Engineering,Procurement, Construction &Maintenance Solutions
![Page 2: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/2.jpg)
Engineering, Procurement & Construction
Services and Maintenance
PDL Projects
PDL Partners
PDL Projects Portfolio
AGENDA
![Page 3: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/3.jpg)
Global Presence Map
![Page 4: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/4.jpg)
Project Management System according to PMI
Basic and Detailed Engineering Packages
Procurement
Construction / Civil & Steel Structure Work
Quality Assurance & Quality Control
Process Safety Management
Operations Technical Support
Miscellaneous Engineering Services
PDL Scope Of Work
sow
![Page 5: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/5.jpg)
PDL capable to provide complete design engineering packagesboth Basic / FEED engineering up to detailed engineeringpackages, engineering solutions, consultancy, in the fields of Oil,Gas, Petrochemicals, Water Treatment, Utilities and AuxiliarySystems both onshore and offshore listed below:
1. Detailed engineering packages
Both Oil & Gas Processing Plants
Petrochemical Plants (Methanol, Ammonia Plants … Etc.)
Prepare Plant As-Built P&IDs
Pump Skids
Oil & Gas Transmission Pipelines both hot & cold
PDL Engineering Capabilities
Capabilities
![Page 6: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/6.jpg)
Utility systems – Storage facilities – Shipping Facilities
Glycol Units (Gas Dehydration by TEG for vapor water removal)
Amine Units (Gas Sweetening CO2 & H2S removal)
Natural Gas Cryogenic Processes (GTL)
Water Treatment Plants
Hydraulic Components and Systems
Waste Water Treatment Plants (Produced Water, Industrial
Water and Sewage Water)
Flare / Blow down Systems
PDL Engineering Capabilities
Capabilities
![Page 7: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/7.jpg)
2. Consultancy and Engineering Solutions:
Feasibility Studies
Conceptual Designs
Cost Reduction Studies
Plant Modifications
Debottlenecking Studies
Process Flare Net / Flare System design & studies
Depressurizing Models
Stack Design / Dispersion Models
PDL Engineering Capabilities
Capabilities
![Page 8: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/8.jpg)
Process Safety Engineering (FF, F&G, C&E matrix, SILcalculation/verification, HAZOP, HAZID, HAZOP Re-Validation,LOPA, Process Safety Review, Risk Assessment, QuantitativeRisk Assessment, What If and other PHA
Redundancy requirement of equipment
Provide Training Instructors & Courses
3. Procurement
All types of Equipment, Packages and Skids related to oil, gas, petrochemical, water treatment, package boilers, utility packages & auxiliary systems including hydraulic components / systems
PDL Engineering Capabilities
Capabilities
![Page 9: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/9.jpg)
4. Operation Technical Support
De-Commissioning Procedures
Commissioning Procedures (including steam blowing)
Startup Procedures (Initial / Black and Normal Startup)
Shut Down Procedures
Operators Training
Safe-to-Operate procedures
Process Improvement Studies / Process Technology
Process Troubleshooting / Problem Solving
PDL Engineering Capabilities
Capabilities
![Page 10: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/10.jpg)
RCA / RBI / MOC / PCR Plant Changes Design
Process Modeling / Simulation
Efficiency – Performance – Emissions studies
PSE design (PSV, PRV and rapture discs), sizing and validation
Heat Exchangers Design, Simulation and Rating (design &
Troubleshooting)
Process Equipment Cost Estimation & Depreciation rate
Process Equipment Depressurization rate
Equipment Datasheets
Pigging and Flow Assurance
PDL Engineering Capabilities
Capabilities
![Page 11: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/11.jpg)
Gas Plants
Gas Plants
![Page 12: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/12.jpg)
Amine Units DEA & MDEAA complete unit with a possibility for addition of sodium hydroxide unit for SO2 removal
Amine Units
![Page 13: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/13.jpg)
Natural Gas Dehydration Glycol or Solid Desiccant
Glycol Units
![Page 14: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/14.jpg)
Natural Gas Shipping Skid
Including
gas-turbine-driven
centrifugal
compressors
NG Skids
![Page 15: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/15.jpg)
Pump Skids
Pump Skids
![Page 16: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/16.jpg)
Boilers
Including
Auxiliary Boilers &
Waste Heat Boilers
Boilers
![Page 17: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/17.jpg)
Separators
Separators
Including Two phase & Three phase, Pressure Vessels (Scrubbers,
Knock Out Drums, vertical and horizontal)
![Page 18: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/18.jpg)
Test & Repair
Test Unit for Control Valves / PSV
Pressure testing and (re) adjusting Container
Shut-off valves
Control valves
Pressure Safety Valves PSV’s
Valve Test & Repair
![Page 19: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/19.jpg)
Service & Maintenance
Hi-standard modern workshop (Equipment
and staff trained by Ventil, Netherlands)
Offshore and Onshore valve services
Mobile self-contained unit for valve testing,
maintenance and repair
Offshore-experienced staff
Valve Test & Repair
![Page 20: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/20.jpg)
Valve Pre-Test Pre-Test Documentation
Pre-Test Instrumentation
Pre-Test Actuator
Disassembly Remove Instruments
Strip down Valve Body
Remove Actuator
Examination Clean and Examine Valve Body
Write-up Seek Approval for Remedial Work
ServiceExecute
Remedial Work
Reassemble Actuator and Paint
Fit Instrumentation Calibrate & Test
Post ServiceInspect
Paperwork/Sign off
Prepare for
Shipment
Raise Advice-Note / Test Certificates
Final Inspection
Dispatch to Customer
Valve Repair Procedure
PDL Valve Repair Sequence
![Page 21: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/21.jpg)
Valve Test RigMobile Valve
Testing UnitRepair Workshop
Lapping Unit Shot Blasting Unit Machining Unit
Valve Test & Repair
Valve Test & Repair
![Page 22: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/22.jpg)
Projects
PDL Projects
AzMeCo
Baku Azerbaijan
![Page 23: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/23.jpg)
GL Station – SOCAR
Project: Gas Lift Compressor Station Location: Baku – AzerbaijanYear: 2015End user: PROKON – SOCARSOW: EPC
Gas Lift Compressor Station
![Page 24: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/24.jpg)
Produced Water Treatment Plant
PWT Plant - BP
Project: Produced Water Treatment Plant Location: Baku - AzerbaijanYear: 2015End user: ENCOTEC - BPSOW: Turn Key
![Page 25: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/25.jpg)
Co-Generation Plant
Co-Generation Plant –
Azer-Aluminum
Project: Co-Generation PlantLocation: Ganya – AzerbaijanYear: 2014End user: Azer-AluminumSOW: Turn Key
![Page 26: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/26.jpg)
Chemical Dosing Package
CDP – SOCAR UMID
Project: Chemical Dosing PackageLocation: Baku – AzerbaijanYear: 2014End user: SOCAR UMIDSOW: EPC
![Page 27: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/27.jpg)
N2 Purging Package
N2 Package –
SOCAR UMID
Project: N2 Purging PackageLocation: Baku – AzerbaijanYear: 2014End user: SOCAR UMIDSOW: EPC
![Page 28: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/28.jpg)
N2 Generation Package
N2 Package – PETRONAS
Project: N2 Generation PackageLocation: Kuala Lumpur – MalaysiaYear: 2014End user: PETRONASSOW: EPC
![Page 29: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/29.jpg)
Instrument Air Package
I.A Package – PETRONAS
Project: I.A PackageLocation: Kuala Lumpur – MalaysiaYear: 2014End user: PETRONASSOW: EPC
![Page 30: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/30.jpg)
Instrument Air Package
I.A Package –
DRAGON OIL
Project: I.A PackageLocation: KazakhstanYear: 2014End user: DRAGON OILSOW: EPC
![Page 31: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/31.jpg)
Cryogenic N2 Plant
N2 Cry-plant - AzMeCo
Project: N2 Cry-Plant Location: Baku - Azerbaijan Year: 2012End user: AzMeCoSOW: Re-engineering of old plant
![Page 32: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/32.jpg)
PSA N2 Generation Plant
N2 PSA - AzMeCo
Project: N2 PSA Location: Baku - AzerbaijanYear: 2013End user: AzMeCoSOW: Turn Key
![Page 33: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/33.jpg)
Water Treatment Package
WTP - AzMeCo
Project: Water treatment packageLocation: Baku - AzerbaijanYear: 2013End user: AzMeCoSOW: EPC
![Page 34: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/34.jpg)
Chemical Dosing Package
CDP - AzMeCo
Project: Chemical dosing packageLocation: Baku - AzerbaijanYear: 2012End user: AzMeCoSOW: PC
![Page 35: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/35.jpg)
Loading Arm
Loading Arm - AzMeCo
Project: Methanol Loading Arm Location: Baku - Azerbaijan Year: 2012End user: AzMeCoSOW: EPC
![Page 36: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/36.jpg)
Compressed Air Package
Air Package - AzMeCo
Project: Utility Air Compressor Location: Baku - AzerbaijanYear: 2012End user: AzMeCoSOW: EPC
![Page 37: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/37.jpg)
Cooling Tower
CT Upgrade - AzMeCo
Project: Cooling tower upgrade Location: Baku - AzerbaijanYear: 2012End user: AzMeCoSOW: EPC
![Page 38: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/38.jpg)
Inert Gas Booster/Receiver (Offshore)
Off Shore Package - BP
Project: Inert Gas Re-Compressor package Location: Off Shore, Caspian Sea (West Azeri Platform)Year: 2014End user: BP/AMECSOW: EPC
![Page 39: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/39.jpg)
Fire Water Pump Station
FW - AzMeCo
Project: Fire Water Pump Station Location: Baku - Azerbaijan Year: 2013End user: AzMeCoSOW: EPC
![Page 40: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/40.jpg)
ISO-Plant - RUSSIA
Isomerization PlantProject: Isomerization PlantLocation: Nijniy Novgorod - RussiaYear: 2013End user: LukoilSOW: Steel & Pipework Construction
![Page 41: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/41.jpg)
Gardner Denver – CompAir
Parker Hanffin Gas Technology
Flowserve Pump Seals Valves
Siemens Controls & Automation
Zennergy Oil and Gas Metering Solutions
LEWA Chemical Dosing
Gardner Denver
PDL Global Partners
PDL Partners
![Page 42: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/42.jpg)
Customer Base
![Page 43: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/43.jpg)
PDL Baku – Azerbaijan
Head OfficeIcheri Sheher, 86 Qasir Str. AZ 1065, Baku AzerbaijanTel:+994124978945Fax:+994124369342 Mail: [email protected]
PDL Malaysia
Unit 9-10, Wisma Warisan (The Heritage House) 332, Jalan Yap Ah Shak 50300 Kuala Lumpur,MalaysiaTel: +60326980130Fax: +60326980131 Mail: [email protected]
PDL Baku – Azerbaijan
Caspian Plaza III, 15th floor 44 J.Jabbarli STR, AZ 1065 Baku – AzerbaijanTel: +994124978945Fax: +994124369342 Mail: [email protected]
PDL UK
Unit 107, Quatro House, Lyon Way, Frimley Road, Camberley, Surrey, GU16 7ER, UKTel: +441276804436Fax: +441276804437Cell: +447949069723Mail: [email protected]
PDL Middle East – Dubai
Office 605, 6th Floor, The Fairmont Dubai, Sheikh Zayed Road, PO Box 73310 Dubai, United Arab EmiratesTel: +9714311 6520Fax: +9714332 8810Mail: [email protected]
PDL Kazakhstan
5 ,Dossorskaya Str., 2nd floorAtyrau, KazakhstanTel: +77122760820Fax: +77122760821Mail: [email protected]
PDL Contacts
PDL Global PresencePDL Russia LLC
Unit 1A. Ibragimov Str. 35/2105318;Moscow,RussiaTel: +79637772397 Mail: [email protected]
![Page 44: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/44.jpg)
Certificates
ISO Certification
![Page 45: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/45.jpg)
Certificates
![Page 46: Engineering, Procurement, Construction & … Safety Engineering (FF, F&G, C&E matrix, SIL calculation/verification, HAZOP, HAZID, HAZOP Re-Validation, LOPA, Process Safety Review,](https://reader030.fdocuments.net/reader030/viewer/2022021420/5adb5fc07f8b9afc0f8db8d7/html5/thumbnails/46.jpg)