  • Energy efficiency in Kazakhstan

    Almat Kabykenov

    Director of the Centre of State energy register

  • -18%Reducing energy

    intensityGDP at the end of

    2017 compared to 2008

    Source: Committee on

    statistics of MNE of RK

    Comparison of Kazakhstan's energy intensity with other

    countries

    toe

    in $

    10

    00

    in

    20

    10

    pri

    ces

    Источник: МЭА 2017 г.

    Comparison with CIS countries

    Rating Country Energy intensity

    77 Azerbaijan 0,24

    83 Armenia 0,27

    108 Tajikistan 0,34

    114 Kazakhstan 0,42

    115 Russia 0,43

    118 Belarus 0,44

    131 Uzbekistan 0,73

    -25% reduce energy intensity Of GDP by 2025.

    * to the level of 2008.

    NATIONAL ENERGY EFFICIENCY TARGETS

    3

    reduce energy intensity

    manufacturing industry by 2019* to the level of 2014

    -12,5% Reducing energy intensityOP at the end of 2017 compared to 2014

    -7%

    0.11

    0.18

    0.31

    0.42

    0

    0.1

    0.2

    0.3

    0.4

    0.5

    OECD WORLD Asian country Kazakhstan

    THE ENERGY INTENSITY OF GDP OF THE REPUBLIC OF KAZAKHSTAN

  • Current policy New policy

    Energy saving,million toeSavings according to export

    prices, million tenge2017 2020 2025 2017 2020 2025

    TPES (million тoe) 79,7 88,3 97,0 79,7 87,8 90,3

    Coal 36,1 37,9 41,2 36,1 37,7 38,4 6,0 57 102

    petroleum 18,3 20,0 25,3 18,3 19,8 23,6 3,6 364 729

    Gas 25,3 30,4 30,5 25,3 30,2 28,4 4,4 104 705

    GDP billion $ 53 57,7 65,4 53 57,7 65,4

    GDP energy intensity % 19,8 18,2 20,8 19,8 18,7 26,3TOTAL 14,0 526 537

    0,46 0,42 0,42 0,42 0,42 - 26,3

    -20.8

    -40.0

    -20.0

    0.0

    20.0

    40.0

    60.0

    80.0

    100.0

    2009 2010 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025

    Изменение ВВП Изменение ОППТЭ Изменение Энергоемкости ВВП

    Reduction Stagnation

    Forecast for 2019-2025

    4

    DYNAMICS OF ENERGY INTENSITY OF GDP REPUBLIC OF KAZAKHSTAN

  • ИНСТИТУТ РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИКИ И ЭНЕРГОСБЕРЕЖЕНИЯ

    KEY INDICATORS AND ACHIEVEMENTS OF SER (5198 subjects)

    2342 |Obliged

    conduct

    Energy audit

    50 %Conduct

    1179

    518Subjects the SER

    has developed a

    plan of action

    Plan of measures

    40 %Subjects passed the

    report through the AIS

    SER

    Digitalization

    200billion tenge or

    0.7 million toe

    Saving

    TENDENCY OF THE SER LEADS TO INCREASE IN ENERGY CONSUMPTION

    2856

    17411

    1632

    5930

    710

    3277

    2017 2018

    LE

    QQ

    PI

    26 618

    5 198

    Not the subjects of the SER - 44%

    Population - 8%

    The subjects of SER in 2017 consumed 45% of

    the country's consumption or 35.8 million toe

    loss - 3%

    The consumption of the country in 2017. - 79,7 million toe

    5

    the

    nu

    mb

    er o

    f

    sub

    ject

    s o

    f th

    e S

    ER

    TENDENCY | STATE ENERGY REGISTRY

  • 469,4 kW×h/t

    specific energy consumption per tonne of commercial aluminium (kWh / t)

    ▪ optimization of technological processes and more

    efficient use of production capacities

    ▪ implementation of ISO 50001 energy

    management system

    LLP

    "Kazzinc"

    1019

    specific energy consumption per ton of refined lead(kWh/t).

    ▪ introduction of soft start device on the fan

    PU-23 scz UK MK

    ▪ synchronization of operation of the

    exhauster VDC with descoberta

    ▪ installation of filter separators in the dust

    collection Department

    366,8 million tenge

    98,5 kW×h/t167,4 million tenge

    LLP

    " Silicate "

    29,9

    specific energy consumption for the production of one

    thousand pieces of brick (kWh / 1000 PCs)

    ▪ replacement of electric motors with phase rotor on

    ▪ asynchronous with short-circuited, with installation of

    frequency converters

    ▪ application of variable frequency drives

    ▪ insulation of non-insulated surfaces of autoclaves

    15,03 kW×h / thousand pieces12,9 million tenge

    6

    14172

    JSC

    "Zhairemsky

    GOK "

    59,2

    specific energy consumption per ton of iron-manganese concentrate(kWh/t).

    ▪ automation of control and management of the main

    drainage installations of the mine "Ushkatyn-3 "

    installation of CRM devices in the electric networks of

    the plant

    16,6 kW×h/t126,8 million tenge

    14641 75,8

    1117 44,9

    2012 2017

    2012 2017

    2012 2017

    2012 2017

    JSC "Kazakhstan

    electrolysis plant "

    22%

    34%9%

    3%

    EXAMPLES OF COMPLETED PROJECTS

  • «Attracting strategic investors in the sphere of energy saving throughthe internationally recognized mechanism of energy service contracts»

    Their main task: to stimulate the development of private energy servicecompanies to provide a range of services in the field of energy saving withreimbursement of their own expenses and obtaining financial profit from theactually achieved energy savings»

    7

    1. Reducing the energy intensity of GDP by 25% by 2020

    2. Annual budget savings for the purchase of energy resources

    3. Annual involvement of at least three internationally recognized companies for the

    implementation of ESCO projects

    EXPECTED RESULT

    59 STEP OF NATIONS PLAN

  • 1 СНИЖЕНИЕ ЭНЕРГОЕМКОСТИ ВВП НА 25% К 2020 ГОДУ

    2 THE ANNUAL BUDGET SAVINGS НА FOR THE PURCHASE OF ENERGY

    3 THE ANNUAL ASSISTANCE OF AT LEAST 3 INTERNATIONALLY RECOGNIZED COMPANIES FOR IMPLEMENTING PROJECTS ON THE PRINCIPLE OF ESCO

    The decrease in the energy intensity of GDP in

    2017 was 18% of the level of 2008.

    - 9 PPP PROJECTS(Transport tower, Atyrau region(3), Pavlodar, Ekibastuz, Kyzylorda region.(3))

    Implemented:

    395,0

    9 domestic company1 a foreign company(RussianFederation)

    3 ATTRACTED A

    STRATEGIC

    INVESTOR

    INVESTORS

    ATTRACTED

    10 COMPANIES

    - WORLD BANK PROJECT«Improving energy efficiency in Kazakhstan(44 subject) 131,0

    Ежегодная

    экономия(млн. тнг)

    526,0

    2008 2017

    0,51toe/1000$

    - 18 %

    0,42toe/1000$

    - 18 %

    2020

    0,38toe/1000$

    - 25 %

    THE REDUCTION OF GDP ENERGY INTENSITY

    ИТОГО

    8

    RESULTS | 59 STEP OF NATIONS PLAN

  • “AFP” branch of JSC “TNK” “Kazchrome””

    KAGAZY RECYCLING

    747,10

    349,00

    2,3

    Investment

    (million tenge)Saving

    (million tenge)payback period

    (years)

    retrofit of the lighting system

    23,76

    16,33

    1,5

    Investment

    (million tenge)Saving

    (million tenge)payback period

    (years)

    retrofit of the lighting system

    99

    ESCO

    ESCО

    DEPARTMENT OF HCS IN PAVLODAR CITY

    TRANSPORT TOWER

    modernization of the lighting system

    1088,00

    142,35

    7,6

    Investment

    (million tenge)Saving

    (million tenge)payback period

    (years)

    54,30

    9,35

    5,8

    Investment

    (million tenge)Saving

    (million tenge)payback period

    (years)

    modernization of the lighting system

    PPP

    PPP

    EXAMPLES OF COMPLETED PROJECTS

  • Address of the Head of state to the people of Kazakhstan

    «New development opportunities in the fourth industrial revolution»BASIS

    THE CONCEPT INCLUDES

    ✓ the establishment of the National information-analytical system on the basis of AIS SER

    ✓ tighter control over the commissioning of new facilities for non-compliance with the energy efficiency class

    On coordination in the interested state bodiesSTATUS

    ▪ the improvement of the energy auditing activities (introduction of

    OPS, the introduction of an Express energy audit)

    ▪ preventive control

    ▪ appointment of responsible persons at large enterprises

    ▪ transfer of control functions to the authorized body for power

    industry

    ▪ creation of incentive mechanisms (financial support, tax

    benefits)

    PRIVATE SECTOR▪ full monitoring of energy consumption (expanding the scope of the

    State energy register)

    ▪ the adoption of measures for strict regulation (strengthening ofresponsibility of heads)

    ▪ establishment of energy consumption standards

    PUBLIC SECTOR

    10

    AMENDMENTS TO THE EE LAW

  • GRANT

    FUNDS 21,7 million $June 1, 2015 -31 March

    2019IMPLEMENTATION

    PERIOD

    PROJECT IMPLEMENTATION

    Implementation of 85 demonstration subprojects ($17.2 million allocated)

    44 the subproject is implemented

    Installation of more than 4 thousand led street lamps

    Improvement of working conditions (training,

    maintenance)more than 50 thousand peopleSaving TEC more than 5 thousand toe/ year (more than

    $ 1 million / year)

    PROJECT BENEFITS

    41 subproject in progress

    11

    WORLD BANK PROJECT«IMPROVING ENERGY EFFICIENCY IN KAZAKHSTAN»

  • ИНСТИТУТ РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИКИ И ЭНЕРГОСБЕРЕЖЕНИЯ

    Example: SSI secondary school № 17, Karaganda

    THE AMOUNT OF WORK PERFORMED

    Architectural solution Heating and ventilation

    Repair seams. Panel joints– 2300 м The installation of ATP – 1 ед.

    Window – 965,3 м2

    Door – 29,1 м2 Electrical equipment and lighting

    Roofing – 1500 м2 Led lights– 902 ед.

    12

    4,5M

    After

    kzt5,6M

    Before the

    modernization

    kzt19%

    SavingE

    ner

    gy

    cost

    s

    Bef

    ore

    the

    mod

    erni

    zatio

    nA

    fter

  • TOTAL AMOUNT

    OF PROJECTS 12,0 billion tenge

    717,0 million tenge

    ANNUAL SAVING

    PROJECT IMPLEMENTATION

    NUMBER OF

    PROJECTS 67 PROJECTS

    792,82Facilities,directedonsubsidies

    Facilities,directedon

    warrantymillion tenge million tenge121,52

    GRANT

    FACILITIES

    UNDP3 millin $

    13

    PROJECT IMPLEMENTATION TOGETHER WITH UNDP AND DAMU

  • Heating

    technologyLighting Boilers

    THE DEVELOPMENT OF LOCAL PRODUCTION

    1645,52 (million tenge)

    Subsidization Guarantee Reimbursement of

    expenses123,32944,15 578,05

    ECONOMIC EFFECT

    [PROFIT PER 1 TENGE OF

    INVESTMENTS]tenge+ 0,41

    14

    REQUESTED STATE SUPPORT FOR ENERGY EFFICIENCY MARKET DEVELOPMENT

  • 1 Analysis and monitoring of 26 thousand subjects SER

    2. The development of ESCO (step 59), the implementation of 20 projects, including 5 PPP

    3. Implementation of PPP project on lighting together with the Committee of roads

    6. Master plan for sustainable energy development with dena and the Ministry of Energy

    5. The creation of a sustainable funding mechanism for PPP projects together with the

    World Bank (including the creation of an energy saving Fund)

    7. Holding International day of energy saving

    15

    4. The introduction of the draft Law «On energy saving and energy efficiency»

    PLANS FOR 2019

  • Holding of

    international forum

    National website in

    the field of energy

    saving

    Conduction

    seminars'

    [WorkShop] in

    regions

    Information

    brochures

    Release

    tv program

    Post

    publications

    in media

    HoldingPress-

    briefings

    Action plan for the 1st half of 2019

    1

    ww

    w.e

    eq.

    kz

    15

    10

    30 15 000

    Short movies

    Billboards'

    3*10

    2

    16

    *20 min.

    INFORMATIONAL AWARENESS OF ENERGY EFFICIENCY POLICY