From the desk of Gabriele Wood E-mail: [email protected] _____________________________________ 12 March 2014 Dear Sir/Madam ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ESTABLISHMENT OF A COAL-FIRED POWER STATION ON A SITE NEAR LEPHALALE, LIMPOPO PROVINCE “IPP THABAMETSI POWER STATION” DEA Ref No. 14/12/16/3/3/3/40 AVAILABILITY OF A DRAFT EIA REPORT FOR PUBLIC COMMENT AND INVITATION TO ATTEND A PUBLIC OPEN DAY/ MEETING Newshelf 1282 (Pty) Ltd), an Independent Power Producer (IPP) is proposing the construction of a coal-fired power station (the “Project”) on a site near Lephalale in the Limpopo Province. This project was previously presented by Exxaro Resources, who subsequently selected Newshelf 1282 (Pty) Ltd as a preferred IPP for the development of the power station. The purpose of the proposed IPP Thabametsi Power Station (previously referred to as the IPP Waterberg Power Station) is to provide baseload power to the national electricity grid. The power station will have a capacity of up to 1200MW, to be developed in two phases of 600MW each. The proposed site (currently owned by Exxaro) is located ~26 km north-west of Lephalale. In terms of sections 24 and 24D of the National Environmental Management Act (No 107 of 1998), as read with the EIA Regulations of GNR543 - GNR546 (as amended), a Scoping and EIA are required to be undertaken for this proposed project. In terms of Government Notice 921 published in terms of the NEM: Waste Act No. 59 of 2008, a waste licence is also required for storage, treatment and disposal of general and hazardous waste. Therefore, an integrated environmental authorisation process is being undertaken for the project. This process will support the application for other permits such as a Water Use License in terms of the National Water Act (Act No 36 of 1998) and an Air Emissions License in terms of the NEM: Air Quality Act (Act No 39 of 2004). A consolidated application has been submitted to the Department of Environmental Affairs (DEA), and the project has been registered under Application Reference Number 14/12/16/3/3/3/40.

Transcript of ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

Page 1: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

From the desk of Gabriele Wood

E-mail: [email protected] _____________________________________

12 March 2014

Dear Sir/Madam

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS

PROPOSED ESTABLISHMENT OF A COAL-FIRED POWER STATION ON A SITE NEAR

LEPHALALE, LIMPOPO PROVINCE

“IPP THABAMETSI POWER STATION”

DEA Ref No. 14/12/16/3/3/3/40

AVAILABILITY OF A DRAFT EIA REPORT FOR PUBLIC COMMENT AND INVITATION

TO ATTEND A PUBLIC OPEN DAY/ MEETING

Newshelf 1282 (Pty) Ltd), an Independent Power Producer (IPP) is proposing the

construction of a coal-fired power station (the “Project”) on a site near Lephalale

in the Limpopo Province. This project was previously presented by Exxaro

Resources, who subsequently selected Newshelf 1282 (Pty) Ltd as a preferred IPP

for the development of the power station.

The purpose of the proposed IPP Thabametsi Power Station (previously referred

to as the IPP Waterberg Power Station) is to provide baseload power to the

national electricity grid. The power station will have a capacity of up to 1200MW,

to be developed in two phases of 600MW each. The proposed site (currently

owned by Exxaro) is located ~26 km north-west of Lephalale.

In terms of sections 24 and 24D of the National Environmental Management Act

(No 107 of 1998), as read with the EIA Regulations of GNR543 - GNR546 (as

amended), a Scoping and EIA are required to be undertaken for this proposed

project. In terms of Government Notice 921 published in terms of the NEM:

Waste Act No. 59 of 2008, a waste licence is also required for storage, treatment

and disposal of general and hazardous waste. Therefore, an integrated

environmental authorisation process is being undertaken for the project. This

process will support the application for other permits such as a Water Use License

in terms of the National Water Act (Act No 36 of 1998) and an Air Emissions

License in terms of the NEM: Air Quality Act (Act No 39 of 2004). A consolidated

application has been submitted to the Department of Environmental Affairs

(DEA), and the project has been registered under Application Reference Number

14/12/16/3/3/3/40.

Page 2: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

DRAFT EIA REPORT AVAILABLE FOR REVIEW:

A Draft EIA Report has been prepared by Savannah Environmental and will be

available for public review at the following venues:

» Lephalale Local Municipality Public Library (Address: Cnr Joe Slovo Street and

Douwater Avenue, Lephalale)

» Marapong Community Library (Address: 1456 Setlhora Street, Marapong)

» Manketti Lodge, Ferroland Management Offices, Lephalale

» AgriSA: Lephalale, Albert Street, Lephalale

The report is also available electronically on the website

www.savannahSA.com/projects. The 40-day period for public review is 12 March

2014 – 23 April 2014. Please submit written comment by 23 April 2014 to the

contact person below.

PUBLIC OPEN DAY AND PUBLIC MEETING:

All interested and affected parties are invited to attend a public open day and

public meeting to be held as follows:

» Date: 01 April 2014

» Times: Open Day: 15:00 – 18:00; Public Meeting: 18h00

» Venue: Mogol Club Cnr of Nelson Mandela and George Wells Street,

Lephalale

Although not a requirement, I&APs should please confirm their attendance at the

above-mentioned meeting with the contact person below by 28 March 2014 for

planning purposes.

To submit written comment on the EIA Report or register your attendance at the

public meeting please contact the undersigned. Out team welcomes your

participation and looks forward to your involvement throughout the process.

Kind Regards

MRS GABRIELE WOOD

PUBLIC PARTICIPATION AND SOCIAL CONSULTANT

SAVANNAH ENVIRONMENTAL

Page 3: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

EIA Process - IPP Thabametsi Power Station (DEA Ref. No.: 14/12/16/3/3/3/40) -Notice of Availability of Draft EIA Report & Public Meeting

Forward

Projects Organisations Stakeholders Calendar Reports Emails more

© 2012 SugarCRM Inc.

EIA Process - IPP Thabametsi Power Sta�on (DEA Ref. No.: 14/12/16/3... h�p://savannahsa.sweetcrm.co.za/index.php?module=Emails&ac�o...

1 of 4 2014/03/12 04:42 PM

Page 4: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

Leonard Sole <[email protected]>, Patrick Motela <[email protected]>,

© 2012 SugarCRM Inc.

Projects Organisations Stakeholders Calendar Reports Emails more

EIA Process - IPP Thabametsi Power Sta�on (DEA Ref. No.: 14/12/16/3... h�p://savannahsa.sweetcrm.co.za/index.php?module=Emails&ac�o...

2 of 4 2014/03/12 04:42 PM

Page 5: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

(0 - 0 of 0)

Attachments

Accounts

Contacts

Email Stakeholders

© 2012 SugarCRM Inc.

Projects Organisations Stakeholders Calendar Reports Emails more

EIA Process - IPP Thabametsi Power Sta�on (DEA Ref. No.: 14/12/16/3... h�p://savannahsa.sweetcrm.co.za/index.php?module=Emails&ac�o...

3 of 4 2014/03/12 04:42 PM

Page 6: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

Print Back to top

Maylene Broderick Development, [email protected]

Users

Projects

edit

© 2012 SugarCRM Inc.

Projects Organisations Stakeholders Calendar Reports Emails more

EIA Process - IPP Thabametsi Power Sta�on (DEA Ref. No.: 14/12/16/3... h�p://savannahsa.sweetcrm.co.za/index.php?module=Emails&ac�o...

4 of 4 2014/03/12 04:42 PM

Page 7: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

From: <Gabriele Wood <[email protected]>>Subject: EIA Process - IPP Thabametsi Power Station (DEA Ref. No.: 14/12/16/3/3/3/40) - Notice of Availability of Draft EIA Report & Public MeetingDate Sent by Sender:12/03/2014 16.40To: Mariagrazia Galimberti <[email protected]>From Local System: IPP Thabametsi Power Station Draft EIA (Notification Letter) 12.03.14 SAHRA.pdf

Dear Mariagrazia Galimberti

Newshelf 1282 (Pty) Ltd), an Independent Power Producer (IPP) is proposing the construction of a coal-fired power station on a site near Lephalale in the Limpopo Province. Thisproject was previously presented by Exxaro Resources, who subsequently selected Newshelf 1282 (Pty) Ltd as a preferred IPP for the development of the power station. A Draft EIAReport has been prepared by Savannah Environmental and will be available for public review. Please refer to the attached notification letter for detailed information regarding theEIA and public participation process.

Please do not hesitate to contact me in if you require any further information.

Kind regards,

Mrs Gabriele Wood

Public Participation and Social Consultant

Savannah Environmental (Pty) Ltd

Tel: 27 11 656 3237

Fax: 086 684 0547

Email: [email protected]

www.savannahsa.com

h�p://savannahsa.sweetcrm.co.za/index.php?module=Emails&ac�on...

1 of 1 2014/03/12 04:40 PM

Page 8: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...
Page 9: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...
Page 10: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

IPP Thabametsi Power Station - Notice of Extension of Review Period

Assigned to: Gabriele Wood Date Sent: 25/04/2014 13.51

Teams: Global Project: Thabametsi Coal-fired Power Station

From: Gabriele Wood <[email protected]>

To:

Cc:

Bcc: John Wesson <[email protected]>, Gideon Erasmus <[email protected]>,Mokgadi Makgato <[email protected]>, Bob Naidoo<[email protected]>, Mortimer Mannya <[email protected]>,Marlaine Andersen <[email protected]>, Molaudzi Engelin <[email protected]>,Hardus Steenekamp <[email protected]>, Pat van Rooyen <[email protected]>,Kobus De Villiers <[email protected]>, Mariette Ventre <[email protected]>, KarenSteenkamp <[email protected]>, Zev Green <[email protected]>,Maila Ledwaba Masetlwa <[email protected]>, A Matukane<[email protected]>, Astrid Basson <[email protected]>, Kubentheran Nair<[email protected]>, Malose Marakalala <[email protected]>, KrishnaReddy <[email protected]>, Ntau Letebele <[email protected]>,Charity Radipabe <[email protected]>, Hanneline Smit<[email protected]>, Rico Euripidou <[email protected]>, TinyikoMalungani <[email protected]>, Regina Makgata <[email protected]>,Andy Mcleod <[email protected]>, Annique Moloisi <[email protected]>,Mahlangu <[email protected]>, Aron Kharivhe <[email protected]>, DalenePitcut <[email protected]>, Department of Energy <[email protected]>,Langi Malamba <[email protected]>, John Geeringh<[email protected]>, Tocky Ngobeni <[email protected]>, RavishaAjodhapersadh <[email protected]>, Rosina Boloka<[email protected]>, Lindiwe Kgomo <[email protected]>, JohannesMolepo <[email protected]>, Phomozo Thivhafuni <[email protected]>,Walter Rachidi <[email protected]>, Peter Novellie<[email protected]>, Ismail Essa <[email protected]>, Louis Rossel<[email protected]>, Jonathan Gafane <[email protected]>,Avhashoni Nicholas Magada <[email protected]>, Debbie Khan<[email protected]>, Dirk van Alphen <[email protected]>, Hennie van denAardweg <[email protected]>, Boeta Steenekamp <[email protected]>, ThulieMdluli <[email protected]>, Henri Nieuwoudt <[email protected]>,Azwihangwisi Mulaudzi <[email protected]>, Wolsey Otto Barnard<[email protected]>, Louis Loots <[email protected]>, MokopaneLetsoalo <[email protected]>, Emile Marell <[email protected]>, ValerieCilliers <[email protected]>, Louise Corbett <[email protected]>,Jeremy May <[email protected]>, Lily Mokonyane <[email protected]>,WJJ Van Rooyen <[email protected]>, Dries Basson<[email protected]>, Maylene Broderick <[email protected]>, JacoWolmarans <[email protected]>, Shelly Currin<[email protected]>, Jacques du Plessis <[email protected]>,

Forward

Projects Organisations Stakeholders Calendar Reports Emails more

Search

© 2012 SugarCRM Inc.

IPP Thabametsi Power Sta�on - No�ce of Extension of Review Period ... h�p://savannahsa.sweetcrm.co.za/index.php?module=Emails&ac�o...

1 of 4 2014/04/25 01:54 PM

Page 11: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

Dawie Smit <[email protected]>, S Snyders <[email protected]>, IanHall <[email protected]>, J.T Ramphago <[email protected]>, FransMabotja <[email protected]>, MM Komape <[email protected]>, NakediMaake <[email protected]>, Susara Maria Gouws <[email protected]>,Khoroshi Motebele <[email protected]>, Johan Koekemoer<[email protected]>, Nnana Manamela<[email protected]>, Dawid van der Walt<[email protected]>, Thomas Tau <[email protected]>, ThokoButhelezi <[email protected]>, Nakkie Maartens <[email protected]>,Marius Fuls <[email protected]>, Catharina Alletha Erasmus<[email protected]>, Koos Smit <[email protected]>, C C van Wyk<[email protected]>, Mariagrazia Galimberti <[email protected]>, EbenBadenhorst <[email protected]>, Francois van der Berg<[email protected]>, Stanley Koenaite <[email protected]>,Lephalale Local Municipality <[email protected]>, Ria Wells <[email protected]>,Mashudu Marubini <[email protected]>, Sambulo Mnguni<[email protected]>, BirdLife South Africa <[email protected]>, Julian Eslait<[email protected]>, Gwen Mahuma <[email protected]>

Subject: IPP Thabametsi Power Station - Notice of Extension of Review Period

Body: Dear Stakeholder

The Environmental Impact Assessment Process for the proposed IPP Thabametsi PowerStation has reference. Please find herewith a letter for your attention.

Kind regardsMrs Gabriele Wood

Public Participation and Social Consultant

Savannah Environmental (Pty) Ltd

Tel: 27 11 656 3237

Fax: 086 684 0547

Email: [email protected]

www.savannahsa.com

Show Plain Text

Attachments: IPP Thabametsi Power Station Draft EIA (extension of review period).pdf

Activities

(0 - 0 of 0)

Subject Status Contact DueDate

AssignedUser

No Data

Attachments© 2012 SugarCRM Inc.

Projects Organisations Stakeholders Calendar Reports Emails more

IPP Thabametsi Power Sta�on - No�ce of Extension of Review Period ... h�p://savannahsa.sweetcrm.co.za/index.php?module=Emails&ac�o...

2 of 4 2014/04/25 01:54 PM

Page 12: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

Subject Contact LastModified

IPP Thabametsi Power Station Draft EIA(extension of review period).pdf

25/04/201413.51

Accounts

(0 - 0 of 0)

Account Name Town/City Phone

No Data

Contacts

(0 - 0 of 0)

Name Organisation Email

No Data

Email Stakeholders

(1 - 10 of 100)

Name Organisation Email

RavishaAjodhapersadh

SavannahEnvironmental [email protected]

Marlaine Andersen Leads 2 Business [email protected]

Eben Badenhorst Lephalale LocalMunicipality [email protected]

Wolsey Otto Barnard Department ofEnergy [email protected]

Astrid Basson Lephalale LocalMunicipality [email protected]

Dries Basson Waterberg DistrictMunicipality [email protected]

Rosina Boloka Lephalale LocalMunicipality [email protected]

Maylene Broderick

Limpopo Departmentof EconomicDevelopment,Environment andTourism

[email protected]

Thoko ButheleziDepartment ofAgriculture, Forestry& Fisheries

[email protected]

Valerie Cilliers Northern News [email protected]

edit

Create

Create

edit

edit

edit

edit

edit

edit

edit

edit

edit

edit

© 2012 SugarCRM Inc.

Projects Organisations Stakeholders Calendar Reports Emails more

IPP Thabametsi Power Sta�on - No�ce of Extension of Review Period ... h�p://savannahsa.sweetcrm.co.za/index.php?module=Emails&ac�o...

3 of 4 2014/04/25 01:54 PM

Page 13: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

Print Back to top

(0 - 0 of 0)

Name User Name Email Phone

No Data

Projects

(1 - 1 of 1)

Name Assigned To Start Date: End Date:

Thabametsi Coal-fired PowerStation

GabrieleWood 01/03/2012 31/07/2013

Select

Create

edit

© 2012 SugarCRM Inc.

Projects Organisations Stakeholders Calendar Reports Emails more

IPP Thabametsi Power Sta�on - No�ce of Extension of Review Period ... h�p://savannahsa.sweetcrm.co.za/index.php?module=Emails&ac�o...

4 of 4 2014/04/25 01:54 PM

Page 14: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

1

Gabriele Wood

From: Gabriele Wood <[email protected]>Sent: 05 May 2014 01:30 PMTo: 'Gideon Erasmus'Subject: RE: IPP Thabametsi Power Station Project - Specialists undertaking AssessmentsAttachments: Map07_Impact_Index.pdf; Map04_Viewshed.pdf; Map06_Proximity_receptors.pdf

Dear Gideon

Lourens of MetroGIS informed me that you did not receive my email last week. I presume the maps were too large to be sent. I have now saved them as PDF files. Please could you kindly confirm receipt of these maps.

Kind regards

Gabriele WoodPublic Participation and Social Consultant | Savannah Environmental (Pty) LtdTel: +27 11 656 3237 | Fax: +27 86 684 0547 | Cell: +27 83 458 5570

From: Gabriele Wood [mailto:[email protected]] Sent: 30 April 2014 11:22 AMTo: 'Gideon Erasmus'Subject: RE: IPP Thabametsi Power Station Project - Specialists undertaking Assessments

Dear Gideon

Please find herewith the updated visual impact maps which were sent to me by Lourens from MetroGIS yesterday afternoon. I have also attached his email which provides an explanation of each of the maps. The visual impact assessment report is being updated and we will forward it to you as soon as it is available. I have asked Lourens to confirm when he would be able to visit your farm.

Kind regards

Gabriele WoodPublic Participation and Social Consultant | Savannah Environmental (Pty) LtdTel: +27 11 656 3237 | Fax: +27 86 684 0547 | Cell: +27 83 458 5570

From: Gideon Erasmus [mailto:[email protected]] Sent: 30 April 2014 07:53 AMTo: Gabriele WoodSubject: Re: IPP Thabametsi Power Station Project - Specialists undertaking Assessments

Dear Gabi

Hope everything is fine on your side. I am a bit worried because the time is almost over for the specialists to rectify the reports and include the farms Kalkvlakte and Maaiamazamshoek.

Till today nobody contact me for visit.

Please find out what is going on. They can contact me via email.

Regards

Page 15: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

2

Gideon Erasmus

Sent from my iPad

On 25 Apr 2014, at 2:31 nm., "Gabriele Wood" <[email protected]> wrote:

Dear Gideon and Chris Erasmus

The Environmental Impact Assessment Process for proposed IPP Thabametsi Power Station project has reference. I have spoken with Lourens du Plessis from MetroGIS, the specialists responsible for undertaking the visual impact assessment for the project regarding his visit to your farm. He indicated that he is in the process of rectifying the visual impact index and map in order to include your farms as sensitised receptors. He said that he would like to come to the site to verify the findings of his analysis and that he would contact you next week to confirm the dates with you.

I have asked the other specialists (water and noise) to contact you as well.

Please do not hesitate to contact me if you have any queries in this regard.

Kind regardsGabi Wood

Gabriele Wood

<114042514314014401>Public Participation and Social Consultant

Email: [email protected]

www.savannahSA.com

<114042514314014601>

Awarded Leading Environmental Consultant on Wind Projects in 2013 (SAWEA)

Disclaimer

This message and any files transmitted with it may contain information which is privileged, confidential or otherwise protected from disclosure. If you are not the intended recipient of this message, or if you have received it in error, please notify the sender immediately and delete the original and any attachments without making a copy or disclosing its contents.

Page 16: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

EIA PROCESS – PROPOSED IPP THABAMETSI POWER STATION

PROOF OF DISTRIBUTION: MINUTES OF THE LANDOWNERS FOCUS GROUP MEETING HELD ON 1 APRIL 2014

Page 17: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

EIA PROCESS – PROPOSED IPP THABAMETSI POWER STATION

PROOF OF DISTRIBUTION: NOTES OF SPECIALIST AND LANDOWNER WORKSHOP HELD ON 23 APRIL 2014

Page 18: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

EIA Process - Proposed IPP Thabametsi Power Station (DEA Ref. No.: 14/12/16/3/3/3/40)

Assigned to: Gabriele Wood Date Sent: 06/05/2014 16.39

Teams: Global Project: Thabametsi Coal-fired Power Station

From: Gabriele Wood <[email protected]>

To:

Cc:

Bcc: John Wesson <[email protected]>, Gideon Erasmus <[email protected]>,Mokgadi Makgato <[email protected]>, Bob Naidoo<[email protected]>, Mortimer Mannya <[email protected]>,Marlaine Andersen <[email protected]>, Molaudzi Engelin <[email protected]>,Hardus Steenekamp <[email protected]>, Pat van Rooyen <[email protected]>,Kobus De Villiers <[email protected]>, Mariette Ventre <[email protected]>, KarenSteenkamp <[email protected]>, Zev Green <[email protected]>,Maila Ledwaba Masetlwa <[email protected]>, A Matukane<[email protected]>, Astrid Basson <[email protected]>, Kubentheran Nair<[email protected]>, Malose Marakalala <[email protected]>, KrishnaReddy <[email protected]>, Ntau Letebele <[email protected]>,Charity Radipabe <[email protected]>, Hanneline Smit<[email protected]>, Rico Euripidou <[email protected]>, TinyikoMalungani <[email protected]>, Regina Makgata <[email protected]>,Andy Mcleod <[email protected]>, Annique Moloisi <[email protected]>,Mahlangu <[email protected]>, Aron Kharivhe <[email protected]>, DalenePitcut <[email protected]>, Department of Energy <[email protected]>,Jo-Anne Thomas <[email protected]>, Langi Malamba<[email protected]>, John Geeringh <[email protected]>, TockyNgobeni <[email protected]>, Ravisha Ajodhapersadh <[email protected]>,Rosina Boloka <[email protected]>, Lindiwe Kgomo<[email protected]>, Johannes Molepo <[email protected]>, PhomozoThivhafuni <[email protected]>, Walter Rachidi <[email protected]>,Peter Novellie <[email protected]>, Ismail Essa <[email protected]>, LouisRossel <[email protected]>, Jonathan Gafane <[email protected]>,Avhashoni Nicholas Magada <[email protected]>, Debbie Khan<[email protected]>, Dirk van Alphen <[email protected]>, Hennie van denAardweg <[email protected]>, Boeta Steenekamp <[email protected]>, ThulieMdluli <[email protected]>, Henri Nieuwoudt <[email protected]>,Azwihangwisi Mulaudzi <[email protected]>, Wolsey Otto Barnard<[email protected]>, Louis Loots <[email protected]>, MokopaneLetsoalo <[email protected]>, Emile Marell <[email protected]>, ValerieCilliers <[email protected]>, Louise Corbett <[email protected]>,Jeremy May <[email protected]>, Lily Mokonyane <[email protected]>,WJJ Van Rooyen <[email protected]>, Dries Basson<[email protected]>, Maylene Broderick <[email protected]>, Jaco

Forward

Projects Organisations Stakeholders Calendar Reports Emails more

Search

© 2012 SugarCRM Inc.

EIA Process - Proposed IPP Thabametsi Power Sta�on (DEA Ref. No.: 1... h�p://savannahsa.sweetcrm.co.za/index.php?module=Emails&ac�o...

1 of 4 2014/05/06 04:43 PM

Page 19: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

Leonard Sole <[email protected]>, Patrick Motela <[email protected]>,Dawie Smit <[email protected]>, S Snyders <[email protected]>, IanHall <[email protected]>, J.T Ramphago <[email protected]>, FransMabotja <[email protected]>, MM Komape <[email protected]>, NakediMaake <[email protected]>, Susara Maria Gouws <[email protected]>,Khoroshi Motebele <[email protected]>, Johan Koekemoer<[email protected]>, Nnana Manamela<[email protected]>, Dawid van der Walt<[email protected]>, Thomas Tau <[email protected]>, ThokoButhelezi <[email protected]>, Nakkie Maartens <[email protected]>,Marius Fuls <[email protected]>, Catharina Alletha Erasmus<[email protected]>, Koos Smit <[email protected]>, C C van Wyk<[email protected]>, Mariagrazia Galimberti <[email protected]>, EbenBadenhorst <[email protected]>, Francois van der Berg<[email protected]>, Stanley Koenaite <[email protected]>,Lephalale Local Municipality <[email protected]>, Ria Wells <[email protected]>,Dominique Doyle <[email protected]>, Mashudu Marubini<[email protected]>, Sambulo Mnguni <[email protected]>, BirdLife SouthAfrica <[email protected]>, Julian Eslait <[email protected]>, GwenMahuma <[email protected]>

Subject: EIA Process - Proposed IPP Thabametsi Power Station (DEA Ref. No.: 14/12/16/3/3/3/40)

Body: Dear Stakeholder

The EIA process for the proposed IPP Thabametsi Power Station (DEA Ref. No.: 14/12/16/3/3/3/40) has reference. Please find a letter attached for your attention.

Please do not hesiate to contact me if you have any queries in this regard.

Kind regardsMrs Gabriele Wood

Public Participation and Social Consultant

Savannah Environmental (Pty) Ltd

Tel: 27 11 656 3237

Fax: 086 684 0547

Email: [email protected]

www.savannahsa.com

Show Plain Text

Attachments: FEIR Submission to DEA 6.05.2014.pdf

Activities

(0 - 0 of 0)

Subject Status Contact DueDate

AssignedUser

© 2012 SugarCRM Inc.

Projects Organisations Stakeholders Calendar Reports Emails more

EIA Process - Proposed IPP Thabametsi Power Sta�on (DEA Ref. No.: 1... h�p://savannahsa.sweetcrm.co.za/index.php?module=Emails&ac�o...

2 of 4 2014/05/06 04:43 PM

Page 20: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

Attachments

(1 - 1 of 1)

Subject Contact LastModified

FEIR Submission to DEA 6.05.2014.pdf 06/05/201416.39

Accounts

(0 - 0 of 0)

Account Name Town/City Phone

No Data

Contacts

(0 - 0 of 0)

Name Organisation Email

No Data

Email Stakeholders

(1 - 10 of 102)

Name Organisation Email

RavishaAjodhapersadh

SavannahEnvironmental [email protected]

Marlaine Andersen Leads 2 Business [email protected]

Eben Badenhorst Lephalale LocalMunicipality [email protected]

Wolsey Otto Barnard Department ofEnergy [email protected]

Astrid Basson Lephalale LocalMunicipality [email protected]

Dries Basson Waterberg DistrictMunicipality [email protected]

Rosina Boloka Lephalale LocalMunicipality [email protected]

Maylene Broderick

Limpopo Departmentof EconomicDevelopment,Environment andTourism

[email protected]

edit

Create

Create

edit

edit

edit

edit

edit

edit

edit

edit

© 2012 SugarCRM Inc.

Projects Organisations Stakeholders Calendar Reports Emails more

EIA Process - Proposed IPP Thabametsi Power Sta�on (DEA Ref. No.: 1... h�p://savannahsa.sweetcrm.co.za/index.php?module=Emails&ac�o...

3 of 4 2014/05/06 04:43 PM

Page 21: ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED ...

Print Back to top

& Fisheries

Valerie Cilliers Northern News [email protected]

Users

(0 - 0 of 0)

Name User Name Email Phone

No Data

Projects

(1 - 1 of 1)

Name Assigned To Start Date: End Date:

Thabametsi Coal-fired PowerStation

GabrieleWood 01/03/2012 31/07/2013

edit

Select

Create

edit

© 2012 SugarCRM Inc.

Projects Organisations Stakeholders Calendar Reports Emails more

EIA Process - Proposed IPP Thabametsi Power Sta�on (DEA Ref. No.: 1... h�p://savannahsa.sweetcrm.co.za/index.php?module=Emails&ac�o...

4 of 4 2014/05/06 04:43 PM