PROJECT PROCEDURE
-
7/31/2019 DUyOT-FinalPres-8Mayo
3/23
Parallel Workshop between DUSP-MIT and DUyOT-ETSAM
COLLABORATION PROJECT PROCESS
ANALYSIS
SPATIAL UNITS
CLIMATE COMFORT
GLOBAL METROPOLITAN CONNECTION
MOBILITY
USES AND ACTIVITIES
NEIGHBOURHOOD PERCEPTION
MANAGEMENT
SOCIO-ECONOMIC PROFILE
DIAGNOSIS
USING CLIMATE CONDITIONS TO DESIGN
HEALTHY URBAN SPACES
GOALS IN ENERGETIC EFFICIENCY
SPATIAL UNITS BETTER USE
NEW PEDESTRIAN EDGES
NEW TRANSPORT MODE
HABITANTS PROFILE
GOALS IN MANAGEMENT
PARTICIPATION WORKSHOP SECTORAL PROPOSALS FINAL PROPOSAL
-
7/31/2019 DUyOT-FinalPres-8Mayo
4/23
Parallel Workshop between DUSP-MIT and DUyOT-ETSAM
COLLABORATION PROJECT
STRATEGIES
GENERAL STRATEGIES:
- Pedestrian axis
- Activity axis
- District Centrality point
- Transformation of Public Spaces
- Public Space Qualification
- Energetic Efficiency in buildings
- Comfort in Public Spaces- Green Connection
-
7/31/2019 DUyOT-FinalPres-8Mayo
5/23
STRUCTURAL INTERVENTIONS
-
7/31/2019 DUyOT-FinalPres-8Mayo
6/23
Parallel Workshop between DUSP-MIT and DUyOT-ETSAM
COLLABORATION PROJECT GREEN SYSTEM CONNECTION
River Manzanares
-
7/31/2019 DUyOT-FinalPres-8Mayo
7/23
Parallel Workshop between DUSP-MIT and DUyOT-ETSAM
COLLABORATION PROJECT DISTRICT ACTIVITIES CONNECTION
CULTURAL CENTERS
INDUSTRY
SPORT
COMMERCIAL
-
7/31/2019 DUyOT-FinalPres-8Mayo
8/23
SECTORIAL PROPOSALS
-
7/31/2019 DUyOT-FinalPres-8Mayo
9/23
Parallel Workshop between DUSP-MIT and DUyOT-ETSAM
COLLABORATION PROJECT TRANSPORT MOBILITY
-
7/31/2019 DUyOT-FinalPres-8Mayo
10/23
Parallel Workshop between DUSP-MIT and DUyOT-ETSAM
COLLABORATION PROJECT PEDESTRIAN MOBILITY
-
7/31/2019 DUyOT-FinalPres-8Mayo
11/23
Parallel Workshop between DUSP-MIT and DUyOT-ETSAM
COLLABORATION PROJECT PUBLIC SPACE USE
-
7/31/2019 DUyOT-FinalPres-8Mayo
12/23
-
7/31/2019 DUyOT-FinalPres-8Mayo
13/23
Parallel Workshop between DUSP-MIT and DUyOT-ETSAM
COLLABORATION PROJECT NEWS ACTIVITIES
-
7/31/2019 DUyOT-FinalPres-8Mayo
14/23
Parallel Workshop between DUSP-MIT and DUyOT-ETSAM
COLLABORATION PROJECT TREATMENT OF EDIFICATION
PLANO JORGE
- New construction area placed two meters from current facade.
- Actions depending on the orientation.
-
7/31/2019 DUyOT-FinalPres-8Mayo
15/23
Parallel Workshop between DUSP-MIT and DUyOT-ETSAM
COLLABORATION PROJECT TREATMENT OF EDIFICATION
- The putting of green facades will be done over west
facing blind walls.
- The insertion of green roof even though is not
reliable at all due to the huge amount of green
space, this kind of action can be done over wide flat
roofs.
-
7/31/2019 DUyOT-FinalPres-8Mayo
16/23
Parallel Workshop between DUSP-MIT and DUyOT-ETSAM
COLLABORATION PROJECT VEGETATION AND PUBLIC SPACE TREATMENT
Mediterranean trees were put within the area,
condidering the environmental conditions of Inland
Spain.
-
7/31/2019 DUyOT-FinalPres-8Mayo
17/23
Parallel Workshop between DUSP-MIT and DUyOT-ETSAM
COLLABORATION PROJECT WEST CONECTION
The former barrack " park of the engineers " occupies 270.000m2 to the west of the neighbourhood.
-
7/31/2019 DUyOT-FinalPres-8Mayo
18/23
Parallel Workshop between DUSP-MIT and DUyOT-ETSAM
COLLABORATION PROJECT WEST CONECTION
In the near future will be built " The park of the engineers "
with 1700 homes, 70,000 m2 of green areas, 50,000 m 2 of
facilities and 70,000 m 2 of road and free zones.
-
7/31/2019 DUyOT-FinalPres-8Mayo
19/23
INTEGRATED FINAL PROPOSAL
-
7/31/2019 DUyOT-FinalPres-8Mayo
20/23
Parallel Workshop between DUSP-MIT and DUyOT-ETSAM
COLLABORATION PROJECT INTEGRATED FINAL PROPOSAL
-
7/31/2019 DUyOT-FinalPres-8Mayo
21/23
ACHIEVED GOALS
-
7/31/2019 DUyOT-FinalPres-8Mayo
22/23
Parallel Workshop between DUSP-MIT and DUyOT-ETSAM
COLLABORATION PROJECT GOALS
PUBLIC SPACES:
- Removal of waterproof surfaces.
- Insertion of caduceus trees within
- Transformation of Public Space- Give Inter- bloc space to community and
neighbours.
- Insertion of news activities in the rest of
spaces
BUILDINGS:
- Closure inter-bloc spaces.
- Insertion of activity in ground floor.
- Insertion of more isolation.- Insertion of clean energies within.
- Adaptation of facades to sun exposure.
- Insertion of green roofs which can help to
storage rain water.
PEDESTRIAN MOBILITY:
- Replacement of parking areas.
- New Pedestrian axis.
- Connection of green activities
TRANSPORT MOBILITY:
- Bike lane
- New Parking areas
- Reduction of speed
-
7/31/2019 DUyOT-FinalPres-8Mayo
23/23
Parallel Workshop between DUSP-MIT and DUyOT-ETSAM
COLLABORATION PROJECT CONCLUSIONS
- Good information to neighbours about
the process, the aids and the project.
- A representative person to carry out the
beginning of the process- Different aids for different occupants.
- The expansion to the West of the
neighbourhood will allow complete the
allocations and services that lacked in
the neighbourhood.
- The incorporation of 1700 new families
will promote in turn to trade and servicesexisting in the neighbourhood.
- The neighbourhood has good bioclimatic
conditions, because of the quality of the
public spaces with vegetation.
- If wed get to configure an accurate
variety of public spaces, there will be a
good appropriation and using of those
public spaces.
- Decentralization of activity cores