Dv project 1 b slide
-
Upload
anthony-chew -
Category
Business
-
view
233 -
download
0
Transcript of Dv project 1 b slide
Project 1B
Measure, Draw and Diagram it! Individual Work 15% (5% in class assignments) * However work in groups to measure the same “space”.
Project 1B
The TASK >>>
The Task:
1. Measure the given space.
The area of about 10x10m.
The Task:
2. Draw the given space to scale.
The plan(1) + elevations (2)
section (1)
The Task:
3. Produce bubble diagram(s)
Of the space and floor
The Task:
4. To produce 1 sketch axonometric.
As a diagram to explain about the
space, components or others.
The Task:
5. To produce 2 detail drawing of an element or object from the space and one object given by the lecturer
The Task:
6. To produce one introduction page
-To include location plan and a perspective of the site
The Task:
7. Compose these documents as a set of presentation drawings (total 8 pages only)
Project 1B
Submission Requirements >>>
Submission Requirements:
1. All information to be hand drawn using a felt pen on art block A3 size paper. You may use ruler before you ink the drawings
Submission Requirements:
2. Total 8 pieces of A3 paper. You may exceed to max 10 pieces if you want to explore the diagrams or drawings. White drawing block
paper.
Submission Requirements:
3. Drawings:- - 1 plan (one A3)
- 2 elevations + 1 section (two A3)
- 2 details (two A3)
- 1 location plan+ 1 sketched perspective (one A3)
- 1 bubble diagram(s) (one A3)
- 1 sketched axonometric (one A3)
Submission Requirements:
4. Diagrams:- - bubble diagram of the
space and floor - axonometric sketch as a diagram
Submission Requirements:
5. Drawings must show: - the use of line thickness (line weight) - main measurements (and scale)
- annotations, title, north point and labeling - the use of proper drawing conventions
abbreviation and symbols - as a presentation drawing please use proper
hatching and rendering - draw loose and build-in furniture's or elements. - floor pattern and details - order of drawings and workmanship
Submission Requirements:
6. Must produce proper bubble diagrams / diagrams. Please refer to books.
Submission Requirements:
7. Must write with proper architectural hand writing.
Submission Requirements:
8. The A3 documents must be properly compiled in to an A3 folder. Will give further
details soon.
Submission Requirements:
9. The clear folder to be submitted at C9 before 3PM, 29/11/2013
Submission Requirements:
10. Drawing must be to scale. Will be determined
during tutorial.
Submission Requirements:
11. “Drawings” are presentation drawings. You may color but it must be in an architectural technique.
A. Block E –
The Lift Wall
B. Block C –
Library Entrance (level two)
C. Block A –
Entrance (level one)
D. Block D
Student Life Center Entrance
E. Block B
Taylor’s Grand Hall Entrance
Block E
Ex Coda Gallery