    Duckskiff is a 14 foot skiff I designed for a buddy of mine named Tim that I work

    with. Tim is an avid Duck hunter and wanted a fairly lightweight boat but in nice quiet

    wood rather than noisy aluminum. He also wanted something a little boatier than a

    Johnboat styled craft. What I came up with for him is a 14 ft long 5 ft wide at the shear

    (45 inches wide at the bottom) kind of semi-dory hull. I did this to make it an easier anddryer proposition when pulling a large dog over the side and back into the boat. The

    additional ultimate stability of the 23 flare to the sides allows a lot of weight to be right

    at the sides of the boat while at the same time getting the shear lower to the water. He

    wanted to be able to use his 7 hp motor to get around now with the probability of

    upgrading to a higher hp later on. As the hull was originally derived from a rowing style

    hull I was playing with a few months previously I tweaked both of them so that they were

    brother and sister similar and decided to present them to you here. Enjoy

    Specifications for motorized version:

    LOA: 14 3

    Beam: 5 2 (with trim)

    Depth at midships: 18Draft at design weight of 860 lbs is 4.5

  • 8/3/2019 Duck Skiff

    2/61

  • 8/3/2019 Duck Skiff

    3/61

  • 8/3/2019 Duck Skiff

    4/61

  • 8/3/2019 Duck Skiff

    5/61

    Bottom Panel Half

    Station X Y X2 Y2

    1 0 0 0 22 8/162 61 3/16 0 61 3/16 22 8/16

    3 76 8/16 0 76 8/16 22 4/16

    4 91 13/16 0 91 13/16 21 1/16

    5 107 2/16 0 107 2/16 18 8/16

    6 122 7/16 0 122 7/16 14 5/16

    7 137 14/16 0 137 14/16 8 4/16

    8 145 9/16 0 145 9/16 4 6/16

    9 153 5/16 0 153 5/16 0

    Side Panel First Chine

    Station X Y X2 Y2

    1 5 4/16 0 0 19 7/16

    2 12 14/16 3/16 12 8/16 19 11/16

    3 28 3/16 8/16 27 12/16 20

    4 43 8/16 13/16 43 1/16 20 6/16

    5 58 12/16 1 2/16 58 6/16 20 11/16

    6 66 7/16 1 4/16 66 20 13/16

    7 74 1/16 1 7/16 73 11/16 21

    8 89 6/16 1 10/16 89 21 3/16

    9 104 13/16 1 11/16 104 6/16 21 4/16

    10 120 8/16 1 9/16 120 1/16 21 2/16

    11 136 11/16 1 2/16 136 4/16 20 11/16

    12 153 11/16 7/16 153 4/16 20

    13 162 9/16 0 176 14/16 18 12/16

    Transom HalfStation X Y

    1 0 22 8/16

  • 8/3/2019 Duck Skiff

    6/61

  • 8/3/2019 Duck Skiff

    7/61

    Bottom Panel Half

    a on

    1 0 0 0 152 7 4/16 0 7 4/16 16 10/16

    3 23 1/16 0 23 1/16 19 3/16

    4 38 6/16 0 38 6/16 21 1/16

    5 53 12/16 0 53 12/16 22 2/16

    6 69 0 69 22 8/16

    7 70 15/16 0 70 15/16 22 8/16

    8 84 5/16 0 84 5/16 22 4/16

    9 99 10/16 0 99 10/16 20 14/16

    10 114 15/16 0 114 15/16 17 13/16

    11 130 4/16 0 130 4/16 12 9/16

    12 145 11/16 0 145 11/16 4 14/16

    13 153 6/16 0 153 6/16 0

    Station X Y X2 Y2

    1 4 4/16 0 0 14 4/16

    2 12 2/16 3/16 11 9/16 15 9/16

    3 27 11/16 8/16 27 2/16 17 2/16

    4 43 3/16 11/16 42 8/16 18 9/16

    5 58 8/16 9 6/16 57 13/16 19 13/16

    6 73 13/16 1 6/16 73 2/16 20 14/16

    Side Panel First Chine

    7 75 12/16 1 7/16 75 21

    8 89 2/16 1 14/16 88 6/16 21 12/16

    9 104 8/16 2 3/16 103 12/16 22 6/16

    10 120 2/16 2 2/16 119 6/16 22 10/16

    11 136 5/16 1 10/16 135 9/16 22 7/1612 153 8/16 11/16 152 12/16 21 12/16

    13 162 10/16 0 176 10/16 20 2/16

  • 8/3/2019 Duck Skiff

    8/61

    DuckSkiff14 and DuckSkiff14RBuilding Instructions

    (Note: Read the whole thing at least once all the way through prior to starting)

    Introduction: Usingtheseinstructions,alongwiththeaccompanyingsketches,drawings,illustrations,photosandtables,youshouldbeabletobuildeitherversionofDuckSkiff14withrelativeease

    overthecourseof2-6weekends.Theoriginalinstructionswerewrittenforjustthemotorized

    versionbuthavebeenaddedto,amendedtoandrevisedintheappropriateareaswherethe

    informationorbuildinginstructionsdifferfortherowingversion.PleasetakethetimetoreadALL

    oftheinformationasbetterthan90%appliestobothformsoftheboatandinbothmethodsof

    construction.Thephotosarenotofthisparticularboatbutareusedtoillustratewhatacertain

    methodoroutcomeshouldlooklike.DonotbethrownoffbyaVeebottomoradifferently

    shapedhullbutuseitasavisualizationofonepossiblewayofdoingsomething.ThePhotosare

    alsonotallminebutarecourtesyofmymanyonlinefriendsinthevariousforumsandgroups

    thatIinhabit

    Bill of Materials and Construction SequenceBill of Materials:

  • 8/3/2019 Duck Skiff

    9/61

    getawaywithshorterstuffifyoudontmindjoints.Alljointsshouldbeintheaftsectionsofthe

    boat.Thebetterthequalityofthewoodtheeasiertofinishandthelongerlasting.

    6:Stempiece:28longpieceof2x3or2x4firorhardwood

    7:Abagof1004plasticwiretiesorarollofcopperwirefortheStitchandGlueversion

    8:Epoxytheminimumamountofepoxyneededisabout1quart,fortaping,gluingandfillingon

    aboatbuiltwithChineLogs.Stitchandgluewillrequireanotherquart,aswillglassingthe

    bottom.Ifyouwishtototallysealtheboat(notabadideaatall)youwillprobablyneedallofthe

    aboveandanadditionalquartsoabout1gallonofepoxy.Idontrecommendpolyesterresinas

    itisnotusefulasaglue,isntreallywaterproofintheamountsyouwoulduseanddoesntstick

    towoodnearlyaswellasepoxydoes.TosavesomeonepoxyyoucanuseagluelikePL

    Premiumpolyurethanegluewhengluingpartstogether,butittendstofoamupsoitdoesnt

    worksowellasasealer.

    7:FillerfortheepoxyIlikewoodflourmixedwithCabosil(fumedsilicawearadustmask)2lbs

    ofwoodflourandlbofCabosilwilldothetrickforStitchandGlue,halfthatforChineLog.

    8:Fiberglass:Tape=10yardsforChineLog,25yardsforStitchandGlueCloth=50widthx5

    yards4-6ozclothifyouplanonglassingitthebottom.

    9:Mixers,mixingcontainers,tonguedepressorsorshapedapplicators(forfillets)latexorplastic

    gloves,dustmasks,sandpaper,3/4"Stainlessscrews(ifleavingthemin)ordrywallscrews(if

    removing)Clamps(cheapplasticonesarefine,orcutsome4-6schedule40PVCpipeinto1

    slicesandsplitoneedgeforareallycheapclamp),primerandpaint.Deckandporchpaintor

    anygoodexteriorheavydutypaintisfinealongwithagoodprimer,Paintersplasticorplastic

    sheetforcoveringwindows(better).

    10 T l Th b l i i I ld b i h i i l d

  • 8/3/2019 Duck Skiff

    10/61

    Step One Laying out the panels:Option One: Stitch and Glue Construction for both versions:

    Wellstartwiththebottompanel.Youwillneedonefullsheet(96)andonepiececuttoa

    lengthof591/2ofyourchosenthicknessPly.

    Buttthetwopiecesofplytogetherlengthwisewiththeshorterpieceonyourleftandthe

    factoryedgestogether.Runalinedownthecenterofthepanelsforthefulllength.ThisistheCenterlineoftheboat.Measureout22oneithersideoftheCenterlineanddrawparallel

    linesthesearetheoutsideedgesofthefinishedpanel.Theleftedgeoftheplywoodisthe

    transomend.Marktheselinesontheothersideofthesheets.Measurealongthecenterlinea

    distanceof613/16(71fortherowingversion)andmarkthispoint.Markpointsalongthe

    outsideedgesatthesamedistanceandconnectthedotswithaline.ThisisyourMaxBeam

    Station(orangehighlightintheoffsetstable).(Fortherowingversionskiptothenext

    paragraph).FromthereforwardthesidescurveinandwillusetheX2andY2offsetstoplotthe

    curvesofthebowonbothsidesofthecenterline.TheX2dimensionismeasuredfromtheleft

    edgeoftheplywoodandtheY2dimensionwillbethedistancefromthecenterlinetotheupper

    andlowerpoints.MeasurethedistanceX2alongthecenterlineandputthesquarethere.

    MeasureupYandmarkapointatthecorrectdistancefromthecenterlineforthatcoordinate.

    Dothesamethingontheothersideofthecenterline.Thelastpointatthebowshouldbeonthe

    centerlineandalmosttotherightedgeoftheplywood.Hammerinnailsplacedoutsideeach

    pointandoffsetbythethicknessofthebatten.Bendthebattenagainsttheinsideofthenails

    andclamptoeachnail,thenrunapencillinethroughthepointsalongthebatten.Takeselectedmeasurementsbetweenthepointsoneachsideandadjustthelinessothattheyareequalall

    the way to the bow Cut out the bottom panel and set it aside

  • 8/3/2019 Duck Skiff

    11/61

    bothsides(Hint:drillaverysmallholejustoutsideeachofthetwopoints,thenconnectthe

    holesontheotherside).Cuteachpairofpanelsatthesametime,makingexactmirroredcopies

    foreachside.Asafinalitem.drawalinefromthebottomcornerofthetransomendatanangleof15fromthetransomedge(or90fromthewaterline)forwardanduptotheshear.Onthe

    motorizedversionthiswillbeperpendiculartothebottomedgebutontherowingversionitwill

    lookslightlycantedduetotheupwardandinwardcurvatureofthebottomonthefinishedhull.

    Youwillusethislinelaterasastartingpointforsomemeasurements.

    Using3/4"ply(3/8fortherowingversion),Layoutanddrawthetransomrememberingto

    subtractthethicknessofthesidepanelfromeachsideedgeandthebottompanelfromthe

    bottomedgeandcutitout.Whencuttingthebottomandtopedges,puta15bevelontheedges(seesketch).FortheMotorizedversionyouwillneedtoknowwhatsizedshaftyourmotor

    has.Ifitisashortshaft(15)youwillneedtocutapieceoutofthetopofthetransomtogetitto

    thecorrectheight.ForaLongshaftyouwillneedtoaddacenterbumpof31/4"toraiseitto

    21.Fortherowingversionyoucanmakethetopofthetransomwithanicecurveabovethe

    shearandyoudonthavetobevelit.Forthemotorversiononly:Cutoutasecondpiecethatis

    thesameasthetopofthetransomdowntoabouthalfthedepthofthetransomthisisthe

    doublerandyouwilltrimittofitlater.TheDoublershouldhavethesamebevelatthetopasthe

    transom(seesketch).Whenlayingoutthetransomtheoffsetsareforhalfofthetransom(just

    likethebottom)andthetransomlookslikeitissideways(seepicture).Forbothmakeam