Energy Management 2020 ICICI Bank BOR Bhawan, Jaipur...ICICI Bank Ltd.,BOR Bhawan,Jaipur –Floor...

33
21 st National Award for Excellence in Energy Management 2020 ICICI Bank – BOR Bhawan, Jaipur Presented by: Deepak Dhar – Retail Infra Head Munish Behl – Chief Manager Abhay Pareek- Tower Manager August 25 - 27, 2020

Transcript of Energy Management 2020 ICICI Bank BOR Bhawan, Jaipur...ICICI Bank Ltd.,BOR Bhawan,Jaipur –Floor...

  • 21st

    National Award for Excellence in

    Energy Management 2020

    ICICI Bank – BOR Bhawan, Jaipur

    Presented by:

    Deepak Dhar – Retail Infra Head

    Munish Behl – Chief Manager

    Abhay Pareek- Tower Manager

    August 25 - 27, 2020

  • ICICI Bank - Introduction

    2

  • ICICI Bank, BOR Bhawan , Jaipur- Orientation

    3

  • ICICI Bank Ltd.,BOR Bhawan,Jaipur – Floor Layouts

    GF1 F2

  • ICICI Bank, BOR Bhawan, Jaipur

    5

    Year of

    occupation1987

    Area 3432 Sq.Mtr.

    No. of

    Workstations280

    HVAC 186 TR

    UPS 1 x 30 kVA

    Diesel

    Generator380 kVA

    Connected

    load300 kW

  • Load Distribution in FY 18

    Type of load Load KW % Load

    HVAC 68 64.77%

    IT 15 14.28%

    Misc 10 9.53%

    Lighting 12 11.42%

    Total 105 100%

  • Load Distribution as on date

    Type of load Load KW % Load

    HVAC 280 87.50%

    IT 20 6.25%

    Misc 15 4.69%

    Lighting 5 1.56%

    Total 320 100%

    HVAC87%

    IT6%

    Misc5%

    Lighting2%

  • SEC Reduction and Variation Trend- EPI

    SEC = Total load

    ----------------

    Total Area

    22.80% improvement against FY 18

    SEC FY17-18 119.64

    SEC FY18-19 108.28

    SEC FY19-20 97.42

  • RatingEPI

    ( Annual kWh / Sq. Mtr.)

    1 STAR 200 - 175

    2 STAR 175 - 150

    3 STAR 150 - 125

    4 STAR 125 - 100

    5 STAR < 100

    ECBC Benchmark for Building Efficiency

    EPI -97.42

  • Setting Targets – Road Map

    FY18

    SEC

    119.64

    FY19

    SEC

    108.28

    FY20

    SEC

    97.42

    • Benchmarking

    • Setting targets

    • Budgeting & Planning

    • Action• Approach & Target

    FY 21

    PUE

    81

    We begin with benchmarking

    and set checkpoints to

    monitor progress

  • Description FY18

    Annual Units in Lacs 3.14

    Annual Cost in Lacs 29.96

    EPI 119.64

    Scope to

    reduce

    Eliminate wastage

    Non office hours

    loads

    Idle/redundant

    equipment

    Awareness to stop

    Wastages

    Optimise Capacity

    Focus on all

    equipment

    Check Redundancy

    Specific power

    consumption of

    equipment

    Investment

    Energy Audit

    EE Equipment

    Monitoring

    mechanism

    Rewards and

    recognitions

    EnCon approach & methodology

  • EnCon projects implemented in FY 2018

  • Remodeling project (First Floor and Cafeteria)– FY 2018

    13

    Remodeling of First floor and Cafeteria

    Replaced old window AC’s with Inverter AC’s

    Segregation of AC and Non AC Area

    Installed LED lights

    Year of action-FY17-18

    Investment – Rs. 66 Lacs

    Savings – 1 Lac kWh

    Payback – 6.4 years

  • LED Lights

    Lighting Load ( Before ) Watts 12000

    Lighting Load ( After ) Watts 5000

    Savings in lighting consumption kWh 23100

    Savings in Rs. 231000

    Investment Rs. 23000

    Payback ( Months ) 12

    Year of Action 17-18

  • EnCon projects implemented in FY 2019

  • Remodeling project(Ground Floor and Second Floor) – FY 2019

    16

    Year of action-FY18-

    19Investment – Rs. 50Lacs

    Savings – 1.25 Lakh kWh

    Payback – 4 years

    Remodeling of Ground and Second floor

    Replaced old window AC’s with Inverter AC’s

    Segregation of AC and Non AC Area

    Installed LED lights

  • Other projects – FY 2019

    17

    Installation of Heat Resistant

    window glass(Saint Gobain

    ST167) to avoid direct heat

    from Sunlight

    Year of action-FY18-19

    Investment – Rs. 3.5 Lacs

    Savings – 0.10 Lakh kWh

    Payback – 3.2 year

  • EnCon projects implemented in FY 2020

  • Installation of Hybrid IDEC Unit - FY 2020

    19

    Hybrid IDEC unit in Server room

    Year of Action- FY 19-20

    Investment – Rs. 0.50 Lakh

    Savings – Rs. 1 lakh

    ROI – 6 Months

    Other Benefits –

    • Based on Natural cooling

    • Fall back in case of AC failure

    • Power Saving upto 40%

  • Green wall - FY 2020

    20

    During the day time in peak summer, the

    green façade can maintain on average a

    temperature i.e 5 degree centigrade

    lower than a bare wall, consequently

    impacting building cooling load and

    improving energy performance

    Year of action – FY 19-20

    Investment – Rs. 1 Lakh

    Savings – Rs.1.3 Lakh

    ROI- 8 Months

  • Rain Water Harvesting unit - FY 2020

    21

    Year of Action-FY 19-20

    Investment – Rs. 0.70 Lakh

    Savings – 40KL Water ( rainy season)

    ROI – 7 Months

    Other Benefits –

    • Water is used for Horticulture

    • Cleaning of basement

  • Summary of EnCon projects

    22

    EPI reduced from119.64 to 97.42

    Sr.Description

    Investment

    (Lakh)

    Savings(lakh/annu

    m)Payback

    Year of

    actionNo.

    1

    Remodeling of Ground floor and

    Canteen with AC - Non AC area

    Segregation, LED Lights and

    inverter AC's

    66 10 78 months FY 2018

    2

    Remodeling of First and Second

    floor with AC - Non AC area

    Segregation, LED Lights and

    Inverter AC's

    50 12.5 48 months FY 2019

    3 Roof Top Solar Installation 0 1.36 0 FY 2019

    4Installation of Heat Resistant Glass

    in windows3.5 0.10 35 months FY 2019

    5Installtion of Hybrid IDEC unit in

    server room0.50 0.10 6 months FY 2020

    6 Green wall 1 1.3 8 months FY 2020

    7 Rain water harvesting 0.70 0.1 7 months FY 2020

  • Plans for reduction in SEC i.e. EPI in FY 2021

    23

    Sr. No. Activity

    1 Ecosavers on ductable Package HVAC

    2Replacement of 30 KVA Hi pulse UPS with

    Modular UPS

  • EPI Projection post project execution

    24

    119.64108.28

    97.4281

    0

    20

    40

    60

    80

    100

    120

    140

    FY2018 FY2019 FY2020 FY2021

    EPI

  • Renewable Energy – 0.072 MW Solar Project

    Roof Top Solar Power Plant

    Capacity : 130 kWp

    Installed in Feb 2018Roof Top Solar Power Plant

    Capacity : 130 kWp

    Installed in Feb 2018

    Monthly Generation:

    15600 kWh

    Monthly Generation:

    15600 kWh

    Technology (Electrical)

    Type of Energy

    Onsite/offsite

    Installed capacity

    Generation million kwh

    % of overall electrical energy

    Electrical Solar Onsite 0.072MW 0.096KWH 32%

  • Utilization of Renewable Energy – 0.072 MW Solar

    •Sourcing 0.072MW Solar power through PPA. Zero investment

    •Commissioned in Nov 18

    •Power generation from Nov 18 till date– 1.6 Lakh Kwh / annum

    •Annual Savings – ` 6.56 Lakh

    •Further reduction in GHG emissions

  • GHG emission quantification & certification

    27

    As a responsible Corporate,

    we have quantified, verified

    & certified the GHG

    emissions due to Noida Sec-

    16 operations

    Due to lockdown, GHG

    inventorisation certification

    is pending

    Financial Year CO2

    emission (Tons)

    FY 2017 364.02

    FY 2018 286.36

    FY 2019 247.76

    FY 2020 218.18

  • Monitoring, control & resources

    28

    Equipment based monitoring & control – HVAC, UPS, DG,

    Energy meters

    Daily consumption & efficiency reporting

    Monthly Energy review – Chaired by Group Head

    EnCon Budget – Rs. 50 Mn p.a. ( Central )

    Training & certification of Tower Manager for IGBC AP

  • 29

    Rooftop Solar plant used for building

    Electronic Field Service Report (EFSR)

    Use of low VOC paints

    Use of Green Ink for fascia printing

    Electronic Annual Reports

    Electronic PIN generation for Credit/Debit Cards

    Green Supply Chain

  • 30

  • 31

    Regional Heads Energy Manager

    ZIFH- Rajasthan

    North

    Tower Manager

    Head - Infrastructure

    Management &

    services Group

    EnCon Management

  • Long term vision on energy efficiency

    32

    By

    2022

    All large offices to be in 5 STAR category

    Renewable energy consumption to be 15% of

    annual energy requirement

    Sourcing cheaper energy to reduce cost by 5%

    Deploy measures / systems / processes to sustain

    the current efficiency levels

    Require technical support as well as supplier engagement

  • Thank You