Eastern Interconnection
Balancing Authority Webinar
NERC Resources Subcommittee
August 15, 2017
RELIABILITY | ACCOUNTABILITY2
Agenda
• Overview of Time and Inadvertent management upon BAL-004 retirement EI BA survey responses
Options
Recommendation
• Other BA operating topics Drawdown of current large Inadvertent Interchange balances
Solar eclipse
Inverter issue
DCS data collection
Generator governor survey
NIa NIs error checking tool
• Post webex survey
RELIABILITY | ACCOUNTABILITY3
Orders on Inadvertent Interchange
• Order No. 693 directed changes to BAL-006 to cap and penalize large Inadvertent Interchange balances
• BAL-001-2 was offered as an alternative, but FERC directed NERC to report in 2 years on impact on Inadvertent Interchange balances
• RS looking for EI BA support in managing and drawing down balances over the next 12-18 months to avoid additional standards
• Time has been running fast over the past several months, if your BA has a + Inadvertent balance and has been increasing, please review your control and metering
RELIABILITY | ACCOUNTABILITY4
Time Error and II Post-BAL-004
• In January, FERC approved retirement of BAL-004 upon the retirement of the NAESB business practice WEQ-006
• While NAESB retired WEQ-006, it will take a FERC Order to remove WEQ-006 from tariffs
• The NERC Operating Committee (OC) approved a Reference Document to allow TECs if needed*
• WECC, ERCOT and HQ Interconnections all planning on continuing TECs in different forms
• Plan is to use a transition approach in the East
* NERC Petition for retirement of BAL-004-0
RELIABILITY | ACCOUNTABILITY5
EI BA Webex and Survey
• Held a webex with Eastern Interconnection Balancing Authorities April 28 covering Current performance issues
BAL-004 transition options
o Halt TECs
o Continue as-is
o Transition/relaxation approach
• Conducted post-webex survey Responses represented 71% of EI load
82% in favor of relaxed/transition approach
18% continue as-is
None in favor of full halt of TECs
RELIABILITY | ACCOUNTABILITY6
Recommended TEC Transition
• Proposing the following transition approach to Inadvertent Interchange and Time Error management
• Step 1 Continue current approach to TECs
Use coordinated unilateral Inadvertent Payback as outlined in following slides
Widen TEC window to +/-20 seconds when FERC retires NAESB WEQ-006 (may not occur this year)
• Step 2 (2018) Evaluate performance compared to previous years and other Interconnections
Discuss options with BAs for 2019o Possible wider window or smaller offset
o Voluntary automatic TEC
• Step 3 (2019) Implement adjustments based on performance (both East and other Interconnections) and BA preferences
RELIABILITY | ACCOUNTABILITY7
Time Management Approach
Lesser of -50MW or -20% of Bias
Inadvertent Recovery Strongly
Encouraged
+10 Seconds
+5 Seconds
0 Seconds
-5 Seconds
-10 Seconds
BA with + Inadvertent Balance BA with - Inadvertent Balance
Lesser of -50MW or -20% of Bias
Inadvertent Recovery OK
While not prohibited, any recovery
of + Inadvertent should be
coordinated with other BAs with an
opposite balance
Lesser of+50MW or +20% of Bias
Inadvertent Payback OK
Lesser of +50MW or +20% of Bias
Inadvertent Payback Strongly Encouraged
While not prohibited, any payback of
- Inadvertent should be coordinated
with other BAs with an opposite
balance
RELIABILITY | ACCOUNTABILITY8
Large Inadvertent Balances
• Resources Subcommittee will reach out to BAs with large balances (greater than +/- 10,000 MWHrs on or off peak) to suggest an approach to draw balances down over about 1 year
• Should be a one-time exercise if time management approach in previous slide is used
RELIABILITY | ACCOUNTABILITY9
Other Operating Topics
RELIABILITY | ACCOUNTABILITY10
August 21 Eclipse
• NERC does not expect major issues due to the solar eclipse, that said, BAs should still be prepared to act
• Those BAs with large solar penetration may see a net generation decline
• Past experience in the UK and the US for major news and sporting events imply there could be a decline in load (people stop what they are doing to watch) during the event, followed by a load pickup
• BAs encouraged to keep maneuvering room in both directions and keep their eyes on the RCIS
RELIABILITY | ACCOUNTABILITY11
Inverter Issue
RELIABILITY | ACCOUNTABILITY12
DCS Data Collection
• BAL-002-2, which becomes effective 1/1/18, no longer requires quarterly reporting
• Summary data still needed NERC State of Reliability Report metrics
NERC directed by FERC on BA performance issues caused by new standard
• NERC RS looking to have a voluntary quarterly reporting process from RSGs and non-RSG BAs to capture the necessary data beginning in 2018
RELIABILITY | ACCOUNTABILITY13
Governor Survey
• Western Interconnection Generator Survey initiated Friday, August 11. Survey requested back within 30 days.
• Eastern Interconnection tentatively set for late September 2017 or early October 2017.
RELIABILITY | ACCOUNTABILITY14
Net Interchange Tool
• NERC OC endorsed development of a real-time error-checking tool that Compares actual net interchange (NIa) between BAs
Sums Eastern Interconnection BAs’ scheduled net interchange (NIs)
Help RCs and BAs identify unexplained abnormal frequency due to EMS outages or errors in line modeling, metering, or interchange schedules
Can be used to create a “backup ACE” for BAs
• Nearly all EI BA data is mapped into the tool
• Proposing a bi-weekly snapshot and outreach to EI BAs to track down data issues
RELIABILITY | ACCOUNTABILITY15
Post-Webex Survey
Please take a minute to respond to this short survey regarding this and future webinars:
https://www.surveymonkey.com/r/GCNVD8Q
RELIABILITY | ACCOUNTABILITY16
Questions?
RELIABILITY | ACCOUNTABILITY17
FAQ
• Are the approaches in this presentation mandatory? No, they are good utility practices that utilities did for decades prior to the existence of
enforceable standards
• What if I don’t participate in the suggested time management approach? More TECs and larger Inadvertent balance
Possible future standards on Inadvertent Interchange
• What if I don’t participate in manual TECs? There are no financial sanctions
Will accumulate some Inadvertent
Some impact on your CPS and BAAL
Lose an opportunity to objectively show that the Industry can perform basic tasks absent a mandatory standard
• What if I have a large Inadvertent Balance? RS can assist with finding partners for coordinated unilateral or bilateral payback
opportunities
RELIABILITY | ACCOUNTABILITY18
Appendix
RELIABILITY | ACCOUNTABILITY19
Acronyms
• ATEC: Automatic Time Error Correction
• BA: Balancing Authority
• CPT: Central Prevailing Time
• FERC: Federal Energy Regulatory Commission
• II: Inadvertent Interchange
• NAESB: North American Energy Standards Board
• NIa: Net Actual Interchange
• OC: Operating Committee
• RS: Resources Subcommittee
• TEC: Time Error Correction
RELIABILITY | ACCOUNTABILITY20
References
• RS Scope
• Time Monitoring Reference Document
• EI Time Error website