Energy Optimization of a Large Central Plant Chilled Water System
Riyaz Papar, PE, CEM
Hudson Technologies Company
Harold Myart, PE, CEM
Mark Krawczyk, PE, CEM
Freescale Semiconductor, Inc.
Texas Chemical Council Seminar
June 09, 2009
![Page 2: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/2.jpg)
Agenda
� Objectives
� System Description
� Data Collection & Models
� System Optimization Opportunities
� System Optimization Results
� Conclusions
![Page 3: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/3.jpg)
Objectives
� Conduct a chilled water system Energy Savings Assessment (ESA) using a Systems Approach at the Oak Hill Plant site
� Identify (and quantify) chilled water plant energy savings opportunities
� Assist plant personnel to gain familiarity with certain bestpractices and to continue to identify energy efficiency improvement opportunities at the site
![Page 4: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/4.jpg)
System Description� Chilled Water loop (42°F supply temperature)
� Chiller #1: Trane CVHF 1280 Centrifugal – 1,250 RT
� Chiller #2: Trane CVHF 1280 Centrifugal – 1,250 RT
� Chiller #3: Trane CVHF Centrifugal – 1,470 RT (New)
� Chiller #4: York YSNNNNS7 Screw – 1,180 RT
� Chiller #5: York YSNNNNS7 Screw – 1,180 RT
� Chiller #6: York YSNNNNS7 Screw – 1,180 RT
� Glycol loop (32°F supply temperature)
� Glycol Chiller #1: Trane CVHF 770 Centrifugal – 600 RT
� Glycol Chiller #2: Trane CVHF 770 Centrifugal – 600 RT
� Glycol Chiller #3: Trane CVHF 770 Centrifugal – 600 RT
![Page 5: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/5.jpg)
System PFD
1 62 3 4 5
1 2 3
Water Chillers (42°F)
Glycol Chillers (32°F)
Air Coils
Air Coils
![Page 6: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/6.jpg)
Identified Chiller Plant BestPractices� Site-level integrated chilled water and glycol loops
� High efficiency two-stage centrifugal chillers for base load and screw machines to provide for swing capacity
� Use of variable speed drives on the secondary pumping loop
� Use of variable speed drives on the condenser water pumps
� Use of two-speed fans on the cooling towers
� Significant instrumentation, data monitoring and controls
� Use of real-time data for tracking efficiency metrics (kW/ton) and a Historian for analysis
� Good periodic maintenance practices for equipment (oil analysis,cleaning of heat exchanger tubes, eddy current testing, etc.)
� Periodic calibration of all critical instrumentation
![Page 7: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/7.jpg)
Data Collection
� Hourly average data for one year (10/01/07 –09/30/08) for each chiller
� Ambient conditions
� Temperature
� Humidity
� Chilled water flow
� Condenser water flow
� Power consumption
� Chilled water supply and return temperatures
� Condenser water supply and return temperatures
� Bypass flow
![Page 8: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/8.jpg)
Load Profile
-
2,000
4,000
6,000
8,000
10,000
9/5/07 10/25/07 12/14/07 2/2/08 3/23/08 5/12/08 7/1/08 8/20/08 10/9/08
42F
Ch
ille
r P
lan
t L
oad
(R
T)
1
2
3
4
5
6
Nu
mb
er
of
Op
era
tin
g C
hil
lers
![Page 9: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/9.jpg)
Chilled Water Plant Efficiency
0.400
0.450
0.500
0.550
0.600
0.650
0.700
0.750
0.800
9/5/07 10/25/07 12/14/07 2/2/08 3/23/08 5/12/08 7/1/08 8/20/08 10/9/08
Overa
ll P
lan
t E
ffic
ien
cy (
kW
/RT
)
![Page 10: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/10.jpg)
Chilled Water Plant Efficiency
0.6230.7040.6500.6770.7050.5410.597Efficiency (kW/RT)
2,144591561599610511553Power (kW)
3,428846863887868944924Load (RT)
8,7502,5916,3366,8772,6337,4587,469Operating hours
Overall Plant
654321Chiller #
![Page 11: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/11.jpg)
Chiller Efficiency
0.50
0.55
0.60
0.65
0.70
0.75
0.80
0.85
0.90
68 70 72 74 76 78 80 82
Condenser Water Temperature (°F)
Ch
ille
r E
ffic
ien
cy (
kW
/RT
)
![Page 12: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/12.jpg)
Chiller Efficiency
0.40
0.45
0.50
0.55
0.60
0.65
0.70
0.75
0.80
39.0 40.0 41.0 42.0 43.0 44.0 45.0 46.0 47.0
Chilled Water Supply Temperature (°F)
Ch
ille
r E
ffic
ien
cy (
kW
/RT
)
![Page 13: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/13.jpg)
Energy Savings Opportunity
� Reduce condenser water temperature
� Condenser water maintained currently at 75°F
� Controlled by two-speed fans
� Typically, 10% energy used by fans, 20% by pumps and 70% by compressor
� Compressor kW/RT increases with higher condenser water temperature
� Float condenser pressure for maximum savings
� Implementation to lower condenser water to 70°F
� Potential savings ~7%
![Page 14: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/14.jpg)
Energy Savings Opportunity
� Constraints / Precautions - Reduce condenser water temperature
� Check manufacturers’ recommendations – 65°F minimum condenser water temperature
� Refrigerant Stacking issues
� Concerns about leaks in low pressure (R123) chillers
![Page 15: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/15.jpg)
Energy Savings Opportunity
� Reduce number of operating chillers
-
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
09/05/07 10/25/07 12/14/07 02/02/08 03/23/08 05/12/08 07/01/08 08/20/08 10/09/08
Ch
ille
r T
on
s (
RT
)
Actual P lant Loa d
O pe ra ting Ca pa city
Ex ce ss Ca pa city
\
![Page 16: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/16.jpg)
Energy Savings Opportunity
� Reduce number of operating chillers
� Typically, one more chiller than needed – capacity in excess of 1,200 RT on average and sometimes as high as 2,000 RT
� Bypass flowmeter readings (average ~2,500 gpm)
� Benefits of shutting down one chiller
� Reduction of overall chillers kW/RT
� Reduction in pumping power
� Improved heat transfer in the evaporators
� Reduction in maintenance costs
� Preliminary estimates ~10% energy savings
![Page 17: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/17.jpg)
Energy Savings Opportunity
� Increase primary chilled water flow through chillers
� Design rating is based on 42°F chilled water, 85°F condenser water and 100% load (Tons)
� But this happens for 1-3% of the operating hours
� Chiller has a lot more capacity at off-design conditions
� Implement – Variable Primary Flow and increase chilled water flow
� Chiller moves to full-load conditions and kW/RT reduces
� Preliminary estimates ~5-10% energy savings
� Constraints / Precautions
� Pumping power capability
� Compressor horsepower limitation
![Page 18: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/18.jpg)
Energy Savings Opportunity
� Transfer load from 32°F glycol loop to 42°F chilled water loop
� Full load operating efficiency
� 32°F glycol chiller – 0.727 kW/RT
� 42°F water chiller – 0.60 kW/RT
� It is possible to transfer 50% of the glycol loop load
� Potential energy savings – 3-5%
� Constraints / Precautions
� Load balancing issues
� Availability of additional heat transfer area on the chilled water loop
� Change of control setpoints
![Page 19: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/19.jpg)
Energy Savings Opportunity
� Implement SMART algorithm to reset chilled water supply temperature
� 1°F increase in chilled water supply temperature leads to a reduction of 0.015 kW/RT
� DAS has information on chilled water flow control valve positions of almost all the air-handling units
� Automatically increase chilled water supply temperature till a control valve reaches 80% open
� Currently, done on a manual basis
� Constraints / Precautions
� Dynamic flow issues
� Will have to ensure “no hunting”
![Page 20: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/20.jpg)
BestPractices� Implement real-time calculation of chiller
efficiencies and trending
� Will provide information for further optimization
� All the data is already available
� Implement a Chiller Chemistry™ program
� Fluids – Refrigerant, Oil and Water should be tested every six months
� An engineering analysis combining all these results
� Root-cause analysis
� Best Predictive Maintenance – can be done online
![Page 21: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/21.jpg)
Energy Savings Opportunities
N5,000NC0NCImplement a Chiller Chemistry™ PM program
N25,000NANANAImplement real time monitoring and add trending of efficiency
MNCNC0NCImplement SMART algorithm to reset chilled water supply temperature
M25,00020,0000315,000Transfer load from the 32°F glycol loop to the 42°F chilled water loop
N10,00060,0000930,000Increase primary chilled water flow through the chillers
N25,00091,00001,400,000Reduce number of operating chillers
N40,00053,0000815,000Reduce condenser water temperature
ThermskWh
PBProject Cost ($)
Cost Savings ($)
Energy Savings
Opportunity
*NA – Not Applicable**NC – Not Calculated (See write up for details)
![Page 22: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/22.jpg)
Conclusions
� Instrumentation & monitoring of “critical”parameters was key for optimization of the chilled water plant
� A Systems Approach is needed for optimizing any energy system
� Typically, chilled water and refrigeration systems are neglected in plants but they offer significant energy savings potential
![Page 23: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/23.jpg)
Acknowledgments
� Kathey FerlandTX Industries of the Future
� Paul Lloyd & Dean BlackmanFreescale Semiconductor, Inc.
![Page 24: Energy Optimization of a Large Central Plant Chilled Water ... · Energy Optimization of a Large Central Plant Chilled Water System Riyaz Papar, PE, CEM Hudson Technologies Company](https://reader030.fdocuments.net/reader030/viewer/2022040918/5e940b12ad42ba2a3a3110c8/html5/thumbnails/24.jpg)
Discussion & Questions