PROJECT PROGRESS REPORT As of EO March 2012
Project Title: Kabugao-Pudtol-Luna-Cagayan Boundary Road
Implementing Agency: Department of Public Works and Highways - CAR
Donor: (x) GOP ( ) Loan ( ) Grant
Loan/Grant Proceeds: Peso Counterpart: Total Project Cost: P 58.827 M
Location/Area Coverage:
Apayao Province
Description: The road is a major component of the Cordillera Roads Improvement Project (CRIP) as the northern tip of the regional backbone. It traverses the municipalities of Kabugao, Pudtol and Luna in Apayao and turns east to Abulog in Cagayan. The Kabugao-Pudtol-Luna-Abulug Road (95.7 km) directly links the capital town Kabugao to lower Apayao. The road starts at junction Lenneng along the Kabugao-Conner-Abbut Road and going north-east traverses municipalities of Kabugao, Pudtol and Luna and ends at Junction Luna in Abulug, Cagayan along the Pan-Philippine Highway. The Pan-Philippine Highway connects Laoag, Ilocos Norte and Tuguegarao, Cagayan. The bridge construction across Maton and Nagan Rivers has been completed. These rivers are major tributaries of Apayao River. The gap at the Kabugao side (19.359 km.), traverses a rugged mountainous terrain, then slowly goes down to the Paco Valley, which was then proposed as government center. The road will also traverse the Mataguisi Valley in Pudtol. The valleys have vast potential for agricultural production. While, Luna, is the location of the new provincial capitol. The specific project output is road construction of 2.873 kms.
Project Duration: Start: February 20, 2012 End: October 16, 2012
PROJECT PROGRESS
For CY 2012 AO 1st Quarter AO 2nd Quarter AO 3rd Quarter AO 4th Quarter
Target 5 %
Actual 5 %
Slippage
Cumulative Status: (Since start of project)
Status Physical Financial
Target 5%
Actual (slippage)
Current Implementation
Issues and/or Problems Encountered (if any):
Actions Taken/ Recommendations:
Remarks: Memo (Nov. 3, 2011) from Secretary Singson: Approved for upgrading from Secondary to Arterial Road
Agency Contact Person:
DIR. EDILBERTO P. CARABBACAN Regional Director, DPWH – CAR
Engineer’s Hill 2600 Baguio City Tel. 444-8838
Project Location
Kabugao-Pudtol-Luna Cagayan Bdry Road
New Apayao Provincial Capitol in Luna
Landmarks
Kabugao-Pudtol-Luna Cagayan Bdry. Road
Babulayan Bridge across Apayao River
Paco Valley
Mataguisi Valley
Junction Lenneng (Kabugao)