layer. The thick confining layer also inhibits vertical
leakage to the confined aquifers. The confined aquifers also show lateral variation in hydraulic characteristic
within short distances.
Local geology: In the project site, no out crops are seen. The area belongs to deccan trap age. The litho
logically, the area covered with soil which has 3-5 m thickness. Below the soil the hard rock’s present.
3.6.2. Topographical Features
The overall topography of the site is flat with a gentle slope from southeast towards southwest. The overall
topography of the area is marked by alluvial plains. The site elevation is about 58 to 64 meters. The
topographical map of the project site is as shown in Figure 3.6.
Project site is located in the NW direction of Gujarat. It has an average elevation 250 to 300 meters. The
approximate center of the proposed site is geographically positioned at 72°58'43.24"E longitude and
20°8'17.54"N. The topographic contour map has been generated from SRTM Version 4 (2008) data. As it has
been observed during the site visit that some area are very low and maximum of the study area is relatively
flat. Along with the regular contour generation elevation extremes of the area is also spotted as spot
elevation point. The Topographic map generated for the 10 km area is illustrated below as figure.3.6.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-23
Figure 3.6: Topographic Map
3.7. Soil Characteristics
3.7.1. Introduction
Soil health, also referred to as soil quality, is defined as the continued capacity of soil to function as a vital
living ecosystem that sustains plants, animals, and humans. This definition speaks to the importance of
managing soils so they are sustainable for future generations.
Healthy soil gives us clean air and water, bountiful crops and forests, productive grazing lands, diverse
wildlife, and beautiful landscapes. Soil does all this by performing five essential functions:
Regulating water - Soil helps control where rain and irrigation water goes. Water and dissolved solutes
flow over the land or into and through the soil.
Sustaining plant and animal life - The diversity and productivity of living things depends on soil.
Filtering and buffering potential pollutants - The minerals and microbes in soil are responsible for
filtering, buffering, degrading, immobilizing, and detoxifying organic and inorganic materials, including
industrial and municipal by-products and atmospheric deposits.
Cycling nutrients - Carbon, nitrogen, phosphorus, and many other nutrients are stored, transformed, and
cycled in the soil
Physical stability and support - Soil structure provides a medium for plant roots. Soils also provide
support for human structures and protection for archaeological treasures.
According to the District Planning Map Series, Department of Science & Technology, GoI, 1991 the three
types of soils reported are
Project Site
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-24
Vertisols i.e. deep black soils that normally form from basaltic material and said to have high clay content (majority of north-to south axis including central part and north-western part of DNH),
Inceptisols i.e. shallow black soils (western part of DNH), and
Ultisols i.e. lateritic soils said to have low clay component (found predominantly in the north-eastern, eastern part abutting the Damanganga Reservoir, and south-western part of DNH, and most of these as mentioned earlier is more undulating / hilly terrain). Show the figure 3.7 for the soil pattern in the DNH area. Rocky out crops are only seen in the Soils of Gujarat plain / soils of hilly terrain.
The project site was cover with vertisols i.e. deep black soils that normally form from basaltic material and
said to have high clay content (majority of north-to south axis including central part and north-western part
of DNH)
Figure-3.7: Soil map of D& NH
(Source: District Planning Map Series, NATMO, Department of Science & Technology, GoI, 1991 with Patelad names added)
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-25
3.7.2. Methodology
Necessity of baseline study is to determine and establish the existing environmental conditions of the project
area. So that the potential stress (impact identified) on the environment due to the upcoming project’s
environmental issues, with the implementation of adequate proposed pollution control measures will be well
within the permissible limit (pollution load bearing capacity of environment) or not is established.
a. Sampling location of surface soil is selected to generate the physio-chemical soil profile of project site;
and to establish the present soil fertility condition of the sensitive/ significant area within the project
study area.
b. The physic-chemical parameters tested on the soil samples are Bulk density, Salinity, Porosity, Soil
Texture, Water holding capacity, pH, EC, OC, N, P, K, S, Zn, B, Fe, Mn, Cu.
c. The sampling and analysis of the surface soil is conducted at 8 locations once in the study period
(October 2017 – December 2017) within the study area of 10 Km radial distance from the project site.
The details of the soil sampling location are in given in below table.
Sr. No.
Sample Code
Sampling Location Co-ordinates
Land use Latitude Longitude
1 SS-1 Project Site, Velugam 20.13779 72.98396 Industrial 2 SS-2 Surangi 20.16068 73.00687 Agricultural 3 SS-3 Pati 20.19273 73.05224 Agricultural 4 SS-4 Karachgam 20.12330 73.01315 Agricultural 5 SS-5 Bindrabin 20.14109 73.05659 Agricultural 6 SS-6 Luhari 20.20561 72.96999 Agricultural 7 SS-7 Kurze 20.11403 72.95264 Agricultural 8 SS-8 Apti 20.15593 72.99470 Agricultural
The detailed quality of the collected soil samples are presented below in subsequent table.
Table 3.11: Soil Quality of Study Area
Sr. No
. Parameter Unit (SS1) (SS2) (SS3) (SS4) (SS5) (SS6) (SS7) (SS8)
1 Bulk Density gm/cm3 1.29 1.27 1.20 1.19 1.23 1.24 1.28 1.21
3 Porosity % 41 42 56 51 45 54 51 40
4 Grain Size Distribution
Sand (2 - 0.02 mm) % 15 17 19 21 24 22 16 17
Silt (0.02 - 0.002 mm) % 34 32 27 26 20 26 32 33
Clay (<0.002 mm) % 51 51 54 53 56 52 52 50
5 Textural Class - Clay Clay Clay Clay Clay Clay Clay Clay
6 WHC ml/100 gm 52 55 51 54 58 58 57 58
7 pH - 7.01 6.85 6.62 8.23 6.85 6.85 6.75 7.25
8 EC µS/cm 200.80 310.10 134.70 187.60 179.80 134.17 171.70 192.80
9 Cation Exchange
Capacity
meq/100g
m 25.11 23.44 20.90 26.48 22.38 23.01 24.16 20.22
10 Organic Carbon (OC) % 0.56 0.59 0.69 0.54 0.50 0.66 0.61 0.65
11 Nitrogen (as N) mg/kg 206.4 213 273.50 188.1 133.9 210.00 194.7 180.3
12 Phosphorus (as P) mg/kg 30.93 7.90 26.50 6.30 20.89 29.53 25.85 25.50
13 Potassium (as K) mg/kg 150.90 347.00 101.30 112.10 220.70 201.90 302.10 290.90
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-26
14 Calcium (as Ca) mg/kg 5.03 6.50 4.90 5.20 5.50 5.75 5.90 5.10
15 Magnesium (as Mg) mg/kg 3.80 3.30 2.86 3.62 5.10 2.10 3.31 3.19
16 Sulphur (as S) mg/kg 23.60 28.04 26.05 30.00 28.84 31.30 29.15 25.22
17 Zinc (as Zn) mg/kg 0.98 1.83 3.19 2.85 1.85 1.19 1.85 2.94
18 Iron (as Fe) mg/kg 50.42 47.90 50.12 40.51 38.95 48.40 53.50 47.55
19 Manganese (as Mn) mg/kg 11.90 5.95 11.10 13.27 5.99 10.98 18.83 10.54
20 Copper (as Cu) mg/kg 1.03 2.52 1.66 1.48 2.52 1.64 1.62 1.52
NOTE: ppt= Parts per thousand, EC= Electric Conductivity, WHC=Water Holding Capacity
3.7.3. Results and discussion
The texture of the soil in the study area is Clay. The colour of the soil is light to dark brownish black in the
study area. The soil is having high water and moisture retention capacity due to clay content. The water
holding capacity of the study area ranges between 51 to 58 mg/100 g and these being clayey soils are capable
of retaining sufficient water which facilitate in plant growth. The pH of the soil samples from the study area is
found to mostly normal (i.e., between 6.5 and 8.2). Hence a good range of micronutrients are available in soil,
making the soil good for agricultural uses. The EC of the soil of the study area ranges between 134.17 to
310.10 µSm/cm). The percentage of Organic Carbon of the study area ranges in medium (i.e., Medium 0.5-
0.75). The soil of the project site is found to be free from any contaminant.
3.8. Ecology and Biodiversity
3.8.1. Objectives of the Terrestrial and Aquatic Ecology Survey
Necessity of baseline study is to determine the flora and fauna diversity in the existing environmental
conditions and ecological layout of the study area. To identify endemic, threatened and endangered species
present in the range of the pollutants from the proposed project.
Terrestrial ecology
Secondary data collection from open source
Detailed, quantitative pre-monsoon biodiversity survey for plants, four vertebrates (mammals, avifauna,
reptiles, amphibians), using quadrate and transect-based analysis
List of flora and fauna species with IUCN category and schedule as per The Wildlife Protection Act, I972
3.8.2. Methodology
3.8.2.1. Study Area Details
a. Field survey area is selected based on the ecologically diverse and dense vegetation identified from
Google map and land use patter map. Verification (ground truthing) of the secondary data obtained is
conducted specific to the study area of the project.
b. Observations were made at different sampling points and qualitative as well as quantitative analysis of
the vegetation and fauna is made.
c. The ICUCN status of the enlisted species is established.
The field survey was conducted at identified survey area, during the study period (October’16 to
December’16) within the study area of 5 Km radial distance from the project site.
3.8.3. Floral Diversity of the study area
Structure in the study area observed for formulating effective management and conservation measures. The
climatic, edaphic and biotic variations with their complex interrelationship and composition of species, which
are adapted to these variations, have resulted in different vegetation cover, characteristic of each region. The
following account of floral inventory has been based on the field survey conducted for a short duration
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-27
during the study period, is not very comprehensive data and is aimed only to give a general pattern of
vegetation of this region during the study period as a baseline data in absence of available secondary data.
Listing of the endangered, threatened and endemic species of flora in a locality and drawing the attention to
the occurrence of such species, would aid in creating awareness amongst the local people as a whole to
protect such species from extinction, and to take necessary measures for their conservation. These type of
floristic study is an inventory for such purpose and hence a necessity. The dominant tree species, herbs,
shrubs and major crops, were documented during this base line study.
The list of floral species is prepared based on visual observation during site visit and through review of site
literatures and secondary data available online on various government websites is referred for identifying
rare or endangered species in the region. In core zone, the vegetation mostly comprises of open scrub
vegetation& deciduous trees. The vegetation type is moist deciduous forests with trees predominantly moist
deciduous type but rarely evergreen. The natural vegetation is scarce, scattered and open almost in all
natural non-forest area. In forest areas, good density of vegetation is observed which was dominated by
Tectona grandis,Tamarindus indica, terminalia arjuna &Acacia nilotica. Details pertaining to flora observed in
the study area have been collected from Local Forest Department and Field Observation.
Agro ecological Features:
Agro ecological region code of the area is 19 - Western Ghats and Coastal Plain, Hot Humid-Perhumid Eco-
Region. The area falls under hot humid Agro ecological sub-region – North Sahyadri & Konkan Coast with
Subregion code –E6B8. The soil type of the area is Medium to deep loamy to clayey mixed red and black soils.
The length of growing period is 210 to 240 days.
The main crops of the area are Paddy, Bajara, Nagli, Juar, Mung, Channa, Tuer, Makai, Val, Vegetables,
Sugarcane, Mango and some other fruits etc.
Forest:
The area falls in Ecoregion zones – 4 of India which is lowland moist with long dry season. The forest of the
area falls under the type of North Western Ghats moist deciduous forests of Biogeographical Realm IM. The
Code combining Realm, Biome and Ecoregion numbers is IM0134.
There is no forest land within the project site; however it has been noticed that the nearest forest area is
situated in western direction at about 2.59 kms. W near Kharadpada – Luhari area of the UT and at about
9.37 kms NE direction which are also protected wild life sanctuary of Vasona. Variety of flora & fauna exhibits
the area of this forest. The flora are listed in above section where as the fauna are listed in subsequent
section.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-28
Fig. 3.8: Reserved Forest and Wild life sanctuary map of D& NH
Flora of the Study area:
The zone of Silvassa shows fairly rich in plant biodiversity having more of annual and perennial herbaceous
vegetation. The small hillocks existing in the perimeter of the proposed project site are already degraded
forest patches and mainly comprised of planted trees and shrubs. Among the plant biodiversity none of the
species belongs to IUCN Red List as well as Schedule species as per Wildlife list.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-29
Table 3.12(a) Plant Family Richness of the region
S. No. Scientific name Family
1. Amaranthaceae 12
2. Asteraceae 19
3. Boraginaceae 06
4. Commelinaceae 10
5. Cyperaceae 09
6. Euphorbiaceae 09
7. Fabaceae 35
8. Malvaceae 14
9. Poaceae 17
Table 3.12(b) wildly occurring Plant species in the region
S. No.
Scientific Name Family IUCN status
1. Tectona grandis Lamiaceae LC
2. Terminalia arjuna Combretaceae LC
3. Adina cordifolia Rubiaceae LC
4. Ougeinia dalbergioides Fabaceae LC
5. Albizia lebbeck Leguminosae LC
6. Erythrina variegata L. Leguminosae. LC
7. Lagerstroemia lanceolata Lythraceae LC
8. Lannea coromandelica Anacardiaceae LC
9. Garuga pinnata Burseraceae LC
10. Madhuca indica Sapotaceae LC
11. Acacia farnesiana var. farnesiana Fabaceae LC
12. Acacia catechu Fabaceae LC
13. Bridelia retusa Phyllanthaceae LC
14. Mitragyna parvifolia Rubiaceae LC
15. Bombax ceiba Fabaceae VU
16. Sterculia urens Malvaceae LC
17. Anogeissus latifolia Combretaceae LC
18. Heterophragma quadricolor Bignoniaceae LC
19. Holoptelea integrifolia Ulmaceae LC
20. Terminalia bellerica Combretaceae LC
21. Bauhinia variegate Fabaceae LC
22. Grewia tiliaefolia Malvaceae LC
23. Dalbergia latifolia Leguminosae VU
24. Mangifera indica Anacardiaceae LC
25. Gmelina arborea Lamiaceae LC
26. Syzygium cumini Myrtaceae LC
27. Cassia fistula Fabaceae LC
28. Ficus glomerata Moraceae LC
29. Mimusops elengi Sapotaceae LC
30. Aegle marmelos Rutaceae LC
31. Pongamia pinnata Fabaceae LC
32. Carissa carandas Apocynaceae LC
33. Cordia dichotoma Boraginaceae LC
34. Semecarpus anacardium Anacardiaceae LC
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-30
35. Plumeria alba Apocynaceae LC
36. Borassus flabellifer Arecaceae LC
37. Thespesia populnea Malvaceae LC
38. Samanea saman Fabaceae LC
39. Pandanus odoratissimus Pandanaceae LC
40. Tamarindus indica Fabaceae LC
41. Phoenix sylvestris Arecaceae LC
42. Thevetia peruviana Apocynaceae LC
43. Hyphaene dichotoma Arecaceae NT
44. Typha angustifolia Typhaceae LC
45. Casuarina equisetifolia Casuarinaceae LC
46. Ficus hispida Moraceae LC
47. Polyalthia longifolia Annonaceae LC
48. Mimusops hexandra Sapotaceae LC
49. Achras sapota Sapotaceae LC
50. Anthocephalus cadamba Rubiaceae LC
51. Gliricidia sepium Fabaceae LC
Note: The wildly occurring plant biodiversity of the zone including the Reserve forest is enclosed as
Annexure-VI
3.8.4 Faunal Diversity of the study area
Mammals
During observations, the sighting of wild animals was negligible in the entire study area. The assessment of
wild life fauna has been carried out on the basis of information collected from personal interviews with local
peoples.
Reptiles
During field survey common garden lizard was observed in the study area, but as per the local information
collected from the villagers there are snakes belonging to both poisonous and non-poisonous category.
Avifauna
During avifauna survey counts of birds were made following the standard survey technique by travelling a
known distance in which designated sampling areas occur. Observations were made during a walk through in
the chosen transect for sighting the birds. The number of birds observed in one milometer (of the car) stretch
of the site was directly counted and list was made.
Dominant birds in the study area are Common peafowl, Indian myna, House sparrow, Common crow, Blue
rock pigeon, common babbler and the other birds are Indian robin, Indian roller, cattle egret.
Table 3.13: List of Flora the study area
Sr. No.
Name of Family Name of Species Local Name IUCN Status/ Shc. ofWLPA
Amphibian
1. Bufonidae Duttaphrynus / Bufo melanosticus
Common Indian Toad LC/-
2. Bufonidae Duttaphrynus / Bufo stomasticus
Marbled toad LC/-
3. Dicroglossidae Euphlyctis cyanophlyctis Skittering frog LC/-
4. Dicroglossidae Hoplobatrachus tigerinus Indian bull frog LC/Shc.IV
5. Ranixalidae Indirana leithii Leith’s Frog VU/-
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-31
Reptiles
6. Trionchidae Lissemys punctata Flap shell turtle LC/Sch-I
7. Gekkonidae Hemidactylus brookii Brook’s Gecko -
8. Agamidae Calotes versicolor Common garden lizard LC
9. Chamaeleonidae Chameleon zeylanicus Chameleon LC/Sch-II
10. Sciuridae Mabuya carinata Common Brahminy skink LC
11. Scincidae Lygosoma punctata Snake skink LC
12. Varanidae Varnus bengalensis Common Indian monitor LC/Sch-I
13. Boidae Eryx johnii Red sand Boa (Andhadi chakad) LC/ Sch-II
14. Colubridae Elaphe Helena / Coelognathus helena
Trinket Snake LC/Sch-IV
15. Colubridae Ptyas mucosa Rat Snake LC/Sch-II
16. Colubridae Argyrogena fasciolatus Banded Racer LC/Sch-IV
17. Colubridae Oligodon arnensis Common kukri snake LC/Sch-IV
18. Colubridae Dendrelaphis tristis Common Bronze back LC/Sch-IV
19. Colubridae Ahaetulla nasuta Green Vine Snake LC/Sch-IV
20. Elapidae Naja naja Common cobra (Nag) LC/Sch-II
21. Elapidae Bungarus caeruleus Common Indian Krait (Kadotaro) LC/Sch-IV
22. Viperidae Vipera russelli Russel -/Sch-II
Aves
23. Corvidae Corvus splendens Common Crow LC/Sch-V
24. Sturnidae Acridotheres tristis Indian myna LC/Sch-IV
25. Ardeidae Bubulcus ibis Cattle Egret LC/Sch-IV
26. Upupidae Upupa epops Hoopoe LC/Sch-IV
27. Charadriidae Vanellus indicus Red wattled lapwing LC/Sch-IV
28. Cuculidae Eudynamys scolopacea Asian Koel LC/Sch-IV
29. Phasianidae Pavo cristatus Common Peafowl LC/Sch-I
30. Meropidae Merops orientalis Little green bee eater LC/Sch-IV
31. Corvidae Dendrocitta vagabunda Indian tree pie LC/Sch-IV
32. Corvidae Streptopelia chinensis Spotted dove LC/Sch-IV
33. Ramphastidae Megalaima haemacephala Crimson breasted barbet LC/Sch-IV
34. Haradriidae Coracias benghalensis Indian roller LC/Sch-IV
35. Ardeidae Egretta garzetta Little Egret LC/Sch-IV
36. Charadriidae Vanellus malabaricus Yellow wattled lapwing LC/Sch-IV
37. Laridae Sterna aurantia River tern LC/Sch-IV
38. Rallidae Amauromis phoenicurus White breasted water hen LC/Sch-IV
39. Rallidae Porphyrio porphyrio Purple Moorhen LC/Sch-IV
40. Rallidae Fulica atra Coot LC/Sch-IV
41. Scolopacidae Tringa totanus Red shank LC/Sch-IV
42. Scolopacidae Numenius arquata Curlew LC/Sch-IV
43. Recurvirostridae Himantopus Black winged stilt LC/Sch-IV
44. Recurvirostridae Recurvirostra avosetta Pied Avocet LC/Sch-IV
45. Columbidae Columba livia Blue rock pigeon LC/Sch-IV
46. Cuvulidae Centropus sinensis Greater Coucal LC/Sch-IV
47. Megalaimidae Megalaima asiatica Blue throated barbet LC/Sch-IV
48. Tytonidae Tyto alba Barn Owl LC/Sch-IV
49. Apodidae Apus affinis House/Little Swift LC/Sch-IV
50. Alcedinidae Halcyon smyrnensis White Throated kingfisher LC/Sch-IV
51. Alcedinidae Alcedo atthis Small blue kingfisher LC/Sch-IV
52. Motacillidae Motacilla flava Yellow wagtail LC/Sch-IV
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-32
53. Cuculidae Cuculus varius Common Hawk-cuckoo LC/Sch-IV
54. Strigidae Athene brama Spotted owlet LC/Sch-IV
55. Laniidae Lanius schach Ling tailed shrike LC/Sch-IV
56. Oriolidae Oriolus xanthornus Blackheaded oriole LC/Sch-IV
57. Paridae Parus major Gray tit LC/Sch-IV
58. Campephagidae Coracina melanoptera Large Cuckoo-Shrike LC/Sch-IV
59. Chloropseidae Chloropsis aurifrons Chloropsis LC/Sch-IV
60. Aegithinidae Aegithina tiphia Common ora LC/Sch-IV
61. Pycnonotidae Pycnonotus cafer Redvented bulbul LC/Sch-IV
62. Timalidae Chrysomma sinense Yellow eyed babbler LC/Sch-IV
63. Timalidae Turdoides caudatus Common babbler LC/Sch-IV
64. Monarchidae Terpsiphone paradisi Paradise flycatcher LC/Sch-IV
65. Riphiduridae Rhipidura albicollis Fantail flycatcher LC/Sch-IV
66. Sylviidae Ortotomus sutorius Tailor bird LC/Sch-IV
67. Muscicapidae Copsychus saularis Magpie robin LC/Sch-IV
68. Muscicapidae Saxicoloides fulicata Indian robin LC/Sch-IV
69. Motacillidae Motacilla caspica Gray wagtail LC/Sch-IV
70. Nectariniidae Nectarinia asiatica Purple-rumped sunbird LC/Sch-IV
71. Ploceidae Ploceus phillipinus Baya weaver bird LC/Sch-IV
72. Passeridae Passer domesticus House sparrow LC/Sch-IV
73. Jacanidae Hydrophasianus chirurgus Pheasant tailed jacana LC/Sch-IV
74. Jacanidae Metopiius indicus Bronze winged jacana LC/Sch-IV
75. Burhinidae Burhinus oedicnemus Stone curlew LC/Sch-IV
76. Accipitridae Accipiter badius Shikra LC/Sch-IV
77. Columbidae Strptopelia decaocto Ringed dove LC/Sch-IV
78. Sturnidae Psturnus roseus Rosy pastor LC/Sch-IV
79. Threskiornithidae Platalea leucorodia Spoonbill LC/Sch-IV
80. Phalacrocoracidae Phalacrocorax niger Little Cormorant LC/Sch-IV
81. Ardeidae Egretta gularis Indian reef heron LC/Sch-IV
82. Ardeidae Ardea cinerea Gray Heron LC/Sch-IV
83. Ardeidae Ardeola graji Paddy bird LC/Sch-IV
84. Ardeidae Nycticorax nycticorax Night Heron LC/Sch-IV
85. Threskiornithidae Pseudibis papillosa Black Ibis LC/Sch-IV
86. Ciconiidae Anastomus oscitans Open-billed stork LC/Sch-IV
87. Podicipedidae Podiceps ruficollis Dabchick LC/Sch-IV
88. Anatidae Sarkidiomis melanotos Comb duck/Nakta LC/Sch-IV
89. Anatidae Tadorna ferruginae Brahming Duck LC/Sch-IV
90. Anatidae Anas crecca Common Teal LC/Sch-IV
91. Anatidae Anas platyrhynchos Mallard LC/Sch-IV
92. Accipitridae Milvus migrans Common Pariah kite LC/Sch-IV
93. Accipitridae Elanus caeruleus Black winged kite LC/Sch-IV
94. Accipitridae Haliastur indus Brahminy kite LC/Sch-IV
Mammals
95. Pteropodidae Pteropus giganteus Indian Flying fox LC/-
96. Pteropodidae Cynopterus sphinx Short-nosed fruit bat LC/Sch V
97. Soricidae Suncus murinus Grey musk shrew/Chen LC
98. Vespertilionidae Pipistrellus coromandra Indian Pipistrelle / house bat LC/-
99. Muridae Rattus rattus Common house rat LC/Sch V
100. Muridae Mus musculus Common house mouse LC/Sch V
101. Muridae Bandicota indica Bandicoot Rat LC/Sch V
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-33
102. Herpestidae Herpestes edwardsi Common Mongoose LC/Sch-II
103. Leporidae Lepus nigricollis Hare LC/Sch-IV
104. Herpestidae Herpestes vitticollis Small Indian mongoose LC/Sch-II
105. Canidae Vulpes bengalensis Indian fox LC/Sch-II
106. Muridae Vandeleuria oleracea Long tailed tree mouse LC/Sch V
107. Muridae Mus booduga Indian field mouse LC/Sch V
108. Sciuridae Funambulus pennantii Five striped palm Squirrel LC/Sch-IV
109. Felidae Panthera paradus Leopard VU/Sch-I
Note:
Vulnerable (VU) - High risk of endangerment in the wild
Least Concern (LC) - Lowest risk. Does not qualify for more at risk category. Widespread & abundant taxa are included in this category
Nearly Threatened (NT) - Moderate Risk. may be considered threatened with extinction in the near future, although it does not currently qualify for the threatened status
3.8.5. Scheduled Fauna of the study area
Wild Life (Protection) Act, 1972, amended on 17th January 2003, is an Act to provide for the protection of
wild animals, birds and plants and for matters connected therewith or ancillary or incidental there to with a
view to ensuring the ecological and environmental security of the country. Some of the sighted fauna was
given protection by the Indian Wild Life (Protection) Act, 1972 by including them in different schedules.
Many of the observed species are covered in various schedules of the Indian Wild Life (Protection) Act, 1972
and IUCN Red list 2016-2 as shown in the data tabulated above.
There are four listed animals included in schedule-I, 8 listed numbers animals included in schedule-II, 79
listed animals included in schedule-IV and 7 listed animals included in schedule-V. Wild life conservation plan
for Scheduled I species are provided in the Annexure: VII
Two endemic amphibian species (Indirana leithii and Pseudo philautus amboli) are found in the region. Both
are endemic to Western ghat region. These endemic species are not covered in Indian Wild Life (Protection)
Act, 1972 but are included in IUCN Red list 2016-2 (vide-IUCN Red List Categories and Criteria, version 2.3)
3.9. Landuse/ Landcover (LU/LC)
It is known that land use of an area is controlled by the environment setting of an area. It is constrained by
the inherent characteristics of a terrain such as lithology, landform, soil, slope and drainage. Any disturbance
beyond a sustainable level affects the local environment which in turn exerts influence on the existing land
use pattern. The changes in the pattern of existing resources are always changing, which either may be due
to natural or human activities. The applicability of land use information in very wide and there may be many
inferences vital for various developmental activities that could be obtained from the study of land use
pattern and its periodical changes over time. The pattern emerging from the land use study throws light on
the demographic, socio-economic and prevailing condition of natural resources in an area. Also, land use data
is requisite for water resources inventory, flood control and is used for environmental impact assessment of
an area. An increase or decrease of specific land use category or change in the use of land parcels always
indicates both economic as well environmental condition of an area. Collecting such dynamic information in a
standardized format is an arduous task. Remote sensing satellite data would assist in obtaining such valuable
and formidable information with respect to land use environment of an area. The synoptic view under
uniform illumination and its repetitive coverage allows employing RSI (remote sensing satellite image) to
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-34
generate land use information of an area at a periodical interval. Change of both macro and micro-level (soil
and water condition) reflected by land use induced by developmental activities could be mapped and
relevant mitigation measures could be implemented.
The land-use & land cover map of the 10 km radial study area from the project site has been prepared using
RS LISS 4- FMX, 2017 satellite image with reference to National Remote Sensing Centre, Hyderabad. Land use
pattern of the study area as well as the catchment area was carried out by standard methods of analysis of
remotely sensed data and followed by ground truth collection and interpretation of satellite data. The
outcome of land use study is presented below in subsequent tables and figures.
Remote sensing satellite data used for the study
In the present study, remote sensing satellite data RS LISS 4- FMX acquired on January 2017 has been used
(Figure 3.9). A land use map showing 10 Km radial buffer with project area having 315 sq.km spatial extent at
its boundary is carried out. The geographical coordinates of the boundary area may be given as 72°58'43.24"E
longitude and 20°8'17.54"N latitude.
Selection of remote sensing satellite image (RSI) is on the availability of cloud free data and interpretability of
predominant land use and land cover (LULC) category. The examination of satellite data showed that the
region is always covered by clouds with lesser percentage during summer. But rain fed crops are cultivated
during southwest monsoon and hence a data acquired during first onset of precipitation is preferred so as to
delineate crop and fallow land parcels of agricultural category.
Delineation of scrub land is also possible since land with scrub could be easily distinguished from crop
vegetation and separated. This may be an arduous task during monsoon since the entire area would be
witnessed with sudden sprout of lush natural vegetation, mostly prosopis, with first onset of precipitation.
Moreover, data acquired during January is completely obscured by clouds. Considering all these factors, a
larger resolution RS LISS 4- FMX data acquired January 2017 has been selected.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-35
Figure 3.9: Study Area as captured in 2017 Winter Season (Source- RS LISS 4- FMX)
3.9.1.1. Methodology of Land use Pattern Studies
Present study involves regional analysis of land use pattern showing 10 km buffer area, secondly changes in
land use pattern using temporal satellite data and lastly, land use within the buffer and core zone of the area.
This necessitates a careful analysis of satellite data adopting a well-defined methodology.
To cater the requirement, a preliminary assessment of terrain using digital analysis helping to infer
relationship between terrain and land use has been carried out. Such an approach provides lucid
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-36
understanding of land use units and enhances the knowledge on the land use pattern assisting in impact
assessment.
The knowledge base thus generated is used to delineate various land use units while carrying out
interpretation of the satellite image. The derived land use information is transformed into a GIS based spatial
database using geo-referencing techniques. Besides, a limited but well focused field investigation also carried
out and coordinates of significant land use units using handheld GPS (Global Positioning System) are gathered
to be used as control points for geo-referencing. Interpreted land use units are verified in the field to
carryout necessary corrections wherever is required before preparing final land use map.
Using the image elements such as color, tone, texture, size, shape and associated elements various land use
units are delineated following the categorization and nomenclature adopted for the national level land use
classification system as recommended by National Remote Sensing Centre (NRSC), Department of Space,
Government of India. Some of the land use units that are identified in the study area are listed in below.
Major Category Landuse unit
Built-up Land Village / Town / Industries
Agricultural Land Crop land Fallow land
Plantation
Waste Land Land without scrub Land with Scrub
Barren / Stony waste
Mining area Mines / dumps / Abandoned quarries
Forest Jungle
Water bodies Rivers / Streams Tanks / Reservoirs
Land use pattern of 10 km radial buffer area of project site
The general land use pattern of the buffer may be broadly classified into four major types – Built up land
(Rural/Urban), agriculture land, Scrub/waste land, Water body and others. In the Industries, settlement,
villages, town and infrastructure facilities are considered. The second category agriculture consists of crop
land, fallow land and plantation. Under the wasteland category, units such as and with scrub, land without
scrub, barren area, is interpreted. Lastly, water bodies such as tanks, ponds and streams are interpreted
under this category. These categories are delineated from the selected satellite image using image elements
such as color, tone, texture, size, shape and associated elements. The delineated land use units are
transformed into a spatial database in GIS environment. The map thus generated in GIS as shown in Figure
3.1 is estimated for area and representation of each category in the study area. The total area of LULC in the
study area is calculated as 315 sq.km and spatial distribution of various LULC categories within buffer area are
discussed below.
Total five major land use/land cover classes were demarcated in the study area following Level III
classification. A thematic map of 1:50,000 scale was generated incorporating these classified categories
considering the area of the project. The area as a whole represents a gently slope, drained by a number of
east to west flowing rivers which debouche into the two rivers flows from east to west in the southern
margin middle of the project site. Large cropland with fallow land is covered which is 176.2 sq km (55.94 %)
of the total area and water body, Dam, River, Reservoir area 13.23 sq km (4.20 %) of the total area and 7.78
sq km (2.66 %) land is covered land with & without scrub in the area adjacent to the study area. The exposed
part of river and dried up river beds constitute this category of land cover.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-37
The Forest including jungle areas constitutes the second dominant category of land use covering as much as
83.33 sqkm (26.45 %) of the total area. The land use for settlement is mostly confined to the ‘rural
settlement’ (built up-rural) 22.90 sq.km (7.27 %), Industrial area 5.85sq.km (1.86%), scattered along the road
networks.
Landuse Categories within 10 Km Buffer zone and their Spatial Extent
Sr. No. Landuse Units Area (Sq.Km) Percentage (%)
1 Built up Land Rural/Urban) Settlement 22.90 7.27
Industry/other industries 5.85 1.86
2 Agriculture Land
Cropland/ fallow land 176.2 55.94
Plantation 3.15 1.00
3 Water bodies River/Dam/Water body/Reservoir 13.23 4.20
4 Scrub/Waste Land Land without scrub 3.99 1.27
Landwith Scrub 4.39 1.39
5 Forest/ Jungle 83.33 26.45
6 Others
Mudflat 0.99 0.31
Mines 0.95 0.30
Crusher 0.02 0.06
Total 315 100
Figure 3.10: Graphical Representation of Land covers
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-38
Figure 3.11: Land use Map of Study Area
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-39
3.10 Socio-Economic Environment
M/s. Beekaylon Synthetics Pvt. Ltd.is a new project which falls under the Union territory of Dadra & Nagar
Haveli. This is Project in velugam village. This project comes under “A” category project, but considered at
central level due to General Condition Applicability. A Secondary data take from Census 2011, Baseline
data/information on socio‐economic front has been collected with the help of 2011 census data, discussion
with Tahsildars, Sarpanchs, various Government officials, local heads, etc. as well as by suitable field surveys.
There are 7 villages coming within the study area of 05 km, (velugam, Apti, Surangi, Karachgam, Kodad,
Khadoli, Sutrakar) That cover all village study area under 05 km, 14 villages coming within the study area of
10 km. but Nearest 10 villages included the study area.(Vasona, Dapada, Chikhali, Khanvel, Kherdi, Udhawa,
Kurze, Varkhande, Talasari, Varwade, Kochai, Luhari, Mondgaon, Kalamdevi) And Information is received by a
FAE, Receive information through obvious, keeps notes in all these diaries. FAE point to be considered as a
final outcome of the project.
An assent part of environmental study is socio-economic environment incorporating varies facts related to
socio-economic conditions in the area, which deals with the total environment. Socio economic study
includes demographers structure of the area, provision of basic amenities viz., housing, education, health and
medical services, occupation, water supply, sanitation, communication, transportation, prevailing diseases
pattern as well as feature of aesthetic significance. This helps in visualizing and predicting the possible impact
depending upon the nature and magnitude of the project.
Research Methodology
Collection of Data:
Data for this project were collected via a combination of secondary source (i.e. Government department,
maps, literature research etc.) and primary source (i.e. interviews, field research, Questionnaires) in the study
area. Data were collected at village level and household level by questionnaires and focus group discussion.
Data & Analysis:
The data collected were presented in a suitable, abridged form for further analysis. The collected data were
presented in the form of tabular statement or diagrammatic or graphic form. These tabulated data were
interpreted and analyzed with the help of multifarious qualitative techniques and ideographic approaches.
Baseline information of the Area:
LAND, PEOPLE & Culture:
The study was conducted within 10 km radius study area from the project site. The study area was
categorized on the basis of the distance of the village from project site. The study area consists of total 21
villages & 3 Town out of which all of village’s & town’s information were collected. Information was collected
from Sarpanch, Gram-sevak, Talati, Doctors, Aanganvadi worker, school teachers and other recognized
persons of the area. To ensure the accuracy of the primary data collected from the study area, the
information was verified from census 2011 of Dadra & Nagar Haveli and information collected from various
government departments like health department, agriculture department etc. These villages are collectively
dependent on agricultures. There are housing mostly Raw, a few RCC. They have business 4 month Cropping
and 8 month tali. Nearest village by available NGO at Talasari, if notbook, pen etc. provide study area villages.
And drink water into borewell , bank , post office, collage for nearest town silavassa and others town, road
are asphalted the all village. The majorly portion in these areas is tribal and majorly follows Hindu religion.
Muslim and Christian (missionary available the a little village) religion also prevails in this part. People here
gets very less remuneration for their work, the average pay they get is Rs.350/- or 300/-. While people in this
villages basically go to the nearby city like Vapi, Silvassa, Bhilad, Sarigam, Umbergam for their earnings.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-40
Demography:
The total population of the study area is 241916. Total households in the study area are 2802. Sex ratio
within study area is found as 775 females per 1000 males. The sex ratio in the study area is far lower than UT
/state level sex ratio and the average household/family size is 4-5 in the region which is a standard size of
family in India.
Agriculture and Cropping Pattern:
Agriculture is the monsoon season in 4 month, almost 80% of the families depend on cultivation. But 50%
population out of city in Silvassa, Bhilad, Umbergam As laborers work. It was found out that in surveyed areas
mostly land is infertile. Villagers depend on rainfall for irrigation and water recharge. . In this area cropping
pattern is based on the three season crops- Rabi, Kharif and Zayad.
Education:
All villages are having a primary school in study area. But some villages cover higher secondary school and
colleges for nearest town silvassa , vapi and Bhilad, The students have to travel, Rofel college at vapi, SSR
college at silvassa, arts & comers college at Bhilad.
Health Facilities:
Primary Health Centre is also available in the nearest town silvassa, Rakholi In the case of emergency patients
are referred to Govt. Hospital (Vinoba bhave) at Silvassa. Disease like water born disease, Skin problems,
Fever, Typhoid, Joint pain, Swine flu, Sickle cell, Headache etc... Are Common in study area. Many other
Multispecialty private hospitals are also available nearest city at Silvassa Besides these medical facilities Polio
vaccination and regular health check-ups are being conducted by Health department.
Transportation:
The study area is served by road transport. Most of the villages are connected with main road and approach
road service, but frequency of government buses is not sufficient due to that which villagers have to use
private transport like auto rickshaw, bike. Students are also facing similar problems in study area.
Communication:
A villages have depended the facility of post office nears town sillvassa , Rakholi, masat etc. and Private
courier services are also available in study .
Electricity in the area:
All villages in the study area are electrified in the housing. In village do not public lighting in the study area,
the source of electricity is fulfilled by DNH Power distribution corporation Ltd.
Drinking water facility:
During the primary survey it has been observed that the requirement of drinking water is being fulfilled by
hand pumps, dug wells and other small water bodies. In the summer season villagers of villages are facing
water crisis. In Gram Panchayat does not available R.O. plant.
Employment:
Unemployment ratio is high in the region as non-worker population accounts for more than half of the total
population i.e. 241916. Non-worker population includes students, household duties, dependent, pensioner,
and others. The respective study found that majority of women working as sell work of (tali, dashi daru) as
well as working agriculture labour as temporary basis, and some women for working (services in the
industrial, and lobules, housing work in city of Bhilad, vapi & silavassa) do.
The study area depicts the critical plight of unemployment to a high level. The basic education is completed
from the village. Further, higher education is perceived from Silavassa, Vapi and Bhilad colleges. i.e.(B.A,
B.com, M.com, M.A, B.B.A, B. sc, M.sc, computer software & hardware, MBA, Diploma Engineer, ITI) etc. The
issue arise here is of migration. Youth is compelled to migrate to nearby cities for better job opportunity and
hence the migration number has increased within last few years to quiet an extent.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-03: Description of the environment (QCI-NABET Accredited Consultant Organization) 3-41
3.10.1 OUT COMES:
The M/s. Beekaylon Synthetics Pvt. Ltd. is a new project located at Velugam. There are several villages
around its periphery but the study will include the villages coming under 05 kms radius in all villages but 10
km radius in 14 villages are some villages include the study area. The name of the villages are (velugam,
Apti, Surangi, Karachgam, Kodad, Khadoli, Sutrakar, Vasona, Dapada, Chikhali, Khanvel, Kherdi, Udhawa,
Kurze, Kochai, Luhari, Mondgaon).
Population Details:
Total populations have been all villages 241916. In which male 106451 and female 107912, in the
study area.
Religions of varlis-62.94%, Koknas-16.85%, dhodias-16.90%, Katodis-0.08%, Dublas-2.29% ,
Nayakas-0.08%, Kolghas-0.84% are the smallest communities in the territory and they constitute
3.31% of the overall tribal population in DNH.
Education faculties:
Primary School is available in all villages of the study area.
Higher Secondary schools are there nearest town Surangi, Rakholi village.
College is there nearest city in Silvassa, Vapi, Bhilad.
Services:
Observed that all people in the mention villages are normally traveled to the nearby city Silavssa,
Vapi, Bhilad for earning. (Labors work and in company and any private sectors)
The major source of income is generated from towns besides agriculture. Timely there is a highly
migration suspected towards city.
Health Centers & Issues:
All villages are not available PHC, private Hospital in the study area, but Government and private hospital nearby at Silavssa and Vapi. And health issues that skin problems, goiter, fever etc.., Problem of clean water and health issue is found in Apti, Kurze and Udhawa village.
Any others Facilities:
It has been into notice that few facility of Anganwadi, Asha worker, Sakhi mandal of the few is in village.
Drinking water is useful of a few villages.
Gram Panchayat is between 2-3 villages. POINTS TO NOTE:
In the village area an individual gets less per day income which is not more than Rs.350/- or 300 per day.
R.O. Plant is not available (gram Panchayat) in the study area villages.
In villages are not electrify public lighting in the study area. Table. 3.14: 24 Hourly Traffic Study of Surangi – Velugam Road
Date 27/12/2017 28/12/2017 29/12/2017
Two Wheeler 1610 1520 1730
Three Wheeler 250 320 280
Four Wheeler 172 185 178
Truck/ Container 0 5 0
Tanker 2 4 3
Tractor 82 65 76
Heavy Vehicle 0 5 6
Public transport 53 51 55
Total 2167 2155 2328
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-1
CHAPTER: 04
ANTICIPATED ENVIRONMENTAL IMPACTS &
MITIGATION MEASURES
4.1 GENERAL
Environmental Impact Assessment (EIA) is an activity or an attempt to identify, predict, evaluate and
communicate the likely environmental impacts of the proposed new project on the surrounding
environment. The anticipated environmental impacts of the proposed new project would be mainly due to
the operational activities. These operations can disturb the environment in various ways, such as change in
air, noise level; water and soil quality of that particular area. While for the purpose of development and
economic up-liftment of people, there is need for establishment of industries, but these have to be
environmental friendly. Therefore, it is essential to assess the impacts of proposed new project on different
environmental parameters, so that abatement measures could be planned in advance for eco-friendly
Project operation in the area.
Environmental impact assessment study includes:
Identification of all the probable impacts (be it positive or negative) of the various activities involved
in the completion of the project.
Classification of the probable impacts i.e. positive or negative, reversible or irreversible, short term
or long term.
Evaluation of the probable impacts i.e. qualitative and quantitative assessment of the likely impacts.
This chapter presents the identification, prediction and evaluation of impacts with mitigation measures of
the proposed new project of M/s. Beekaylon Synthetics Pvt. Ltd. effected in the baseline environmental
status
4.2 PHASES OF IMPACTS ASSESSMENT STUDY
In the opening phase of impact assessment, the study was conducted for screening & scoping by EIA Team
for further scheduling of the EIA Study by study of records, documents & details provided by the proponent
M/s. Beekaylon Synthetics Pvt. Ltd. At the later stage of the screening & scoping, FORM-I of EIA notification
SO 1533 was filed along with the Prefeasibility report & Draft TOR and application to MoEF, New Delhi for
approval of the draft TORs. The awarded TOR issued by MoEF, New Delhi has been considered for further
actions to start the EIA study. As described in sections of baseline environmental status of area, study for
environmental quality of the area was started with reference to the awarded TOR and then all completed &
ongoing studies were verified & confirmed with reference to the awarded TOR to comply with the conditions
of awarded TOR issued by MoEF, New Delhi. Simultaneously, the reporting of the study was also started for
extensive study & review of work accomplished time to time. The study was conducted for 10 Km radial area
from site during the Winter Season in months of October 2017 to December 2017.
Primarily, studies for Identification & prediction of impacts were conducted by following assessment of
baseline environmental quality with special reference to the project activities/ components and their
potential stress on the environment as well as with reference to the awarded TOR issued by MoEF, New
Delhi. Further, ground reality survey by site inspections, meetings with associated technical & administrative
persons, technical data /document study as well as cross referencing with various subject references was
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-2
done for the purpose throughout the study period. All possible impacts / stresses are identified for further
study and citation of primary mitigation measures for each identified impacts/stresses. The Environmental
Impact Assessment was conducted by following Checklist Method using the Questionnaire, Analysis &
Interpretation of document/record &data by expert of EIA Team and Technical Experts of Proponent,
Scientific & Technical referencing for Identification & interpretation of probable impacts. Activity-Impact
relation approach for identification of impact has been used for the present study and presented in
diagrammatic form in subsequent section.
After Identification, prediction of the major impact, viz., emissions & Air pollution has been done using
mathematical modeling software for quantitative determination of probable impacts of emissions. In the
later stage, impact assess study was conducted by the thorough study for preparation of description of
potential environmental Impacts & mitigation measures as well as by following Matrix Analysis for identified
impacts. The Matrix Analysis was conducted for construction as well as operation phase of the proposed.
Further Matrix was formulated for two scenarios: with mitigation measures & without mitigation measures.
With the necessary details of components of EIA study & necessary document review the Draft EIA report
was prepared and reviewed for necessary update for adequate and efficient presentation of the proposed
project activities, environmental impacts, mitigation measures, safety & management plan etc. in EIA
Report. Finally, completed studies for EIA was reviewed and verified against the Approved Terms of
reference for EIA for compliance to the awarded TOR issued by MoEF. All recommendations & requirement
sited by MoEF, Gujarat were carefully studied to finalize the EIA Report for submission to MoEF along with
EC Application. A detailed report for the compliance of Approved TOR was prepared and covered in the EIA
report as Annexure-I.
4.3 IDENTIFICATION OF IMPACTS
Study for identification of impacts has been carried out in two parts. Firstly the determination of impacting
activities of the proposed new project, then based on the outcome of the first part, further study for
determination of impacts based on types, nature& significance has been carried out to detailing all probable
impacts for further study. The details of the impact identification study carried out are presented below in
two different sections under respective headings.
4.3.1 PROJECT ACTIVITIES, PROBABLEIMPACTS
In the beginning of identification of the probable impacts of the proposed project, isolation of activity phase
& groups of the proposed project has been performed for identification of impacting activities as well as
impacts of specific activities. With such task, the project activities have been segregated in two main phases:
Construction Phase as well as Commissioning & Operation Phase. Further, the activities of these phases have
been distributed in main groups to aggregate activities of similar type & nature in single group for easy
appraisal of probable impacts.
Further, in very inception of the EIA study data of the project activities & component as well as study of
operation has been done very cautiously & systematically. This has revealed that there would not be any
major sever impacts on environment due to the proposed project except the impacts of major accident
scenarios & uncontrolled released of pollutant (gaseous, liquid & Solid), which may extend out of the plant
area.
Further, it is also noticed that the continuous impacts due to emissions, water consumption, wastewater
generation & disposal and occupational hazards are of main concern for the EIA study for the proposed new
project. However, it is marked that the impacts of the emission from the utilities will be acceptable &
insignificant as Diesel and coal are proposed as fuel for the utilities with proper control pollution control
measures for the proposed project. Also the impacts of the wastewater generation will be very minimal as
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-3
wastewater will be regularly treated effectively in efficient treatment and treated effluent is partially
recycled back to process and partially utilized for gardening purpose. Hence, there will be no discharge of
treated effluent outside the company premises to achieving Zero Liquid Discharge goal. Further, hazardous
waste generation from proposed new project will be ETP sludge, used oil & Empty drums/ bags, Process
Residue, waste yarns& lumps which will be managed as per regulatory requirement. Thus considerable
major impacts of hazardous waste generation & management are not anticipated from proposed new
project.
In addition to these, it has been noticed that significant impacts are likely to occur due to the hazards
associated with the industrial operations of the project. It is revealed in risk assessment study that the
impacts of hazards associated with proposed new project is likely to be major in case of catastrophes only.
Minor incidents of spill/leak will not have serious impacts on occupational health & safety but will be
controllable with adequate safety practices & preventive measures.
The phase wise identified activities and the probability of impacts of those activities of the proposed are
presented below.
Table 4.1: Details of Project Activities and Probable Impact
OPERATIONS OF PROPOSED PROJECT
PARAMETERS La
nd
Acq
uis
itio
n &
Pre
par
atio
n
Tran
spo
rtat
ion
of
Co
nst
ruct
ion
Mat
eri
als
Civ
il W
ork
s
Fab
rica
tio
n, E
lect
rica
l & O
the
r En
gin
ee
rin
g W
ork
s
Raw
Mat
eri
als
& P
rod
uct
s Tr
ansp
ort
atio
n
Mat
eri
al S
tora
ge &
Han
dlin
g
Man
ufa
ctu
rin
g P
roce
ss
Uti
lity
Op
era
tio
ns
Op
erat
ion
of
Pla
nt
Mac
hin
eri
es/
Eq
uip
me
nt
Wat
er
& w
aste
wat
er
Man
age
me
nt
Act
ivit
ies
Haz
ard
ou
s &
So
lid W
aste
Man
age
me
nt
Act
ivit
ies
Bre
akd
ow
n &
Mai
nte
nan
ce o
f C
on
tro
l Eq
uip
me
nt
Ad
min
istr
ativ
e &
Do
me
stic
Act
ivit
ies
Gre
enb
elt
Dev
elo
pm
en
t, C
SR&
RW
H
Meteorology - - - - - - - A - - - - - -
Air Quality& Air Pollution A A A A A A A A - A - A A B
Noise Level A A A A A A A A A - - A - B
Change in Ground Water Quality - - A - - A A A - A A A A -
Change in Surface Water Quality - - A - - A A A - A A A A -
Load on Ground Water Resources - - - - - - - - - - - - - B
Load on Surface Water Resources - - A - - - - A - A - A A B
Change in Hydrological Pattern - - - - - - - - - - - - - -
Geology - - - - - - - - - - - - - -
Landuse A - - - - - - - - - - - - B
Soil Quality A - A - A A - A - A A A A B
Terrestrial Flora & Fauna A A A A A A - A - A A A - B
Aquatic Flora & Fauna - - - - - - - - - A - - - -
Ecological Habitat - - - `- A A - A - A - A - B
Demography - - - - - - B - B - - - - -
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-4
OPERATIONS OF PROPOSED PROJECT
PARAMETERS La
nd
Acq
uis
itio
n &
Pre
par
atio
n
Tran
spo
rtat
ion
of
Co
nst
ruct
ion
Mat
eri
als
Civ
il W
ork
s
Fab
rica
tio
n, E
lect
rica
l & O
ther
En
gin
eeri
ng
Wo
rks
Raw
Mat
eri
als
& P
rod
uct
s Tr
ansp
ort
atio
n
Mat
eri
al S
tora
ge &
Han
dlin
g
Man
ufa
ctu
rin
g P
roce
ss
Uti
lity
Op
erat
ion
s
Op
erat
ion
of
Pla
nt
Mac
hin
erie
s/ E
qu
ipm
en
t
Wat
er
& w
aste
wat
er
Man
agem
en
t A
ctiv
itie
s
Haz
ard
ou
s &
So
lid W
aste
Man
agem
en
t A
ctiv
itie
s
Bre
akd
ow
n &
Mai
nte
nan
ce o
f C
on
tro
l Eq
uip
me
nt
Ad
min
istr
ativ
e &
Do
me
stic
Act
ivit
ies
Gre
enb
elt
Dev
elo
pm
en
t, C
SR&
RW
H
Education - - - - - - - - - - - - - B
Employment & Economy B B B B B B B - - - - - B -
Socioeconomic Activities - - - - A A - - - - - A - B
Public Health & Safety A A - - A A - A - A - A - B
Public Amenities & Services - A - - A - - - - - - - - B
Occupational Health & safety A A A A A A A A - A - A - -
Work Place Condition A - A A A A A A - - - A - -
Note: A-Adverse; B- Beneficial
The diagrammatic presentation has been prepared to identify the probable impacting activities and aspects
of commissioning & operation phase after review of project operation & documents as well as by discussions
with the officials & experts of proponent. Based on the considerable potential of impacts, main activities of
the commissioning & operation phase of project and associated environmental aspects identified for further
study are depicted below as illustration in figure 4.1 whereas the detailed description regarding the
anticipated impacts along with necessary details of identification, prediction & significance as well as
mitigation measures are presented in subsequent sections under respective headings.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-5
Figure 4.1: Probable Impacts & Mitigation (Operation Phase)
4.3.2 TYPES, NATURE & SIGNIFICANCE OF IMPACTS:
The second important step & task of the impact assessment study which determines necessity of further
study is classification of nature & types of impacts identified for the proposed project. This task serves as the
base platform for further study. Considering this, the impacts identified for the proposed project activities
are studied to determine the type & nature of the impacts. The detail of outcome of this study for
determination of the types, nature & Significance of the identified impacts are presented below as prepared
by the Functional Area Experts in in subsequent section of their respective functional areas.
“Overall Impact Significance” is estimated to evaluate quantification of probable impacts on environmental
attributes using following “Environmental Significance Factors” and impact score. The “Environmental
Significance Factors” are determined based on quality of the prevailing environmental conditions, prevailing
stress of the study area, sensitivity of receptor and probable project specific influence of the proposed
project.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-6
Environmental Attribute Environmental Significance Factors (ESF)
1. Ambient Environment
Meteorology
Air Quality& Air Pollution
Ambient Noise
25
5
15
5
2. Water Environment
Ground Water Quality
Surface Water Quality
Groundwater Quantity
Surface Water Quantity
Hydrological Pattern
20
5
5
2
7
1
3. Land Environment
Geology
Land use
Soil Quality
10
1
4
5
4. Ecological Environment
Terrestrial Flora & Faun
Aquatic Flora & Fauna
Ecological Habitat
20
10
3
7
5. Socioeconomic Environment
Demography
Education
Employment& Economy
Socioeconomic Activities
Public Health & Safety
Public Amenities & Services
20
4
2
5
2
2
5
6. Work Environment
Occupational Health & Safety
Work Place Condition
5
3
2
Criteria for Impacts Scoring: (-) = Negative, (+) Positive, (0)=No Impact/ Negligible /Insignificant,
(1)= Minor/Slightly Significant, (2)= Moderate/Considerably Significant, (3) = Major/Highly Significant,
OVERALL IMPACT SIGNIFICANCE (OIS)= (∑ Impact Score for the Environmental parameter/10) x ESF
Criteria for interpretation of Overall Impact Significance:
If OIS indicates negative impacts & absolute value of OIS >ESF than Serious impacts Required
more attention and acceptable only if it can be reduced by mitigation measures
If OIS indicates negative impacts & absolute value of OIS = 51% -100% of ESF than Considerable
impacts requires systematic action plan & mitigation measures
If OIS indicates negative impacts & absolute value of OIS ≤ 50% ESF than minor impacts requires
generic action plan & mitigation measures
If OIS indicates positive impacts than impact is unconditionally accepted with mitigation
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-7
4.4 DESCRIPTION OF ANTICIPATED IMPACTS & MITIGATIONS
The proposed Manmade fiber other than Rayon manufacturing project being a new project located within
Notified Industrial area of Silvassa D&NH, does not require additional land but requires considerable
quantity of water, power, fuel, human resources, machineries & utilities etc. The details of all major
resources required for proposed project are described in earlier sections under respective headings.
Considering the above mentioned details of resource requirements and potentials of pollution as well as
above tabulated identified impacts on environment; impact statements have been prepared after necessary
detailed study. The impacts statements for the proposed project as predicted & assessed are described in
subsequent section under respective headings.
4.4.1 IMPACT ON AMBIENT ENVIRONMENT
All probable impacts on ambient environment are considered for determination of probable impacts of the
proposed project. Under the ambient environment, meteorology, air quality and noise level are considered
as environmental parameters for ambient environment. All operations of the proposed project are
considered for the assessment of the impacts from the proposed project. Initially the impact significance has
been estimated to determine the need of further study as well as to determine the necessary mitigation for
proposed project. Finally the impact significance for residual impacts after mitigation has also been assessed
to determine need of detailed EMP. The details of impact assessment study and necessary mitigation has
been presented below in subsequent tables and paragraphs under the current section of Impacts on
Ambient Environment.
DESCRIPTION FOR IDENTIFIED IMPACTS
Impact On Air Quality/Air Pollution Level
Construction Phase
The preparation of additional land for construction work will have moderate impacts on air quality & air
pollution mainly due to increased level of particulate resulted by mechanical operations for land
levelling. This will also pose minor impacts on air quality & air pollution due to exhaust of machineries
and equipment (i.e Dozer & Tractor etc.) used for land preparation. Water sprinkling for dust
suppression would be done to minimise these impacts.
As the project is new, significant civil work will be done for development of buildings & structures. These
will have significant moderate impact on air quality & air pollution and noise level of the local area
mainly due to the particulates emission from construction materials handling & transfer as well as civil
masonry work, which will result in increased Particulate level in ambient air of local area.Dust curtain
and barricade will be provided to restrict the dusting within the site to minimise the impacts on air of
local area.
Considerably huge transportation activities for construction materials may result in contaminations of air
due to the particulates escaping from the transport vehicles. The vehicular exhaust will result in marginal
increase in levels of SO2, NOx, SPM, CO, unburnt HC and also noise generation. These effects will
however, be temporary and reversible.
Heavy Fabrications& other engineering works will be required for development of the proposed project
which will have considerable impacts on air quality & air pollution due to the fine particulates & gaseous
pollutants emitted from the fabrication works like metal cutting &grinding, welding etc. These impacts
would be within the project premises hence the significance will not be high if work is done in
designated area with all safe work measures.
Commissioning & Operation Phase
The commissioning &operational activities are expected to have long-term impacts on the air quality. The
details of the identified impacts of these phases are described below.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-8
Utility operation will have minor impacts on humidity level of local area due to high evaporation losses
from cooling.
During the transportation of the raw materials & transport, particulates emission from transport vehicles
are likely to release which may increase the PM level in ambient air of transportation route. However,
this impact will be negligible and acceptable without any major mitigation as all materials are
transported in closed bags, bales or containers. Similar impacts are likely to occur during the activities of
material storage, handling and transfer which will be negligible and can be mitigated by provision of
proper storage with adequate ventilation & proper handling & transfer facilities.
Wastewater treatment and domestic activities will have negligible impacts on ambient air quality due to
release of volatile pollutants in domestic wastewater and industrial wastewater in ETP. The pollutant of
concern is Ammonia and Sulfide which will be very low to detect in ambient air quality.
Greenbelt will have positive impact on the ambient air environment as it will act as pollution sink.
In case of accidental release of stored materials especially of PTA may have significant impacts due to
hazard related with dust in air. Hence, utmost care shall be taken with implementation of nitrogen
blanketing, nitrogen flushing system recommended by technology supplier for storage system,
continuous monitoring of O2 ppm in the PTA storage silos and necessary safety measures to prevent risk
of dust emission etc. shall be maintained.
The process emission will not occur from main process of CP for production of POY but it will arise due to
gaseous emission from stripping of liquid from CP which is to be sent for treatment in ETP. Hence, it is
planned by the proponent to provide stripping column with close waste gas transfer system to manage
& control the emission from stripping column. The stripped gasses, if release in atmosphere directly may
have significant impacts on air quality. Considering this and the thermal properties of the waste gasses,
it has been planned to use the gas in HTM with the fuel-natural gas. Further, the emission of HTM due to
use of waste gas with fuel will not result in any major issue of air contamination as the waste gas
combustion products are only CO2 and moisture due to present of carbon & hydrogen only in the
composition of the waste gases. Thus, the overall impacts of the process emission will be almost
eliminated by using the waste gas in TFHs with fuel. Besides this, there will not be any considerable
impacts due to process emissions.
The only major impacts of the proposed project are envisaged due to the operation of the utilities
(Boilers, TFHs &DG Sets). As the effects of emission from the utilities, level of PM, SOx, NOx, CO, and
unburned fuel would increase significantly. The increase in pollutants’ level may result in different health
effects like respiratory problem, asthma, bronchitis, allergic condition, effects on vision etc. Severity of
these effects varies according to the level of increase of the pollutant in the ambient air.
The proposed project would require 3 Boilers and 3 nos. of HTM Heaters. FO is proposed to be used as
the preferred fuel for these utilities. Beside these, 3 DG sets would also be installed to meet the power
requirement during the time of grid power failure. Thus the stationary emission would be significant
from the proposed project. As the project study area exhibits a wild life sanctuary, impacts on air quality
due to the proposed emission need to be studied very carefully.
Considering the necessity of the further study to determine the quantitative impacts of the stationary
emission from the stacks of proposed project, modelling study has been carried out using the Aermod
View software of Lake’s Environmental Inc., Canada. The details of the modelling study have been
elaborated with necessary information of input parameters as well as outcome in form of Incremental
GLCs and Predicted Ambient Air Quality in the subsequent description & illustrations.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-9
Air Quality Modelling Details
o Source Input:
Table 4.2: Details of Source Input:
Stack Attached To UTM Coordinates
For ISCST3
Input
Height,
Mt
Exit Gas
Temp.0C
Exit Gas
Velocity,
mt/sec
Diameter
At Top,
Mt
X, mt Y mt
Stack 1:1 TPHx2 Boiler 290201.36 2227955.43 30.00 180 9.8 0.2
Stack 2: 10TPH boiler 290203.35 2227948.99 30.00 180 10.5 0.6
Stack 3: TFH1 290205.01 2227945.39 30.00 140 10.8 0.6
Stack 4: TFH2 290206.51 2227941.92 30.00 140 10.8 0.6
Stack 5: TFH3 290207.89 2227939.12 30.00 140 10.8 0.6
Stack 6: DG Set (1000 KVA) 290202.84 2227935.39 30.00 450 35.1 0.33
Stack 7: DG Set (2500 KVA) 289879.19 2227896.09 30.00 450 35.1 0.5
Stack 8: DG Set (2500 KVA) 289876.62 2227873.48 30.00 450 35.1 0.5
o Emission Input:
Table 4.3: Details of Emission Input:
Sr. No.
Stack ID & Utility Pollutant Emission rate (gm/sec) APCD & efficiency
W/O APCD With APCD
Not Required
1 Stack 1: (TPHx2 Boiler)
PM2.5 0.0158 --
PM10 0.0158 --
SOx 0.1912 --
NOx 0.11167 --
CO 0.02030 --
2 Stack 2: 10TPH boiler
PM2.5 0.0791 --
PM10 0.0791 --
SOx 0.9531 --
NOx 0.5565 --
CO 0.1012 --
3 Stack 3: TFH1
PM2.5 0.0813 --
PM10 0.0813 --
SOx 0.9798 --
NOx 0.5721 --
CO 0.104 --
4 Stack 4: TFH2
PM2.5 0.0813 --
PM10 0.0813 --
SOx 0.9798 --
NOx 0.5721 --
CO 0.104 --
4 Stack 5: TFH3
PM2.5 0.0813 --
PM10 0.0813 --
SOx 0.9798 --
NOx 0.5721 --
CO 0.104 --
5 Stack 6: DG Set (1000 KVA) PM2.5 0.0453 --
PM10 0.0469 --
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-10
Sr. No.
Stack ID & Utility Pollutant Emission rate (gm/sec) APCD & efficiency
SOx 0.2185 --
NOx 1.1413 --
CO 0.7429 --
6 Stack 7: DG Set (2500 KVA)
PM2.5 0.1132 --
PM10 0.1172 --
SOx 0.5464 --
NOx 2.8533 --
CO 1.8572 --
7 Stack 8: DG Set (2500 KVA)
PM2.5 0.1132 --
PM10 0.1172 --
SOx 0.5464 --
NOx 2.8533 --
CO 1.8572 --
o Receptors Input:
Table 4.4: Details of Receptors Input:
Village/Receptor Grid Coordinate(UTM Zone 43N) Remarks
X, mt Y, mt
Discrete Cartesian Receptors
The Discrete Cartesian Receptors selected are the location selected for the ambient air quality monitoring for baseline environmental study.
AQ1 (Project Site) 290144.6 2228028
AQ2 (Surangi) 291560.7 2229821
AQ3 (Pati) 288662.1 2235018
AQ4 (Karachgam) 291327 2225490
AQ5 (Bindrabin) 295208.4 2228840
AQ6 (Luhari) 295833.2 2232817
AQ7 (Kurze) 286952.9 2225992
AQ8 (Apti) 289272 2229953
Uniform Cartesian Grid Center 290201.36 2227955.43
Grid Size: 20,000mt X 20,000mt, No. of X & Y receptors: 21 Nos. each Grid Spacing: X=1000 Mt, Y=1000 Mt.
Discrete Polar Receptors 290201.36 2227955.43 20 Discrete Cartesian Receptor @500 mt interval are selected in downwind direction (282) from stack of Boiler.
o Meteorological & Other Input:
The meteorological input details used for modelling are presented in earlier chapter -3. In
addition to these, terrain was also considered as input data for the modelling. The input terrain
details for the modelling have been presented in earlier chapter 3.
o Output Selections:
Detailed report for Modelling for 24 Hourly outcomes
1st highest 24 Hourly Average Incremental GLC
Contour Indicating 1st 24 Hourly highest Incremental GLC for Cartesian grid area showing
Discrete Cartesian receptor.
1st highest 24 Hourly Average Incremental GLC for 20 Discrete Polar Receptors at 500 mt
interval in downwind direction (Graph)
o Predicted Incremental GLC:
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-11
Table 4.5: Outcome of Model: Predicted Incremental GLC:
Village Coordinates, mt. Predicted Highest 24hr. Avg. Incr. GLC, µg/m3
X Axis Y Axis PM2.5 PM10 SO2 NOx CO
1st Highest 288201.36 2224455.43 1.74966 1.7649 17.96981 33.48983 0.1012
AQ1 (Project Site) 290144.6 2228028 1.1863 1.19189 13.15454 11.52109 0.0408
AQ2 (Surangi) 291560.7 2229821 0.23683 0.2393 2.34774 2.93989 0.0120
AQ3 (Pati) 288662.1 2235018 0.19487 0.19692 1.92831 2.42781 0.0083
AQ4 (Karachgam) 291327 2225490 0.25518 0.25737 2.62809 2.92023 0.0087
AQ5 (Bindrabin) 295208.4 2228840 0.12481 0.12621 1.21822 1.59724 0.0097
AQ6 (Luhari) 295833.2 2232817 0.08781 0.08903 0.80972 1.24296 0.0094
AQ7 (Kurze) 286952.9 2225992 0.25177 0.25495 2.38267 3.40992 0.0115
AQ8 (Apti) 289272 2229953 0.25781 0.26153 2.34693 3.72552 0.0122
o Predicted Ambient Air Quality:
Table 4.6: Predicted Ambient Air Quality:
Location Particular PM2.5, µg/m3
PM10, µg/m3
SO2, µg/m3 NOX, µg/m3 CO mg/m3
CPCB Limit Residential Area 60 100 80 80 04
Project Site
Baseline 25.46 75.67 20.17 23.08 <1
Incremental GLC 1.1863 1.19189 13.15454 11.52109 <1
Predicted Air Quality 26.65 76.86 33.32 34.58 <1
Surangi
Baseline 25.46 74.50 17.92 23.42 <1
Incremental GLC 0.23683 0.2393 2.34774 2.93989 <1
Predicted Air Quality 25.70 74.73 20.27 26.35 <1
Pati
Baseline 27.25 82.54 20.17 20.71 <1
Incremental GLC 0.19487 0.19692 1.92831 2.42781 <1
Predicted Air Quality 27.44 82.74 22.10 23.14 <1
Karachgam
Baseline 31.08 75.08 16.67 22.54 <1
Incremental GLC 0.25518 0.25737 2.62809 2.92023 <1
Predicted Air Quality 31.34 75.34 19.30 25.46 <1
Bindrabin
Baseline 16.58 68.75 15.71 23.13 <1
Incremental GLC 0.12481 0.12621 1.21822 1.59724 <1
Predicted Air Quality 16.7 68.88 16.93 24.73 <1
Luhari
Baseline 30.54 79.92 16.88 21.33 <1
Incremental GLC 0.08781 0.08903 0.80972 1.24296 <1
Predicted Air Quality 30.63 8.01 17.69 22.57 <1
Kurze
Baseline 25.33 76.88 16.79 22.54 <1
Incremental GLC 0.25177 0.25495 2.38267 3.40992 <1
Predicted Air Quality 25.58 77.13 19.17 25.94 <1
Apti
Baseline 27.96 77.13 17.25 23.08 <1
Incremental GLC 0.25781 0.26153 2.34693 3.72552 <1
Predicted Air Quality 28.22 77.39 19.60 26.78 <1
As it is observed from the above details of outcome of model and predicted ambient air quality, there will be
slight to considerable change in studied ambient air quality parameters of the project area due to the
emission of proposed utilities of the project. However, the impacts would be restricted in area close to
project site. The ambient air quality at all studied location will remain well below the NAAQS issued by CPCB
as the predicted incremental GLC indicates non-measurable increase in all studied parameters. Hence, there
will not be any indication of critical air pollution and therefore issue of health effects on people and animals
as well as flora of the area is not envisaged.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-12
Figure 4.2: Contour of Predicted 24 Hourly Incremental GLC of PM2.5:
Figure 4.3: Contour of Predicted 24 Hourly Incremental GLC of PM10:
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-13
Figure 4.4: Contour of Predicted 24 Hourly Incremental GLC of SOX:
Figure 4.5: Contour of Predicted 24 Hourly Incremental GLC of NOX:
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-14
Figure 4.6: Contour of Predicted 1 Hourly Incremental GLC of CO:
IMPACTS ON NOISE LEVEL
Construction Phase
Land preparation work will have pose some considerable minor impacts on noise as temporarily noise
level in the area will increase due to high noise emission from the Dozers & Tractors etc.
The noise level in the local area would also increase slightly during the civil work due to the operations of
high noise generating construction machineries & equipment.
High noise generation in fabrication area will result in increase in noise level in local area during some
operation like metal cutting, grinding and welding etc.
Transportation of raw material and products will increase the movements of truck which in turn will
increase the noise level. The increased noise level in such way will have effects on sleeping of people as
well as fauna of the transport route.
Commissioning &Operation Phase
The main sources of high noise are texturizing & spinning sections of manufacturing plant will have high
noise from 80 dB (A) to 100 dB (A) which can increase the noise level of process area and surrounding
area. Such increase in noise level will have considerable impacts on employee engaged in process area.
As the tenure of exposure to this high noise will be high due to continuous operation of manufacturing
process, head ache is most likely to occur in employee engaged in this area. Also up on long time, such
regular exposure to high noise may result in hearing impairment of the employee engaged in this area.
Further, the impacts of the high noise outside the premises will not be major as these noise generating
operations will be done in soundproof enclosed building will serve as highly effective barrier, which will
effectively reduce the noise propagation outside of process area.
In addition to the above, proposed boilers, TFHs and DG Sets will be the sources of high noise. The noise
generated by the utilities will be confined within the utility area. The noise level outside the utility area
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-15
will be slightly higher which will have effects on normal hearing of the person engaged in the nearby
area. Continuous exposure to the increased noise level in the vicinity of utility area may result in head
ache in the person exposed to the noise depending on the tenure of exposure.
Greenbelt will have positive impact on the ambient noise level as it will act as noise barrier.
The maximum noise level outside the premises due to all activities will remain below 75 dB (A) at any
time and the site is situated within the industrial Area. Hence no major issue related with adverse effects
on noise of human and other fauna of the area is anticipated.
C. Mitigation Measures:
AIR POLLUTION CONTROL
Fabrication work shall be done in properly ventilated area in the shed whenever possible.
Proper ventilation shall be ensured in the storage & working area during all stages of project
Properly designed PTA storage system with nitrogen blanketing & nitrogen flushing system as recommended by technology supplier for storage system and continuous monitoring of Oxygen level in the PTA storage silos and necessary safety measures to prevent risk of dust emission etc.
The emissions from stripping column shall be collected in closed system and transferred to HTM for
combustion with primary fuel.
Stack of adequate height & internal diameter at top shall be provided to all utilities. The stack height as
per regulatory guideline and use of Low sulphur FO to reduce the emission of SO2.
Only DG Sets confirming applicable statutory norms shall be installed with stack of adequate height.
Adequate handling & transfer system preferably closed automated system operated through PLC.
All mitigation, control & prevention measures as suggested in RA report and disaster management plan
shall be provided.
Transportation must be done in closed vehicles only having all safety measures and complying with
HAZMAT guidelines & statutory requirements.
NOISE CONTROL
Adequate sound proofing and provision of highly efficient noise protection equipment for employees in
Texturizing, spinning & weaving section.
Turning off equipment/machinery not in use
During night time, prefer to avoid high noise generating activities
Proper Sturdy non-vibrating foundation with rubber/vibration reducing pads for equipment/machinery
Housing of high noise generating equipment/machinery in closed area
Provision of acoustic enclosure & silencer for all DG set & silencer for the Boilers
Boiler Shoot blowing operation shall be properly managed to eliminate impacts of high noise.
Regular maintenance of the equipment & machineries including static /dynamic balancing & lubrication
Provision of proper PPE (hearing protection aids) like ear muff and plug to all employee
A greenbelt in and around the premises to create barrier for noise propagation
Minimum transportation in night time on route passing from residential area & restriction on Loud Horns
Regular monitoring of noise level with in & nearby area outside premises
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-16
Significance of Impacts
OPERATIONS OF PROPOSED PROJECT
PARAMETERS &ESF La
nd
Acq
uis
itio
n &
Pre
par
atio
n
Tran
spo
rtat
ion
Act
ivit
ies
Civ
il W
ork
s
Fab
rica
tio
n, E
lect
rica
l & O
ther
En
gin
eeri
ng
Wo
rks
TOTA
L O
F C
ON
STR
UC
TIO
N P
HA
SE
OV
ERA
LL IM
PA
CT
SIG
NIF
ICA
NC
E (I
OS)
Tran
spo
rtat
ion
Act
ivit
ies
Mat
eria
l Sto
rage
& H
and
ling
Man
ufa
ctu
rin
g P
roce
ss
Uti
lity
Op
erat
ion
s
Op
erat
ion
of
Pla
nt
Mac
hin
erie
s/ E
qu
ipm
ent
Wat
er &
was
tew
ater
Man
age
men
t A
ctiv
itie
s
Haz
ard
ou
s &
So
lid W
aste
Man
agem
ent
Act
ivit
ies
Bre
akd
ow
n &
Mai
nte
nan
ce o
f C
on
tro
l Eq
uip
men
t
Ad
min
istr
ativ
e &
Do
me
stic
Act
ivit
ies
Gre
enb
elt
Dev
elo
pm
ent
& C
SR
TOTA
L O
F O
PER
ATI
ON
PH
ASE
OV
ERA
LL IM
PA
CT
SIG
NIF
ICA
NC
E (O
IS)
WITHOUT MITIGATION MEASURES
1. Meteorology (5) 0 0 0 0 0 0 0 0 0 -1 0 0 0 0 0 0 -1 -0.5
2. Air Quality & Air Pollution (10) -2 -1 -2 -1 -6 -6.0 -1 -1 -2 -2 0 -1 -1 -2 -1 +1 -10 -10.0
3. Noise Level (3) -1 -1 -1 -2 -5 -1.5 -1 -1 -2 -2 -2 0 0 -2 0 +1 -9 -2.7
Total (18) -3 -2 -3 -3 -11 -7.50 -2 -2 -4 -5 -2 -1 -1 -4 -1 +2 -20 -13.2
WITH MITIGATION MEASURES
1. Meteorology (5) 0 0 0 0 0 0 0 0 0 -1 0 0 0 0 0 0 -1 -0.5
2. Air Quality & Air Pollution (10) 0 0 -1 -1 -2 -2.0 0 0 0 -1 0 0 0 -2 0 +1 -2 -2.0
3. Noise Level (3) 0 0 -1 -1 -2 -0.6 0 0 -1 -1 -1 0 0 -2 0 +1 -4 -1.2
Total (18) 0 0 -2 -2 -4 -2.6 0 0 -1 -3 -1 0 0 -4 0 +2 -7 -3.7
4.4.2 IMPACTS ON WATER ENVIRONMENT
A. ANTICIPATED IMPACTS:
As it has been noticed there will not be any major issue with project operation related with impacts on water
environment except the high use of surface water/ground water for cooling which will result in loss of water
due to evaporation. Besides, minor impacts due to the wastewater management are likely to occur.
Considering this, the impact assessment for water environment has been carried out for each operation of
proposed project. The details of impact evaluation & description of probable impacts are presented in
subsequent table & paragraphs under the current section.
DESCRIPTION FOR IDENTIFIED IMPACTS
Construction phase:
During construction phase, considerable issue of moderate to major impacts are anticipated due to
the high water requirement for proposed construction works as well as due to probability of
contamination of ground & Surface water resources due to contaminated runoff from site. The rate
of seepage & percolation of contaminated runoff is very less considering the geological condition of
the area & there is no surface water resource in the close vicinity. Hence the anticipated impact of
runoff would be minor and negligible.
During construction average water requirement would be around 100-200 KLD for civil works only
which will have considerable impacts. However, as the water source (Damanganga)/ground water is
adequate to cater the demand, the impacts of water consumption would be acceptable with
adequate measures reduce to consumption rate & wastage of water.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-17
Beside these, there would be no other considerable significant impact occurring during the
construction phase. Hence, it has been noticed that the probable impacts of construction phase
would be acceptable with generic measures for water conservation &prevention of water pollution
during civil work.
Commissioning & Operation phase
During commissioning & Operation phase, considerable impacts are anticipated in case of material handling-
storage & transfer, manufacturing process, utility operation, wastewater management activities, hazardous
waste management and Breakdown & maintenance of control equipment. The descriptions of identified
impacts are presented below:
The proposed project would have two major organic raw materials which may result in considerable
impacts on quality of ground & surface water resources if spilled / leak / fall on bared soil or run away
causing outfall in nearby surface water body. Such probability is envisaged during the activities of
transportation, material storage/handling/transfer and manufacturing process.
Utility operation especially cooling will have considerable impacts on water environment in terms of
depletion of water due to high water requirement in cooling to make up the high evaporation losses.
Besides, small losses from boiler are also likely to occur in terms of steam losses. As these losses are
collectively contributes about 82% of total water requirement, the impacts on water resources will be
considerable. However the overall significance of this impact would be low as the water requirement
would be met from Damanganga Canal / ground water with required permission from CGWA which is an
adequate source to cater the demand. Further, these impacts would be reversible & controllable as the
area has high potential of annual rain fall and a considerable quantity of water will be recycled back after
necessary treatment. Rain water harvesting would be done by proponent during monsoon, which will
mitigate this impact to considerable extent as use of harvested rain water will be done to meet the
water requirement and the drawl of surface water/ground water will be minimal.
The manufacturing process & allied activities like washing & cleaning as well as utility (boiler & cooling
tower) operation will have considerable impacts on water quality due to the wastewater generation. If
the untreated or partially treated effluent from these activities are disposed off may result in the
significant impacts on groundwater quality. Similar impacts are also likely if the untreated effluents from
these activities before treatment are leaked or spilled on bared land or causing runoff outside the
premises.
Similarly, because of wastewater management activities, impacts on water in terms of contamination of
groundwater due to seepage & percolation and contamination of surface water due to outfall of
contaminated runoff resulting due to untreated wastewater are likely to arise. This will have effects on
water quality due to increase level of TDS, Hardness, Alkalinity and suspended solid in receiving water
body/resource. However, it has been noticed that proponent will implement 100% recycling/reuse
scheme for wastewater management with provision of adequate & efficient ETP and RO/MEE, hence
such impacts will not occur in normal course of operation of the unit.
Beside of this, minor impacts on water environment is likely to occur due to seepage of leachate from
hazardous waste (ETP waste & Used Oil) in soil. As a result of such incident, increased toxicity of
affected groundwater will result in toxic effects on human and other animals consuming this
groundwater as well as flora irrigated with the contaminated groundwater, which can be very serious for
health and even can result in fatality depending up on the toxicity level & type of pollutant in leachate.
Similar impacts on water quality may occur due to disposal of untreated sewage generated from
domestic activities. However, chances of this impact are less as the sewage will be managed by
treatment & disposal through septic tank & soak pit.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-18
In addition to these, Minor impacts on water quality due to operation of utility are envisaged as the
pollutant emitted in air during the operation of utility may get deposited in surface water resources and
on soil of nearby area. Eventually this deposition would result in contamination of surface water &
groundwater resources of affected area. However, the level of contamination would be negligible and
acceptable if proper air pollution control devices are to be provided.
The failure of ETP & impervious lining of Hazardous waste storage area can cause significant negative
impact on the water environment due to contamination of water resources of the area as described in
above paragraphs.
No major impact is identified on hydrology as the water will be sourced from adequate water resource.
Rain water harvesting will have beneficial impacts on water resources of the area.
There will be no impact on groundwater hydrology as ground water will not be used in any case.
B. Mitigation Measures:
Prevention of generation of the runoff from construction site and adequate measures to keep the run off
(if generated) within the site to prevent any issue of impact outside of the premises due to
contaminated run off.
Minimal & optimum usage of water and prevention of wastage of water by adequate prevention of
leakage & systematic usage during construction phase
Adequate effluent treatment plant and Septic Tank & Soak pit for domestic wastewater management
during construction phase.
Efficient & Adequate Sewage Treatment plant for treatment of domestic sewage and 100% reuse of
treated sewage for irrigation of greenbelt during commissioning & operation phase.
Efficient & Adequate Effluent Treatment plant for treatment of industrial effluent and 100% reuse of
treated effluent in cooling tower makeup during commissioning & operation phase.
MEE for evaporation of RO reject
Hazardous waste storage area with leachate collection line connected with ETP and disposal as per the
regulatory guideline/ provisions
Impervious lining of floor of material storage area, hazardous waste storage area and production area
with all necessary arrangement of prevention of spread up and collection of any waste stream
Higher COC (>8) for cooling tower using RO or any other suitable technology like Softener, ScaleBan etc.
Water requirement shall be met only by drawl of water from Damanganaga canal/Ground water with
required permission from CGWA.
Roof top Rainwater harvesting and use of harvested rainwater to meet water requirement of unit or
groundwater recharging if permitted by concern authority.
Implementation of all APCD as suggested for air pollution prevention for utilities
Significance of Impacts As observed, the impacts of the project will be considerable and requires systematic action plan &
mitigation. Even after mitigation, major serious impacts are likely to occur during Breakdown & Maintenance
of Control Equipments like effluent collection / transfer / pipeline, process safety equipment &ETP. Detailed
EMP requires mainly for pollution control due to manufacturing process, material storage, utility operation &
handling and wastewater management as well as for Breakdown & Maintenance of Control Equipment.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-19
OPERATIONS OF
PROPOSED PROJECT
PARAMETERS & ESF
Lan
d A
cqu
isit
ion
& P
rep
arat
ion
Tran
spo
rtat
ion
Act
ivit
ies
Civ
il W
ork
s
Fab
rica
tio
n, E
lect
rica
l & O
ther
En
gin
eeri
ng
Wo
rks
TOTA
L O
F C
ON
STR
UC
TIO
N P
HA
SE
OV
ERA
LL IM
PA
CT
SIG
NIF
ICA
NC
E (I
OS)
Tran
spo
rtat
ion
Act
ivit
ies
Mat
eria
l Sto
rage
& H
and
ling
Man
ufa
ctu
rin
g P
roce
ss
Uti
lity
Op
erat
ion
s
Op
erat
ion
of
Pla
nt
Mac
hin
erie
s/ E
qu
ipm
ent
Wat
er &
was
tew
ater
Man
age
men
t A
ctiv
itie
s
Haz
ard
ou
s &
So
lid W
aste
Man
agem
ent
Act
ivit
ies
Bre
akd
ow
n &
Mai
nte
nan
ce o
f C
on
tro
l Eq
uip
men
t
Ad
min
istr
ativ
e &
Do
me
stic
Act
ivit
ies
Gre
enb
elt
Dev
elo
pm
ent
& C
SR
TOTA
L O
F O
PER
ATI
ON
PH
ASE
OV
ERA
LL IM
PA
CT
SIG
NIF
ICA
NC
E (O
IS)
WITHOUT MITIGATION MEASURES
1. Change in Ground Water Quality (5) 0 0 -2 0 -2 -1.0 -1 -1 -1 -1 0 -2 -1 -2 -1 0 -10 -5.0
2. Change in Surface Water Quality (5) 0 0 -1 0 -1 -0.5 -1 -1 0 -1 0 -2 -1 -2 -1 0 -9 -4.5
3. Load on Ground Water Resources (2) 0 0 0 0 0 0.0 0 0 0 0 0 0 0 0 0 0 0 0.0
4. Load on Surface Water Resources (7) 0 0 -2 0 -2 -1.4 0 0 0 -2 0 -1 0 -2 -1 +1 -5 -3.5
5. Change in Hydrological Patter (1) 0 0 0 0 0 0.0 0 0 0 0 0 0 0 0 0 0 0 0.0
TOTAL(20) 0 0 -5 0 -5 -2.9 -2 -2 -1 -4 0 -5 -2 -6 -3 +1 -24 -13.0
WITH MITIGATION MEASURES
1. Change in Ground Water Quality (4) 0 0 0 0 0 0 0 0 0 0 0 0 0 -1 0 0 -1 -0.4
2. Change in Surface Water Quality (6) 0 0 0 0 0 0 0 0 0 0 0 0 0 -1 0 0 -1 -0.6
3. Load on Ground Water Resources (2) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 +1 +1 +0.2
4. Load on Surface Water Resources (7) 0 0 0 0 0 0 0 0 0 -1 0 +1 0 -1 0 +1 0 0
5. Change in Hydrological Patter (1) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL (20) 0 0 0 0 0 0 0 0 0 -1 0 +1 0 -3 0 +2 -1 -0.8
4.4.3 IMPACTS ON LAND ENVIRONMENT
a. Anticipated Impacts:
For effective identification of impacts of the proposed project on Land environment has been assessed in
very beginning of the task of impact assessment. The details are presented in subsequent table & paragraphs
under the current section.
DESCRIPTION FOR IDENTIFIED IMPACTS
Construction phase
During construction phase, minor adverse impacts are envisaged and only minor impacts are noticed in
case of land preparation activities & civil works.
Minor impacts of these activities will occur in terms of disturbance of top soil & change in soil quality.
No impact will occur on geology and minor beneficial impacts are likely to occur on landuse status of the
project due to utilization of unused land in industrial zone.
These identified impacts are acceptable and doesn’t require any major mitigation measures except
prevention of contaminated runoff & dust generation from civil works.
Commissioning & Operation phase
During commissioning & operation phase, considerably significant & moderate impacts are noticed in case of
wastewater &Hazardous/ Solid waste management activities and Breakdown & maintenance of control
equipment. Besides, minor impacts are noticed in case of transportation activities, materials storage &
handling, utility operation & domestic activities. Impacts of these activities will occur only due to
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-20
contamination of soil. No impact will occur on geology and minor beneficial impacts are likely to occur on
land use status due to greenbelt development. The identified impacts are described in details as below:
Negative impacts may occur in term of contamination of soil due to mixing of heavy load of pollutants of
effluent from Process, washing. This may alter many soil quality parameters (pH, soluble salt, inorganic
elements, SAR, Nutrient level, Total Carbon, Carbon to Nitrogen Ratio and Biological organisms)
depending on the contents of wastewater & solid causing the moderate impacts. Increase in pollutant
levels & toxicity of soil are most likely due to this impact, which in turn will affect the soil quality, soil
fertility and depletion/reduction of soil organisms (biotic factor of soil)& fauna. These impacts will be
reduced to minor & acceptable as the wastewater will be properly treated in ETP &STP for reuse to meet
the water requirement.
Similar negative moderate impacts would occur due to mixing of leachate from hazardous waste storage
area. However, such impacts would be controlled as proponent has already planned to provide properly
designed hazardous waste storage area confirming statutory requirement and disposal will be done as
per statutory requirement. All leachate will be collected and treated in ETP, hence the impacts would be
reduced to minor & acceptable.
It is obvious that many materials/pollutants of the project can be airborne or emitted in environment
during breakdown & maintenance of control equipment. Such material may get settled on soil which
may in turn cause moderate and significant negative impacts similar to the above mentioned impacts in
terms of soil contamination.
Similarly, minor to moderate negative impact will occur on land environment in term of contamination
of soil due to mixing of heavy load of chemicals on soil caused by mixing of raw materials from
transportation, materials storage & handling activities in case of malfunctioning or major hazard
occurred in storage & process area.
Further, the particulate& gaseous emitted from the utility and machineries operation can be deposited
on soil which may result in some minor impact on quality of soil of affected.
Domestic activities may also pose some minor impacts on soil quality due to contamination due to
dumping of untreated sewage & domestic solid waste on bared land.
Greenbelt development will have positive impact on the ambient environment as it will act as pollution
sink and may help in reducing the pollutant load of the soil of the local area.
No impact on Geology has been identified for proposed project.
b. Mitigation Measures:
Domestic waste water should be disposed off only through adequate septic tank and then soaks pit
during construction phase.
During commissioning & operation phase, ETP of adequate capacity to treat wastewater prior to reuse
for cooling tower makeup and STP of adequate capacity to treat sewage prior to reuse for irrigation.
Properly designed hazardous waste storage area as per statutory requirementand leachate shall be
collected and treated in ETP.
Hazardous waste disposal shall never be done on bare land but shall be done as per regulatory provision
Proper air pollution control system to control the gaseous pollutant &dust emission of the project.
Proper impervious lining in material storage area as well as production area for prevention of fire hazard
causing the contamination of soil.
All mitigation measures as suggested by respective FAEs (of AP, AQ, WP, RH) should be implementation
to eliminate the possibilities of soil contamination.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-21
Transportation activities shall be done with provision of all necessary safety measures to prevent
hazards as well as to ensure containment of material close to the transportation vehicle.
Development & maintenance of dense greenbelt in and around plant periphery.
Significance of Impacts
OPERATIONS OF
PROPOSED PROJECT
PARAMETERS & ESF
Lan
d A
cqu
isit
ion
& P
rep
arat
ion
Tran
spo
rtat
ion
Act
ivit
ies
Civ
il W
ork
s
Fab
rica
tio
n, E
lect
rica
l & O
ther
En
gin
eeri
ng
Wo
rks
TOTA
L O
F C
ON
STR
UC
TIO
N P
HA
SE
OV
ERA
LL IM
PA
CT
SIG
NIF
ICA
NC
E (I
OS)
Tran
spo
rtat
ion
Act
ivit
ies
Mat
eria
l Sto
rage
& H
and
ling
Man
ufa
ctu
rin
g P
roce
ss
Uti
lity
Op
erat
ion
s
Op
erat
ion
of
Pla
nt
Mac
hin
erie
s/ E
qu
ipm
ent
Wat
er &
was
tew
ater
Man
age
men
t A
ctiv
itie
s
Haz
ard
ou
s &
So
lid W
aste
Man
agem
ent
Act
ivit
ies
Bre
akd
ow
n &
Mai
nte
nan
ce o
f C
on
tro
l Eq
uip
men
t
Ad
min
istr
ativ
e &
Do
me
stic
Act
ivit
ies
Gre
enb
elt
Dev
elo
pm
ent
& C
SR
TOTA
L O
F O
PER
ATI
ON
PH
ASE
OV
ERA
LL IM
PA
CT
SIG
NIF
ICA
NC
E (O
IS)
WITHOUT MITIGATION MEASURES
1. Geology (1) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2. Landuse (5) +1 0 0 0 +1 +0.5 0 0 0 0 0 0 0 0 0 +1 +1 +0.5
3. Soil Quality (6) -1 0 -1 0 -2 -1.2 -1 -1 -1 -1 0 -2 -2 -2 -1 +1 -10 -6.0
TOTAL (12) 0 0 -1 0 -1 -0.5 -1 -1 -1 -1 0 -2 -2 -2 -1 +2 -9 -5.5
WITH MITIGATION MEASURES
1. Geology (1) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2. Landuse(5) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 +1 +1 +0.5
3. Soil Quality(6) 0 0 0 0 0 0 0 0 0 0 0 -1 0 -2 0 +2 -1 -0.6
TOTAL (12) 0 0 0 0 0 0 0 0 0 0 0 -1 0 -2 0 +3 0 -0.1
4.4.4 IMPACTS ON ECOLOGY AND BIODIVERSITY
a. Anticipated Impacts:
The impact assessment for ecological environment has been carried out for each operation of proposed
project. The probable impacts on ecological environment have been envisaged mainly due to air & water
pollution potential of project and high noise generation of proposed project. The details are presented in
subsequent table & paragraphs under the current section.
DESCRIPTION FOR IDENTIFIED IMPACTS
Construction Phase:
During construction phase no considerable impacts has been envisaged as the land acquired is in industrial
zone and well connected with highway networks. However, it has been noticed that minor impacts are likely
to occur due to gaseous emission, particulate emission & noise generation from land preparation activities,
Civil works, mechanical works like fabrication and transportation activity.
These impacts will be restricted to vicinity of project site and temporary. Hence, no major mitigation
measures are anticipated and the impacts would be acceptable with generic measures like sprinkling of
water to prevent dusting, dust curtaining around construction site and restriction on high noise generation
during night time.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-22
Commissioning &Operation Phase:
Major impacts on ecology due to the operation of proposed project are likely to occur because of utility
emission, water & wastewater management activities and hazardous &solid waste management activities
and breakdown & maintenance of control equipment as the project site is situated near forest land. The
major impacts of these activities will occur only due to contamination of other environmental attributes
mainly air, water & soil. Beside of major impacts due to these activities, minor impact will occur on ecology
due to the noise from operation of plant & machineries and transportation activities. Minor beneficial
impacts are likely to occur on ecological status of the area due to greenbelt development activities. The
details of identified impacts are described in details as below:
Due to utility emission impact will occur on ecological environment as secondary impacts due to
environmental contamination caused mainly by pollutant & particulate emissions from project. Such
environmental contamination may have very adverse effects on flora, fauna and ecological habitat. As,
observed by Air Quality Modeling, mainly level of NOx & SO2 will increase considerably due to emissions
of utilities which may have significant impact on local flora & fauna. Hence it is required that all
mitigation measures suggested for control of air pollution are implemented.
Similarly, the emission from process must be controlled by proper collection for use with primary fuel for
TFHs. If the process emission is not controlled it will have significantly major impact on ecology causing
dreadful toxic effects on local fauna & flora.
Wastewater management activities and Hazardous & solid waste management activities are likely to
cause negative impacts in term of contamination of soil due to mixing of heavy load of pollutants, which
may alter many soil quality parameters. The intensity and quantum of such impact may vary depending
on the contents of wastewater & solid/hazardous waste causing the impacts. In normal course of project
operation such impacts will not occur as the company has plan for Zero Discharge Unit by adopting
scheme of 100% recycling /reuse of treated waste water but in event of untreated/poorly treated
effluent or any hazardous/solid waste disposal the impacts would be considerable on receiving
soil/water body resulting in impacts on ecology of the receiving soil/water body.
Significant impacts in term of adverse health effects on fauna and enrichment of toxic content in flora
due to the Hazardous waste management may occur in case of mishap in operation of transportation &
disposal hazardous/solid waste resulting in contamination of soil & air of the mishap or disposal area.
The eventual effects of this may vary depending on the toxic local of the waste being transported or
disposed.
Due to breakdown of control equipment, pollutant will enter in to the environment and it will affect the
flora and fauna of the surrounding habitat.
The plantation in greenbelt may also result in minor beneficial impact on ecology as the plantation may
result in creation of micro habitat which may lead to beneficial impacts in terms of dwelling, resting and
nesting ground for local fauna.
b. Mitigation Measures:
All necessary control & measures for prevention of air pollution due to emissions from utility &
process of the project shall be implemented.
100% recycling/reuse of wastewater after adequate treatment in in-house ETP with RO/MEE.
100% reuse of sewage after adequate treatment in in-house STP.
Properly designed hazardous waste storage area as per statutory requirementand leachate shall be
collected and treated in ETP.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-23
Safety measures & action plan for prevention of spreading of materials being transported shall be
provided in transport vehicles to ensure safety & protection of ecological factors during major
accident.
Safety measures & action plan for control & prevention of hazards associated with the materials &
operation of proposed project shall be provided to ensure safety & protection of ecological factors
during major accident.
Creation &Maintenance of dense greenbelt in and around the company premises covering 33% of
total plot area.
No disposal of effluent and solid & hazardous waste on land and in water bodies.
Significance of Impacts
OPERATIONS OF PROPOSED PROJECT
PARAMETERS & ESF La
nd
Acq
uis
itio
n &
Pre
par
atio
n
Tran
spo
rtat
ion
Act
ivit
ies
Civ
il W
ork
s
Fab
rica
tio
n, E
lect
rica
l & O
ther
En
gin
eeri
ng
Wo
rks
TOTA
L O
F C
ON
STR
UC
TIO
N P
HA
SE
OV
ERA
LL IM
PA
CT
SIG
NIF
ICA
NC
E (I
OS)
Tran
spo
rtat
ion
Act
ivit
ies
Mat
eria
l Sto
rage
& H
and
ling
Man
ufa
ctu
rin
g P
roce
ss
Uti
lity
Op
erat
ion
s
Op
erat
ion
of
Pla
nt
Mac
hin
erie
s/ E
qu
ipm
ent
Wat
er &
was
tew
ater
Man
age
men
t A
ctiv
itie
s
Haz
ard
ou
s &
So
lid W
aste
Man
agem
ent
Act
ivit
ies
Bre
akd
ow
n &
Mai
nte
nan
ce o
f C
on
tro
l Eq
uip
men
t
Ad
min
istr
ativ
e &
Do
me
stic
Act
ivit
ies
Gre
enb
elt
Dev
elo
pm
ent
& C
SR
TOTA
L O
F O
PER
ATI
ON
PH
ASE
OV
ERA
LL IM
PA
CT
SIG
NIF
ICA
NC
E (O
IS)
WITHOUT MITIGATION MEASURES
1. Terrestrial Flora & Fauna (12) -1 -1 -1 -1 -4 -4.8 -1 -1 -1 -2 -1 -2 -1 -2 0 +1 -10 -12.0
2. Aquatic Flora & Fauna (3) 0 0 0 0 0 0 0 0 0 0 0 -1 0 0 0 0 -1 -0.3
3. Ecological Habitat (10) 0 0 0 0 0 0 -1 -1 -1 -2 0 -1 0 -1 0 +1 -6 -6.0
TOTAL (25) -1 -1 -1 -1 -4 -4.8 -2 -2 -2 -4 -1 -4 -1 -3 0 +2 -17 -18.3
WITH MITIGATION MEASURES
1. Terrestrial Flora & Fauna (12) 0 0 0 0 0 0 0 0 0 -1 0 0 0 -1 0 +2 0 0
2. Aquatic Flora & Fauna (3) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
3. Ecological Habitat (10) 0 0 0 0 0 0 0 0 0 -1 0 0 0 -1 0 +1 -1 -1.0
TOTAL 0 0 0 0 0 0 0 0 0 -2 0 0 0 -2 0 +3 -1 -1.0
4.4.5 SOCIO-ECONOMICS
a. Anticipated Impacts:
The impact assessment for socioeconomic environment has been carried out for each operation of proposed
project. For effective identification of impacts of the proposed project significance of probable impacts has
been assessed in very beginning of the task of impact assessment. The details are presented in subsequent
table & paragraphs under the current section.
DESCRIPTION FOR IDENTIFIED IMPACTS
Construction Phase
As the proposed project is to be developed in notified industrial zone and company has already
acquired industrial land. Hence, issue of impacts on socioeconomic environment due to loss of land
will not occur. Also the construction work, fabrication works and other activities of construction will
not have any considerable adverse impacts on socioeconomic environment.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-24
Minor adverse impacts on public health & safety and public amenities are likely to occur due to
transportation of construction materials. These impacts would be acceptable with generic traffic
management & transportation schedule.
Besides these, minor but considerable beneficial impacts would occur due to temporary direct &
indirect employment of minimum about 200 people for construction phase.
Commissioning & Operation Phase
Moderate considerable adverse impacts would occur on health and safety due to hazards associated
with transportation, accident in material storage, utility emission, untreated wastewater disposal and
increased pollution & hazard potential during breakdown of control equipment.
Significant moderate positive impacts in terms of employment &economic benefit to local public are
anticipated due to the direct & indirect employment potential of the project. About 2000 people will be
directly employed and many other will be indirectly employed due to the project, which will result in
economic improvement of more than 2000 families. Such improvement will also lead to the
improvement in other social indicators like lifestyle, education & health etc. These impacts will be long
term beneficial impacts.
Increase noise level & traffic on local road passing through the residential areas will have impacts on
local people in terms of annoyance due to noise, disturbed sleep, increased travelling time and
annoyance due to heavy traffic.
Increase noise level due to the utilities and machineries operation may have impacts in terms of
annoyance in sleep as well as other noise related health problem like head ache. However such
probability will be less as the noise from the proposed project will have impacts in close vicinity of the
site and there is no residential area within distance of high noise propagation.
CSR activities proposed by company will have minor beneficial impacts on education, socioeconomic
activities, public health & safety and public amenities & services.
b. Mitigation Measures Suggested
Pollution prevention measures for prevention & control of pollution of Air, Water, Land & Noise
Implementation of all hazards and risk prevention & control measures as suggested in Risk Assessment
report
Implementation of all emergency action measures and provision of all emergency equipment as
suggested in Risk Assessment report & Disaster Management & Emergency Action Plan
Prevention of contaminated runoff from proposed project
Safe & well planned raw materials / chemical transportation
Provision of maximum employment from local area
Adequate management of transportation& traffic and maximum transportation through Highways.
Proper public relation to prevent conflicts with local people
Regular CSR activity for Social welfare & upliftment of local people
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-25
Significance of Impacts
OPERATIONS OF PROPOSED PROJECT
PARAMETERS & ESF La
nd
Acq
uis
itio
n &
Pre
par
atio
n
Tran
spo
rtat
ion
Act
ivit
ies
Civ
il W
ork
s
Fab
rica
tio
n, E
lect
rica
l & O
ther
En
gin
eeri
ng
Wo
rks
TOTA
L O
F IM
PA
CT
SCO
RE
OV
ERA
LL IM
PA
CT
SIG
NIF
ICA
NC
E (I
OS)
Tran
spo
rtat
ion
Act
ivit
ies
Mat
eria
l Sto
rage
& H
and
ling
Man
ufa
ctu
rin
g P
roce
ss
Uti
lity
Op
erat
ion
s
Op
erat
ion
of
Pla
nt
Mac
hin
erie
s/ E
qu
ipm
ent
Wat
er &
was
tew
ater
Man
age
men
t A
ctiv
itie
s
Haz
ard
ou
s &
So
lid W
aste
Man
agem
ent
Act
ivit
ies
Bre
akd
ow
n &
Mai
nte
nan
ce o
f C
on
tro
l Eq
uip
men
t
Ad
min
istr
ativ
e &
Do
me
stic
Act
ivit
ies
Gre
enb
elt
Dev
elo
pm
ent
& C
SR
TOTA
L O
F O
PER
ATI
ON
PH
ASE
OV
ERA
LL IM
PA
CT
SIG
NIF
ICA
NC
E (O
IS)
WITHOUT MITIGATION MEASURES
1. Demography (2) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
2. Education (2) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 +1 +1 +0.2
3. Employment & Economy (5) +1 +1 +1 +1 +4 +2.0 +1 +1 +2 0 0 0 0 0 +1 0 +5 +2.5
4. Socioeconomic Activities(2) 0 0 0 0 0 0 0 0 0 -1 0 0 0 -1 0 +1 -1 -0.2
5. Public Health & Safety(5) 0 -1 0 0 -1 -0.5 -1 -2 -2 -2 0 -1 0 -2 0 +1 -9 -4.5
6. Public Amenities & Services(4) 0 -1 0 0 -1 -0.5 -1 0 0 0 0 0 0 0 0 +1 0 0
TOTAL (20) +1 -1 +1 +1 +2 +1.0 -1 -1 0 -3 0 -1 0 -3 +1 +4 -4 -2.0
WITH MITIGATION MEASURES
1. Demography (2) 0 0 0 0 0 0 0 0 +1 0 +1 0 0 0 0 0 +2 +0.8
2. Education (2) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 +1 +1 +0.2
3. Employment & Economy (5) 0 0 0 0 0 0 +1 +1 +2 0 0 +1 0 0 +1 0 +6 +3.0
4. Socioeconomic Activities (2) 0 0 0 0 0 0 -1 -1 0 0 0 0 0 -1 0 +1 -2 -0.4
5. Public Health & Safety (5) 0 0 0 0 0 0 -1 0 0 -1 0 0 0 -1 0 0 -3 -1.5
6. Public Amenities & Services (4) 0 0 0 0 0 0 -1 0 0 0 0 0 0 0 0 0 -1 -0.4
TOTAL (20) 0 0 0 0 0 0 -2 0 +3 0 +1 +1 0 -2 +1 +2 +4 +2.7
4.4.6 IMPACTS ON WORK ENVIRONMENT
The impact assessment for Work environment has been carried out for each operation of proposed project.
For effective identification of impacts of the proposed project significance of probable impacts has been
assessed in very beginning of the task of impact assessment. The details are presented in subsequent table &
paragraphs under the current section.
DESCRIPTION FOR IDENTIFIED IMPACTS
Construction Phase
Occupational hazards related with machine /equipment operations, working on height, manual lifting &
movement of heavy goods and dusting & high noise in workplace may result in adverse impacts on health &
safety of workers and work place condition. These impacts would be minor and acceptable with generic
measures like sprinkling of water for prevention of dusting, PPEs, construction safety measures and properly
planned execution of works.
Commissioning &Operation Phase
Major impacts due to high noise in the texturizing, weaving& spinning section of manufacturing plant
will have high noise from 80 dB(A) to 100 dB(A), which can severely affect the health of
employee/workers working in this high noise process area. However, to minimize the impacts of these
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-26
high noise, proponent has planned to provided sound proof building for housing of the machineries
texturizing, weaving& spinning section and the compulsory provision of highly efficient PPEs.
Significant adverse impacts on health of employee are envisaged due to process emission if not managed
properly. The process emission may contain many toxic materials causing serious health effects, hence it
is suggested to prevent the contamination of workplace due to the process emission.
Transportation, storage & handling of raw materials may cause minor negative impact on employee
health & safety and workplace condition in case of leakage and accident. Any hazards associated with
these activities will also have serious impacts on workplace conditions & health of employees.
Transportation of hazardous waste may cause negative impact in case of leakage and accident on
employee health & safety and workplace condition. Infectious diseases are also likely due to spill/leak of
hazardous wastes in workplace area.
Negative minor short term impacts on health & safety are anticipated due to the injury, health effects
due to unfavorable work place conditions and ergonomic issues related with material handling &
transportation, manufacturing process, maintenance works. Such impacts will occur mainly in terms of
MSD and other injury (cut, burn, irritation eye & respiratory tract etc.) are likely to occur due to lifting or
shifting of heavy goods and equipment. Rotating machineries &sharp edged tools/machinery can cause
serious injury (like cut, fracture of bone, crushing of hand etc.) to the employee engaged in operation of
the machinery.
Minor negative short term impacts on health & safety are anticipated due to unmanaged disposal or
released or spill or leakage of wastewater and hazardous waste.
Due to release of pollutant in work place during utility operation as well breakdown of equipment cause
negative impacts on health & safety may occur in terms of major health effects like saponification fat of
cell, lung injury & burns of the upper airway, chest pain, cough and bronchospasm, conjunctival irritation
and chemosis, corneal epithelial defects, permanent vision loss etc.
b. Mitigation Measures:
During Operation Phase
Non-slippery Floor of plant & storage and be ensured that there is no liquid spilled on floor.
Safety measures like safety guard around rotating part for all rotating equipment/machineries
Adequate measures for prevention of workplace air contamination due to the emission from process &
utilities.
Highly efficient PPEs for spinning, texturizing & weaving sections to prevent adverse effect on hearing
capability of employee engaged in these areas. Sound proofing of these areas shall also be ensured.
Proper ergonomic condition to ensure safe & non-tiring work place conditions
Lifting & shifting of all heavy materials shall be done using trolley or fork lift.
Chemical safety plan shall be prepared & implemented before commissioning & routine operation of the
plant.
RA study for the proposed project shall be conducted & all necessary hazard/risk control/prevention
measures shall be implemented before erection & commissioning of plant.
All fittings in area having flammable materials shall be flameproof and all necessary fire-fighting facilities
shall be ensured in this area.
In all area first aid kit shall be available.
All necessary PPEs, Safety & emergency equipment for all concern employee in all areas
Disaster management plan shall be prepared & all necessary arrangement for emergency action plan
shall be provided well before commissioning of plant.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-04: Anticipated impacts & Mitigation measures (QCI-NABET Accredited) 4-27
Regular occupational health check program shall be conducted. Pre-employment & Annual post-
employment health check-up of all employee shall be done. Health check of affected employee shall be
done when any employee is significantly exposed to hazardous material.
Significance of Impacts
OPERATIONS OF PROPOSED PROJECT
PARAMETERS La
nd
Acq
uis
itio
n &
Pre
par
atio
n
Tran
spo
rtat
ion
Act
ivit
ies
Civ
il W
ork
s
Fab
rica
tio
n, E
lect
rica
l & O
ther
En
gin
eeri
ng
Wo
rks
TOTA
L O
F C
ON
STR
UC
TIO
N P
HA
SE
OV
ERA
LL IM
PA
CT
SIG
NIF
ICA
NC
E (I
OS)
Tran
spo
rtat
ion
Act
ivit
ies
Mat
eria
l Sto
rage
& H
and
ling
Man
ufa
ctu
rin
g P
roce
ss
Uti
lity
Op
erat
ion
s
Op
erat
ion
of
Pla
nt
Mac
hin
erie
s/ E
qu
ipm
ent
Wat
er &
was
tew
ater
Man
age
men
t A
ctiv
itie
s
Haz
ard
ou
s &
So
lid W
aste
Man
agem
ent
Act
ivit
ies
Bre
akd
ow
n &
Mai
nte
nan
ce o
f C
on
tro
l Eq
uip
men
t
Ad
min
istr
ativ
e &
Do
me
stic
Act
ivit
ies
Gre
enb
elt
Dev
elo
pm
ent
& C
SR
TOTA
L O
F O
PER
ATI
ON
PH
ASE
OV
ERA
LL IM
PA
CT
SIG
NIF
ICA
NC
E (O
IS)
WITHOUT MITIGATION MEASURES
1. Occupational Health & safety (3) -1 -1 -1 -1 -4 -1.2 -1 -2 -2 -2 -1 -1 -1 -2 0 0 -12 -3.6
2. Work Place Condition (2) -1 0 -1 -1 -3 -0.6 -1 -1 -2 -2 -1 -1 -1 -2 -1 0 -12 -2.4
TOTAL (5) -2 -1 -2 -2 -7 -1.8 -2 -3 -4 -4 -2 -2 -2 -4 -1 0 -24 -6.0
WITH MITIGATION MEASURES
1. Occupational Health & safety (4) 0 0 0 0 0 0 0 -1 0 -1 0 0 0 -2 0 +1 -3 -1.2
2. Work Place Condition (4) 0 0 0 0 0 0 0 0 0 0 0 0 0 -2 0 +1 -1 -0.4
TOTAL (5) 0 0 0 0 0 0 0 -1 0 -1 0 0 0 -4 0 +1 -6 -1.6
4.4.7 IMPACTS DUE TO HAZARDOUS /NON-HAZARDOUS WASTE MANAGEMENT
As described in earlier, the assessment of significance of impacts of hazardous/non-hazardous waste management is already considered in earlier sections of Air, water, Land, Socioeconomic & work environments. As described in those sections, the hazardous/non-hazardous waste will have minor to major impacts on various attributes of environment. The highlighted moderate to major impacts of hazardous/non-hazardous waste management are presented below.
The hazardous waste generated from process & event of accident in unit as well as used oil will have many adverse impacts depending on the chemical constituents of the waste. Such waste upon mixing with soil & water may contaminate soil and water. If any person exposed to such toxic waste beyond tolerable limit may get serious health effects. The volatile content of this waste can contaminate air of the area where the waste is stored or dumped.
The ETP waste including residue from MEE may contain many toxic organic load as well as other constituent which may contaminate water, soil and air upon release/mixing. Disposal of the ETP waste & MEE residue in area other than TSDF may lead to considerable impacts on environment due to air, water, land contamination and also cause serious negative effects on ecological factors and human health upon exposure to it.
Empty drums/barrels/liner of hazardous materials can contaminate air up on release of the residual volatile materials in these containers. Such contamination of air may badly affect the human health as well as other living beings. The decontamination wastewater if disposed off without treatment may contaminate soil if disposed on land or water if disposed off in water bodies/land.
Fire in the hazardous waste storage area or transport vehicles may lead to the contamination of air which in turn results on impacts on ecology & land environment as well as socioeconomic environment.
The non-hazardous wastes (waste yarn) will not have any impact on environment.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-05: Analysis of Alternatives (QCI-NABET Accredited) 5-1
CHAPTER: 05 ANALYSIS OF ALTERNATIES
(TECHNOLOGY & SITE)
5.1. GENERAL
The analysis of alternative technology and site is an important tool for the selecting the best of the
technologies and project location.
Alternative analysis is the process of analyzing the proposed locating for suitability for basic necessities to
operate the plant safely, this analysis also covers the environmental aspect of pollution prevention and
improvement in quality of life nearby the project vicinity.
The project alternative (Technology & Site) is the course of action in pace of another, that would meet the
same purpose, but which would avoid or minimize negative impacts and enhance project benefits.
Such projects may result in specific impacts which can be avoided or mitigated by adherence to certain
predetermined performance standards, guidelines or design criteria. Alternative approaches may therefore
be more effective in integrating environmental and social concerns into the project planning process.
5.2. SITE SELECTION
M/s. Beekaylon Synthetics Pvt. Ltd., Velugam has proposed to setup a new manufacturing unit for
manufacturing of synthetic manmade fibres & Polyester granules through continuous polymerisation of MEG
& PTA and knitting & weaving for fabric production. The proposed project involves the production of
Polyester POY/FDY/Staple Fibres & Granules @ 432000 TPA, various types of Synthetic Filament Yarn @
378000 TPA and various other types of manmade fibres like Texturized Yarn/Twisted Yarn/Acrylic Yarn
/Covered Yarn/Spandex Yarn etc. @288000TPA. The proposed product line also includes Winding Of
Yarn/Heat Setting Of Yarn/Circular Knitting/Warping / Warp Knitting/Weaving Fabrics/Carpet Weaving/
Narrow Fabrics @ 36000 TPA and Colour Master Batch Chips / granules@9000 TPA. The site has been
preferred in UT of D&NH considering the proximity of existing unit as well as necessary infrastructure as
mentioned below.
Industrial Zone D&NH is having the infrastructure facilities, Land, water sources, transportation facilities, power requirement and CETP,GEPIL, TSDF facility etc.
Availability of all basic facilities like infrastructure, communication, medical facilities, fuel, water, power, unskilled & skilled manpower, raw materials, road network etc.
The nearest town Silvassa is at 13.00Kms (N) away from the project site.
Nearest Railway station is Sanjan- 18.90 Km W.
Mumbai International Airport of is 117 KMs (S) km away.
Good communication and transportation facilities.
No R&R will be required. Further, the site is also selected considering the need of the huge human resource, adequate land area,
availability of adequate water resources etc. the details of other considered industrial areas and selected
area are presented below. The score for each parameter has been given out of Ten (10) based on availability
& condition of the Infrastructure as well as Economic benefit to company & local area. Suitability rank has
been decided based on total score of 70 for each area.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-05: Analysis of Alternatives (QCI-NABET Accredited) 5-2
Table 5.1: Analysis of Alternative Industrial Area considered
Sr. No.
Considered Area
Infrastructure Availability & condition Economic Benefit
Total Score Suitability Rank
Land Power Supply
Water Transport & Traffic
Human Resource
Company Local Area
1. Dadra 4 6 5 4 7 6 6 38; 54.29% 4
2. Piparia 2 6 5 4 7 6 6 36; 51.43% 5
3. Kharadpada 7 6 7 5 7 6 8 46; 65.71% 3
4. Masat 6 6 7 5 7 9 8 48; 68.57% 2
5. Velugam 9 7 9 8 10 8 10 61; 87.14% 1
Based on the above analysis three areas (Kharadpada, Masat & Velugam) were considered for final selection
of site for proposed project. The land availability in industrial zone of Kharadpada & Masat are enough but
not in a single chunk, whereas the land at Velugam is available in a single chunk. Further, the high traffic in
the area of Masat & Kharadpada can create many issues for company & local people due to increased traffic
due to proposed project. Velugam is connected with National Highway by many approach routes having
negligible traffic. Also the water& power availability condition at Masat & Kharadpada is not good enough
due to competitive users of canal water in the region which is considerably better in Velugam. In Velugam
canal water availability is more than adequate to cater the demand of water for proposed project. Human
resource in Velugam is available in the local areas as the area has not significant availability of employment
potential and numbers of family are in need of employment. Finally, the Velugam has high ecological benefit
to company at Masat which is almost similar at Velugam whereas very high economic benefit to the local
area is anticipated at Velugam. Hence, considering the availability of land in single chunk & other merits of
the Velugam area, Site in industrial zone of Velugam has been selected for the proposed project.
5.3. ALTERNATIVE TECHNOLOGIES
The technology proposed by M/s. Beekaylon Synthetics Pvt. Ltd., for manufacturing of Manmade Fiber other
than Rayon (Polyester POY/FDY/Staple Fibres & Granules through continuous polymerisations, various types
of Synthetic Filament Yarn and various other types of manmade fibres like Texturized Yarn/Twisted
Yarn/Acrylic Yarn /Covered Yarn/Spandex Yarn etc. The Winding Of Yarn/Heat Setting Of Yarn/Circular
Knitting/Warping / Warp Knitting/Weaving Fabrics/Carpet Weaving/ Narrow Fabrics and Color Master Batch
Chips / granules.) is one of the well-established and proven technologies available in the market. The
accuracy and operability of the processes are judged to be proven based on consistency of production,
specification of products, safety as well as environmental advantages. Hence, no alternative technology has
been analyzed.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-06: Environmental monitoring program (QCI-NABET Accredited) 6-1
CHAPTER: 06 ENVIRONMENTAL MONITORING PROGRAM
6.1 GENERAL
The post Environmental Clearance, environmental monitoring program serves as the key tool to keep track
on performance of mitigation measures implemented & pollution control technologies installed to prevent
impacts associated with various operations of the project. Environmental monitoring is the repetitive and
systematic measurement of the characteristics of environmental components to test specific hypotheses of
the effects of human activity on the environment. Environmental monitoring is undertaken primarily to
determine the environmental effects of human activities, and secondarily to increase understanding of
cause-effect relationships between human activity and environmental change. Thus, environmental
monitoring is the effective observation of site conditions and work activities; and identification of potential
non-compliance situations and initiation of corrective or remedial actions. Monitoring is as important as that
of control of pollution, since the efficiency of control measures can only be determined by monitoring.
M/s. Beekaylon Synthetics Pvt. Ltd. has proposed a new manufacturing unit of Manmade Fiber and allied
products. As the project requires obtaining prior environmental clearance, present EIA study has been
conducted as per provision of SO 1533 (as timely amended). As described in Chapter-4, there would some
minor impacts on environment due to the operation of proposed project. Considering the probabilities of
impacts on environment, detailed impacts evaluation study has been conducted as presented in earlier
chapter. Based on the predicted & assessed impacts as well as the baseline environmental status of the
project area, present environmental monitoring plan has been designed, suggested & planned for
implementation as post project environmental monitoring program as described below in subsequent
sections under respective headings.
6.1.1 OBJECTIVE OF ENVIRONMENTAL MONITORING PROGRAM
As described in earlier chapter, the proposed project will have only acceptable minor impacts due to utility
emission, wastewater disposal and particulate contamination of workplace air due to fugitive & process
emission. Noise & vibration generation will not a major issue as the noise level outside of source area will
always remain well below the stipulated standard & limits prescribed by CPCB/PCC and NIOSH/OSHA.
Necessary mitigation has been suggested by EIA team and all major points have been covered in EMP for
prevention, control & mitigation of these probable impacts.
For regular tracking of the effectiveness of mitigation measures & EMP at specific interval, regular
monitoring of the necessary environmental parameters is required to keep the records updated for review
and revision of EMP as & when required. With this vision, the present environment monitoring program has
been prepared with due consideration of the baseline status of the project area, various components of
project & environmental attributes likely to be affected.
The Environmental Monitoring Program has been scheduled for the following major objectives:
To comply with the statutory requirements of monitoring for compliance with conditions of EC,
NOC and CC&A
To comply with the provision of Factory Act & MSIHC Rules
Assessment of the changes in environmental conditions, if any, during the project
operation/activities.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-06: Environmental monitoring program (QCI-NABET Accredited) 6-2
Monitoring & tracking the effectiveness of Environment Management Plan & implementation of
mitigation measures planned.
Identification of any significant adverse transformation in environmental condition to plan
additional mitigation measures; if & as required
The environmental monitoring program designed with the above objective and understandings have been
described in the present chapter in subsequent sections under respective heading. M/s. Beekaylon
Synthetics Pvt. Ltd. shall implement the environment monitoring programs in line with the planned
schedule. The company shall ensure that the necessary requisite & facilities are made available and
necessary arrangement including budgetary provision has been made as & when required to ensure regular
efficient environmental monitoring activities.
6.2 ENVIRONMENTAL MONITORING PROGRAM
From the monitoring point of view, the important components are air, water, soil, noise and occupational
health & safety. Regular monitoring will be carried out by MoEF&CC Recognized/ NABL approved laboratory
as per the need after the commissioning of proposed project.
Monitoring of environmental samples shall be done as per the guidelines provide by MoEF&CC/CPCB. The
method followed shall be recommended / standard method approved/ recommended by MoEF&CC/CPCB.
List of preferred method of sampling/ monitoring and analysis of environmental samples in provided in the
Annexure- II of EIA Report.
For monitoring of workplace area methods suggested / published by NIOSH or any other authorities shall be
adopted.
The sampling/monitoring points/location, frequency& responsibility, parameter mentioned as following:
Table 6.1: Details of the Environmental Monitoring program
Sr. No.
Type of Monitoring
Location of Monitoring station
Frequency of sampling &
Responsibility
Duration of Sampling
Parameters to be test
1. Ambient Air 2 place within the plant premises (1 in downwind direction at between 500 m. & 1 km distance from plant boundary.)
Monthly- In-house lab. or External MoEF & CC recognized lab
24 hrs PM2.5, PM10, SO2, NOX, CO, VOC
2. Work Place Monitoring
Production Block, Godown
Monthly- In-house lab. or External MoEF & CC recognized lab
8 hrs PM2.5, PM10, SO2, NOX, VOC,
Temperature, Humidity, Light &
Noise
3. Stationary Emission
Boilers, TFHs and D.G. Sets
Monthly- In-house lab. or External MoEF & CC recognized lab
-- PM, SO2, NOX, CO for all stack and VOC for
TFHs as additional parameter
4. Ambient Noise
At all high noise generating sources; (DG
Monthly- In-house lab.
At least 1 hr. continuous
Equivalent Noise Level - dB (A)
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-06: Environmental monitoring program (QCI-NABET Accredited) 6-3
Sr. No.
Type of Monitoring
Location of Monitoring station
Frequency of sampling &
Responsibility
Duration of Sampling
Parameters to be test
set, Boilers, Production machineries in spinning-
weaving-texturizing, other machineries,
Blowers, Compressors etc.)
and at different areas within premises (Spinning area,
texturizing area & weaving area
Production, Storage & transportation area,
Administrative & security area, STP, ETP
etc.)
or External MoEF & CC recognized
lab
5. Treated waste water for Reuse
From ETP & STP- Untreated (Inlet) and
Treated (outlet) wastewater
Daily- In-house lab.
Monthly- External MoEF &
CC recognized lab
-- Parameters as per norms prescribed by
UTPCC (D&NH).
6. Surface Soil 2 locations from storage & greenbelt area,
Quarterly - External MoEF &
CC recognized lab
-- pH, EC, Moisture, Organic matter, Total
N, P, K, SO4-2, Cl-,
Ca+2, Mg+2 & Na+
7. Greenbelt/ Vegetation Cover
Greenbelt Areas developed by Company
Throughout Year at regular interval: In House by EHS Executive & other EMC members
-- Number of plantation (Units), Number of
Survived Plants/Trees,
Number of Poor Plant/Trees, Survival & Replantation Rate
8. Employee Medical/Health Checkup:
Whole Unit Yearly- Through Approved Medical Officer & Doctor as per OHS Plan
As per statutory provision & requirement
9. Social Aspects:
Project Area Throughout year- by welfare officer or Designated person.
Employee social status and issues, Disbursement of fund for CSR, as per requirement of the local area informed by local people.
All the above observations will be complied and documented by the EMC to serve the following purposes.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-06: Environmental monitoring program (QCI-NABET Accredited) 6-4
Identification of any environmental problems that are occurring in the area.
Initiating or providing solution to those problems through designed channels and verification of the
implementation status
Controlling activities inside the plant, until the environmental problem has been corrected.
Suitably responds to emergency situations
The industry will engage recognized laboratories to carry out all necessary monitoring parameters. Qualified
staff has been appointed for the purpose of Operation and maintenance of the pollution control facilities. All
necessary facilities are provided to ensure full proof wastewater treatment.
6.3 DOCUMENTATION & REPORTING
The records of the monitoring program shall be kept on regular basis for all aspects of the monitoring.
Separate records for water, wastewater, solid waste, air, emission, soil &noise shall be prepared and
preserved regularly.
Immediately upon the completion of monitoring as per the planned schedule, report shall be done &
necessary documents shall be forwarded to the concern person.
Methodology of monitoring (sampling & analysis) shall be prepared as separate documents as SOP (standard
Operating Procedure) wherever required.
The records showing results/outcome of the monitoring programs shall be prepared as per the requirement
of the schedule mentioned above.
Regularly these documents & records shall be reviewed for necessary improvement of the monitoring
plan/mitigation measures/environmental technologies as well as for necessary actions of environmental
management cell.
Environmental statements &/or performance report/compliance report/audit report as per conditions of EC,
CTE and CC&A shall be prepared and submitted to the concern authority as per the guidelines provided by
the authorities within the stipulated timeframe. CTE, CC&A and other statutory permission (as required)
must be obtained & renewed timely as per legal provision & guidelines. Similarly, all necessary report &
forms shall be prepared and submitted to the concerned authority as per the statutory requirement of
Environmental Acts/rules, Factory Act & MSIHC rules. Reporting of accident & other requirements shall be
made in prescribed format well within stipulated time frame as per statutory requirements & guidelines.
As per the requirements of UTPCC, documentation and report shall be done as below on regular basis.
To obtain Consent to Operate (CC&A) renewal under the Water Act – 1974, Air Act – 1981 &
Authorization under Hazardous Waste (M, H & T) Rules, 2016.
To submit the Environmental Audit Statement (Form V) for the previous year.
To file regular annual return as per Hazardous Waste (M, H & T) Rules, 2016
To submit required justifiable reply against observation made by UT PCC & Other Authority during
the inspection, as and when required.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-07: Additional Studies (QCI-NABET Accredited) 7-1
CHAPTER: 07
ADDITIONAL STUDIES 7.1. GENERAL
As per the provision of EIA Notification - SO 1533 (as amended time to time), additional studies are the vital
component of EIA especially when specific additional study is awarded as approved TOR condition by the
concerned authority EAC or SEAC during the scoping for EIA. This section / chapter of additional studies of
EIA report comprises mainly the Risk Assessment, Public Participation and Social Studies for R&R plan as per
the generic structure of EIA report as mentioned in the SO 1533.
In case of the present EIA study for proposed project of M/s. Beekaylon Synthetics Pvt. Ltd. at Velugam, Risk
Assessment Study as additional study has been given as condition in awarded TOR, which needs to be
included in the EIA study & report. The Risk Assessment Study for the upcoming project has been conducted
by Risk Assessment expert of the EIA team. In addition to the RA Report, Disaster & Emergency management
plan is also prepared by expert.
The Public hearing is not applicable to our project as the proposed project is to be developed within the
Notified Industrial Zone/Estate, established before 2006. Similarly, Social Studies for R&R plan have not
being conducted for the proposed project as the unit is situated within notified industrial zone of D&NH and
no additional land outside the industrial estate is required; and hence Rehabilitation & Resettlement is not
required.
The details regarding the additional studies have been described below under respective heading with
reference to relevant Annexure of present EIA report.
7.2. PUBLIC CONSULTATION
As per statutory requirements, Public consultation is not applicable to the proposed project as the project is
to be developed in the premises situated within the notified industrial zone of Velugam, UT of D&NH which
is established before 2006 (Ref. OM Dated 10/12/2014). Therefore, Public hearing is not required for the
proposed project and hence, public hearing is not conducted.
7.3. RISK ASSESSMENT & DISASTER MANAGEMENT
The Risk Assessment Study for the proposed project of M/s. Beekaylon Synthetics Pvt. Ltd. at Velugam has
been conducted by Risk Assessment & Hazard Management functional area expert (RH FAE) of EIA Team.
The risk assessment has been carried out with consideration of some probable worst case scenarios of
flammable hazards & Toxic hazards of the project. The major hazards are noticed due to be associated with
one hazardous chemical (Monoethylene Glycol) & fire hazard in Diesel & FO storage area which can have
worst case scenarios of fire & explosion as well as dispersion of toxic vapour & flammable cloud. Thus with
such probabilities & considerations of hazards & risk, Risk Assessment Study has been carried out by
proponent as pre-project conceptual RA study. The Disaster & Onsite Emergency Management plan has also
been prepared as a part of RA study report. The whole Risk Assessment Report along with onsite emergency
plan has been enclosed herewith the EIA report as Annexure- V
7.4. SOCIAL STUDY AND R&R ACTION PLAN
The proposed project of M/s. Beekaylon Synthetics Pvt. Ltd. is to be setup in the notified industrial zone at
Velugam of U.T. of D&NH. Hence the proposed project does not require any public land for the project.
Therefore, issue of displacement of any population or public facility/utility or property does not arise for the
proposed project. Considering this, social study for R&R plan has not been conducted because there will not
be any requirement of Resettlement & Rehabilitation actions for setting up the proposed project.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-08: Project benefits (QCI-NABET Accredited) 8-1
CHAPTER: 08 PROJECT BENIFITS
8.1. IMPROVEMENT IN INFRASTRUCTURES
Project benefit focus on those points which will become beneficial to the surrounding area or community in
terms of infrastructural development, Social development, employment and other tangible benefits due to
project. Proposed project has a potential for employment of skilled, semiskilled and unskilled employees
during construction phase as well as operational phase.
Proposed project of M/s. Beekaylon Synthetics Pvt. Ltd. is a new manufacturing unit which will be engaged in
manufacturing of Manmade Fiber other than Rayon and allied products like Polyester granule & fabrics. The
proposed project will be within the Industrial zone at Velugam of UT of D&NH. The proposed project site is
well linked with national highway and is situated in the area of Industrial zone having all required
infrastructures. Therefore infrastructural development because of proposed project will not be major, but
considerable improvement in public infrastructure due to CSR is anticipated.
8.2. EMPLOYMENT POTENTIAL
The employment opportunity of the project is envisaged to be higher for both skilled and unskilled person as
well as direct & indirect employment from nearby area. Direct employment as well as indirect employment
due to ancillary services will be given to the local people and thereby the socio-economic status of the local
people will be improved. The proposed peak manpower requirement during construction and
commissioning would be around 200 persons. Besides, for operation of the proposed project about 1353 will
be employed from local area which will be beneficial to employment structure of local area as maximum
recruitments will be done from local area.
Further, the indirect employment via contractual works, transportation activities & local economic activities
like food stall and other shops will also add in the employment potential of the proposed project. Thus the
potential of employment will be considerably beneficial to the local people.
8.3. OTHER TANGIBLE & INTANGIBLE BENEFITS
As mentioned earlier sections, the proposed project is to be setup for production of synthetic filament yarns
which are the materials of good market potentials. These products of company will have winning
competition with other producer or open market supply. Considering this, company can have good share in
state’s & country’s economic status. Also the development of industrial unit in the vacant plot of a Notified
industrial zone of D&NH will significantly beneficial to the local industrial development.
Recruitment of from the local area will have the economic growth of more than 1500 families of local area
and hence economic growth of the area in terms of consumption of goods and market-growth are expected
outcome of employment potential the project.
The general social development of the area, at least in restricted sense of the term-CSR, is expected due to
the improvement in infrastructure and public facilities. This will have impact on the current literacy level,
primary and middle level education and on exiting health facilities. A new awareness generated will have
positive impact on the social pattern, which at this stage, is caste and community oriented. The long-term
implications of this change are definitely progressive.
Moreover these, important benefits to the ecological quality of the region would occur due to the
plantation, awareness programs for wild life protection & forest conservation as well as financial aid for
institutional activities for wildlife protection & development of nearby wild life sanctuary. Proponent has
planned to step ahead for these activities in consultation with local forest department, community and non-
profit organisation working on wild life protection and forest development & conservation
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-09: Environmental Cost Benefit Analysis (QCI-NABET Accredited) 9-1
CHAPTER: 09 ENVIRONMENTAL COST BENEFIT ANALYSIS
9.1. Environmental Cost Benefit Analysis
As per EIA Notification 2006, this Chapter of the ‘Environmental Cost Benefit Analysis’ is applicable only if it
is recommended at the Scoping stage.
As per the ToRs awarded by MoEF, New Delhi vide TOR Letter No. IA-J-11011/493/2017-IA II (I) dated
16/11/2017 for the proposed project; the Environmental Cost Benefit Analysis is not applicable and hence
has not been prepared.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-1
CHAPTER: 10 ENVIRONMENTAL MANAGEMENT PLAN
10.1. GENERAL
M/s. Beekaylon Synthetics Pvt. Ltd., Velugam has proposed to setup a new manufacturing unit for
manufacturing of synthetic manmade fibres & Polyester granules through continuous polymerisation of MEG
& PTA and knitting & weaving for fabric production. The proposed project involves the production of
Polyester POY/FDY/Staple Fibres & Granules @ 432000 TPA, various types of Synthetic Filament Yarn @
378000 TPA and various other types of manmade fibres like Texturized Yarn/Twisted Yarn/Acrylic Yarn
/Covered Yarn/Spandex Yarn etc. @288000TPA. The proposed product line also includes Winding of
Yarn/Heat Setting of Yarn/Circular Knitting/Warping / Warp Knitting/Weaving Fabrics/Carpet Weaving/
Narrow Fabrics @ 36000 TPA and Colour Master Batch Chips / granules @ 9000 TPA.The proposed project
being manufacturing of “Manmade fiber Synthetic Filament yarn“ falls under Category-B (Considered at
central level due to applicability of GC). In line with the provisions of SO 1533, company has conducted the
EIA study through the NABET accredited consultant –Unistar Environment & Research Labs Pvt. Ltd., Vapi
with respect to the awarded TOR as described in earlier chapter.
A detailed impacts identification, prediction and assessment study has been conducted as described in
earlier chapter - 4. The EIA team cited some necessary mitigation measures for the major impacts identified
for proposed project. Considering those mitigation measures and requirements to prevent &/or
control/minimize the probable major impacts, the present Environmental Management Plan for the
proposed project has been prepared as a part of the EIA report as per the requirement cited in EIA
Notification-SO 1533 (as amended timely). The detailed descriptions of the formulated EMP, as finalized by
the FAEs under guidance of EIA coordinator have been presented in the present chapter under subsequent
section with respective heading.
10.1.1. Environmental Policy:
M/s. Beekaylon Synthetics Pvt. Ltd. (BSPL) is committed to protect & conserve environment by preventing
environmental impact of its activities.
The key points of its strategy to achieve this are:
BSPL will always prefer to adopt recovery, recycling & reuse of resources including chemicals and
water
BSPL is committed to reduce the wastes by evaluating operations and ensuring they are as efficient
as possible.
BSPL will always conform to relevant environmental legislations & standards and prepare &
implement the environmental management system to report any non-conformity, violation &
infringement.
BSPL will measure its impact on the environment through regular environmental monitoring
program and set targets for ongoing improvement.
BSPL will always ensure to report its non-conformity, environmental performance to the
stakeholders and concern authority/party
BSPL will implement a training program for its staff to raise awareness of environmental issues and
enlist their support in improving the Company's performance.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-2
10.1.2. OBJECTIVE:
Primary objectives of this EMP are to provide an environmental management manual for use by
management & staff involved in the operations of the company and to provide information to regulatory
authorities regarding the environmental management practices that will be implemented throughout the life
of the project. The EMP has following secondary objectives:
To describe mitigation measures that will be applied during all the phases of the project;
To identify the policies and principles that are to be put in to the place to ensure that the proposed
mitigation measures are effectively implemented including managerial arrangement that will be applied in
the event that the mitigation measures prove ineffective or unforeseen environmental impacts arise;
To describe the environmental monitoring programs that will be implemented to verify and manage
predicted effects, confirm performance of mitigation measures and improve environmental protection
strategies of company to describe resources that will be made available to implement the recommendation
of the EIA including staffing and training requirements to describe the arrangement that will be put in place
for consultation & participation of interested & affected parties during project operations.
10.1.3. PURPOSE
The present EMP provides and outline of the EMP, as well as brief description of the project and summary of
the applicable regulations. The purpose of this document is to describe the structure of the EMP and to
provide a guideline for completing it as the project progresses. Also, the purpose of this EMP is to provide
necessary documented procedures for requirements cited for necessary legal/Statutory
clearances/Consents/Licensing/Permission especially Environmental Clearance as per Environmental
Protection Act & EIA Notification-SO 1533 (as amended timely) and CC&A under Air & Water Acts (As
amended time to time). The EMP is intended to be a working document during the tenures of various
operations of the project and as such will require periodic review and update.
10.1.4. SCOPE
The present EMP is prepared for only the impacts identified during the present EIA study and it does not
cover EMP for the unforeseen impacts. It covers mainly aspects that are relevant for the major impacts
causing activities of operation phase as identified in the earlier chapter-4. The present EMP covers the
detailed EMP for construction phase as no major considerable impacts has been identified for the project
construction phase. However, generic action plan for environmental protection during construction phase
has been outlined to provide guideline to the proponent for environmental protection during the phase. The
EMP is a subordinate document to the present EIA report. The present EMP is valid for the one year of
operation of the proposed project after that necessary review &updating in the present EMP will be required
to address unforeseen impacts and non-conformities.
10.2. BUDGETARY PROVISION FOR ENVIRONMENT MANAGEMENT SYSTEM
The company has made capital provision of Rs. 1000 Lakhs for the environment management system.
Company has also made provision of recurring cost @166 Lakhs /Annum for EMS. The details of these
budgetary provisions are presented below.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-3
Table No. 10.1 Budgetary Provision for EMS
Sr.
No.
Particulars Proposed
Amount
(In Lakhs)
Capital Cost
1 Air Pollution Control & Noise pollution control 225.00
2 Water & Wastewater Management 564.00
3 Solid /Hazardous Waste Management 31.00
4 Greenbelt & Ecological Conservation & Protection 30.00
5 Occupational Health & Safety 150.00
TOTAL 1000.00
Recurring Cost
1 Water and Wastewater Management 48.30
2 Air Pollution and Noise Control 7.60
3 Solid/Hazardous Waste Management 1.85
4 Occupational Health & Safety 5.75
5 Greenbelt, soil & Ecological Conservation & Protection 2.50
6 CSR 100.00
TOTAL 166.00
10.3. ENVIRONMENTAL MANAGEMENT CELL
The company has already formulated the environment management cell with vision to improve the
efficiency of environmental actions and to operate the planned EMP requirements as suggested in the
present chapter. Environmental Management Cell has been formed for efficient & easy operation of
environment management system & operations thereof. The illustrative presentation of the suggestive EMC
is presented below in Fig- 10.1.
As indicated in organogram, the Managing Director of the company will lead the EMS as head of the
Environmental Management Cell. Managing Director will be assisted by Plant In-charge for day to day
activities of EMC. Plant In-charge will guide the subordinate staff members- Environment & safety Manager,
Medical Officer & PRO/ Welfare officer for necessary action plan & activities of environmental management
plan. PRO will look after the issues related with government offices, public and other stakeholders for
necessary operation including statutory proceedings. Environment & safety officer will look after the
technical operations including environmental monitoring and efficient operations & maintenance of
pollution control equipment/machineries and safety related matters etc. The Lab in charge will look after the
operations of in-house monitoring & analysis of environmental samples. Approved environmental
laboratory/consultant will also be appointed for the operations related with third party environmental
monitoring, environmental audit (as & when required) and other techno-legal environmental services. The
Operators will look after the plant level operations including ETP operation, APCD Operation, Process and
Utility operations to ensure that all instructions & action plans issued by superior authorities are efficiently
followed & implemented to prevent environmental pollution & operational hazards. Primarily the
Environment & safety manager will be responsible for all technical non-conformities of EMS and he/she is
responsible to prepare necessary documents & report for day to day compliance to stipulated EC/ NOC/
CC&A Conditions as well as other statutory & voluntary requirements.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-4
All necessary standard operating procedures for technical matters of EMP will be prepared by Environment
& Safety Manager whereas the standard operating procedures administrative operation will be prepared by
PRO. The standard operating procedures will be prepared well before the inception of operation phase of
the project and the Plant In-charge will check these SOPs. After necessary corrections, Plant In-charge will
forward these SOP to the Managing Director for approval and approved SOP will be controlled by
responsible personnel. The approved copy of these SOP will be issued to concerned personnel for day to day
operations.
Up on citation of any non-conformities/non-compliance in EMP and related operations, Environment &
safety Manager/PRO will immediately report to the Plant In-charge with necessary report/document. The
Plant In-charge then will call up a meeting on urgent basis and will issue an action plan to close the non-
compliance/non-conformity. If the issue of non-conformities/non-compliance is cited to be serious or major,
Plant In-charge will consult Managing Director of the company and according to the instruction of the
Managing Director, further action plan will be issued by Plant In-charge to all members of EMC. The
environment & safety manager /PRO by help of other personnel of EMC and company will start operation to
resolve the issue of non-conformities/non-compliance and he/she will regularly update the Plant In-charge
for the current status. Similarly Plant In-charge will give instruction to PRO for necessary actions required to
be initiated at administrative level including necessary proceeding with other organization, govt. offices &
public etc. All official declaration about the non-conformities will be made by the Managing Director. Such
declaration can also be made by Plant In-charge after authorization by the Managing Director. Whenever
required information or report of non-conformities will be submitted or issued to govt. offices or public by
PRO in line with the necessary instructions given by Plant In-charge.
Figure: 10.1: Environment & Safety Management Cell
Responsibility of ESMC Members
Managing Director:
Overall responsibility for environmental & safety performance of the Company as well as for EMP &
safety Plan implementation
Decision-maker on applicable policies & legal requirements to the Company
Managing Director
Plant In-charge
Approved Consultant,
Lab & Auditor
Helpers
Operators
Helpers
Chemist
Environment& Safety Manager Medical Officer Welfare Officer
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-5
Review reports of the Independent Environmental Monitoring Consultant
Approves changes to the EMP & safety Plan, as necessary, as part of an adaptive approach to
environmental & safety management of the Company
Approval of financial budget for EMP & Safety Plan
Ensures all resources including human resources, mechanical facilities, Plants & technologies etc.
required for environment & safety are made available
Responsible for working & communicating with stakeholders
Plant In-charge:
Develop an environmental unit, headed by the Manager Production to implement EMP & Safety Plan
Check the EMP & Safety Plan Prepared by Environment & Safety Manager
Management, implementation, monitoring and compliance of the EMP & Safety Plan and conditions
of all legal clearances including compliance with applicable legislative act & rules etc.
Supervision & performance monitoring of all staff, contractors and subcontractors
Review of EMP & safety Plan performance and implementation of correction actions, or stop work
procedures, in the event of breaches of EMP & safety Plan conditions, that may lead to serious
impacts on local communities, or affect the reputation of the project
Ensures all resources including human resources, mechanical facilities, Plants & technologies etc.
required for environment & safety are made available
Ensuring timely action for necessary maintenance of resources (like safety & emergency equipment,
machineries, equipment, technologies, plant etc.) required for EMP & safety performance as part of
an overall commitment to continuous improvement
Checking of draft financial budget for EMP & Safety Plan and submitting final budget for EMP &
Safety plan to Managing Director
Ensure effective communication and dissemination of the content and requirements of the EMP &
safety Plan to staff, contractors and subcontractors
Assisting the Staff & contractor with implementation of EMP & safety Plan and sub-plans
Monitoring of Environmental & safety performance
Ensure safety at all stages of works with special emphasis on high hazard areas
Report environmental & safety performance of the company directly to Managing Director& concern
authorities
Prepare environmental & safety reports summarizing project activities and representing the project
at different meetings as required
Ensuring effective community liaison and fulfilling commitments to facilitate public consultation
throughout the project cycle
Environment & Safety Manager
Preparation and implementation of the Environmental Management Plan & Procedures
Preparation and implementation of the Safety Plan & Procedures
Preparation and implementation of the Environmental Monitoring Plan, Procedures & Schedule
Supervision of staff & contractor performance of implementation of the Environment Management
Plan & Safety Plan
Reporting any incidents or non-compliance with the EMP & Safety to the Plant In-charge
Ensuring adequate training and education of all staff & contractors involved in project operations
Ensures all resources including human resources, mechanical facilities, Plants & technologies etc.
required for environment & safety are functioning efficiently
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-6
Ensure that all personnel and subcontractors are informed of the intent of the EMP and are made
aware of the required measures for environmental compliance and performance
Making recommendations to the Plant In-charge regarding EMP & safety performance as part of an
overall commitment to continuous improvement
Informing the Plant In-charge regarding necessary requirements & maintenance of resources (like
safety & emergency equipment, machineries, equipment, technologies, plant etc.) required for EMP
& safety performance
Preparation of draft financial budget for EMP & Safety Plan
Arrange human resources as directed by Plant In-charge for implementation of EMP & safety Plan
Inform Plant In-charge about any issue of non-compliance and obstructed performance in EMP &
safety observed in administrative actions
Perform various tasks like Public relations, liaison and communications as directed by Plant In-
charge.
Assist other team members to prepare records and data as required for assessment of EMP & safety
performance
Chemist
Implementation of the Environmental Monitoring Plan & schedule for various required monitoring
works as directed by Environment & safety Manager
Guiding concern authority for environmental compliance in line with the obtained environmental
monitoring reports/results.
Prepare and maintain records and all required reporting data for submission to the Environment &
safety Manager
During work, maintain safety at all stages of work with special emphasis on high hazard areas
Informing the Environment & Safety Manager regarding requirement of resources (like chemicals,
tools, equipment, instruments, machineries, etc.) required for EMP & safety performance
Operator
Implementation of the Environmental Management Plan & procedures for Plant Operations (ETP &
APCD) as directed by Environment Manager
Ensure that all personnel and subcontractors working under or with him/her are informed of the
intent of the EMP and are made aware of the required measures for environmental compliance and
performance
Inform Environment Manager about any issue of non-compliance and obstructed performance in
EMP
Prepare and maintain records and all required reporting data for submission to the Environment
Manager
During work, maintain safety at all stages of work with special emphasis on high hazard areas
Informing the Environment & Safety Manager regarding requirement of resources (like chemicals,
tools, equipment, instruments, machineries, etc.) and requirement of necessary maintenance works
required for EMP & safety performance.
Helpers
Implementation of the Environmental Management Plan & procedures for various
operations/activities assigned to them as directed by Environment Manager
Inform operator & Environment Manager about any issue of non-compliance and obstructed
performance in EMP
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-7
Assist superior as required to prepare records and data as required for assessment of EMP & safety
performance
During work, maintain safety at all stages of work with special emphasis on high hazard areas
Medical Officer (Empaneled)
Implementation of the Medical & Health related plans & procedures required for Environmental &
Safety Management as directed by Plant In-charge
Inform Plant In-charge about any issue of non-compliance and obstructed performance in EMP &
safety
Assist other team members to prepare records and data as required for assessment of EMP & safety
performance
During work, maintain safety at all stages of work with special emphasis on high hazard areas
Welfare Officer
Implementation of the plans & procedures required for EMP for Socioeconomic environment
including CSR as directed by Plant In-charge
Inform Plant In-charge about any issue of non-compliance and obstructed performance in EMP for
socioeconomic environment including public safety& CSR
Assist other team members to prepare records and data as required for assessment of EMP &
DMP/EMP
Maintain all necessary documents & records related with socioeconomic environment, CSR as well
as Public safety & conflict related issues at all stages of work with special emphasis on high hazard
areas
Communication of project information as and when required as per direct of plant in-charge.
Contractors
Implementation of the Environmental Management Plan for contract work as directed by
Environment Manager
Prepare and maintain records and all required reporting data as stipulated by the EMP, for
submission to the Environment Manager
Ensure that all personnel and subcontractors working for him/her are informed of the intent of the
EMP and are made aware of the required measures for environmental compliance and performance
Inform Environment Manager about any issue of non-compliance and obstructed performance in
EMP
During work, maintain safety at all stages of work with special emphasis on high hazard areas
Environmental Consultant
Report to Plant In charge & managing Director and other concern party on project compliance with
environmental and commitments in the EMP & EIA and other applicable standards
Prepare various documents & records to meet the requirement of environmental service works
awarded
10.4. ENVIRONMENTAL MANAGEMENT PLAN
10.4.1. AIR QUALITY AND AIR POLLUTION CONTROL
Considered Aspects and Major Impacts
Air quality changes due to emission resulted from Land preparation works, civil works, fabrication
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-8
Air quality changes due to emission resulted from process of CP plant, utilities operations
Transportation, storage & handling of raw materials causing impacts due to fire hazard in terms of toxic
contamination of air quality of the affected area
Toxic contamination due to emissions caused by Major hazards associated with utility operation
EMP for Air Pollution Prevention:
Managing Director& plant In-charge shall ensure that:
o Provision of waste gas collection system and transfer system for combustion in TFHs with
primary fuel has been made prior to inception of commissioning of plant.
o Provision of properly designed PTA & MEG storage area with all necessary safety & emission
prevention measures has been made prior to inception of commissioning of plant.
o All Stacks (with sampling/monitoring port, adequate internal diameter @top and adequate
height) mentioned & recommended in earlier chapter 2 & 4 of the present EIA report has been
provided well during construction phase prior to commissioning of plant to prevention & control
the pollution due to stationary emission during commissioning & operation phase.
o PTA & MEG storage system/area, process gas management system & all stacks are in good
condition throughout the life of the project starting from the commissioning of the production
unit.
o Regular inspection & maintenance/modification of stacks as required are done throughout the
life of the project starting from the commissioning of the production unit.
o Prior to commissioning of plant, properly planned well-ventilated area is designated & provided
for in the factory shed for storage of raw materials and process
o Ventilation facilities in the all storage areas & process area in good condition throughout the life
of the project starting from the commissioning of the production unit.
o Proper & adequate handling facilities & procedures have been provided to prevent
fugitive emission from handling of all materials & wastes of the project.
o Properly formulated & timely updated procedures (including necessary/required SOPs) and
action plan for all pollutant emitting activities & sources for prevention of
pollution/contamination of work place air & ambient air of surrounding area have been
prepared & implemented by Environment & safety Manager.
Managing Director, plant In-charge & environment & safety manager also shall ensure that all other
mitigation measures as mentioned below are implemented and are followed efficiently throughout the
project life starting from commissioning of plant.
o During construction phase, transportation in covered/closed vehicles, dust curtain & barricade
around site of civil works and water sprinkling on bare land in the site.
o Allvehicles, machineries & equipment used during construction are properly tuned and
maintained to minimise emissions to prevent air pollution
o Use of low sulphur FO as fuel with adequate AFR in all boilers & TFHs
o Installation of DG sets confirming applicable statutory norms for emissions & noise
o Waste gas from CP plant is efficiently collected without leak & transferred to TFHs for
combustion @1200 Deg Celsius by injecting the gas on burner flame.
o Transportation, handling & storage of the materials shall be done as per statutory requirements,
HAZMAT and guidelines issued by concerned authorities.
o Regular air quality monitoring is being done as per environment monitoring program presented
in earlier chapter.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-9
o The trucks/vehicles used for the transportation of materials shall be approved by concerned
authority and the driver shall be well trained to overcome the safety issues occur during the
transportation. All necessary safety & emergency equipment must be provided in vehicles.
The supervision by Environment & Safety Manager shall be done on daily basis throughout the life of
the project starting from the commissioning of the production unit. Environment & safety Manager
shall regularly supervise:
o The efficacy of the implemented mitigation measures including installed air pollution control
devices
o The functioning of all concerned employees and contractor to ensure that the EMP, Procedures
& SOPs are implemented properly to efficiently prevent air pollution issues
Contractors & other staff engaged in the operations works shall ensure that:
o All procedures, plans and guidelines provided to them by Environment & Safety Manager are
followed for prevention of air contamination/pollution within the premises and in surrounding
area.
o All air pollution control devices and other air pollution prevention measures provided are
functioning well during the operation works.
Environment & safety Manager shall regularly prepare necessary records/documents related with the
planned & implemented mitigation & EMP including the record of performance of APCD to enable
superior to review the performance. The following are minimal documents record requirements:
o SOPs for:
Storage & Handling of Materials
Operation & Maintenance of Stacks
Utility Operation & Minimisation of Utility Emission
Hazardous/Solid waste Collection, Handling & Storage
o Register for:
Supervision Schedule & Observation
Operation Time of Utilities & APCD
Power & Resources Used for APCD
Attendance register for employee engaged with APCDs
Non-Conformity Register with Root Cause Analysis & Details of Action Taken
APCDs & Stack Maintenance Log
o Other Documents for:
Compliance status for Legal Requirement
Detailed report for Non-conformity & Action Required (for reporting to Superior)
Daily Performance report for APCDs & other Mitigation Implemented (for reporting to
Superior)
Training Documents & Register
Managing Director, plant In-charge & environment & safety manager shall also ensure that all
Administrative actions & measures as mentioned in the later section are implemented and are followed
efficiently throughout the project life starting from commissioning of plant.
Resources
Structural: Waste gas (process emission) collection & transfer system for combustion with Fuel in TFHs,
Stacks attached to all utilities with sampling port with adequate height & internal dia. at top (as per
statutory requirement), Properly Designed Storage area for PTA with all necessary safety measures,
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-10
Properly Designed well ventilated Storage & process area, Efficient Ventilation Facility, Air quality &
Emission Monitoring equipment/instruments as required
Other: Adequate Human Resource, uninterrupted power supply to all APCD, chemicals & all required
requisites for analytical works for sampling & monitoring of Air & Emissions
Performance Monitoring Measures
Managing Director, plant In-charge & environment & safety manager shall ensure that monitoring of
ambient air quality, work place air quality and all emissions (Particulate matters, SO2& NOX, CO, VOC)
are done on regular basis as per the monitoring schedule mentioned in earlier chapter.
Chemist/External Approved Lab shall perform assessment of Ambient Air, workplace Air & Emissions
from DG sets &boilers.
All results of the monitoring carried out for the project shall be reviewed by Environment & Safety
Manager & Plant Incharge on regular basis.
Budgetary Provision
The estimated budgetary provision for initial time of operation phase as prepared by the EIA team is
presented below which shall be revised as per above mentioned system after six month from
commissioning.
o Capital Cost for Structural Measures for air pollution prevention & Control:
A. Stacks for utilities: Rs.75.00Lacs
B. Waste gas collection & transfer system for CP: Covered in capital cost of project
C. PTA & MEG storage: Covered in capital cost of project
o Recurring Cost for Non-Structural Measures for air pollution prevention & Control:
A. Maintenance of Waste Gas Collection & Transfer and Stacks: Rs.5.0Lacs per annum
B. Emission, Ambient Air & Workplace Monitoring: Rs.2.00 Lacs per annum
10.4.2. WATER POLLUTION PREVENTION & CONTROL
Considered Aspects and Major Impacts
Water quality changes due to contamination resulted from process & domestic wastewater generation
& disposal
Water quality changes due to contamination resulted from hazardous waste management
Water quality changes due to contamination resulted from hazards associated with project
EMP for Operation Phase
Managing Director& plant In-charge shall ensure that
o Prior to commissioning of plant, ETP (300KLD) as well as Wastewater collection pipelines and
related arrangements in process & utility areas as well as material storage area as mentioned &
recommended in earlier chapter 2 & 4 of the present EIA report has been provided well during
construction phase prior to commissioning of plant to prevention & control the water pollution
due to wastewater generated during the commissioning & operation phase of the project.
o Prior to commissioning of plant, STP (80 KLD) as well as sewage collection pipelines and related
arrangements in domestic activity areas as mentioned & recommended in earlier chapter 2 & 4
of the present EIA report has been provided well during construction phase prior to
commissioning of plant to prevention & control the water pollution due to sewage generated
during the commissioning & operation phase of the project.
o Prior to commissioning of plant, all storage areas, process areas and areas are provided with
impervious lining and wastewater /runoff collection line connected with collection tank of ETP or
emergency storage tank.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-11
o Prior to commissioning of plant, industrial waste storage areas are provided with impervious
lining and leachate collection line connected with collection tank of ETP as per the guidelines of
MoEF/CPCB/GPCB.
o Prior to commissioning of plant, all necessary resources as mentioned in later section for
efficient operation &functioning of ETP and STP have been provided to ensure proper treatment
of wastewater generated from the operations of the proposedproject.
o ETP, STP and allied facilities including pipeline, equipment & machineries are in good working
condition throughout the life of the project starting from the commissioning of the production
unit.
o Properly formulated procedures (including necessary/required SOPs) and action plan for all
wastewater generation activities & sources for prevention of water pollution have been
prepared & implemented by Environment & safety Manager before commissioning of plant.
Managing Director, plant In-charge & environment & safety manager shall also ensure that all other
mitigation measures as mentioned below are implemented and are followed efficiently throughout the
project life.
o 100 % reuse of the treated industrial wastewater for cooling tower makeup and 100% reuse of
treated sewage for irrigation of greenbelt have been done throughout the project life
o Reduce wastage by preventing leak/spill from pipes, taps/valves etc.
o Regular recording of water consumption using flow meter
o Regular inspection, control & necessary maintenance for reduction of water loss
o Reduction of wastewater generation rate by minimal use of water for various industrial activities
and by prevention of leakage from tap/valve and pipeline.
o Continuous attempts to reduce pollutant load in effluent
o Provision shall be made for alternative treatment option for effluent generated clean-up
operation undertaken during emergency/major disaster.
o Maintaining records of water consumption, wastewater generation & reuse and raw (intake)
water as well as treated &untreated wastewater characteristics.
o Maintenance of good housekeeping to avoid contamination of storm water.
The supervision shall be done by Environment & safety Manager on daily basis throughout the life of
the project starting from the commissioning of the production unit. Environment & safety Manager
shall regularly supervise:
o The efficacy & Adequacy of the ETP and STP as well as all other implemented mitigation
measures including reduction of wastewater from operations.
o The functioning of all concern employees and contractor to ensure that the EMP, Procedures &
SOPs for water pollution prevention are implemented properly to efficiently prevent water
pollution issues.
Contractors & other staff engaged in the operations works shall ensure that:
o All procedures, plans and guidelines provided to them by Environment & Safety Manager are
followed for prevention of water pollution.
o ETP, STP& all other water pollution prevention/ control measures provided are functioning well
during the operation works.
Environment & safety Manager shall regularly prepare necessary records/documents related with the
planned & implemented mitigation & EMP including the record of performance of ETP, STP& other
mitigation measures implemented for prevention of water pollution to enable superior to review the
performance. The following are minimal documents record requirements:
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-12
o SOPs for:
Storage & Handling of Materials with precautions for prevention of spill/leak
Operation & Maintenance of ETP and STP
Process Operation & Minimisation of Wastewater generation
Solid waste Collection, Handling & Storage
o Register for:
Supervision Schedule & Observations
Operation Time of ETP and STP
Power & Resources Used for ETP and STP
Attendance register for employee engaged with ETP and STP
Analytical Results of water, Treated & untreated wastewater
Non-Conformity Register with Root Cause Analysis & Details of Action Taken
Maintenance Log for ETP, STP, wastewater pipeline & allied facility
o Other Documents for:
Compliance status for Legal Requirement
Detailed report for Non-conformity & Action Required (for reporting to Superior)
Daily Performance report for ETP, STP& other Mitigation Implemented (for reporting to
Superior)
Training Documents & Register
Managing Director, plant In-charge & environment & safety manager shall also ensure that all
Administrative actions & measures as mentioned in the later section are implemented and are followed
efficiently throughout the project life starting from commissioning of plant.
Resources
Structural: Effluent Treatment Plant (300 KLD); Sewage Treatment Plant (80 KLD); Leak proof Pipelines
connected with ETP for wastewater & contaminated stream collection from storage area, process area,
utility area and washing area as well as leachate collection from hazardous /soil waste storage area;
Proper sanitation facility including septic tank & soak pit; Leak proof Pipelines connected with STP with
septic tank for wastewater collection from domestic activity area; Impervious lining in Storage area,
process area, hazardous/solid waste storage area and other area having potential of hazardous material
handling; power supply for ETP & STP and allied equipment/machineries, Meters for wastewater flow
measurement
Other: Adequate Human Resource, uninterrupted power supply to all component of ETP& STP,
chemicals & all required requisites for analytical works for monitoring
Performance Monitoring Measures
Managing Director, plant In-charge & environment & safety manager shall ensure that monitoring of
water, sewage& wastewater quality (Minimum for pH, TDS, BOD, COD, Phenol, Ammonia & Oil &
Grease) are done on regular basis as per the monitoring schedule mentioned in earlier chapter.
Chemist/External Approved Lab shall perform daily assessment of quality of raw water, untreated
wastewater, quality of wastewater at different level of ETP and STP
All results of the monitoring carried out for the project shall be reviewed by Environment & Safety
Manager & Plant Incharge on regular basis.
Budgetary Provision
The estimated budgetary provision for initial time of operation phase as prepared by the EIA team is
presented below which shall be revised as per above mentioned system after six month from
commissioning.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-13
o Capital Cost for Structural Measures for Water pollution prevention & Control:
A. STP and ETP : Rs.525.00Lacs
B. Pipelines & power unit etc.: Rs.24.00 Lacs
o Recurring Cost for Non-Structural Measures for Water pollution prevention & Control:
A. Operation &Maintenance of ETP& STP: Rs.47.30 Lacs per annum
B. Monitoring: Rs.0.25Lacs per annum
10.4.3. HYDROLOGY, GROUNDWATER & WATER CONSERVATION
Considered Aspects and Major Impacts
Water quality changes due to contamination of subsoil/groundwater disposal of poorly/untreated
wastewater (effluent & sewage) as well as accidental spillage/leakage of toxic materials and leachate of
hazardous/solid wastes of the project
Uncontrolled toxic runoff generated due to emergency actions during major hazard associated with
hazardous material resulting in increase in contamination of subsoil/groundwater resources
EMP for Groundwater Pollution Prevention & Water Conservation
Managing Director& plant In-charge shall ensure that
o All mitigation measures and EMP suggested for prevention of water pollution are implemented.
o The treated wastewater pipeline for reuse for Gardening & utility operation.
o Prior to commissioning of plant, all storage areas, process areas as well as hazardous waste
storage area are provided with impervious floor to prevention percolation & seepage of toxic
material & leachate from hazardous/solid waste storage.
Managing Director, plant In-charge & environment & safety manager shall also ensure that all other
mitigation measures as mentioned below are implemented and are followed efficiently throughout the
project life.
o Reduction of ground water withdrawal by 100% reuse of treated sewage for irrigation and industrial wastewater for cooling tower makeup
o Regular recording of water consumption using flow meter
o Regular inspection, control & necessary maintenance for reduction of evaporation loss from
cooling system
o Maintenance of higher COC (preferably >8) for cooling tower to reduce the blow down& makeup
water consumption
o Reduction of wastewater generation & wastage rate by optimum use of water and prevention of
leakage from tap/valve &pipeline.
o Rainwater harvesting as per “Rainwater Harvesting Plan” for use to meet water requirements of
project
Environment & safety Manager shall regularly prepare necessary records/documents related with the
planned & implemented mitigation & EMP including the record of performance of mitigation measures
implemented for prevention of Groundwater pollution to enable superior to review the performance.
The following are minimal documents record requirements:
o SOPs for:
Storage & Handling of Materials with precautions for prevention of spill/leak on bare
land
o Register for:
Supervision Schedule & Observations
Analytical Results of Surface water
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-14
Non-Conformity Register with Root Cause Analysis & Details of Action Taken
All other registers as mentioned in water /soil pollution prevention section
o Other Documents for:
Compliance status for Legal Requirement
Detailed report for Non-conformity & Action Required (for reporting to Superior)
Daily Performance report for Mitigation Implemented (for reporting to Superior)
Training Documents & Register
Environment & safety Manager shall regularly supervise:
o The efficacy & Adequacy of the all mitigation measures implemented.
o The functioning of all concern employees and contractor to ensure that the EMP, Procedures &
SOPs for water pollution prevention are implemented properly to efficiently prevent water
pollution issues.
Contractors & other staff engaged in the operations works shall ensure that:
o All procedures, plans and guidelines provided to them by Environment & Safety Manager are
followed for prevention of water pollution.
o Ground water pollution prevention/ control measures provided are functioning well during the
operation works.
Managing Director, plant In-charge & environment & safety manager shall also ensure that all
Administrative actions & measures as mentioned in the later section are implemented and are followed
efficiently throughout the project life starting from commissioning of plant.
Resources
Structural: All equipment/machineries/technologies/plant/ facilities suggested in section of water &
soil pollution prevention, Impervious lining in Storage, process & hazardous/solid waste storage area;
Meters for intake Water & wastewater flow measurement, Rainwater harvesting system with water
storage tank & necessary pipelines
Other: Adequate Human Resource, chemicals & all required requisites for analytical works for
monitoring
Performance Monitoring Measures
Managing Director, plant In-charge & environment & safety manager shall ensure that monitoring of
surface water quality (Minimum for pH, TDS, BOD, COD, Phenol, Ammonia & Oil & Grease) are done on
regular basis as per the monitoring schedule mentioned in earlier chapter.
Chemist/External Approved Lab shall perform regular assessment of quality of surface water and other
analysis as mentioned in Water & Soil pollution Prevention section.
All results of the monitoring carried out for the project shall be reviewed by Environment & Safety
Manager & Plant Incharge on regular basis.
Budgetary Provision
The estimated budgetary provision for initial time of operation phase as prepared by the EIA team for
water & Soil pollution prevention covers the major financial requirement for Prevention of
groundwater pollution. Hence, no separate budget is required for Prevention of groundwater pollution
at present. In addition to these, the estimated budgetary provision for initial time of operation phase as
prepared by the EIA team for water conservation by rain water harvesting & groundwater monitoring is
presented below which shall be revised as per above mentioned system after six month from
commissioning.
o Capital Cost for Structural Measures for Water conservation:
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-15
A. Rainwater Harvesting System with recharge facility: Rs. 15.00 Lacs
B. Water Storage Tank & Pipelines: Covered in capital cost of project
o Recurring Cost for Non-Structural Measures for water conservation:
A. Maintenance of Rainwater Harvesting System: Rs.0.50 lacs per annum
B. Groundwater Monitoring: Rs.0.25 per annum
10.4.4. LAND USE
There is no considerable impact on landuse due to the construction & operations of the proposed project.
Hence, detailed EMP is not required. However, implementation of following generic actions shall be ensured
by Managing Director, plant In-charge & environment & safety manager
Greenbelt Development, maintenance & protection as per greenbelt development plan suggested
Dust emission Prevention & minimization measures as suggested in Air Pollution Prevention section.
10.4.5. SOIL CONSERVATON
Considered Aspects and Major Impacts
Soil quality changes due to settling of particulates emitted from project and disposal/accidental
spillage/leakage of untreated /poorly wastewater(Industrial & Domestic) as well as leachate of
hazardous/solid wastes of the project
Soil quality changes due to spillage/leakage of raw materials & process liquors of the project
Uncontrolled runoff generated due to emergency actions during major hazard associated with hazardous
material resulting in increase in contamination of soil of area affected by the hazard
EMP for Soil Conservation
Managing Director& plant In-charge shall ensure that
o All structural measures suggested for Water & Air Pollution Prevention in earlier sections has
been provided well during construction phase prior to commissioning of plant to prevent soil
pollution during the commissioning & operation phase of the project.
o Impervious Lining of all storage areas, hazardous & solid industrial waste storage areas, process
areas with provision of wastewater /runoff collection line connected with ETP are provided Prior
to commissioning of plant.
o Prior to commissioning of plant, all necessary resources as mentioned in later section have been
provided.
o All necessary mitigation measures including the impervious lining in all planned area are in good
working condition throughout the life of the project starting from the commissioning of the
production unit.
o Before commissioning of plant, properly formulated procedures (including necessary/required
SOPs) and action plan for various operation of concern for prevention of soil pollution have been
prepared & implemented by Environment & safety Manager.
Managing Director, plant In-charge & environment & safety manager shall also ensure that all other
mitigation measures as mentioned below are implemented and are followed efficiently throughout the
project life.
o During construction phase, all necessary actions shall be taken for minimisation of waste
generation, reuse of construction waste in suitable construction works, proper sanitation with
septic tank & soak pit, proper storage facilities for construction wastes and use of unused
earthen materials for landscaping within premises.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-16
o During construction phase, necessary provision shall be taken for closed storage area for
construction materials like Cement and stabilisation of stock piles of excavated earthen
materials, soil & sand etc.
o Emergency Response protocol shall be prepared for all chemical material & shall be available at
all places having potential of chemical spill/leakage.
o Any accidents or leakage & chemical material Emergency shall be first reported of incident of
spill/leak of actions shall be taken by responsible personnel as per guidelines provided in specific
Emergency Response Protocol for spilled/leaked chemical.
o No untreated/poorly treated wastewater disposal takes place throughout the project life.
o Reuse of domestic effluent for irrigation only after treatment in STP. o Maintenance of good housekeeping to avoid contamination of Soil.
o Fertilization & Irrigation of Greenbelt & other plantation area.
The supervision shall be done by Environment & safety Manager on daily basis throughout the life of
the project starting from the commissioning of the production unit. Environment & safety Manager
shall regularly supervise:
o The efficacy & Adequacy of the implemented mitigation measures including condition of
impervious lining & spill/leak prevention measures.
o The functioning of all concern employees and contractor to ensure that the EMP, Procedures &
SOPs for Soil pollution prevention are implemented properly.
Contractors & other staff engaged in the operations works shall ensure that:
o All procedures, plans and guidelines provided to them by Environment & Safety Manager are
followed for prevention of Soil pollution.
All Soil pollution prevention/ control measures provided are functioning well during the operation
works. Environment & safety Manager shall regularly prepare necessary records/documents related
with the planned & implemented mitigation & EMP including the record of performance of mitigation
measures implemented for prevention of Soil pollution to enable superior to review the performance.
The following are minimal documents record requirements:
o SOPs for:
Storage & Handling of Materials with precautions for prevention of spill/leak
O&M of ETP & STP
Hazardous waste handling, transfer & storage
Maintenance of Impervious Lining of various areas
Fertilisation & irrigation of Plantation area
o Register for:
Supervision Schedule & Observations
Attendance register for employee engaged with EMP for Soil Conservation
Analytical Results of Soil and Treated Sewage used for irrigation
Time& quantity for Treated sewage used for irrigation
Non-Conformity Register with Root Cause Analysis & Details of Action Taken
Maintenance Log for Impervious Lining of various areas
o Other Documents for:
Compliance status for Legal Requirement
Detailed report for Non-conformity & Action Required (for reporting to Superior)
Daily Performance report for Mitigation Implemented (for reporting to Superior)
Training Documents & Register
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-17
Managing Director, plant In-charge & environment & safety manager shall also ensure that all
Administrative actions & measures as mentioned in the later section are implemented and are followed
efficiently throughout the project life starting from commissioning of plant.
Resources
Structural: All equipment/machineries/technologies/plant/ facilities suggested in section of water
pollution prevention, Impervious lining in Storage, process & hazardous/solid waste storage area;
Storage area for Fertilizer and irrigation utility
Other: Adequate Human Resource, Fertilizer for fertilization of plantation & water for irrigation of
plantation area & all required requisites for analytical works for Soil quality monitoring
Performance Monitoring Measures
Managing Director, plant In-charge & environment & safety manager shall ensure that monitoring of
Soil quality (Minimum for pH, Conductivity, Moisture content, Nutrient Contents and TOC) are done on
regular basis as per the monitoring schedule mentioned in earlier chapter.
Chemist/External Approved Lab shall perform assessment of soil quality on regular basis as directed by
Environment & Safety Manager.
All results of the soil quality monitoring carried out for the project shall be reviewed by Environment &
Safety Manager & Plant In charge on regular basis.
Budgetary Provision
The estimated budgetary provision for initial time of operation phase as prepared by the EIA team is
presented below which shall be revised as per above mentioned system after six month from
commissioning.
o Capital Cost for Structural Measures for Soil Conservation:
A. Impervious Lining in Storage & Process area and Hazardous/solid waste storage area:
Considered in project’s capital cost
B. Plant & other requisites for plantation in premises: Considered in Greenbelt
Development Plan
o Recurring Cost for Non-Structural Measures for water conservation:
A. Irrigation & Fertilization of Plantation area: Considered in Greenbelt Development Plan
B. Soil Quality Monitoring: Rs.0.25Lacs per annum
10.4.6 NOISE & VIBRATION PREVENTION & CONTROL Considered Aspects and Major Impacts
Increased noise & vibration in premises due to spinning, texturizing & weaving work
Increased noise & vibration in premises due to operations of utility, Plant & Equipment/machineries
Increased noise level in area falling in route of transportation
EMP for Noise & Vibration Reduction & Control
Managing Director& plant In-charge shall ensure that
o Prior to commissioning of plant, spinning, weaving & texturizing machineries are installed in the
dedicated sound proof room/area designed for minimization of noise propagation outside the
area.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-18
o Prior to commissioning of plant, Boilers, TFHs &DG Setsare provided with Silencers &/or Acoustic
enclosure and are installed in the dedicated room/area designed for minimization of noise
propagation outside the area.
o Prior to commissioning of plant, all vibrating & rotating machineries/equipment are founded on
sturdy non-vibrating base and fitted with necessary paddings (like rubber pads) at base.
o Prior to commissioning of plant, all high vibrating plant/machineries/equipment are properly
isolated from other plant/machineries/equipment.
o Prior to commissioning of plant, all vibrating & rotating machineries/equipment are checked for
static & dynamic balancing to prevent noise & vibration.
o Prior to commissioning of plant, all necessary high efficiency PPEs have been provided to
employees to protect them from high noise.
o Before commissioning of plant, properly formulated procedures (including necessary/required
SOPs) and action plan for various operation of concern for prevention & control of Noise &
Vibration have been prepared & implemented by Environment & safety Manager.
Managing Director, plant In-charge & environment & safety manager shall also ensure that all other
mitigation measures as mentioned below are implemented and are followed efficiently throughout the
project life.
o During construction phase, restriction on operation of machineries/equipment causing high
noise level during the night time and minimal night time transportation through residential &
forest area.
o During construction phase, management shall ensure regular maintenance of construction
machineries/equipment & vehicles for minimisation of high noise generation and turning off of
idle vehicles, equipment& machineries when not in use.
o High efficiency PPEs for employee working in spinning, weaving & texturizing units are regularly
maintained/replaced to protect them from high noise.
o Provision of silencer/Acoustic enclosure/noise attenuator wherever suitable
o Provision of mufflers & good silencer for vehicle
o Regular maintenance including lubrication and Static & dynamic balancing of rotating
equipment/machineries
o Replacement of rubber paddings of foundation shall be done whenever required as preventive
actions/maintenance
o Dense & adequate greenbelt shall be maintained around the high noise area to provide barrier
o Minimum transportation from residential & eco-sensitive area
o Avoidance of night transportation from residential & eco-sensitive area
The supervision shall be done by Environment & safety Manager on daily basis throughout the life of
the project starting from the commissioning of the production unit. Environment & safety Manager
shall regularly supervise:
o The efficacy & Adequacy of the implemented mitigation measures including condition of
foundation, paddings, acoustic enclosure & silencer etc.
o Noise level increase in any area above 10 dB(A).
o The functioning of all concern employees and contractor to ensure that the EMP, Procedures &
SOPs for prevention & control of Noise & Vibration are implemented properly and all employees
are using necessary PPEs as directed by Superior.
During the whole operation time, Contractors & other staff engaged in the operations works shall
ensure that:
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-19
o All procedures, plans and guidelines provided to them by Environment & Safety Manager are
followed for prevention & control of Noise & vibration.
o All Noise & Vibration prevention/ control measures provided are functioning well during the
operation works.
o All PPEs are being used by them as directed by Environment & Safety Manager
Environment & safety Manager shall regularly prepare necessary records/documents related with the
planned & implemented mitigation & EMP including the record of performance of mitigation measures
implemented for prevention & Control of Noise & Vibration to enable superior to review the
performance. The following are minimal documents record requirements:
o SOPs for:
Operation of Utility, Plant, Machineries & equipment including required actions for
prevention & Control Noise & Vibration
Maintenance of Padding, Foundation, Acoustic enclosures, Silencers etc.
o Register for:
Supervision Schedule & Observations
Analytical Results of Noise & Vibration Monitoring
Non-Conformity Register with Root Cause Analysis & Details of Action Taken
Maintenance Log for Padding, Foundation, Acoustic enclosures, Silencers etc.
o Other Documents for:
Compliance status for Legal Requirement
Detailed report for Non-conformity & Action Required (for reporting to Superior)
Daily Performance report for Mitigation Implemented (for reporting to Superior)
Training Documents & Register
Managing Director, plant In-charge & environment & safety manager shall also ensure that all
Administrative actions & measures as mentioned in the later section are implemented and are followed
efficiently throughout the project life starting from commissioning of plant.
Resources
Structural:Sound proof building for housing of spinning, weaving & texturizing machineries; Rubber
Paddings, Sturdy & Non-vibrating Foundations, Designated Installation area for utilities; Silencers &/or
Acoustic Enclosures for utilities
Other: Adequate Human Resource, High efficiency PPEs, Lubricants & all required requisites for Noise
level monitoring
Performance Monitoring Measures
Managing Director, plant In-charge & environment & safety manager shall ensure that monitoring of
Noise & Vibration Level are done on regular basis as per the monitoring schedule mentioned in earlier
chapter.
Chemist/External Approved Lab shall perform the monitoring on regular basis as directed by
Environment & Safety Manager.
All results of the monitoring carried out for the project shall be reviewed by Environment & Safety
Manager & Plant In-charge on regular basis.
Budgetary Provision
The estimated budgetary provision for initial time of operation phase as prepared by the EIA team is
presented below which shall be revised as per above mentioned system after six month from
commissioning.
o Capital Cost for Structural Measures:
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-20
A. Foundation & Padding: Considered in project’s capital cost
B. Soundproof Process & dedicated Utility building/rooms: 100 Lacs
C. Acoustic Enclosures &/or Silencers etc.: 50 Lacs
o Recurring Cost for Non-Structural Measures for water conservation:
A. Maintenance works for Noise & Vibration reduction: Rs 0.50 lacs per Annum
B. Noise & Vibration Monitoring: Rs. 0.10 lacs per annum
C. PPEs: Included in Cost of Safety & Emergency Equipment
10.4.7 HAZARDOUS WASTE & INDUSTRIAL SOLID WASTE MANAGEMENT
Considered Aspects and Major Impacts
Contamination Air due to volatile losses & Gaseous emission during incident of fire from hazardous &
solid wastes
Contamination Soil & Water due to leachate from hazardous & solid wastes
EMP for Management of Hazardous & Non-Hazardous Wastes
Managing Director & plant In-charge shall ensure that
o Prior to commissioning of plant, dedicated Hazardous & non-hazardous Wastes Storage areas
with leachate collection lines connected with ETP and necessary floor lining as per statutory
requirements are provided within the premises for storage of Hazardous & non-hazardous
Wastes generated from project.
o Prior to commissioning of plant, dedicated Hazardous & non-hazardous Wastes handling system
& facilities as per statutory requirements are provided within the premises for collection,
handling & transfer of Hazardous & non-hazardous Wastes generated from project.
o Prior to commissioning of plant, dedicated Hazardous & non-hazardous Wastes Storage areas
are provided all safety measures like facility for firefighting.
o Prior to commissioning of plant, membership of TSDF Site and arrangement with buyers for sell
of non-hazardous reusable wastes has been done for disposal of Hazardous & non-hazardous
Wastes generated from project.
o During entire project life, the conditions of dedicated Hazardous & non-hazardous Wastes
handling system & facilities as well as storage areas are maintained in good condition to comply
with the applicable statutory requirements to ensure efficient faultless activities of collection,
handling, transfer, storage & disposal of Hazardous & non-hazardous Wastes generated from
project.
o Prior to commissioning of plant & during entire project life, all necessary PPEs have been
provided to employees to protect them from toxic hazards associated with hazardous wastes.
o During entire project life, the safety measures including firefighting system provided for
prevention of hazards in hazards & Non-hazardous wastes storage areas are functioning well.
o Before commissioning of plant, properly formulated procedures (including necessary/required
SOPs) and action plan for various operation of concern for prevention & control of pollution of
air, water & soil due to hazards & Non-hazardous wastes management have been prepared &
implemented by Environment & safety Manager.
Managing Director, plant In-charge & environment & safety manager shall also ensure that all other
mitigation measures as mentioned below are implemented and are followed efficiently throughout the
project life.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-21
o During construction phase, all necessary actions shall be taken for minimization of waste
generation, reuse of construction waste in suitable construction works and use of unused
earthen materials for landscaping within premises.
o All solid & hazardous waste are stored only in designated storage area.
o The solid & hazardous storage area shall be separated for each type of waste for easy
management.
o Proper labeling shall be done on storage area for ready & easy identification of waste stored in
that particular area.
o Proper labeling shall be done on storage containers/bags for ready & easy identification of waste
stored in that storage container/bag.
o The handling & transfer facilities are strictly used to collect, handle & transfer the wastes to
prevent spill/leak during handling & transfer as well as to prevent exposure of employee
engaged in handling & transfer.
o All waste shall be stored in their respective storage area only and shall be disposed off as per
Hazardous waste management rule-2008.
The process residue generated from CP plant shall be sent to common incineration
facility or shall be sold to cement manufacturer for co-processing.
The used oil shall be stored in leak/spill proof container and shall be sold to authorized
recycler.
ETP waste shall be stored in hazardous waste storage area and shall be disposed off
through TSDF Site.
Used drums/barrels/liners shall be stored in the designated hazardous waste storage
area near production/RM storage area. These waste shall be decontaminated and then
sold to authorized recyclers
The hazardous waste generated from clean-up procedure during the incident of
accidental spillage or leakage of chemicals shall be stored along with the ETP waste and
shall be sent to TSDF site.
o Only registered vehicles shall be used for transportation of the hazardous wastes.
o Following Methodology for Decontamination and disposal of containers shall be followed.
All empty drums or bags must be decontaminated to remove any harmful chemicals or
infectious organisms that may have adhered to them.
Empty as much material out of the drum or bags as possible, including easily removable
residues.
Wash/rinse the drum/bags three times with a suitable solvent. If the material is soluble
in water, use water to wash/rinse. If the material is not soluble in water, use a suitable
organic solvent such as acetone for the first two washes and water for the final rinse.
Remove the top of the drum, using a drum de-header if necessary. If the drum contains
a flammable material, it should be evaluated for potential explosive hazards.
Wear safety goggles during the washing/rinsing process. Wear heavy gloves to prevent
crushed fingers and protect against sharp edges. When washing the drum, wear gloves
that are impervious to the solvent.
Label the drum(s)/bags: "these drum/bags have been triple washed/ rinsed." Paint over
or cross through any other markings on the drum.
After Neutralization & decontamination of all empty drums & bags have to sell to
authorized recyclers
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-22
Keep record properly of all empty bags and drums which are decontaminated before
selling to authorized recyclers.
The supervision shall be done by Environment & safety Manager on daily basis throughout the life of
the project starting from the commissioning of the production unit. Environment & safety Manager
shall regularly supervise:
o The efficacy & Adequacy of the implemented mitigation measures including condition of hazards
& Non-hazardous wastes storage areas, condition of hazards & Non-hazardous wastes handling
system and condition of Safety Measures etc.
o The functioning of all concern employees and contractor to ensure that the EMP, Procedures &
SOPs for prevention & control of pollution due to hazards & Non-hazardous wastes management
are implemented properly and all employees are using necessary PPEs as directed by Superior.
During the whole operation time, Contractors & other staff engaged in the operations works shall
ensure that:
o All procedures, plans and guidelines provided to them by Environment & Safety Manager are
followed.
o All mitigation measures provided are functioning well during the operation works.
o All necessary PPEs and other facilities/system provided for hazards & Non-hazardous wastes
management are being used by them as directed by Environment & Safety Manager
Environment & safety Manager shall regularly prepare necessary records/documents related with the
planned & implemented mitigation & EMP including the record of performance of mitigation measures
implemented for hazards & Non-hazardous wastes management to enable superior to review the
performance. The following are minimal documents record requirements:
o SOPs for:
Collection, Handling, Transfer, Storage & Disposal of hazards & Non-hazardous wastes
Maintenance of Generation & Disposal of hazards & Non-hazardous wastes Collection,
Handling, Transfer facilities and storage area
o Register for:
Supervision Schedule & Observations
Generation & Disposal of hazards & Non-hazardous wastes
Analytical Results of Leachate, Soil & Water
Non-Conformity Register with Root Cause Analysis & Details of Action Taken
Maintenance Log storage area and facilities provided for hazards & Non-hazardous
wastes management
o Other Documents for:
Compliance status for Legal Requirement
Detailed report for Non-conformity & Action Required (for reporting to Superior)
Daily Performance report for Mitigation Implemented (for reporting to Superior)
Training Documents & Register
Resources
Structural: dedicated Hazardous & non-hazardous Wastes handling system & facilities, dedicated
Hazardous & non-hazardous Wastes storage areas, Fire Fighting System/facility
Other: Adequate Human Resource, PPEs & all required requisites for analytical works for Soil quality
monitoring
Performance Monitoring Measures
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-23
Managing Director, plant In-charge & environment & safety manager shall ensure that required
monitoring of Soil & Water as well as Leachate are done on regular basis as per the monitoring schedule
mentioned in earlier chapter.
Chemist/External Approved Lab shall perform the monitoring on regular basis as directed by
Environment & Safety Manager.
All results of the monitoring carried out for the project shall be reviewed by Environment & Safety
Manager & Plant Incharge on regular basis.
Budgetary Provision
The estimated budgetary provision for initial time of operation phase as prepared by the EIA team is
presented below which shall be revised as per above mentioned system after six month from
commissioning.
o Capital Cost for Structural Measures:
A. Dedicated Hazardous & non-hazardous Wastes storage area: Rs.30.00 lacs
B. Hazardous & non-hazardous Wastes handling system & facilities: Rs. 1.00 lacs
o Recurring Cost for Non-Structural Measures for water conservation:
A. Maintenance works: Rs. 0.50 lacs per Annum
B. TSDF Membership & Disposal Fees: Rs. 1.10 lacs per Annum
C. Monitoring: Rs. 0.25 lacs per annum
D. PPEs: Included in Cost of Safety & Emergency Equipment
10.4.8 OCCUPATIONAL HEALTHAND SAFETY
Considered Aspects and Major Impacts
Impacts on health & safety are anticipated due to the injury, health effects due to unfavorable work
place conditions and ergonomic issues related with material handling & transportation, manufacturing
process, maintenance works.
Contamination Air due to volatile losses & Gaseous emission during incident of fire from hazardous &
solid wastes
Contamination Soil & Water due to leachate from hazardous & solid wastes
EMP for Occupational Health & Safety
Managing Director& plant In-charge shall ensure that
o During construction phase, construction safety plan is formulated & implemented with all
construction safety equipment & facilities.
o Prior to commissioning of plant following structural measures are provided:
Proper storage is provided for all materials with adequate isolation between two
materials as required for safe storage condition
Prior to commissioning of plant, spinning, weaving & texturizing machineries are
installed in the dedicated sound proof room/area designed for minimization of noise
propagation outside the area.
High efficiency PPEs for employee working in spinning, weaving & texturizing units are
regularly maintained/replaced to protect them from high noise.
Shift planning shall be done with respect to the exposure level of noise at various plant
areas in line with the statutory requirements & provisions related with threshold noise
exposure.
In CP plant, waste gas collection & transfer system for combustion in TFHs is provided to
prevent workplace & ambient air quality.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-24
Provision of Local exhaust in storage area/warehouse & process area
Safety measures like safety guard around rotating part for all rotating
equipment/machineries
Non-slippery Floor of plant & storage.
Emergency Control Room, Fire detection system, Assembly point are provided
All necessary Emergency management equipment & facilities including first aid kit, fire-
fighting facilities as recommended in Risk Assessment Report
Proper ergonomic condition in all areas to ensure safe & non-tiring work place
conditions
Mechanical material handling & transfer facility like Trolley or fork lift etc. for lifting &
shifting of all heavy materials.
Flameproof electrical fittings
Pre-employment health check-up of employee has been done.
o RA study for the proposed project is conducted and all necessary hazard/risk control/prevention
measures are provided/implemented before erection & commissioning of plant and during
entire project life.
o Required Safety plans are prepared & implemented before commissioning & routine operation
of the plant and followed during entire project life by all employees & contractors.
o During entire project life, following mitigation measures are implemented & followed:
Non-slippery Floor of plant & storage and there is no liquid spilled on floor.
The conditions of dedicated material handling system & facilities as well as material
storage areas are maintained in good condition to comply with the applicable statutory
requirements to ensure safety.
All necessary PPEsSafety & emergency equipmentincluding first aid kit have been
provided to employees to protect them from hazards associated with the project
operations & materials.
The safety measures including fire-fighting system provided for prevention of hazards in
storage & production as well as other areas are functioning well and necessary
maintenance & replacement are done regularly as required.
Regular training and awareness programs including basic training for first aid & fire
fighting, environment management, safe work procedures shall be
conducted/organised.
Pre-employment & post-employment health check-up programs shall be organised and
records of employee general health status shall be maintained. Necessary action for
ensuring good health of employee shall be taken timely.
Risk assessment study, Disaster & on-site emergency management plan and EHS policies
shall be made up to date by regular revision as needed in order to minimize risk in case
of emergencies.
o Before commissioning of plant, properly formulated procedures (including necessary/required
SOPs) and action plan for various operation of concern for ensuring safety at all works of project
have been prepared & implemented by Environment & safety Manager.
Managing Director, plant In-charge & environment & safety manager shall also ensure that all other
mitigation measures as mentioned below are implemented and are followed efficiently throughout the
project life.
o Proper ventilation with adequate air change ratio in all areas
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-25
o Proper label and identification board /stickers in the storage area
o Identification label and NFPA diamond code sticker on all chemicals drums & bags and tank area.
o Strict Restriction on Smoking and other spark, flame generating item within the premises
o Periodic On Site Emergency, Mock Drills should be conducted, in order to train the staff and
make them mentally prepared to tackle any emergency.
o Emergency management equipment &facilities including fire extinguishers/hydrant system
should be maintained in a tip top condition round the clock.
o Safety devices and control instruments should be calibrated once in a year.
o Proper colouring as per IS 2379 should be done & maintained in plant for all pipeline network
o Permit to work system should be implemented on 100 % basis for hazardous work to be carried
out in the plant.
o Training should be made compulsory to all new employees about safety measures before
starting duties in plant.
o Only registered vehicles shall be used for transportation of the hazardous wastes.
The supervision shall be done by Environment & safety Manager on daily basis throughout the life of
the project starting from the commissioning of the production unit. Environment & safety Manager
shall regularly supervise:
o The efficacy & Adequacy of the implemented safety & other mitigation measures including
condition of storage areas; condition of process equipment/machineries etc.; material handling
& transfer system and condition of all safety & emergency equipment including fire-fighting
system & PPEs etc.
o The functioning of all concern employees and contractor to ensure that the EMP, Procedures &
SOPs for safety and prevention of hazards in all areas are implemented properly and all
employees are using necessary PPEs as directed by Superior.
During the whole operation time, Contractors & other staff engaged in the operations works shall
ensure that:
o All procedures, plans and guidelines provided to them by Environment & Safety Manager are
followed.
o All mitigation measures provided are functioning well during the operation works.
o All necessary PPEs and other facilities/system provided for safety & emergency management are
being used by them as directed by Environment & Safety Manager
Environment & safety Manager shall regularly prepare necessary records/documents related with the
planned & implemented mitigation & EMP including the record of performance of mitigation measures
implemented for hazards & Non-hazardous wastes management to enable superior to review the
performance. The following are minimal documents record requirements:
o SOPs for:
Handling, Transfer, Storage of materials
Plant Operations including Utility Operations, Equipment/machineries operations etc.
Safe work Practices
Emergency Management
All maintenance works
o Register for:
Supervision Schedule & Observations
Specific Parameters pertaining to the specific Operational Activity
Analytical Results of workplace
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-26
Employee Health Check-up
Non-Conformity Register with Root Cause Analysis & Details of Action Taken
Work Permit for various operations
Logs of all Maintenance to be carried out
o Other Documents for:
Compliance status for Legal Requirement
Detailed report for Non-conformity & Action Required (for reporting to Superior)
Daily Performance report for Mitigation Implemented (for reporting to Superior)
Training Documents & Register
Resources
Structural: Pollution control technologies & facilities as suggested in other sections; dedicated material
storage areas, Fire Fighting System/facility, Safety Devices for Process equipment/machineries/Plants.
Other: Adequate Human Resource, PPEs & Emergency equipment & facilities, First Aid Kits with
necessary medicines & antidotes, all required requisites for analytical works for workplace monitoring
Performance Monitoring Measures
Managing Director, plant In-charge & environment & safety manager shall ensure that required
monitoring of work place conditions as well as employee health are done on regular basis as per the
monitoring schedule mentioned in earlier chapter.
Chemist/External Approved Lab / Appointed Medical Practitioner shall perform the monitoring on
regular basis as directed by Environment & Safety Manager.
All results of the monitoring carried out for the project shall be reviewed by Environment & Safety
Manager & Plant In-charge on regular basis.
Budgetary Provision
The estimated budgetary provision for initial time of operation phase as prepared by the EIA team is
presented below which shall be revised as per above mentioned system after six month from
commissioning.
o Capital Cost for Structural Measures:
A. Dedicated Material storage areas: Included in project’s capital cost
B. Fire Fighting and other safety & emergency facilities: Rs. 150.00 lacs
o Recurring Cost for Non-Structural Measures for water conservation:
A. Maintenance works for Safety equipment & facilities: Rs.4.50 lacs per Annum
B. PPEs: Rs. 1.00 lacs per Annum
C. Monitoring: Rs.0.25 lacs per annum
10.4.9 ECOLOGICAL CONSERVATION & PROTECTION
Considered Aspects and Major Impacts
Impacts on Flora & fauna due to toxic effects of pollutants /hazardous chemicals released in
environment during operations of material handling/ transportation/handling /storage and utility
operations.
Impacts on Flora & fauna due to toxic effects of pollutants /hazardous chemicals released in
environment as well as due to effects of heat released from fire hazards
Secondary impacts of Contamination Air, water, soil & generation of high noise
EMP for Ecological Conservation
Managing Director& plant In-charge shall ensure that
o Prior to commissioning of plant following structural measures are provided:
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-27
Efficient measures for air, water & soil pollution prevention & control to reduce the level
of contaminants in environmental attributes
Efficient measures for prevention & control of noise to reduce the changes in ambient
noise level
Efficient & Adequate hazard prevention & control and safety & emergency control
measures for prevention & control of adverse effects on flora & fauna due to toxic
contaminants and heat radiation generated from fire.
Properly levelled and prepared dedicated area for greenbelt in and around the premises
Area for storage of Sapling, fertilizers & other requisites like Shovel, spade, cutter,
irrigation utensils etc.
o RA study for the proposed project is conducted to determine the extent of possible risk zone
comprising ecologically important area
o Required Safety plans for protection of ecological features especially micro level plantation area
of vicinity are prepared & implemented before commissioning & routine operation of the plant
and followed during entire project life by all employees & contractors.
o During entire project life, following mitigation measures are implemented & followed:
Regular monitoring for Emission & Ambient air quality, Noise and water & wastewater
quality and soil quality as per monitoring plan.
Proper & efficient implementation of mitigation measures & EMP suggested for Air,
Water, Soil & Noise environment and waste management.
Proper &efficient implementation of non-structural preventive/precautionary/control
measures as well as procedures suggested for prevention/control of major hazards in
the proposed unit
As suggested in below Greenbelt Development Plan, development & maintenance of
adequate dense Greenbelt as per CPCB guideline within premises & around periphery
throughout project life.
Disaster management and emergency action plan shall be prepared carefully and
implemented to eliminate / minimize the chances of impact on ecological features of
local area.
o Before commissioning of plant, properly formulated procedures (including necessary/required
SOPs) and action plan for various operation of concern to eliminate the chances of impacts on
ecological features of the local area have been prepared & implemented by Environment &
safety Manager.
The supervision shall be done by Environment & safety Manager on daily basis throughout the life of
the project starting from the commissioning of the production unit. Environment & safety Manager
shall regularly supervise:
o The efficacy & Adequacy of the implemented mitigation measures for prevention of
environmental pollution including APCDs, ETP, STP, Hazard prevention & Safety measures etc.
o The functioning of all concern employees and contractor to ensure that the EMP, Procedures &
SOPs for prevention of impacts on ecological features of the local area are implemented
properly and all employees are using necessary PPEs as directed by Superior.
During the whole operation time, Contractors & other staff engaged in the operations works shall
ensure that:
o All procedures, plans and guidelines provided to them by Environment & Safety Manager are
followed.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-28
o All mitigation measures provided are functioning well during the operation works.
Environment & safety Manager shall regularly prepare necessary records/documents related with the
planned & implemented mitigation & EMP including the record of performance of mitigation measures
implemented for prevention of adverse effects of environmental pollution & hazards of project on Flora
& Fauna to enable superior to review the performance. The following are minimal documents record
requirements:
o SOPs as defined in section of air/water/soil pollution prevention & control, Noise & vibration
prevention & control, Hazard prevention & Control etc. and SOP for Fertilization & Irrigation as
well as plantation in greenbelt areas
o Register for:
Supervision Schedule & Observations
Plantation & re-plantation in greenbelt area
Survival Rate
Non-Conformity Register with Root Cause Analysis & Details of Action Taken
Logs of all Maintenance of Irrigation & Other facilities used for Greenbelt development
& Maintenance
o Other Documents for:
Compliance status for Legal Requirement
Detailed report for Non-conformity & Action Required (for reporting to Superior)
Daily Performance report for Mitigation Implemented (for reporting to Superior)
Training Documents & Register
Resources
Structural: Dedicated storage area for sapling, fertilizer & irrigation equipment etc., All other structural
measures suggested for air/water/soil pollution prevention & control, Noise & vibration prevention &
control, Hazard prevention & Control
Other: Adequate Human Resource, all other resources required for air/water/soil pollution prevention &
control, Noise & vibration prevention & control, Hazard prevention & Control
Performance Monitoring Measures
Managing Director, plant In-charge & environment & safety manager shall ensure that required
monitoring of various required environmental parameters as well as survival rate of plantation in
greenbelt & soil fertility parameters are done on regular basis as per the monitoring schedule
mentioned in earlier chapter.
Chemist/External Approved Lab shall perform the monitoring on regular basis as directed by
Environment & Safety Manager.
All results of the monitoring carried out for the project shall be reviewed by Environment & Safety
Manager & Plant Incharge on regular basis.
Budgetary Provision
The estimated budgetary provision for initial time of operation phase as prepared by the EIA team is
presented below which shall be revised as per above mentioned system after six month from
commissioning.
o Capital Cost for Structural & non-structural Measures:
A. Seeds & Sapling and Plant in Polybags: Rs. 8.00 Lacs
B. Dedicated storage areas for Sapling & fertilisers etc.:Rs. 12.0 Lacs
C. Equipment& facilities: Rs.10.00Lacs
o Recurring Cost for Non-Structural Measures:
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-29
A. Maintenance of Equipment & facilities: Rs.0.25Lacs per Annum
B. Sapling, Plantation & replantation: Rs. 0.50Lacs per Annum
C. Fertilizer: Rs. 1.50 Lacs per Annum
D. Monitoring: Included in recurring cost of other EMP sections
10.4.10 GREENBELT DEVELOPMENT PLAN:
The greenbelt will be developed by thecompany in premises in about 33612m2 area(34.23 % area of total
land). Healthy & every green plantation in greenbelt is being maintained and ensured by the company all the
time. Following guidelines has been suggested & shall be followed by the company for future operations of
greenbelt development & maintenance.
Guidelines for Greenbelt Development
Design and development of greenbelt should be in adherence to industry-specific requirements and
prevalent climatic conditions.
Company shall ensure healthy & dense greenbelt throughout the project life.
Company shall ensure greenbelt development & maintenance in minimum 33612Sq. m. at any time.
Company shall follow CPCB guidelines for development & maintenance of greenbelt area
Company shall ensure regular irrigation & fertilization of greenbelt area as required timely
Company shall ensure re-plantation in greenbelt area depending upon the survival rate of planted
vegetation to maintain greenbelt.
Company shall plant trees with density of about 2000 trees per hectare (i.e. around 6725 trees) for
developing the greenbelt area.
Indigenous species with fast growth are only selected or form the base of selection as Green Belt can
come in view as fast as possible.
Company shall plant local species of trees & shrub for greenbelt development
The tress shall be planted in three tiers pattern so as to ensure that the entire area gets covered and
ensure effective pollution abatement. For this, management shall ensure that plantation of trees shall
include mixture of lower, higher and middle canopy structure, which shall be mixed appropriately /
proportionately / uniformly.
The plantation shall also include fruit bearing trees/ species which shall be uniformly distributed which
shall act as dwelling place for Varity of birds and other fauna and form a breeding ground for them. The
tree products should have acceptable characteristics to suit local customs and traditions flowering Herbs
& shrubs species.
Company has selected & planted following species:
Sr. No. Scientific Name Common Name Family No. of Plants
Tree
1. Azadirachtaindica Neem Meliaceae 195
2. SaracaIndica Ashoka Fabaceae 600
3. Delonixregia Gulmohar Fabaceae 450
4. Polyalthialongifolia Asopalav Annonaceae 375
5. Terminalia catappa Linn The Indian Almond tree combretaceae 750
6. Mangifera indica Linn Mango tree Anacardiaceae 450
7. Phoenix sylvestris The Wild datepalm Arecaceae 520
8. Cocos nucifera Linn Coconut tree Arecaceae 350
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-30
9. Thuja occidentalis Linn. white kedar Cupressaceae 350
10. Emblica officinalis Gaertn. Euphorbiaceae Amali 420
11. Zizyphus mauritiana Indian jujube Rhamnaceae 220
12. Thespesia populneoides Umbrella tree malvaceae 275
13. Terminalia chebula Fetz Hardo combretaceae 390
14. Terminalia bellerica Bahera combretaceae 450
15. Terminalia arjuna Sadado combretaceae 365
16. Tectona grandis Linn. Teak Verbenaceae 290
17. Tecoma stans Linn. Koreneklar Bignoniaceae 275
Shrub
1 Acalyphagodseffiana Acalypha Euphorbiaceae 115
2 Durantaerecta Daranta Gold Verbenaceae 80
3 Ixorabrachiata Ixora Rubiaceae 110
4 Thujakoraiensis Thuja Cupressaceae 120
5 JasminumOfficinale Jasmine Oleaceae 55
6 Hibiscus rosasinensis Jasud Malvaceae 100
Care shall be taken to plant ample trees along the road side, boundary wall as well as within the plant
premises. It shall enable proper balance of atmosphere both outside the campus by absorbing noise and
gaseous pollutants of the road side movement of vehicles and also absorption of noise and emissions
within the premises of the plant.
Company shall follow the following five year comprehensive greenbelt development program after that
the company shall keep following the prevailing practices of greenbelt management.
1st to 5th YEAR PLAN
o Company shall maintain all necessary facilities for irrigation of greenbelt in good condition and
necessary maintenance of irrigation facilities shall be done regularly
o Company shall regularly assess survival rate of planted trees & shrub and if required necessary re-
plantation shall be done to ensure healthy & dense greenbelt area in minimum 33 % (33612sq. m.
area) of the total area of proposed premises
o For re-plantation, if required, company shall acquire saplings from local private/government (Forest
& Other) nursery
o Company shall do fertilization as required for healthy & dense greenbelt development
Management Period
The properly designed greenbelt area, irrigation facilities, Sapling storage & maintenance area and
storage for greenbelt development resources/tools etc. shall be provided in construction phase prior to
commissioning of plant operation. The necessary structural maintenance shall be done throughout the
extent of operation phase.
The greenbelt development guidelines and five year program shall be initiated with inception of
construction phase of project and shall be implemented & practiced as routine throughout the project
life.
Budgetary Provision
Considered in capital & recurring cost for Ecological Conservation & Protection
Responsible Authority
Project Proponent, Project manager, accounting head/manager, Site Officer & engineers, Contractors.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-31
10.4.11 MANAGEMENT OF SOCIO-ECONOMIC ISSUE
No considerable negative Impacts on socioeconomic condition are anticipated from proposed project except
the rare & temporary impacts of hazards associated with proposed project. It has been noticed that the
project will have minor positive impacts on socioeconomic conditions of project area. Hence, following
generic EMP has been recommended for proposed project
EMP for Management of Socio-Economic Issues
Managing Director& plant In-charge shall ensure that
o Prior to commissioning of plant following structural measures are provided:
Efficient measures for air, water & soil pollution prevention & control to reduce the level
of contaminants in environmental attributes
Efficient measures for prevention & control of noise to reduce the changes in ambient
noise level
Efficient & Adequate hazard prevention & control and safety & emergency control
measures for prevention & control of adverse effects on socioeconomic layout and
agricultural land of vicinity & local area
o A study for the proposed project is conducted to determine the extent of possible risk zone
comprising public area outside of project site.
o Required Safety plans for protection of socioeconomic parameters of area of vicinity are
prepared & implemented before commissioning & routine operation of the plant and followed
during entire project life by all employees & contractors.
o During entire project life, following mitigation measures are implemented & followed:
Regular monitoring for Emission & Ambient air quality, Noise and water & wastewater
quality and soil quality as per monitoring plan.
Proper & efficient implementation of mitigation measures & EMP suggested for Air,
Water, Soil & Noise environment and waste management.
Proper &efficient implementation of non-structural preventive/precautionary/control
measures as well as procedures suggested for prevention/control of major hazards in
the proposed unit
Disaster management and emergency action plan shall be prepared carefully and
implemented to eliminate / minimize the chances of impact on ecological features of
local area.
Properly formulated procedures (including necessary/required SOPs) and action plan for
various operations as mentioned in sections of prevention & control of air, water & soil
pollution, Noise & Vibration and Hazards have been prepared & implemented by
Environment & safety Manager.
CSR Activities are being carried out on regular basis as per CSR Plan (Annexure-XIII).
Adequate management for transportation of raw materials & Products to reduce traffic
on state and national highway network as well as to prevent accidents.
Minimum use of local road passing through residential area
Avoidance of night transportation from the residential area and ban on use of loud
horns
Careful recruitment by employing unemployed person of the local area to maximum
extent to ensure adequate availability of labour for local socioeconomic activities and to
ensure high employment status of local area.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-32
Proper public relation & management activities to prevent conflicts between project and
local people
Efficient Emergency Action & Disaster Management Plan to ensure no/minimum effects
on surround area during catastrophic accident
The supervision shall be done by Environment & safety Manager on daily basis throughout the life of
the project starting from the commissioning of the production unit. Environment & safety Manager
shall regularly supervise:
o The efficacy & Adequacy of the implemented mitigation measures for prevention of
environmental pollution & hazards.
o The issues arising in surrounding area due to operations of the project.
o The functioning of all concern employees and contractor to ensure that the EMP, Procedures &
SOPs are implemented properly and all employees are using necessary PPEs as directed by
Superior.
During the whole operation time, Contractors & other staff engaged in the operations works shall
ensure that:
o All procedures, plans and guidelines provided to them by Environment & Safety Manager are
followed.
o All mitigation measures provided are functioning well during the operation works.
Environment & safety Manager shall regularly prepare necessary records/documents related with the
planned & implemented mitigation & EMP including the record of performance of mitigation measures
implemented for prevention of adverse effects of environmental pollution & hazards of project on Flora
& Fauna to enable superior to review the performance. The following are minimal documents record
requirements:
o SOPs as defined in section of air/water/soil pollution prevention & control, Noise & vibration
prevention & control, Hazard prevention & Control etc. and SOP for Fertilization & Irrigation as
well as plantation in greenbelt areas
o Register for:
Schedule for CSR Activities & Observations
Public Complaint & Suggestion register
Non-Conformity Register with Root Cause Analysis & Details of Action Taken
o Other Documents for:
Compliance status for Legal Requirement
Detailed report for Non-conformity & Action Required (for reporting to Superior)
Daily Performance report for Mitigation Implemented (for reporting to Superior)
CSR Plan
Resources
Structural: All structural measures suggested for air/water/soil pollution prevention & control, Noise &
vibration prevention & control, Hazard prevention & Control
Other: Adequate Human Resource, all other resources required for air/water/soil pollution prevention
& control, Noise & vibration prevention & control, Hazard prevention & Control
Performance Monitoring Measures
Managing Director, plant In-charge & environment & safety manager shall ensure that required
monitoring of various required environmental parameters as suggested in other sections are done on
regular basis as per the monitoring schedule mentioned in earlier chapter.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-33
Chemist/External Approved Lab shall perform the monitoring on regular basis as directed by
Environment & Safety Manager.
All results of the monitoring carried out for the project shall be reviewed by Environment & Safety
Manager & Plant Incharge on regular basis.
Budgetary Provision
The estimated budgetary provision for initial time of operation phase as prepared by the EIA team is presented below which shall be revised as per above mentioned system after six month from commissioning.
o Capital Cost for Structural Measures: Included in capital cost mentioned in other EMP sections
o Recurring Cost for Non-Structural Measures:
A. CSR Fund: Rs.100.00Lacs per Annum
B. Monitoring: Included in recurring cost of other EMP sections
10.4.12 ENERGY CONSERVATION
The company is committed to continual improvement in its energy conservation programs. It will
successfully implement following actions to realize efficient energy conservation in its proposed unit.
Managing efficiently the utilization of energy resources, upgrade operational practice and employ
more energy efficient technologies.
Employee Training for energy conservation& Promoting awareness among all employees
Interdepartmental sharing of experience on energy conservation
Regular internal audits to identify areas for improvement & benchmark continuously performance
against the best
Formation of Energy Conservation cell headed by senior personnel with following duties for Energy
Conservation:
o Periodic monitoring of unit/plant/department wise energy consumption.
o Planning of corrective actions for deviations.
o Carry out internal energy audits & field study on need basis.
o Preparing annual energy activity plan
o Benchmarking for energy performance.
o Arrange training program for energy efficiency.
10.4.13 RAINWATER HARVESTING PLAN
Potential of Harvesting of Rainwater & Utilization
The company will have about 32805.00 m2 usable rooftop areas, which will have potential of rainwater
harvesting with runoff co-efficient of 0.8. The long term average minimal rainfall of the area is noticed to be
around 2100 mm, which can have great potential of rainwater harvesting resulting in 76674.4 m³ /annum
monsoon harvested water quantity considering the available area for RWH as mentioned above.
The harvested rainwater will be utilized to meet the water requirement of proposed project. The harvested
rainwater will be enough to cater water requirement for about 17 days. Also, if permitted by concern
authority, harvested rain water will be utilized to recharge ground water.
Sufficient land is available in site for creation of harvested rainwater storage facility. Such facilities if not
lined with impervious material can also have groundwater recharge potential and water availability of water
to meet operation requirement for few months considering the evaporative losses from pond as well as
losses due to soil hydraulic conductivity enabling seepage and resulting in groundwater recharge.
Following actions shall be taken for effective implementation of rain water harvesting plan.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-34
The roof top area shall be designed for maximum rainwater collection and with necessary facilities like
gutter and drain pipes. A well designed pipeline network or properly lined impervious storm water
drainage shall be provided near all building.
All storm water drainage or pipeline shall be connected with the rain water storage pond. Proper slope
shall be provided to all storm water drainage & pipelines to ensure easy & efficient transfer of collected
rain water in the pond.
The adequate storage facility of like unlined earthen pond or tank shall be prepared to ensure adequate
supply for project requirement. Also the recharging well may be created to ensure partial use of
rainwater for groundwater recharging.
If pond is created, the surface area of the pond shall be kept minimal to the possible extent to reduce
the evaporative losses during non-monsoon especially in summer season.
Resources & Management Period
The structural measures like properly designed drainage network, adequate water storage pond,
properly designed paved area & buildings etc shall be provided in construction phase prior to
commissioning of plant operation. The necessary structural maintenance shall be done throughout the
extent of operation phase.
The non-structural actions shall be initiated with inception of commissioning stage and shall be
implemented & practiced as routine throughout the project life on all raining days during whole
monsoon season.
Budgetary Provision
Costs for Rain water harvesting programs have been included in budgetary provision for EMP of
Hydrology, Groundwater & Water Conservation.
Maintenance cost as and when required will be allocated by management.
10.5 ADMINISTRATIVE MEASURES
Environment & Safety Manager shall prepare & implement approved necessary procedure (including
necessary/required SOPs) and action plan. All employees & Contractors shall strictly ensure that all
works are done following the SOPs issued for the specific task. This shall be followed on regular basis
throughout the life of the project starting from the commissioning of the production unit. Such
procedures & action plan shall be followed on regular basis by all concerned employees/contractor
throughout the life of the project starting from the commissioning of the production unit. Wherever
required, such procedures/plan shall be revised and updated by Environment & safety Manager and
shall be implemented by him after getting checked by Plant Incharge& approved by Managing Director.
Environment & safety Manager shall regularly prepare the schedule of monitoring and get the
monitoring done timely. He shall ensure that the effluent quality is checked on daily basis by chemist.
He shall regularly review the results of water & wastewater quality submitted by Chemist /External
Environmental Lab for performance evaluation of implemented mitigation measures & installed ETP.
In case of any issue of non-functioning of any Pollution Control Measure and any Major Non-
Conformity,
o Concerned employee/contractor shall immediately inform/report environment & safety
manager.
o Upon receipt of such information, environment & safety Manager shall immediately report to
Plant Incharge to initiate necessary action till the non-conformity is closed to ensure there is no
issue of serious pollution arises due to operation of the plant.
M/S. BEEKAYLON SYNTHETICS PVT. LTD.(VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-10: Environmental management plan (QCI-NABET Accredited) 10-35
o If required, Plant Incharge shall order to stop the operational activities causing air pollution
beyond acceptable level.
o The stopped operations/activities shall be started only after necessary maintenance &
restoration of failed Pollution control device/measure for efficient functioning.
o This task shall be done on regular basis throughout the life of the project starting from the
commissioning of the production unit.
On daily basis reporting by Environment & Safety Manager shall be done to the superior. Such
documentation/reporting shall be done on daily basis throughout the life of the project starting from
the commissioning of the production unit.
Managing Director, plant In-charge & environment & safety manager shall ensure that all necessary
budgetary provision made as per the actual requirement are sufficient for efficient implementation of
the EMP. Whenever required, necessary change in budgetary provision shall be made to overcome the
issue of non-conformity. The budget shall be reviewed and revised on yearly basis. The budget shall be
prepared by environment & safety manager, checked by Plant Incharge& approved timely by the
Managing Director.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-11: Summary & Conclusion (QCI-NABET Accredited) 11-1
CHAPTER: 11 SUMMARY & CONCLUSION
11.1INTRODUCTION ABOUT PROJECT
M/s. Beekaylon Synthetics Pvt. Ltd., Velugam has proposed to setup a new manufacturing unit at Survey No.:
287/1, 284P, 289/1/3, 289/1/2, 289/2; in the Notified Industrial Zone situated at Village-Velugam of U.T. of
Dadra and Nagar Haveli. The proposed new project involves the production of “Various types & grades of
Synthetic Polyester Yarns through continuous polymerization of MEG & PTA and various kinds of Fabrics”.
As per the EIA notification‐ 2006 as amended time to time, the proposed project for the production of
Synthetic filament yarn falls under Category “B” (Considered at central level due to applicability of GC).
Proponent had applied for approval of Terms of Reference for EIA study for proposed project on 03th October
2017 to EAC New Delhi. EAC vide letter no. J-11011/493/2017-IA II (I). Dated 16th November 2017 issued
approved/awarded TORs. The MOEF had earmarked the area covering 10 km radial area from site proposed
EIA study and exempted Public Hearing / Consultation as the project is to be developed in the notified
industrial Zone established before 2006.
11.2DESCRIPTION OF PROJECT
The proposed project involves the production of Polyester POY/FDY/Staple Fibres & Granules @ 432000 TPA,
various types of Synthetic Filament Yarn @ 378000 TPA and various other types of manmade fibres like
Texturized Yarn/Twisted Yarn/Acrylic Yarn /Covered Yarn/Spandex Yarn etc. @288000TPA. The proposed
product line also includes Winding Of Yarn/Heat Setting Of Yarn/Circular Knitting/Warping / Warp
Knitting/Weaving Fabrics/Carpet Weaving/ Narrow Fabrics @ 36000 TPA and Colour Master Batch Chips /
granules@9000 TPA for manufacturing of synthetic manmade fibres & Polyester granules through continuous
polymerisation of MEG & PTA and knitting & weaving for fabric production at Survey No.: 287/1, 284P,
289/1/3, 289/1/2, 289/2 in the Notified Industrial Zone situated at Village-Velugam of D & NH-396 240 (U.T.
of Dadra and Nagar Haveli). (20° 8'15.46"N and 72°59'32.41"E). The capital cost of the proposed project is Rs.
443 Crore. The project site is well connected with State & National Highway network and the nearest National
Highway (NH48) is about 7.8 km W away from project site. The nearest interstate boundary is Gujarat (7.5 Km
E) and Maharashtra (0.3Km E) away from the project site. Nearest wildlife sanctuary- 1.30 E (D & NH Wild Life
Sanctuary), Vasona Lion safari 9.37 km NW(Approx.) & Dapada, Satmaliya Deer Park 5.3 Km NE (Approx.).
The proposed project will require Land –77800.00Sq. m., Water-3740 KL/day Fresh water (source: Irrigation
Canal/Ground water with required permission from CGWA), Power- 27 MW (supply from DNH Power
distribution corporation Ltd.).
In proposed unit HSD @3750 L/Hr will be used as fuel for DG sets (1 No. of 1000 KVA & 2 Nos. of 2500 KVA).
LSHS/ Furnace Oil 60 KLD for Boiler (1 No., 10 TPH, 2 Nos., 1 TPH) and Thermic Fluid Heater (3 Nos, 10 M
Kcal/Hr). Total employment of the project will be 1353 persons.
For the production of afore said products, company will require 7 raw materials out of which 1 chemical (Mono
Ethylene glycol) is hazardous in nature as per MSIHC rules (as amended), 2000. This hazardous material will
be received in tanker load by road tanker and stored in tanks provided in designated areas of storage. All safety
measures will be provided at design level with all required safety system for the specific chemicals to prevent
the associated hazards & risks.
The details of the major pollution potential/identified sources of impacts are presented below. A. Wastewater:
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-11: Summary & Conclusion (QCI-NABET Accredited) 11-2
For Proposed project Domestic waste water generation will be 80 KLD whereas total industrial effluent generation will be 800.00 KLD. Sewage will be disposed off through septic tanks & STP. The industrial effluent will be treated in full-fledged in-house ETPs equipped with all required Primary, Secondary & Tertiary Treatment units. The treated effluent will be reused in cooling and gardening.
B. Emissions:
For the proposed project the stationary sources are Boilers (Stack: 30 m Ht. & 0.5 m Dia. (Common Stack)) , DG sets (Stack: 30 m Ht. &0.15 m Dia. (Each)), and Thermic Fluid Heater (Stack: 30 m Ht. &0.5 m Dia. (Common Stack)) the emission quality from stationary sources will be below the applicable norms for the parameters.
C. Solid/Hazardous wastes:
Total ETP Waste from proposed project will be 60.00 MT/Month and will be sent to GEPIL site, Silvassa. Total used oil will be 1. KL and sold to registered refiners. Total empty drums will be 50000 Nos and reused for packing /sold to authorize scrap vendor. Total Process waste will be 15.00 MT/ Month and Sell to authorized recycler or for co-incineration or to Common Incineration Facility. Yarn waste & Lumps will be 750.00 MT/Month and it will be sell to actual users.
11.3 ANTICIPATED IMPACTS & MITIGATIONS
The present environmental impact assessment study has been conducted for the proposed Project. All
necessary details of proposed project has been studied & referred carefully to determine the anticipated
impacts of the proposed project. The baseline environment status established during the study has also been
considered for determination and assessment of anticipated impact of the project. After impact assessment
study necessary mitigations measures to minimise and/or eliminate the identified impacts of the project.
The summary of the Impacts Assessment study as well as planning of mitigation measures for anticipated
impacts are described in subsequent paragraphs under respective headings.
Anticipated Impacts
A. Ambient environment The identified main sources of impacts of the project are utilities (Boiler, TFH & DG set) emission. The
pollutants emitted from these sources are PM, SOx, NOx and CO. The effect of the pollutants on human and
fauna may occur in form of respiratory problem, asthma, bronchitis, allergic condition, effects on vision etc.
Severity of these effects varies according to the level of increase of the pollutant in the ambient air.
Detailed modelling for air quality change has been done to ascertain the level of change of these pollutants. It
has been found that Maximum Resultant GLC from the proposed project would be 1.74 for PM2.5, 1.76 for
PM10, 17.96 for SOx, 33.48 for NOx, 0.10 for CO. This values are under the permissible limit by CPCB.
B. Noise & vibration The main sources of noise pollutions from the projects are machineries like Extruders, Spindle Driven Turrets
and dryer etc. In work place exposure to these sources will be high due to continuous operation of
manufacturing process. Head ache is most likely to occur in employee engaged in this area. Also up on long
time, such regular exposure may result in hearing impairment of the employee engaged in this area.
Transportation of raw material and products will increase the movements of truck which in turn will increase
the noise level. The increased noise level in such way will have effects on sleeping of people as well as fauna
of the transport route.
C. Water environment: During operation & commissioning phase, major impacts are noticed in case of transportation activities,
materials storage & handling, manufacturing process, wastewater& hazardous/solid waste management
activities and Breakdown & maintenance of control equipment. The major impacts of these activities will occur
only due to water pollution and negligible on hydrology (Surface water & groundwater). Due to such
contamination of water resources, increase in pollutant levels & toxicity of water resources due to mixing of
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-11: Summary & Conclusion (QCI-NABET Accredited) 11-3
toxic chemical is most likely to occur and some water quality parameters like the pH, TDS, Hardness, Alkalinity
& Acidity, Sodium, Chloride, Sulfate, BOD, COD, TOC and Phenolic compounds are likely to increase to a greater
extent depending up on the quantity of chemicals spilled/leak causing the impact. As a result of such increased
toxicity of affected water bodies, considerable toxic effects on aquatic organism, as well any other animal
consuming the water and flora irrigated with the contaminated water can be occur.
D. Land Environment: The identified major impact of soil due to pollutant load on soil, such impacts would occur mainly due to from
materials storage & handling activities and manufacturing process due to malfunctioning or major hazard
occurred in storage & process area. The intensity and quantum of such impact may vary depending on the
contents of wastewater & solid/hazardous waste causing the impacts. Due to the above said impacts, it will
affect the soil quality, soil fertility and depletion/reduction of soil organisms (biotic factor of soil). As a result
of such impacts, soil quality parameters like the pH, soluble salt, inorganic elements, SAR, Nutrient level, Total
Carbon, Carbon to Nitrogen Ratio and Biological organisms are likely to be affected to a greater extent
depending up on the quantity & nature of chemicals spilled/leak causing the impact. The toxicant in soil may
also affect the flora of the region and up on use of such flora toxic effects may occur on the consumer of the
affected flora. Irrigation of soil may contaminate/pollute water. Minor beneficial impacts of the operation
phase of the project is identified in terms of improvement in plantation status of vicinity area due to greenbelt
development.
E. Ecology & Biodiversity Long term or short term Negative impact because of materials storage & handling, manufacturing process,
utility emission and Breakdown & maintenance of control equipment, release/spill/leak of toxic materials from
project will occur on ecological environment. Such environmental contamination caused by emissions & toxic
chemicals may lead to heavy toxic load on ecological components (biotic & abiotic) which may have very
adverse effects on flora, fauna and ecological habitat depending up on the toxicity type & level of the
contaminant. The above said impacts due to the toxicity of contaminants released may also occur in the distant
fauna due to the interaction & migration of the fauna between micro habitats of the region. The eventual toxic
effects of the said impacts may increase as a result of bio-magnification in food chain and food web. The heat
radiated from fire site during Major Fire Hazard may cause burning and drying of flora of nearby area
(Especially greenbelt) which in turn may result in adverse impacts on micro habitat of the local area and thus
may result in considerable adverse impacts on ecology.
F. Socio-Economic Environment About 1353 people will be directly employed and many other will be indirectly employed due to the project,
which will result in economic improvement. It will result in major positive impacts in terms of improvement in
status of employment & economy of the area. Such improvement will also lead to the improvement in other
social indicators like lifestyle, education & health etc. Fire & explosion in material storage area and
manufacturing area may result in considerable Major negative impact on socioeconomic environment, which
may cause the problem of health of local people and domestic animals of the affected area. Due to such
hazards, loss or damage of crop of nearby agricultural fields may occur and also will result in very serious
health issues like respiratory problem, cancer, irritation to eye & nose, skin problem etc.
G. Work Environment Major negative short term impacts on health & safety are anticipated due to the injury, health effects due to
unfavorable work place conditions and ergonomic issues related with material handling & transportation,
manufacturing process, maintenance works. Such impacts will occur mainly in terms of MSD and other injury
(cut, burn, irritation eye & respiratory tract etc.) are likely to occur due to lifting or shifting of heavy goods and
equipment. Rotating machineries & sharp edged tools/machinery can cause serious injury (like cut, fracture
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-11: Summary & Conclusion (QCI-NABET Accredited) 11-4
of bone, crushing of hand etc.) to the employee engaged in operation of the machinery. Due to release of toxic
materials in air of workplace during handling & transfer of materials, process and catastrophic incident may
occur in terms of major health effects like saponification fat of cell, necrosis, lung injury & burns of the upper
airway, burn of oropharynx/ oesophagus/ stomach, development of blisters, ulcerations, dyspnoea, pleuritic
chest pain, cough and bronchospasm, conjunctival irritation and chemosis, corneal epithelial defects, limbal
ischemia, permanent vision loss etc.
Mitigation Measures:
A. Ambient Environment
CPCB approved DG Set, only to be used during power failure.
Adequate height of the stacks shall be attached to Boilers , TFHs and DG Sets
Regular Monitoring as per monitoring plan
B. Noise & vibration
Proper non-vibrating foundation, rubber padding and Regular maintenance of the equipment &
machineries including static /dynamic balancing & lubrication for rotating/vibrating
equipment/machinery
Housing in closed area and/or acoustic enclosures & silencers for high noise generating
equipment/machinery. Barriers wherever required/possible.
C. Water Environment
Adequate effluent treatment plant for wastewater.
Treated waste water is reused again in gardening & cooling tower.
Maximum possible recycling of water in process& gardening
Impervious lining of floor of chemical storage and production area with all necessary
arrangement of prevention of spread up and collection of spilled/leaked materials
Hazardous waste storage area with leachate collection line connected with ETP and disposal as
per the regulatory guideline/provisions.
Domestic effluent disposal through adequate soak pit and septic tank.
D. Landuse
Greenbelt development in and around premises.
Measures for protection of vegetation area from fire hazards.
E. Soil Quality
Connection of storage & production area with ETP or waste collection facility for collection of
toxic material accidentally spilled/leaked.
No disposal of Effluent outside the company premises as the treated effluent will be reused for
gardening & cooling tower.
Hazardous waste disposal as per regulatory provision
Domestic waste water should be disposed off only through adequate septic tank and then soaks
pit.
Proper impervious lining in material storage area as well as production area
Proper air pollution control system to control the gaseous pollutant &dust emission of the
project.
All mitigation measures as suggested by respective FAEs (of AP, AQ, WP, RH)
Transportation activities shall be done with provision of all necessary safety measures
F. Ecology & Diversity
All necessary control & measures for prevention of release of toxic contaminants from project
as well as for prevention of pollution due to emissions of the project
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-11: Summary & Conclusion (QCI-NABET Accredited) 11-5
Safety measures & action plan for prevention of spreading of toxic materials being transported
Creation &Maintenance of dense greenbelt in and around the company premises.
No disposal of effluent and solid & hazardous waste on land and in water bodies.
G. Socioeconomics
Mitigation and control/ prevention measures for prevention & control of environmental
pollution and hazards & risk
Prevention of contaminated runoff
Regular medical check-up and Proper public relation to prevent conflicts with local people
Regular CSR activity for Social welfare & upliftment of local people
Work Environment
Non-slippery Floor of plant & storage and be ensured that there is no liquid spilled on floor.
Safety measures like safety guard around rotating part for all rotating equipment/machineries
Proper ergonomic condition to ensure safe & non-tiring work place conditions
Lifting & shifting of all heavy materials shall be done using trolley or fork lift.
Chemical safety plan shall be prepared & implemented before commissioning & routine
operation of the plant.
RA study for the proposed project shall be conducted & all necessary hazard/risk
control/prevention measures shall be implemented before erection & commissioning of plant.
(RA Study is conducted for proposed project, Refer Annexure V)
Proper storage shall be provided for all hazardous materials and there shall be adequate
isolation between two materials as required for safe storage condition.
All fittings in area having flammable materials shall be flameproof and all necessary fire-fighting
facilities shall be ensured in this area.
In all area first aid kit shall be available.
All necessary PPEs, Safety & emergency equipment shall be provided for all concern employee
in all areas
Disaster management plan shall be prepared & all necessary arrangement for emergency action
plan shall be provided well before commissioning of plant.
Regular occupational health check program shall be conducted. Pre-employment & Annual post-
employment health check-up of all employee shall be done. Health check of affected employee
shall be done when any employee is significantly exposed to hazardous material.
11.4 CONCLUSION
It has been revealed from impact assessment study that the continuous impacts due to utility emissions, water
consumption, wastewater generation & disposal and occupational hazards are of main concern for the EIA
study for the proposed project. However, it is marked that the impacts of the emission from boilers, TFHs and
DG sets will be acceptable & insignificant as adequate stack height will be provided, and LSHS/ Furnace Oil: &
Diesel are used as fuel in Boilers, TFHs & DG sets respectively, and confirming the CPCB Standards. Also the
impacts of the wastewater generation will be very minimal as wastewater will be regularly treated adequately
in efficient treatment and reused cooling tower. And the domestic water will be treated in STP and will be
used in gardening. Further, hazardous/solid waste generation from proposed project will be ETP sludge,
Process waste, used oil &discarded containers/barrels/ bags which will be managed as per regulatory
requirement. The used oil will be Reuse or Sell to registered refiners, empty containers/bags/drums will be
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-11: Summary & Conclusion (QCI-NABET Accredited) 11-6
Reuse for packing or Sell to authorized scrap vendor, the ETP sludge will be sent to TSDF, Process waste, will
be Sell to actual users.
In addition to these, it has been anticipated that significant impacts are likely to occur due to the hazards
associated with the industrial operations and accidents. It is revealed in risk assessment study that the impacts
of hazards associated with proposed project is likely to be major in case of catastrophes only. Minor incidents
of spill/leak will not have serious impacts on occupational health & safety but will be controllable with
adequate safety practices & preventive measures. However, continuous exposure of employees to some toxic
chemicals may lead to some health issues which need to be controlled by efficient occupational health
management program & activities.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-12: Disclosure of consultant engaged (QCI-NABET Accredited Consultant Organization) 12-1
CHAPTER: 12 DISCLOSURE OF CONSULTANT ENGAGED
12.1. ABOUT UNISTAR ENVIRONMENT & RESEARCH LABS PVT. LTD.
Unistar Environment And Research Labs Private Limited is a company registered under the companies Act in
India (Vapi, Gujarat) to provide efficient and economical services in the areas of environmental pollution
control/ monitoring and chemical analysis & research activities to various industries and institutions. Unistar
Environment and Research Labs Private Limited is a service providing organization rendering a wide range of
environment pollution control related services.
Unistar Environment And Research Labs Private Limited is a growing environmental pollution control service
providing company having a team of qualified and experienced persons from various disciplines to handle
complex assignments. In addition, we have a pool of highly qualified experts from related and specialized
fields to draw upon should an assignment dictate so. The organization has a sufficing infrastructure along
with a fully equipped laboratory and field staff.
The client list includes some of the foremost industry houses in India, mainly in the area of pharmaceuticals,
Personal care products, Metal and Metal Processing, Textile processing, Paper manufacturing, Dyes and
Intermediates, Specialty chemicals, Engineering (Fabrication, surface Treatment, coating and assembling),
Plastics and Packaging, Hotels, various miscellaneous industrial units and government and semi-government
departments.
The company aims to provide effective and optimum environment management systems for treatment &
control of gaseous emissions, water, wastewater and hazardous waste.
Vision – To establish a strong technical foothold in the area of environmental pollution control, Monitoring,
Chemical testing and Research.
Mission - to provide reliable and economical solution in timely manner that best meets the individual
concerns for each client.
Our Services - M/s. Unistar Environment and Research Labs Pvt. Ltd. provide the following services in the
field of environment:
Consultancy Services:
Environmental Impact Assessment (EIA) Study.
Treatability/Feasibility study to establish Effluent Treatment Scheme.
Study of pollution control system and its adequacy & efficacy.
Environmental Audit of the industrial units.
Environmental studies and reports.
Legal and Technical assistance to comply with environmental legislations.
Environmental Monitoring Services:
Post Environment Clearance monitoring programs.
Potable water testing as per IS 10500: 2012 and WHO standard.
Chemical & Microbial monitoring and analysis of Water & Waste Water.
Hazardous and non-hazardous Solid Wastes and soil samples monitoring and analysis.
Ambient Air quality, Work place, Flue gas stack, process gas stack emission, Ambient Noise level
Monitoring.
Analytical testing of all kind of chemicals, metals, etc.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-12: Disclosure of consultant engaged (QCI-NABET Accredited Consultant Organization) 12-2
Engineering Services:
Designing, Erection and Commissioning of ETP and STP.
Designing, Erection and Commissioning of APCD.
Operation & Maintenance of ETP and STP.
Introducing Our Additional Services:
Education and training in the area of Energy, Safety, Health, Various CSR activities and Environment.
CSR Activity plan or Proposal and implementation, documentation and reporting.
Carry out Social Need Assessment study.
Conducting CSR Audits.
Recognition
1) MoEF&CC (Govt. Of India) Recognized Environmental Laboratory under the Environment (Protection)
Act-1986.
2) GPCB (Govt. Of Gujarat) Recognized Environmental Auditor (Schedule- II).
3) QCI-NABET Accredited Consultant Organization under the “Scheme for Accreditation of EIA Consultant
Organization (Version 3)”.
4) NABL (ISO/IEC 17025: 2005) Accredited Testing Laboratory.
5) OSHAS 18001:2007 certified Occupational Health & Safety Management System.
6) ISO 9001: 2015 certified company.
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-12: Disclosure of consultant engaged (QCI-NABET Accredited Consultant Organization) 12-3
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-12: Disclosure of consultant engaged (QCI-NABET Accredited Consultant Organization) 12-4
M/S. BEEKAYLON SYNTHETICS PVT. LTD. (VELUGAM UNIT) EIA Report for new manmade fiber manufacturing unit-other than rayon - 5(d)
UniStar Environment & Research Labs Pvt. Ltd. Chapter-12: Disclosure of consultant engaged (QCI-NABET Accredited Consultant Organization) 12-5