Edmondo Occhipinti
-
Upload
phungnguyet -
Category
Documents
-
view
240 -
download
1
Transcript of Edmondo Occhipinti
Edmondo Occhipinti
• 3 Years CEO of 3-im
• 12 years in the AECO
• 15 years on 3D and BIM in AEC
• 100+ successful BIM projects
• 10+ countries in 5 continents
• 7 years Director of Europe and South America at Gehry Technologies
The Most Ambitious projects in the World have used our know-how, our technology and our expertise to get built
faster, cheaper and with unprecedented quality
World Trade Center New York
Fondation Louis Vuitton Paris
Yas Island Hotel F1 Track Abu Dhabi
New National Museum of Qatar Centro Direzionale ENI Milano
Nuovo Stadio della Roma
Red Metro Line Varsavia
Midfield Terminal Abu Dhabi Midfield Concourse Honk Kong
Centro Direzionale SNAM Milano
Four Seasons’ Sao Paulo and Recife
Nuovo Aeroporto di Venezia
At 3-im we use sophisticated 3D technologies and innovative BIM processes to increase project efficiency,
costs and time control, client productivity.
3-im is focused on corporate and enterprise wide BIM implementation
BIM obbligatorio nelle opere pubbliche? Il nuovo Codice appalti
Il 19 aprile 2016 è entrato in vigore il nuovo Codice appalti (dlgs 50/2016), che riscrive la disciplina dei contratti pubblici sul territorio italiano.Uno degli obiettivi del nuovo Codice è senz’altro quello di favorire il progressivo utilizzo di strumenti elettronici, come la modellazione per l’edilizia e le infrastrutture, nel cui ambito rientra il BIM (Building Information Modeling). L’art. 23 comma 13 del Codice prevede esplicitamente che le stazioni appaltanti possano già richiedere per le nuove opere e per interventi di recupero, in maniera prioritaria per gli interventi più complessi, l’uso dei metodi e strumenti elettronici specifici, quali quelli di modellazione per l’edilizia e le infrastrutture (il BIM).
Apparato Normativo Esterno
1D
BIM obbligatorio in alcune opere private