ENVICO Consultants Company information
Contents
Ⅱ. Company Experience
Ⅰ. Company Profile
1
Ⅲ. Experience with GS
Ⅳ. Conclusion
Company Profile
ENVICO
3
ENVICO is ‘Bridge Engineering Experts Group’
ENVICO’s Main Job has been
I. Company Profile
ENVICO’s Engineers are Expert for Bridge Design & Construction Engineering.
Planning
&
Design
Construction
Engineering
Technical
Consulting
Research
&
Development
ENVICO’s Engineers
• More than 70% of Engineers possesses Master’s Degree or More
• More than 90% of Engineers has worked has experiences in site engineering and has involved in tender design of cable bridge.
Company History
4
I. Company Profile
Aug. 2003 Established ENVICO Consultants Co., Ltd.
Dec. 2003 Registered Field of ‘Civil-Structure’ at KoreaEngineering & Consulting Association(KENCA)
Sep. 2004 Registered Research Institute
Nov. 2009 Established (Subsidiary Company)KWANSOO E&C Co., Ltd. - Bridge Construction Company
Sep. 2010 Registered ‘INNO-BIZ’ in KOREA
Oct. 2010 Registered ‘Venture Business’ in KOREA
Technical Network for Bridge
5
I. Company Profile
Configuration of Technical Personnel Network Including Construction Engineering, Construction and R&D as well as Design for bridge
ENVICOConsultants
KWANSOOE & C
Construction of Cables & Girders
(ENVICO’s subsidiary firm)
Planning & Design,Construction Engineering,
R&D
Staff Composition
6
I. Company Profile
26 Bridge Engineers
inENVICO
CEOCEO Dongho YOODongho YOO
OthersOthers 4 person4 person
Vice PresidentVice President Yunki SONYunki SON
Project ManagerProject ManagerChangsun LEE / Seongheon KIM
/ Wooseok LEE
Changsun LEE / Seongheon KIM
/ Wooseok LEE
Chief EngineerChief EngineerSeungho CHOI / Dohyung KIM
/ Chungheon CHOI
Seungho CHOI / Dohyung KIM
/ Chungheon CHOI
Total : 30 Person
EngineerEngineer 18 person18 person
24years / MSCE24years / MSCE
Professional Engineer Civil Engineering StructuresProfessional Engineer Civil Engineering Structures
1991 ~ 1993 : Korea Highway Corporation (Researcher)
1993 ~ 2003 : Yooshin Co. Ltd. (Project Manager)
2003 ~ Present : ENVICO Consultants Co., Ltd (President)
2009 ~ Present : KWANSOO E&C (President)
1991 ~ 1993 : Korea Highway Corporation (Researcher)
1993 ~ 2003 : Yooshin Co. Ltd. (Project Manager)
2003 ~ Present : ENVICO Consultants Co., Ltd (President)
2009 ~ Present : KWANSOO E&C (President)
CV of Major Staff
7
I. Company Profile
Employment Record
· Tender design of Lusail Marine Bridge(CE)
· Basic and Detailed Design New Millennium Bridge(DB)
· Basic Design of NamBit Bridge(DB) / Basic Design of DanDeung Bridge(DB)
· Erection Design for Tender Design of Izmit Bay Bridge(DB/CE)
· Construction Engineering for Ulsan Bridge(CE) / Yi Sun-sin Bridge(CE)
· Tender design of Lusail Marine Bridge(CE)
· Basic and Detailed Design New Millennium Bridge(DB)
· Basic Design of NamBit Bridge(DB) / Basic Design of DanDeung Bridge(DB)
· Erection Design for Tender Design of Izmit Bay Bridge(DB/CE)
· Construction Engineering for Ulsan Bridge(CE) / Yi Sun-sin Bridge(CE)
Work experience
Dongho YOOCareer
Qualification
· Tender design of Lusail Marine Bridge(DB/CE)
· Basic and Detailed Design New Millennium Bridge(DB)
· Basic Design of NamBit Bridge(DB) / Basic Design of DanDeung Bridge(DB)
· Erection Design for Tender Design of Izmit Bay Bridge(DB/CE)
· Construction Engineering for Ulsan Bridge(CE) / Sorok Bridge(CE)
· Construction Engineering for 3rd Bosphorus Bridge(CE)
· Tender design of 6th Crossing Bridge(DB)
· Tender design of Lusail Marine Bridge(DB/CE)
· Basic and Detailed Design New Millennium Bridge(DB)
· Basic Design of NamBit Bridge(DB) / Basic Design of DanDeung Bridge(DB)
· Erection Design for Tender Design of Izmit Bay Bridge(DB/CE)
· Construction Engineering for Ulsan Bridge(CE) / Sorok Bridge(CE)
· Construction Engineering for 3rd Bosphorus Bridge(CE)
· Tender design of 6th Crossing Bridge(DB)
17years / MSCE17years / MSCE
Professional Engineer Civil Engineering StructuresProfessional Engineer Civil Engineering Structures
1998 ~ 2003 : Yooshin Co. Ltd. (Manager)
2003 ~ Present : ENVICO Consultants Co., Ltd (Vice President)
1998 ~ 2003 : Yooshin Co. Ltd. (Manager)
2003 ~ Present : ENVICO Consultants Co., Ltd (Vice President)
CV of Major Staff
8
I. Company Profile
Employment Record
Work experience
Yunki SONCareer
Qualification
16years / MSCE16years / MSCE
Professional Engineer Civil Engineering StructuresProfessional Engineer Civil Engineering Structures
1999 ~ 2009 : Dasan Consultansts Co. Ltd(Senior Engineer)
2009 ~ Present : ENVICO Consultants Co., Ltd(Project Manager)
1999 ~ 2009 : Dasan Consultansts Co. Ltd(Senior Engineer)
2009 ~ Present : ENVICO Consultants Co., Ltd(Project Manager)
CV of Major Staff
9
I. Company Profile
Employment Record
· Basic Design New Millennium Bridge(DB)
· Erection Design for Tender Design of Izmit Bay Bridge(DB/CE)
· Construction Engineering for Yi Sun-sin Bridge(CE)
· Construction Engineering for Ulsan Bridge(CE)
· Super long-span Bridge R&D Project 1-1-2-3 “Future Cable Supported Bridge”
· Basic Design New Millennium Bridge(DB)
· Erection Design for Tender Design of Izmit Bay Bridge(DB/CE)
· Construction Engineering for Yi Sun-sin Bridge(CE)
· Construction Engineering for Ulsan Bridge(CE)
· Super long-span Bridge R&D Project 1-1-2-3 “Future Cable Supported Bridge”
Work experience
Changsun LEECareer
Qualification
CV of Major Staff
10
I. Company Profile
Seongheon KIM
l Work Experience· Basic and Detailed Design New Millennium Bridge(DB)
· Basic Design DanDeung Bridge(DB)
· Tender design of 6th Crossing Bridge(DB)
· Erection Design for Tender Design of Izmit Bay Bridge(DB/CE)
· Construction Engineering for Yi Sun-sin Bridge(CE)
· Construction Engineering for Ulsan Bridge(CE)
· Construction Engineering for 3rd Bosphorus Bridge(CE)
l Work Experience· Basic and Detailed Design New Millennium Bridge(DB)
· Basic Design DanDeung Bridge(DB)
· Tender design of 6th Crossing Bridge(DB)
· Erection Design for Tender Design of Izmit Bay Bridge(DB/CE)
· Construction Engineering for Yi Sun-sin Bridge(CE)
· Construction Engineering for Ulsan Bridge(CE)
· Construction Engineering for 3rd Bosphorus Bridge(CE)
Career : 10years / MSCE / Civil Engineer
Wooseok LEE
l Work Experience· Basic and Detailed Design for An access Road construction ofYeosu National Industrial complex(Section III)(DB)
· Detailed Design of SinGal Overpass Bridge (DB)
· Construction Engineering for Ulsan Bridge(CE)
· Construction Engineering for Lusail Bridge(CE)
· Construction Engineering for 3rd Bosphorus Bridge(CE)
l Work Experience· Basic and Detailed Design for An access Road construction ofYeosu National Industrial complex(Section III)(DB)
· Detailed Design of SinGal Overpass Bridge (DB)
· Construction Engineering for Ulsan Bridge(CE)
· Construction Engineering for Lusail Bridge(CE)
· Construction Engineering for 3rd Bosphorus Bridge(CE)
Career : 10years / MSCE / Civil Engineer
CV of Major Staff
11
I. Company Profile
l Work Experience
· Design-Build in the accessRoad Between Hwayang& Jeokguem(SectionIII)(DB)
· Design in the access Roadfor Cheongju Technoplis(DB)
· Construction Engineering for Yangyang Bridge(CE)
· Construction Engineering for Sepung Bridge(CE)
l Work Experience
· Design-Build in the accessRoad Between Hwayang& Jeokguem(SectionIII)(DB)
· Design in the access Roadfor Cheongju Technoplis(DB)
· Construction Engineering for Yangyang Bridge(CE)
· Construction Engineering for Sepung Bridge(CE)
Seungho CHOI
Career : 10years / MSCE
l Work Experience
· Basic and Detailed DesignYi Sun-sin Bridge(DB)
· Basic Design DanDeungBridge(DB)
· Construction Engineering for Jeokgeum Bridge(CE)
· Construction Engineering for Ulsan Bridge(CE)
l Work Experience
· Basic and Detailed DesignYi Sun-sin Bridge(DB)
· Basic Design DanDeungBridge(DB)
· Construction Engineering for Jeokgeum Bridge(CE)
· Construction Engineering for Ulsan Bridge(CE)
Dohyung KIM
Career : 9years / BSCE
l Work Experience
· Basic and Detailed Design Yi Sun-sin Bridge(DB)
· Basic Design DanDeungBridge(DB)
· Construction Engineering for Yi Sun-sin Bridge(CE)
· Construction Engineering for Ulsan Bridge(CE)
l Work Experience
· Basic and Detailed Design Yi Sun-sin Bridge(DB)
· Basic Design DanDeungBridge(DB)
· Construction Engineering for Yi Sun-sin Bridge(CE)
· Construction Engineering for Ulsan Bridge(CE)
Chungheon CHOI
Career : 8years / MSCE
12
(Since 2009, ENVICO’s Subsidiary firm)
Kwansoo is ‘Bridge Construction Experts Group.
Kwansoo’s Main Job has been
I. Company Profile
Company Profile of Kwansoo
Supply
of
Cable System
Construction of
Suspension Bridge
&
Cable Stayed Bridge
Supply
of
Cable System
Construction
Engineering
&
Technical
Consulting
Kwansoo’s member have participated in most of suspension bridgesin Korea.
Kwansoo is the leader in construction of cable bridge especially for suspension bridge.
Company Experience (Major Project)
Project List
14
II. Company Experience
Lusail Marine Br.(Tender Design in Oversea)
Cheongpung Br.(Design)
Yi Sun-sin Br.(Construction Engineering)
Sepung Br.(Construction Engineering)
Mokpo Br.(Construction Engineering)
1st Gong Chon Br.(Design)
3rd Bosphorus Br.(Tender Design in Oversea)
6th Crossing Br.(Tender Design in Oversea)
New Millennium Br.(Design)
Major Project Major Project
Including major projects, over 130 projects in Design, CE and Research ExperienceOver a decade.
ENVICO is the best pathfinder in bridge engineering
by having a successful track record in this field.
R & D
DesignTender Design
in Oversea
ConstructionEngineering
15
II. Company Experience
· Tender of Iconic Bridge (UAE)/ May.2007~Jul.2007 / 250m / Cable Stayed Bridge / Samsung
· Tender of Western Freeway Sea Link Project (India)/ Jul.2008~Oct.2008 / 13.75km / PC Box Girder / Samsung
· Tender of 6th Crossing Bridge (UAE) / Sep.2008~Nov.2008 / 610m / Arch Bridge / Samsung
· Erection Design for Tender of Izmit bay Bridge (Turkey)/ Sep.2010~Nov.2010 / 1,500m / Suspension Bridge / Hyundai
· Erection Design for Tender of Lusail Marine Bridge (Qatar) / Feb.2011~Mar.2011 / 129m / Suspension Bridge / Samsung
Tender Design in Oversea (Project/Period/Main span/Bridge Type/Client)
Project List
16
II. Company Experience
· Tender of Mumbai Trans Harbour Link Project (India)
/ May.2012~Aug.2012 / 22km / Cable Stayed Bridge / GS
· Tender of Vam Cong Bridge Construction Project (Vietnam)
/ Mar.2013~Jun.2013 / 450m / Cable Stayed Bridge / GS
· Tender of Padma Multipurpose Bridge Project (Bangladesh)
/ Dec.2013~Feb.2014 / 150m / Truss Bridge / Daelim
· Tender of 3rd Bosphorus Bridge (Turkey)/ Mar.2012~Apr.2012 / 1,465m / Suspension Bridge / POSCO
(Erection Design)/ Sep.2012~Present / 1,408m / Suspension Bridge / DAELIM
(Design Modification and CE)
Project List Tender Design in Oversea (Project/Period/Main span/Bridge Type/Client)
Project List
17
II. Company Experience
Basic & Detail Design (Project/Period/Main span/Bridge Type/Client)
· Detailed Design of CheongPung Bridge/ Aug.2004~Dec.2004 / 327m / Cable Stayed Bridge / Daelim
· Basic Design DongMakCheon Bridge/ Feb.2005~Mar.2005 / 75m / Arch Bridge / Korea Development Corp.
· Basic Design Gosaek Bridge/ May.2005~Jul.2005 / 105m / Arch Bridge / SsangYong
· Detailed Design NamChang Bridge/ Aug.2005~Dec.2005 / 160m / Arch Bridge / Korea Development Corp.
· Detailed Design of 1st GongChon Bridge/ Apr.2007~May.2007 / 300.5m / Cable Stayed Bridge / PyungHwa
· Basic Design of DanDeung Bridge for Design-Build in the access Road for Gogunsan islands project/ Dec.2008~Mar.2009 / 330m / Suspension Bridge / Samsung
Project List
18
II. Company Experience
· Detailed Design for the alternative of Tower Crossbeam in Yeosu industrial site road construction project (Yi Sun-sin Bridge)/ Dec.2008~Jun.2009 / 1,545m / Suspension Bridge / Daelim
· Basic and Detailed Design of New Millennium Bridge for Design-Buildin Road Construction Project Between Aphae and Amtae/ Jun.2009 ~ Aug.2010 / 2@650m / Suspension Bridge / Daelim
· Detailed Design of SinGal Overpass Bridge/ Dec.2010~Dec.2011 / 150m / Extradosed Bridge / Hyundai
· Erection Design of Suspension bridge for Design-Build in the access Road Between Hwayang and Jeokguem/ Apr.2011~May 2011 / 750m / Suspension Bridge / Samsung
· Detailed Design of Saddle, Band, Hand Rope SystemThe 3rd Bosphorus Bridge/ Jan.2013~Jun.2014 / 1,408m / Suspension Bridge / T-ENGINEERING
Basic & Detail Design (Project/Period/Main span/Bridge Type/Client)
19
II. Company Experience
Construction Engineering (Project/Period/Main span/Bridge Type/Client)
· Construction Engineering of the 2nd JinDo Bridge/ Nov.2003~Dec.2004 / 344m / Cable Stayed Bridge / Hyundai
· Construction Engineering and Safety Check of Geo-Gum Bridge (Sorok Bridge)
/ Dec.2005~Dec.2006 / 250m / Suspension Bridge / Daelim
· Construction Engineering for the Cable erection in Yeosu industrial siteroad construction project(Yi Sun-sin Bridge)/ Apr.2009~Mar.2011 / 1,545m / Suspension Bridge / Daelim
· Construction Engineering for the Cable erection of Jeokgeum Bridge/ Dec.2010~Jan.2011 / 850m / Suspension Bridge / Daelim/ Sep.2011~Dec.2011 / 850m / Suspension Bridge / Daelim
· Construction Engineering for the Girder erection in Yeosu industrial siteroad construction project(Yi Sun-sin Bridge) / Sep.2011~Dec.2011 / 1,545m / Suspension Bridge / Kwanso E&C
Project List
20
II. Company Experience
· Construction Engineering in Yeosu industrial site road constructionproject(Yi Sun-sin Bridge) / Jun.2010~Apr.2012 / 1,545m / Suspension Bridge / Kwanso E&C
· Independent check for DanDeung Bridge Design and Construction Engineering for the Cable erection of DanDeung Bridge/ Nov.2011~Apr.2012 / 400m / Suspension Bridge / Daelim
· Construction Engineering for Mokpo Bridge/ Aug.2009~Dec.2010 / 500m / Cable Stayed Bridge / GS
· Construction Engineering for the Cable erection of Jeokgeum Bridge/ Mar.2012~Sep.2012 / 850m / Suspension Bridge / Kwanso E&C
· Construction Engineering of Lusail Marine Bridge (Qatar) / Nov.2011~Sep.2012 / 129m / Suspension Bridge / Samsung
Project List Construction Engineering (Project/Period/Main span/Bridge Type/Client)
21
II. Company Experience
· Construction Engineering for Sepung Bridge/ Dec.2010~Aug.2013 / 220m / Cable Stayed Bridge / Daelim
· Construction Engineering for Cable & Girder erection in Ulsan Bridge/ Sep.2012~Dec.2014 / 1,150m / Suspension Bridge / Hyundai Steel
· Construction Engineering in Ulsan Bridge Project/ Feb.2011~Mar.2015 / 1,150m / Suspension Bridge / Hyundai
· Construction Engineering of 3rd Bosporus Bridge (Istanbul, Turkey)/ May2013~ Dec.2015 / 1408m / Suspension & Stayed Bridge / Hyundai
Project List Construction Engineering (Project/Period/Main span/Bridge Type/Client)
22
II. Company Experience
· Engineering Technology Development for Suspension Bridge/ Nov.2011~Dec.2012 / POSCO
· The Cable Twisting Study by Cable 3D Widening for 3D SuspensionBridge (2ND Namhae Bridge)
/ Apr.2012~Dec.2012 / GS
· Internalization of Cable Erection Technology for Long SpanSuspension Bridge
/ Apr.2011~Mar.2013 / Samsung
· Development for Main Cable Geometry Control/ Apr.2013~Nov.2014 / GS
· Super long-span Bridge R&D Project 1-1-2-3 “Future Cable SupportedBridge”– Multi-span Suspension Bridge / Cable-Stayed and SuspensionBridges
/ May 2009~Dec.2015 / MLTM
Research (Name/Period/Client)
Project List
23
Project Name : 3rd Bosphorus Bridge Project
Location : Istanbul, TurkeyPeriod : Mar. 2012 ~ PresentClient : ICA / Hyundai-SK Joint Venture / T-Engineering
Bridge Outline- Name : 3rd Bosphorus Bridge- Type : Hybrid Cable-Stayed Suspension Bridge- Total Length of Main Bridge: 2,165m (378+1,408+378)- Girder : Concrete and Steel Box Girder
Project Name of Consulting Services by ENVICO :- Erection Design for Superstructure of Suspension Bridge - Erection Design for Tender Design of 3rd Bosphorus Bridge- Detailed Design of Saddle, Band and Hand Rope System- CE of Suspension Part for 3rd Bosphorus Bridge
Work Scope- Preparation of tender & Estimation of construction cost- Detailed Design for suspension bridge part- Erection planning & Check of the construction schedule
II. Company Experience
3rd Bosphorus Bridge (Turkey)
Tender Design in Oversea
(1 / 2)
(Including Design & CE)
24
II. Company Experience
Project Type Work Scope Client
Tender(P.P.P)
Erection Concept for Main Cable & Girder
POSCO
Tender(EPC)
Erection Method,Temp. Structure Design
DAELIM
Detailed DesignSaddle, Band and Hand rope system
T-engineering
ConstructionEngineering 1
Basic erection Sequence, Temp. Structure Design Geometry Control
HDSK
ConstructionEngineering 2
Detailed erection Sequence, Method statements
Hyundai Steel
ENVICO is participating in all engineering phases of 3rd Bosphorus Bridge
3rd Bosphorus Bridge (Turkey)(2 / 2)
Tender Design in Oversea (Including Design & CE)
25
Project Name : Lusail Development Primary Infrastructure(Construction Package 3A, Phase2)
Location : Lusail, QatarPeriod : Feb. 2011 ~ Mar. 2011 Client : Lusail Real Estate Development Company / Samsung
Bridge Outline- Name : Lusail Marine Bridge- Type : Self anchored Suspension Bridge- Span Length : 204m (75+129)
Project Name of Consulting Services by ENVICO :- Erection Design for Tender of Lusail Marine Bridge - Construction Engineering of Lusail Marine Bridge
Work Scope- Tender Design for Bridge Erection- Construction Engineering for Cable & Girder Erection - Geometry Control of Cable, Tower and Girder Erection
II. Company Experience
Lusail Marine Bridge (Qatar)(1 / 2)
Tender Design in Oversea (Including CE)
26
II. Company Experience
Project Type Work Scope Client
TenderEstimation of Quantity,
Temp. Structure DesignSamsung
ConstructionEngineering
Detailed Erection Sequence,
Temp. Structure Design,
Geometry Control
Samsung
Lusail Marine Bridge (Qatar)(2 / 2)
Tender Design in Oversea (Including CE)
27
Project Name : Tender Design of Izmit Bay Bridge (Turkey)
Location : Izmit Bay, TurkeyPeriod : Sep. 2010 ~ Nov. 2010Client : The NÖMAYG Joint Venture / Hyundai
Bridge Outline- Name : Izmit Bay Bridge- Type : 3 span Suspension Bridge- Total Length of Main Bridge: 2,800m (625+1,550+625)
Project Name of Consulting Services by ENVICO :- Erection Design for Tender Design of Izmit Bay Bridge (Turkey)
Work Scope- Erection planning & Check of the construction schedule- Estimation of construction cost- Preparation of tender document
II. Company Experience
Izmit Bay Bridge (Turkey)
Tender Design in Oversea
28
II. Company Experience
6th Crossing Bridge (UAE)
Project Name : The 6th Creek Crossing Bridge
Location : Dubai, UAEPeriod : Sep. 2008 ~ Nov. 2008Client : Dubai Roads & Transport Authority / Samsung
Bridge Outline- Name : 6th Crossing Bridge- Type : Arch Bridge- Total Length of Main Bridge : 610 + 380 = 990m- Main Span Length : 610m- Girder : PSC Box Girder with Strut
Project Name of consulting services by ENVICO :- Tender Design of 6th Crossing Bridge
Work Scope- Erection Planning of Anch- Stage Analysis for Each Erection Method- Design of Temporary Structure- Section Development and Design
(1 / 2)
Tender Design in Oversea
29
- Arch Erection Method
Option 1 : Heavy Lifting Method
6th Crossing Bridge (UAE)
Option 2 : High Line Method
Option 3 : Rotation Method Option 4 : Typical Method with FCM
II. Company Experience
(2 / 2)
Tender Design in Oversea
30
II. Company Experience
Iconic Bridge (UAE)
Project Name : Iconic Bridge Preconstruction Design
Location within Country : Palm Jebel Ali, Dubai, UAEPeriod : May. 2007 ~ Jul. 2007 Client : Nakheel / Samsung
Bridge Outline- Name : Iconic Bridge- Type : Cable Stayed Bridge- Total Length of Main Bridge : 450m (200+250)- Main Span Length : 250m- Girder : PSC Box Girder+Steel Box Girder
Project Name of consulting services by ENVICO :- Report of Preconstruction Design
Work Scope- Basic Design- Planning for basic configuration- Planning for construction method - Quantity Estimation
Tender Design in Oversea
Design Project
31
II. Company Experience
Project Name : Road Construction Project Between Aphae and Amtae
Location : Sinan-gun, Jeollanam-doPeriod : Jun. 2009 ~ Aug. 2010Client : Iksan Regional MOCT / Daelim
Bridge Outline- Name : New Millennium Bridge- Type : Multi Span Suspension Bridge- Span Length :1,750m (225+2@650+225)
Project Name of Consulting Services by ENVICO :- Basic and Detailed Design of New Millennium Bridge forDesign-Build Tender in Road Construction Project Between Aphae and Amtae
Work Scope- Design of the Main Bridge(Basic & Detailed Design)- Main cable, hanger, Stiffening Girder Detail Design- Erection Analysis of Suspension Bridge
New Millennium Bridge
32
Project Name : Approach road project of Gogunsan islands
Location : Gunsan-si, Jeollabuk-do, KoreaPeriod : Dec. 2008 ~ Mar. 2009Client : Iksan regional construction management Administration
/ Daelim
Bridge Outline- Name : DanDeung Bridge- Type : Mono cable Suspension Bridge - Total Length of Main Bridge: 400m (35+330+35)
Project Name of Consulting Services by ENVICO :- Tender Design of DanDeung Bridge for Design Build in the access road for Gogunsan inslands project
Work Scope- Design of the Suspension Bridge
II. Company Experience
DanDeung Bridge
Design Project
33
Project Name : Construction of Cheongpung bridge
Location : Jecheon-si, Chungcheongbuk-doPeriod : Aug. 2004 ~ Dec. 2004Client : Chungcheongbuk-do / Daelim
Bridge Outline- Name : CheongPung Bridge- Type : Cable Stayed Bridge- Total Length of Main Bridge: 442m (22.2+35.3+327+35.3+22.2) - Main Span Length : 327m- Girder : Composite Girder + Concrete Edge Girder
Project Name of Consulting Services by ENVICO :- Detailed Design of CheongPung Bridge
Work Scope- Design of the Cable Stayed Bridge(All Structure excluded Foundation)
II. Company Experience
CheongPung Bridge
Design Project
34
Project Name : IFEZ development Project (Zone4)
Location : Incheon Metropolitan CityPeriod : Apr. 2007 ~ May. 2007Client : Incheon / PyungHwa
Bridge Outline- Name : 1st GongChon Bridge- Type : Cable Stayed Bridge- Total Length of Main Bridge: 300.5m(45.5+170+85)- Main Span Length : 170m- Girder : Concrete, Steel Composite Girder
Project Name of Consulting Services by ENVICO :- Detailed Design of 1st GongChon Bridge
Work Scope- Design of the Cable Stayed Bridge(All Structure excluded Foundation)
II. Company Experience
1st GongChon Bridge
Design Project
35
Project Name : Singal bypass road Project
Location : Yongin-si, Gyeonggi-doPeriod : Dec. 2010 ~ Dec. 2011Client : Seoul Metropolitan Government / Hyundai
Bridge Outline- Name : SinGal Overpass Bridge- Type : Extradosed Bridge - Total Length of Main Bridge: 330m (90+150+90) - Main Span Length : 150m- Girder : PSC Box Girder
Project Name of Consulting Services by ENVICO :- Detailed Design of SinGal Overpass Bridge
Work Scope- Detailed Design for all Structures
II. Company Experience
SinGal Overpass Bridge
Design Project
36
Project Name : Yeosu Industrial Site Road Construction Project
Location : Gwangyang-si, Jeollanam-do KoreaPeriod : Apr. 2009 ~ Apr. 2012Client : Jeollanam-do / Daelim / Kwansoo E&C
Bridge Outline- Name : Yi Sun-sin Bridge- Type : 3-span Suspension Bridge- Span Length : 2,260m (357.5+1,545+357.5)
Project name of Consulting Services by ENVICO :- Construction Engineering for the Cable erection- Construction Engineering for the Girder erection
Work Scope- Planning of Cable & Girder Erection- Detail Design of Temp. structure for Cable & Girder Erection- Detail Erection Planning for Cable & Girder Erection- Planning for Mobilization/Demobilization of Equipment
II. Company Experience
Construction Engineering Project Yi Sun-sin Bridge
37
Project Name : Geogeum Bridge Construction (Sorok Bridge)
Location : Gohueng-gun, Jeollanam-do, Korea Period : Dec. 2005 ~ Dec. 2006Client : Jeollanam-do / Daelim
Bridge Outline- Name : Sorok Bridge- Type : Self anchored Suspension Bridge- Span Length : 470m (110+250+110) )
Project Name of Consulting Services by ENVICO :- Construction Engineering and Safety Check of Geo-Gum Bridge Construction (Sorok Bridge)
Work Scope- Calculation for Initial Equilibrium Condition - Safety Check during Construction- Review for Hanger Installation Method- Simulation of Hanger Installation Sequence
II. Company Experience
Sorok Bridge
Construction Engineering Project
38
Project Name : 2nd JinDo Bridge Project
Location : Jindo-gun, Jeollanam-doPeriod : Nov. 2003 ~ Dec.2004Client : Iksan Regional Construction Management Administration
/ Hyundai
Bridge Outline- Name : 2nd JinDo Bridge- Type : Cable Stayed Bridge - Total Length of Main Bridge: 484m (70+344+70) - Girder : Steel Box Girder
Project Name of Consulting Services by ENVICO :- Construction Engineering of the 2nd JinDo Bridge
Work Scope- Construction Engineering
II. Company Experience
2nd JinDo Bridge
Construction Engineering Project
39
Project Name : Ulsan Bridge
Location : Ulsan Metropolitan City, KoreaPeriod : Feb. 2011 ~ Dec. 2015 Client : Ulsan Harbor Bridge / Hyundai / Hyundai Steel
Bridge Outline- Name : Ulsan Bridge- Type : Single Span Suspension Bridge- Span Length : 1,150m
Project Name of Consulting Services by ENVICO :- Construction Engineering(Basic) in Ulsan Bridge Project- Construction Engineering(Detail) for Cable & GirderErection in Ulsan Bridge Project
Work Scope- Construction Engineering- Design of Temp. Structure for Cable & Girder Erection - Erection Planning of Cable & Girder - Geometry Control of Tower, Cable and Girder- Detail Erection Planning of Cable Work
II. Company Experience
Ulsan Bridge
Construction Engineering Project
40
Project Name : The access Road for Gogunsan islands project
Location : Gunsan-si, Jeollabuk-do, KoreaPeriod : Nov. 2011 ~ Apr. 2012 Client : Jeollanam-do / Daelim
Bridge Outline- Name : DanDeung Bridge- Type : Single span Suspension Bridge with one tower- Span Length: 705m(425+280)
Project Name of Consulting Services by ENVICO :- Independent check for DanDeung Bridge Design andConstruction Engineering Structure for the Cable Erection ofDanDeung Bridge
Work Scope- Independent Design Check- Detail Design of Temp. structure for cable & Super-structure- Detail Erection Planning of Cable work- Detail Erection Planning of Girder installation
II. Company Experience
DanDeung Bridge
Construction Engineering Project
41
Project Name : Construction of Jeokguem-Youngnam Bridge
Location : Yeosu-si, Jeollabuk-do, KoreaPeriod : Dec. 2010 ~ Dec. 2011 Client : Iksan Regional Construction / Daelim
Bridge Outline- Name : Jeokguem Bridge- Type : Single span Suspension Bridge- Span Length: 1,340m(310+850+180)
Project Name of consulting services by ENVICO :- Construction Engineering for the Cable Erection ofJeokgeum Bridge
Work Scope- Construction Engineering- Detail Design of Temp. structure for Cable- Detail Erection Planning of Cable Work
II. Company Experience
Jeokguem Bridge
Construction Engineering Project
42
Project Name : National detour road construction Gwangyang city
Location : Gwangyang-si, Jeollanam-doPeriod : Dec. 2010 ~ Aug. 2013Client : Iksan Regional Construction Management Administration
/ Daelim
Bridge Outline- Name : Sepung Bridge- Type : Cable Stayed Bridge- Total Length of Main Bridge : 725m(57.5+85+2@220+85+57.5)- Main Span Length : 220m- Girder : PC Box Girder
Project Name of consulting services by ENVICO :- Construction Engineering for Sepung Bridge
Work Scope- Independent Check- Construction Engineering, Geometry Control- Design of Temp. Structure
II. Company Experience
Sepung Bridge
Construction Engineering Project
43
Client : Ministry of Land, Transportation and Maritime Affairs
Research Period : May. 2009 ~ Dec. 2015
Work Scope
- Study of Prototype model in Multi-span Suspension Bridge
- Study of Prototype model in Cable-Stayed-Suspension
Bridge
- Parametric Study on Safety Factor for Cable Slip in Multi-Span
Suspension Bridges
- Optimum Pylon stiffness in Multi-Span Suspension Bridges
- Cost Optimization using High-performance Material
in Multi-Span Suspension Bridges
- Optimum Span Ratio of Cable Stayed-Suspension Bridge
Ls Lc Lc Ls
B
Iν
Kx
Kz
δ
1 ν2 ν1N
R(x)R(z)
R(x)R(z)
R(x)R(z)
F F F
II. Company Experience
Research Project Super long-span Bridge R&D Project 1-1-2-3
“Future Cable Supported Bridge”
44
Client : Samsung
Research Period : Apr. 2011 ~ Mar. 2013
Work Scope
- Cable Erection Procedure and Method
- Arrangement of Design Items for Temporary Structures
according to Cable Erection Methods
- Guideline of Geometry Control Technique during Cable Erection
- Erection manual for Cable work considering detailed cable
erection sequence
- Development for Cable Geometry Control Software
II. Company Experience
Internalization of Cable Erection Technology for Long Span Suspension Bridge
Research Project
45
Client : POSCO
Research Period : Nov. 2011 ~ Dec. 2012
Work Scope
- Study for Planning & Design of Suspension Bridge
- Recent Trend for Planning & Design of Suspension Bridge
- Guideline of Necessity Items for Engineering of
Suspension Bridge
- Specifications for Suspension Bridge Construction
- Study of Applied Examples for Special Equipments
- Study of Management Method for Special Equipments
II. Company Experience
Engineering Technology Development for Suspension Bridge
Research Project
Experience with GS
47
Project Name : Mokpo Bridge Project
Location within Country : Mokpo-si,Sinan-gun,JeollanamdoPeriod : Aug. 2009 ~ Dec. 2010Client : Jeollanam-do / GS
Bridge Outline- Name : Mokpo Bridge- Type : Cable Stayed Bridge- Total Length of Main Bridge: 900m (200+500+200) ) - Main Span Length : 500m- Girder : Steel Box Girder
Project Name of Consulting Services by ENVICO :- Construction Engineering for Mokpo Bridge
Work Scope- Independent Check- Geometry Control & Design of Temp. Structure
Ⅲ. Experience with GS
Mokpo Bridge
Experience with GS
48
Project Name : Sluice Extension at Nakdong River Project
Location within Country : Busan Metropolitan CityPeriod : Sep. 2009 ~ Nov. 2009Client : Korea water Resources Corporation / GS
Bridge Outline- Name : Narae Bridge- Type : Arch Bridge- Total Length of Main Bridge: 360m (80+2@100+80) ) - Main Span Length : 100m- Girder : Steel Box Girder
Project Name of Consulting Services by ENVICO :- Design of Narae Bridge
Work Scope- Basic Design
Ⅲ. Experience with GS
Narae Bridge
Experience with GS
49
Mumbai Trans Harbour Link Project (Incomplete project)
Location : Mumbai, Maharashtra State, India
Service Done in : 2012
Structural Type : Concrete Box Girder and Stayed Cable Bridge
Function / usage : Road bridge
Total Length : 22km
Work Scope : Quantity Studying for biddingConstruction Engineering
Experience with GS Tender Design
Sewri
Chirle
Main Land
Island City
MTHL
Ⅲ. Experience with GS
Vam Cong Bridge Construction Project
Location : Cao Lanh City and Can Tho City, Vam Cong, Vietnam
Service Done in : 2013
Structural Type : Stayed Cable Bridge
Function / usage : Road bridge
Total Length : 2.97km
Main Span : 210 + 450 + 210 = 870m
Work Scope : Quantity Studying for bidding
50
Cable Twisting Study by Cable 3D Widening for 3D Suspension Bridge(2nd Namhae Bridge)Work Scope- Cable Twisting Study by Cable 3D Widening
- Development of FEA method(Multi-Strand Model Analysis)
to reflect the geometric stiffness representing the torsional
behavior of suspension bridge cables.
- Analysis for application of FEA method "Multi-Strand Model“
- Verification of FEA method "Multi-Strand Model"
using measurement record of installation cable force and
angle for pre-build 3-D Cable bridge, “Yong-jong Bridge"
- For Namhae 2nd Bridge, suggestion of the angle of
the initial installation cable band
Experience with GS Research Project
Ⅲ. Experience with GS
Development for Main Cable Geometry ControlWork Scope- Manual for Erection of Suspension Bridge
- Development for 3D Elastic – Catenary Element
- Main Cable Program for Geometry Control
- Erection Rope Program for Geometry Control
Conclusion
52
ConclusionⅣ. Conclusion
Ability for Design & Construction Engineering
Basic & Detail DesignConstruction Engineering
Experiencefor Tender Design in Oversea
Local
Code
With ENVICO’s experience, following can be achieved;
- Quality Improvement & Cost Optimization (including tender and detail design cost)
- Idea for Erection Method in Tender Stage
- Minimization of Erection Cost in Bidding Price
Experience
for Any Type
of Bridges
ArchCable StayedSuspension
Appendix
54
Project of Kwansoo
Jeok Guem Bridge
Lusail Marine Bridge (Qatar) Dan Deung Bridge
Appendix
Company Profile of Kwansoo
Yi Sun-sin Bridge
Completion
2nd Nam Hae Bridge
2nd Gansun 4 Bridge