Engineering Services 1
Engineering Services
17.01.07New Delhi
Engineering Services 2
Presentation Sequence
• Company Profile
• Engineering Services, ONGC
• Assets Created
• Typical Offshore Facilities
• Assets under Creation/Renewal
• Assets Creation – Under Tendering
• Asset Creation – Future Plan
Contd . .
Engineering Services 3
Company Profile
MSP
Engineering Services 4
ONGC’s Strategic Vision 2001-2020
• To focus on core business of E&P
• Doubling reserves (i.e. accreting 6 billion tonnes of O+OEG) by 2020; out of this 4 billion tonnes are targeted from the Deep-waters.
• Improving average recovery from 28% to 40%.
• Equity Hydrocarbon from abroad.
SH
Engineering Services 5
Financial Status (2005-06)
• ONGC posted a net profit of Rs. 14431 Crores, the Highest by any Indian Company.
• Practically zero debt Corporate.• Contributed over Rs. 23376
Crores to the exchequer.• Highest ever Dividend of Rs.
6417 Crores by any Indian Corporate.
Engineering Services 6
Recognition in Last 12 Months
• ONGC became the NO. 1 E&P Company in the World and 20th among leading Global Energy majors as per Platts Top 250.
• ONGC became the first Central Public Enterprise to receiver the designated national authority for its clean development mechanism under the Kyoto Protocol.
• ONGC was conferred the “Golden Peacock Award for Corporate Social Responsibility in Emerging Economics, 2006.
Engineering Services 7
Recognition in Last 12 Months
• ONGC secured the NDTV Profit Business Leadership Award in the Oil and Gas Category, handed over by the Hon’ble Prime Minister of India.
• ONGC was awarded the highest-ever Credit Rating for any Indian corporate by the International Credit Rating Agency Moody’s Investor Services.
• FY06 performance of ONGC has been rated ‘Excellent’ by the Department of Public Enterprises.
• ONGC has become the first PSU to get ISO 9001-2000 Certification from DNV for Internal Audit.
Engineering Services 8
Engineering Services
ONGC
Engineering Services 9
Engineering Services, ONGC
• Engineering Services is responsible for creating facilities for exploitation & transportation of hydrocarbons.
• To meet the above objectives, Engineering Services undertakes following activities:-
• Engineering• Construction• Facility Renewal• Marine Surveys
MSP
Engineering Services 10
Engineering Services, ONGC
• Works(ISO-9001-2000 Certified)• Tendering & Award of EPC Contract• Contract Execution including Project
Management• Engg. & Construction related
Surveys.
• Design(ISO-9001-2000Certified)
• Engineering Consultancy• Facility Optimization• Technological Upgradation
• Maintenance Management
Activities
Engineering Services 11
Engineering Services, ONGC
• Offshore• Process Platforms• Well Platforms• Clamp-on structures on existing
Platforms• Submarine Pipelines (trunk line, in-
field lines)• Offshore Power
Generation/Submarine cabling etc.
• Onshore• GGS/GCS• CTF• ETP• Mini Refineries• Pipelines• Power Generation
BHS
SA PF
Engineering Services 12
Projects Execution Strategy
Western Region
Assets:Ahmedabad,Ankleshwar,Mehsana
Mumbai
Region
Assets:Mumbai High, Bassein & Satellite, Neelam & Heera&Engineering Services
North EasternRegion
Assets:Assam,Tripura
Central Region
SouthernRegion
Assets:Karaikal,Rajamundary
Major Works Centers of Engg. Services
Engineering Services 13
Projects Execution Strategy
Western Region
Assets:Ahmedabad,Ankleshwar,Mehsana
Mumbai
Region
Assets:Mumbai High, Bassein & Satellite, Neelam & Heera&Engineering Services
North EasternRegion
Assets:Assam,Tripura
Central Region
SouthernRegion
Assets:Karaikal,Rajamundary
Major Works Centers of Engg. Services
Engineering Services 14
Assets Created
Engineering Services 15
•Western Offshore
• Process Platforms : 34
• Well Platforms : 146
• Clamp-on : 66
• Submarine P/L (Kms) : 4500+
• Eastern Offshore
• Well Platforms : 4
(upto pre-monsoon’06)
Assets Created
Contd . .Neelam Process Complex
Engineering Services 16
Growth of Process Platforms
Nos.
* For one year
IC Complex
Engineering Services 17
Growth of Well Platforms
0
20
40
60
80
100
120
140
160
New 22 39 34 31 5 6 9
Cumm. 22 61 95 126 131 137 146
76-80 81-85 86-90 91-95 96-00 '01-05 '05-06*
Nos.
* For one year
Engineering Services 18
Nos.
Growth of Clamp on Structures
0
10
20
30
40
50
60
70
New NIL NIL NIL NIL 30 36
Cumm. 30 66
76-80 81-85 86-90 91-95 96-00 2001-05
Engineering Services 19
Kms.
Growth Of Pipelines
0
1000
2000
3000
4000
5000
New 500 742 704 1281 346 395 669
Cumm. 500 1242 1946 3227 3447 3842 4511
76-80 81-85 86-90 91-95 96-00 '01-05 '05-06*
* For one year
Engineering Services 20
Typical Offshore Facilities
Engineering Services 21
Typical Well Platform Requirements
• Structural Steel • 2000 to 3000 tonnes
• Submarine Pipelines• 15-20 Km (4” to 18”)
WF/WI/GL
• Other Items
• Valves• Vessels• Batteries• Line Pipes• CP Systems• Shutdown Systems
• Composite Materials• Solar Power Systems• Life Support Systems• Personal Safety Systems• Fire Detection & Protection Systems• Electrical, Instrumentation & Fiber Optic Cables.
Engineering Services 22
Typical Process Platform Requirements
• Structural Steel - 4000 to 5000 tonnes• Line Pipe - 40 to 50 Km from interconnecting WF/WI/GL • Cables (Elect. & Instt.) - 200 Km • Other Items
• Pipes• Valves• Vessels• DCS• PLC• UPS & Batteries • HVAC Systems• CP Systems• HT Panels• LT Panels• Composite Material• Pipeline Coatings
• CCTV Systems• Paging & Intercoms • Gas Turbine Generator • Process Gas Compressor • MOL Pumps & Water Injection Pumps• Air Compressors • Solar Power Systems • Fire Detection & Protection Systems• Produced Water Treatment Systems• Life Support &Personal Safety System• Electrical, Instt. & Fiber Optic Cables.
Engineering Services 23
Assets Under Creation / Renewal
Engineering Services 24
Asset Under Creation
• Facilities
• Process Platform : 2 (BCP-B2 & Vasai East )
• Well Platforms : 16 (Heera Re-Development, C-Series, WPP-1 & 2)
• Submarine Pipelines : 267 Kms
• Value : US$ 1844 M(Rs. 8378 Crores)
Engineering Services 25
Asset Under Creation
Sl.No.
Project Description Value Completion
1 BCP-B2 Gas Compressor Platform
US$ 283 M (Rs. 1300 Crs.)
29.02.2008
2. Vasai East
Process-cum Booster Compressor Platform Well Platform
US$ 456 M (Rs. 2117 Crs.)
02.04.2008
3. WPP-I Well Platform US$ 239 M (Rs. 1000 Crs.)
04.04.2007
4. WPP-2 Well Platform US$ 189 M (Rs. 866 Crs.)
19.04.2007
5. C-Series Well Platforms US$ 388 M (Rs. 1791 Crs.)
20.04.2008
6. Heera Re-development
Well Platforms & Pipelines
US$ 289 M (Rs. 1304 Crs.)
30.04.2008
Engineering Services 26
Asset Under Renewal
• Facilities
• Process Platform : 1 (SH-RC)
• Well Platforms : 26
• Pipelines : 239 Kms
• Awarded Cost : US$ 639 M(Rs. 2855 Crores)
Engineering Services 27
Asset Under Renewal
Sl.No.
Project Description Value Completion
1. 26 Well Platforms
Revamp of un-manned platforms in Mumbai High
US$ 71 M (Rs. 330 Crs.)
30.04.2007
2. SH Revamp
Revamp of SHP Platform
US$ 42 M (Rs. 194 Crs.)
15.04.2007
3. PRP Replacement of Old Pipeline
US$ 526 M (Rs. 2330 Crs.)
30.04.2008
Engineering Services 28
Asset Creation (Under Tendering)
Engineering Services 29
Project under Tendering
• Facilities
• Process Platforms : 1 (New MHN)
• Clamp-on Project : 1
• Pipeline : 24 Kms. (UTG)
• Estimated Cost : US$ 904 M (Rs. 4160 Crores)
Engineering Services 30
New MHN Process Platform
• Process Platform having following facilities:-
• Oil Handling : 48000 BOPD• Gas Handling : 6.8 MMSCMD• Water Handling : 215000 BOPD• Living Quarters : For 220 Persons• Flare Jacket :• Pipeline : 100 Kms• Modification of Existing : 14 Nos.
Platforms
• Estimated Cost : US$ 821 M (Rs. 3776.6 Crores)
• Schedule Completion : April, 2010
Engineering Services 31
20” Gas Line between Uran & Trombay
• Laying of 20” pipeline between Uran Plant and Trombay Terminals
• Total Length : 24 KmsOnshore Area – 8.1 KmsOffshore Area – 8.4 KmsMarshy Area – 7.5 Kms
• Estimated Cost : US$ 52.4 M (Rs. 235 Crores)
• Schedule Completion : 31.05.2008
Engineering Services 32
6 – Clamp-on Project
• Installation of Clamp-on Structure alongwith Modification works in Mumbai High Well Platforms.
• WA Platform• WB Platform• WI-6 Platform• IN Platform• IP Platform
• Estimated Cost : US$ 31 M (Rs. 148.5 Crores)
• Schedule Completion : 29.02.2008
Engineering Services 33
Asset Creation:Future Plans
Engineering Services 34
Future Business Plan
Offshore
• Project - 11 Nos.
• Indicative Cost - US$ 3986 M
Onshore
• Project - 9 Nos.
• Indicative Cost - US$ 2284 M
Engineering Services 35
Asset Creation Future Plans - Offshore
Sl.No.
Project Description Indicative Cost Completion
1. B-22 Platforms
Well-cum Process Platform, Well Platform, Pipelines & Modifi.
US$ 360 M (Rs. 1650 Crs.)
28.02.2010
2. B-193 Platform
Well-cum Process Platform, Well Platform, Pipelines & Modifi.
US$ 406M (Rs. 1870 Crs.)
01.03.2010
3. B-Series Gas (MH) Platform
Well Platform & Pipeline
US$ 290 M (Rs. 1330 Crs.)
30.04.2010
Engineering Services 36
Asset Creation Future Plans-Offshore
Sl.No
Project Description Indicative Cost
Completion
4. Grid Inter Connectivity
Grid Inter connectivity of 26 Well Platforms with Process Platforms
US$ 175 M (Rs. 850 Crs.)
30.04.2010
5. Conversion of Sagar Samrat
Conversion of Sagar Samart to MOPU
US$ 75 M (Rs. 345 Crs.)
01.03.2009
6. Pipeline Replacement Project
Rolling Plan for replacement of old pipelines
US$ 450 M (Rs. 2025 Crs.)
31.03.2011
7. Re-Re-Devlop plan of MH
Process & Well Platforms in Mumbai High
US$ 1340 M (Rs. 6164 Crs.)
Not yet firmed up
Engineering Services 37
Future Revamp Projects:Offshore
Sl.No.
Project Description Indicative Cost
Completion
1. 30 PLF. Revamp
Revamp of 30 well head platforms in MH & N and H
US$ 85 M (Rs. 400 Crs.)
30.01.2010
2. Revamp of WIN, WIS, ICW & SHW PLF.
Revamp of Water Injection Platforms of Mumbai High
US$ 400 M (Rs. 1840 Crs.)
30.04.2010
3. Revamping Well-head of PLF.
3rd Phase of revamp of Well-head Platforms
US$ 85 M (Rs. 400 Crs.)
30.04.2009
4. Revamp of Neelam & Heera Platforms
Revamp of NLM,HRG & HRA Process Platforms and 13 Well Platforms
US$ 320 M (Rs. 1470 Crs.)
15.05.2009
Engineering Services 38
Future Business Potential : Onshore
Sl.No.
Project Description Indicative Cost
Completion
1. Assam Renewal Project
Revamp of existing facilities in Assam Asset
US$ 550 M (Rs. 2500 Crs.)
30.01.2010
2. Western Onshore Renewal
Revamp of existing facilities in Western onshore Asset
US$ 650 M (Rs. 3000 Crs.)
30.12.2010
3. Tripura Power Plant
1000MW Power Plant in Tripura
US$ 870 M (Rs. 4000 Crs.)
-
4. GCS and Trunk Pipeline
GCS and Trunk pipeline in Tripura Project
US$ 40 M (Rs. 180 Crs.)
31.12.2008
5. Refinery and new facilities
Refinery and new facilities at Rajahmundry
US$ 31.5 M (Rs. 148 Crs.)
31.05.2009
Engineering Services 39
Future Business Potential : Onshore
Sl.No.
Project Description Indicative Cost Completion
6. Cauvery Asset
New Facilities at Karikal
US$ 31 M (Rs. 145 Crores)
31.03.2010
7. Ahmedabad Asset
Construction of 3 GGS
US$ 25 M (Rs.120 Crores)
31.05.2009
8. Mehsana Asset
Construction of 4 GGS and 1 ETP
US$ 40 M (Rs. 185 Crores)
31.05.2009
9. Ankelashwar Asset
Construction of GGS, ETP, CPF etc.
US$ 47 M (Rs. 225 Crores)
30.04.2010
Engineering Services 40
Expectation from the Industry
1) Competitive and Clean bids.
• All BEC requirements to be addressed.• Proven Technology• No deviations
2) Functional specifications are given in ONGC Tender, ONGC expects bidders to use this flexibility to provide:-
• Cost effective solution• Optimized Design• New generation of equipment
3) ONGC is following Three Tier Safety System during Offshore Construction, it expects all statutory SHE considerations/ requirements are followed during execution for
• Crew• Vessel• Equipment• Procedure
Engineering Services 41