Works Area Width WORKS AREA 3.00 m Min. Lane Width 0.5 m Carriageway Width Varies Traffic Cone Footpath Footpath Pedestrian Barrier Safety Zone Pedestrian Barrier SITE LOCATION 25m WK 060 SIGNS TO BE 25m APART WK 060 WK 001 WK 095 WK 001 P 010 25m WK 095 SIGNS TO BE 25m APART WK 060 WK 001 WK 060 WK 095 25m WK 060 SIGNS TO BE 25m APART WK 060 WK 001 WK 001 P 010 25m SAFETY ZONE PEDESTRIAN BARRIER PEDESTRIAN ROUTE A A 0.5 SAFETY ZONE OPERATIVE TO MANAGE PEDESTRIAN CROSSING OPERATIVE TO MAINTAIN EQUIPMENT WHEN WORKS AREA REACHES PINCH POINT HGV NO TRUE ROAD AT HAMPTON STREET 7UiFKW DU 0KDODLUW 6Ot DIVERTED TRAFFIC DIVERTED TRAFFIC DIVERTED TRAFFIC 7UiFKW DU 0KDODLUW 6Ot DIVERTED TRAFFIC DIVERTED TRAFFIC END DETOUR WORKS AREA HGV NO TRUE ROAD TO BALBRIGGAN FOLLOW DIVERSION HGV NO TRUE ROAD TO BALBRIGGAN FOLLOW DIVERSION HGV NO TRUE ROAD TO BALBRIGGAN FOLLOW DIVERSION DIVERTED TRAFFIC DIVERTED TRAFFIC 7UiFKW DU 0KDODLUW 6Ot DIVERTED TRAFFIC END DETOUR THIS DRAWING IS THE PROPERTY OF GARY KEVILLE TRAFFIC MANAGEMENT. THE DESIGN INFORMATION CONTAINED HEREIN IS STRICTLY CONFIDENTIAL. THIS DOCUMENT IS NOT TO BE USED, REPRODUCED, DISCLOSED OR CIRCULATED IN WHOLE OR IN PART WITHOUT THE PRIOR WRITTEN CONSENT IN EACH INSTANCE OF GARY KEVILLE TRAFFIC MANAGEMENT. c GARY KEVILLE TRAFFIC MANAGEMENT LTD. DESIGNED: DRAWN: VERIFIED: APPROVED: AK AK CMQ BB SCALE: NTS DATE: PROJECT TITLE: STAGE: DWG. NO.: REV: Rev. No. Revision Details Rev. Date: Designed: Drawn: Verified: Approved: 0 CLIENT: South Bank Road,Ringsend,Dublin 4, Co. Dublin,Ireland Tel: (+3531) 668 8838 Fax: (+3531) 667 4339; Email: [email protected] Visit us at: www.gktm.ie Copyright Notes: GKTM 2015 DRAWING NAME: BALBRIGGAN ROUNDABOUT, RESURFACING WORKS 4 WAY TRAFFIC LIGHTS TM LAYOUT CONSTRUCTION 21-10-15 2263 - 00 - 02 DESIGN PARAMETERS Road Level Roadworks Type Speed Limit (km/h) Min. Lane Width (m) Longitudinal (m) At Tapers (m) Set Back (m) Lateral (m) Longitudinal (m) RATE OF TAPER Taper at H/ S (m) Taper at Lane (m) Distance (m) Number Sign Visibility (m) TRAFFIC MANAGEMENT SYSTEM Method Coned Area Length (m) Max. Traffic Flow (veh/h) Min. Size (mm) Min. Height (mm) LAMP SPACING Longitudinal (m) At Tapers (m) 2 B 50 50 3 25 25 0.5 3 6 3.00 Traffic Lights 500 800 - 600 750 6 12 DESIGN PARAMETERS CONE SPACING AND SIZE SAFETY ZONE TEMPORARY SIGNS 1 in 10 1 in 15 - TRAFFIC CONES - WORKS AREA - SIGN LOCATION & ORIENTATION LEGEND - LONGITUDINAL SAFETY ZONE - LATERAL SAFETY ZONE - PEDESTRIAN ROUTE - PEDESTRIAN BARRIERS SECTION A-A GENERAL NOTES: SITE SPECIFIC NOTES: CONTRACTOR TO LIAISE WITH LOCAL BUS AUTHORITY IF ANY OF THE BUS STOPS HAVE TO BE RELOCATED AND SUITABLE BUS DIVERSION ROUTES. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING ALL REQUIRED RAMP ACCESS TO ALL CHANGES IN ROAD SURFACE LEVEL WHERE TRAFFIC/PEDESTRIANS ARE RUNNING ON A TEMPORARY SURFACE AS A RESULT OF WORKS. - ONE WAY TRAFFIC FLOW DUBLIN STREET - TRAFFIC LIGHT TM LAYOUT HGV DIVERSION ROUTE

Transcript of DUBLIN STREET - TRAFFIC LIGHT TM LAYOUT HGV DIVERSION … · DUBLIN STREET - TRAFFIC LIGHT TM...

Page 1: DUBLIN STREET - TRAFFIC LIGHT TM LAYOUT HGV DIVERSION … · DUBLIN STREET - TRAFFIC LIGHT TM LAYOUT HGV DIVERSION ROUTE. Title: Phase A Created Date: 10/22/2015 11:38:50 PM ...

Works Area Width

WORKS AREA

3.00 m Min. Lane Width

0.5 m

Carriageway Width Varies

Traffic Cone

Footpath

Footpath

Pedestrian

Barrier

Safety Zone

Pedestrian

Barrier

SITE

LOCATION

2

5

m

WK 060

SIGNS TO BE 25m APART

WK 060 WK 001

WK 095

WK 001

P 010

2

5

m

WK 095

SIGNS TO BE 25m APART

WK 060WK 001

WK 060

WK 095

2

5

m

WK 060

SIGNS TO BE 25m APART

WK 060 WK 001

WK 001

P 010

25m SAFETY

ZONE

PEDESTRIAN

BARRIER

PEDESTRIAN

ROUTE

A

A

0.5 SAFETY

ZONE

OPERATIVE

TO MANAGE

PEDESTRIAN

CROSSING

OPERATIVE

TO MAINTAIN

EQUIPMENT

WHEN WORKS

AREA

REACHES

PINCH POINT

HGV NO

TRUE ROAD

AT

HAMPTON

STREET

Trácht ar

Mhalairt Slí

DIVERTED

TRAFFIC

DIVERTED

TRAFFIC

DIVERTED

TRAFFIC

Trácht ar

Mhalairt Slí

DIVERTED

TRAFFIC

DIVERTED

TRAFFIC

END

DETOUR

WORKS

AREA

HGV NO

TRUE ROAD

TO

BALBRIGGAN

FOLLOW

DIVERSION

HGV NO

TRUE ROAD

TO

BALBRIGGAN

FOLLOW

DIVERSION

HGV NO

TRUE ROAD

TO

BALBRIGGAN

FOLLOW

DIVERSION

DIVERTED

TRAFFIC

DIVERTED

TRAFFIC

Trácht ar

Mhalairt Slí

DIVERTED

TRAFFIC

END

DETOUR

THIS DRAWING IS THE PROPERTY OF GARY KEVILLE TRAFFIC MANAGEMENT.

THE DESIGN INFORMATION CONTAINED HEREIN IS STRICTLY CONFIDENTIAL.

THIS DOCUMENT IS NOT TO BE USED, REPRODUCED, DISCLOSED OR

CIRCULATED IN WHOLE OR IN PART WITHOUT THE PRIOR WRITTEN

CONSENT IN EACH INSTANCE OF GARY KEVILLE TRAFFIC MANAGEMENT.

c

GARY KEVILLE TRAFFIC MANAGEMENT LTD.

DESIGNED:

DRAWN:

VERIFIED:

APPROVED:

AK

AK

CMQ

BB

SCALE:

NTS

DATE:

PROJECT TITLE:

STAGE: DWG. NO.: REV:

Rev. No. Revision DetailsRev. Date: Designed: Drawn: Verified: Approved:

0

CLIENT:

South Bank Road,Ringsend,Dublin 4, Co. Dublin,Ireland

Tel: (+3531) 668 8838

Fax: (+3531) 667 4339;

Email: [email protected]

Visit us at: www.gktm.ie

Copyright Notes:

GKTM 2015

DRAWING NAME:

BALBRIGGAN ROUNDABOUT, RESURFACING WORKS

4 WAY TRAFFIC LIGHTS TM LAYOUT

CONSTRUCTION21-10-15 2263 - 00 - 02

DESIGN PARAMETERS

Road

Level

Roadworks

Type

Speed Limit

(km/h)

Min. Lane

Width (m)

Longitudinal

(m)

At Tapers

(m)

Set Back

(m)

Lateral

(m)

Longitudinal

(m)

RATE OF TAPER

Taper at

H/ S (m)

Taper at

Lane (m)

Distance

(m)

Number

Sign

Visibility (m)

TRAFFIC MANAGEMENT SYSTEM

Method

Coned Area

Length (m)

Max. Traffic

Flow (veh/h)

Min. Size

(mm)

Min. Height

(mm)

LAMP SPACING

Longitudinal

(m)

At Tapers

(m)

2B 50

5032525 0.5

363.00

Traffic Lights 500800

-600 750 6

12

DESIGN PARAMETERS CONE SPACING AND SIZESAFETY ZONE TEMPORARY SIGNS

1 in 10 1 in 15

- TRAFFIC CONES

- WORKS AREA

- SIGN LOCATION & ORIENTATION

LEGEND

- LONGITUDINAL SAFETY ZONE

- LATERAL SAFETY ZONE

- PEDESTRIAN ROUTE

- PEDESTRIAN BARRIERS

SECTION A-A

GENERAL NOTES:SITE SPECIFIC NOTES:

CONTRACTOR TO LIAISE WITH LOCAL BUS

AUTHORITY IF ANY OF THE BUS STOPS

HAVE TO BE RELOCATED AND SUITABLE

BUS DIVERSION ROUTES.

THE CONTRACTOR SHALL BE RESPONSIBLE

FOR PROVIDING ALL REQUIRED RAMP ACCESS

TO ALL CHANGES IN ROAD SURFACE LEVEL

WHERE TRAFFIC/PEDESTRIANS ARE RUNNING

ON A TEMPORARY SURFACE AS A RESULT OF

WORKS.

- ONE WAY TRAFFIC FLOW

DUBLIN STREET - TRAFFIC LIGHT TM LAYOUT

HGV DIVERSION

ROUTE