Econergy Midlands Office Case Study 30kW
Transcript of Econergy Midlands Office Case Study 30kW
8/7/2019 Econergy Midlands Office Case Study 30kW
http://slidepdf.com/reader/full/econergy-midlands-office-case-study-30kw 1/2
W ood f ue l l ed bo i l e r s B i omas s ene r gy s e r v i c es D i s t r i c t Hea t i ng
T e l : 0 8 7 0 0 5 4 5 5 5 4 w w w . e c o n e r g y . l t d . u k e - m a i l : s a l e s @ e c o n er g y . l t d . u k
Econergy Midlands Office, Harnage, 30kW
Harnage Estates, near Telford, is the location of
Econergy Midlands office. This office is the centre forEconergy Distributors and Econergy staff technical &servicing boiler training. Econergy decided to install awood boiler to heat the office and provide a training tool.
Boiler
Due to the availability of logs on the estate from theadjacent Midlands Wood Fuel company, a 30kW FHGFroling high efficient log boiler was chosen.
Technical Summary
• 91% efficient.
• Lambdatronic S3100 Comfort controls to givemodulating combustion control via Lambdasensor.
• Turbulator package for easy cleaning andsustained high efficiencies.
• Large filling capacity for half metre logs andcoarse chopper fuel
• Electronically controlled induced draught fan, so
the boiler can be started with ease, even when theflue is cold
Below; 30kW Log boiler with 2,000 litre buffer tank
8/7/2019 Econergy Midlands Office Case Study 30kW
http://slidepdf.com/reader/full/econergy-midlands-office-case-study-30kw 2/2
W ood f ue l l ed bo i l e r s B i omas s ene r gy s e r v i c es D i s t r i c t Hea t i ng
T e l : 0 8 7 0 0 5 4 5 5 5 4 w w w . e c o n e r g y . l t d . u k e - m a i l : s a l e s @ e c o n er g y . l t d . u k
Above; Log store, one box last approximately 4 weeksBelow; Boiler loaded and ready for lightening through the secondchamber door
Buffer Tanks
The use of a hot water buffer tank in logboiler central heating systems is a newconcept in the UK, although common placein Austria.
It operates as a heat store for the system,
charging up when the boiler has satisfiedthe heat load, and discharging when theboiler has burnt through a batch of logs andthe heating system requires heat.
This reduces the number of times the boilerhas to be attended, reducing customerworkload and increasing system efficiency.
A 2000 litre buffer tank was installed for thisproject.
Operation
• Boiler is loaded with logs up to once aday in the coldest part of the heatingseason, perhaps 2 or 3 times a weekin spring and autumn,
• The boiler is safely lit through themiddle door.
• The boiler will start immediately withhelp from the induced draught fan
• Due to the high efficiency there isvery little ash.
• Maintaining the boiler is very straightforward, normally a 10 minute cleanevery week to remove the ash fromtwo accessible places using the toolsprovided.
• The log boiler at Harnage uses a boxof logs about every three to four
weeks.
• This equates to around 3 / 4 tonnes ayear
Fuel Requirements
The boiler requires seasoned logs / wastewood up to half a metre in length and anaverage moisture content of 25%. It isessential that clean logs / waste wood fuelis used. In particular, it must have no
additives such as paints, varnish orchemical treatment.