Eastside Type N Riparian Effectiveness Project

ENREP - FHS ExtensionFebruary 5, 2015

Page 2: Eastside Type N Riparian Effectiveness Project ENREP - FHS Extension ENREP - FHS Extension February 5, 2015.

Why the FHS Extension

2. Modify the westside Type N study designs for the eastside and proceed with the study in basins with spatially-continuous Np streams.

The variability in hydrologic condition and extent of dry Np channels led to a two-part recommendation from the TWIG for ENREP study design development.

November 2013: Policy approved this recommendation, and expressed an interest in seeing a single study design applied to all eastside basins, if feasible.

1. Extend FHS to learn more about the distribution and persistence of dry reaches.

Page 3: Eastside Type N Riparian Effectiveness Project ENREP - FHS Extension ENREP - FHS Extension February 5, 2015.

FHS Extension products

Page 4: Eastside Type N Riparian Effectiveness Project ENREP - FHS Extension ENREP - FHS Extension February 5, 2015.

Variation in hydrologic condition

Page 5: Eastside Type N Riparian Effectiveness Project ENREP - FHS Extension ENREP - FHS Extension February 5, 2015.

Isolated Channels

• Isolated channels were identified by the lack of a channel connection to the downstream network.• These breaks in channel connectivity occurred where an

upstream channel ended in a section of unchanneled hillslope.

• Lack of channel connectivity interrupted surface water transport of water, material, biota, and thermal energy.

• Some basins contained no isolated Np. In some others there was no channel at the outlet, so the entire channel network was isolated.

• Np channels that were both dry and isolated comprised 2%-4% of the total channel network.

Page 6: Eastside Type N Riparian Effectiveness Project ENREP - FHS Extension ENREP - FHS Extension February 5, 2015.

Association with potential Np buffer zones

11% (0.5%) Isolated: 3% (0.14%)

29% (1.3%) Isolated: 7% (0.31%)

Page 7: Eastside Type N Riparian Effectiveness Project ENREP - FHS Extension ENREP - FHS Extension February 5, 2015.

Key findingsIn the drier FHS basins (>500 feet of dry Np):

• 35% of the Np channel length was dry in late summer (FHS: 21% was dry).

• 12% of the Np channel length was dry in late spring.

• 70-75% of dry Np channels have a channel connection to downstream waters beyond the basin outlet (FHS: 77%).• Important for the delivery of material and energy to the fish-

bearing network.

• Stream hydrologic condition is generally stable within seasonal drying patterns. Therefore, a single ENREP study design is feasible.

Page 8: Eastside Type N Riparian Effectiveness Project ENREP - FHS Extension ENREP - FHS Extension February 5, 2015.

Next steps• Prepare the FHS Extension report.

• In close cooperation with landowners, develop a single study design to test the effectiveness of current FP Type N rules.• Determine study basin characteristics

• Size, hydrologic condition, distribution, etc.

• Determine type and scale of harvest• Identify at least 20 study basins• Number of treatment types and overall success

depend on availability of study basins.

• Collect pre-harvest data in spring 2016 – 2017.

• Apply the designed harvest in fall 2018 – 2019.