Discussion for a co-ordinated trans-European Deployment Plan
for ERTMS
15 June 200415 June 2004ERTMS Working GroupERTMS Working Group
Jean-Arnold Vinois Head of Unit “Rail Transport and Interoperability”
European Commission
22
Orders of Magnitude of CostsOrders of Magnitude of CostsOrders of Magnitude of CostsOrders of Magnitude of Costs
2 000 M€
(25 000 km)
Full Full implementation implementation ETCS level 2 on ETCS level 2 on HSL TEN-THSL TEN-T
0.08 M€ / km
Unit cost ETCS level 2 (double track - interlocking)
78 000 km
(25 000 km)
EU-15 TEN-T network
(of which HSL) 2010
153 000 km
EU-15 Rail network length 2004
4 200 M€
30 % European fleet retrofitted
0.4 M€
Unit cost ETCS level 2 per loco
(AEIF)
35 000
EU-15 Locomotives and railcars
Directorate General for Energy and TransportDirectorate General for Energy and Transport
European Commission
33
Orders of Magnitude of BenefitsOrders of Magnitude of BenefitsEcorys ResultsEcorys Results
Orders of Magnitude of BenefitsOrders of Magnitude of BenefitsEcorys ResultsEcorys Results
Benefit itemBenefit item Net present value Net present value (in million (in million
Euro)Euro)
Direct impactsDirect impacts 63136313
Impact on the rolling stock industry 72
Impact on infrastructure managers: 89
- Maintenance costs 45
- Rail capacity 59
- Rail infrastructure costs -15
Impact on railway undertakings: 3385
- Operating costs 2709
- Operating revenues passengers 656
- Operating revenues freight 20
Impact on users: 2768
- Travel time and costs ‘remaining’ passengers 1670
- Travel time and costs ‘modal-shift’ passengers 47
- Travel time and costs ‘remaining’ freight 1039
- Travel time and costs ‘modal-shift’ freight 12
- Punctuality rail No benefit
Indirect impacts:Indirect impacts:631631
External impacts:External impacts:568568
- Noise production rolling stock No benefit
- Rail safety 14
- Environmental (air pollution, global warming, noise) 149
- Accidents315
- Road infrastructure maintenance 13
- Congestion costs (Transport user costs) 77
TotalTotal 75137513
European Commission
44
Net cashflow TSI CCS (in million Euro)
-1000
-500
0
500
1000
1500
2000
2500
3000
2003
2005
2007
2009
2011
2013
2015
2017
2019
2021
2023
2025
2027
2029
2031
2033
2035
2037
2039
2041
2043
Net cashflow TSI CCS
Orders of Magnitude of BenefitsOrders of Magnitude of BenefitsEcorys ResultsEcorys Results
Orders of Magnitude of BenefitsOrders of Magnitude of BenefitsEcorys ResultsEcorys Results
European Commission
55
Overview of costs and benefits Overview of costs and benefits (results expressed in net present (results expressed in net present value) at different time horizonsvalue) at different time horizons
20 years 40 years
Benefits:
-Direct impacts 2104 6313
-Indirect impacts 210 631
-External impacts 48 568
Total 2362 7513
Overview of costs and benefits Overview of costs and benefits (results expressed in net present (results expressed in net present value) at different discount ratesvalue) at different discount rates
4% 6% 8%
Benefits:
-Direct impacts 10805 6313 3808
-Indirect impacts 1080 631 381
-External impacts 1104 568 276
Total 12989 7513 4465
Sensibility AnalysisSensibility AnalysisSensibility AnalysisSensibility Analysis
European Commission
66Directorate General for Energy and TransportDirectorate General for Energy and Transport
A clear need for EU financial support A clear need for EU financial support to accelerate the baseline scenario for to accelerate the baseline scenario for
ETCS implementationETCS implementation
European Commission
77
Discussion for EU deployment planDiscussion for EU deployment planDiscussion for EU deployment planDiscussion for EU deployment plan
1/ A Corridors’ Approach based on different layers:1/ A Corridors’ Approach based on different layers:
- TEN-T netwok and Pan-European Corridors (30 Priority Projects)
- National Deployment Plans (Projects where implementation is decided)
- RNE preconstructed train paths
- Traffic Forecasts
To achieve a coherent and co-ordinated trans-European implementation
Aternative approaches? Proposals?Aternative approaches? Proposals?
European Commission
88
European Commission
99
2/ A Reasonable Timeframe (2005-2015) 2/ A Reasonable Timeframe (2005-2015)
- to accelerate the « national strategies » and baseline scenario resulting from the legal demands (>2020)
- to foster the iterative and automatic change rate (see situation GSM-R) resulting from the absence of alternatives
- to match the EU guidelines for the development of the TEN network (2020)
- to use the opportunity/open window of the EU “new financial perspectives” post 2006
- to match to “softwares” evolutions and change control management of these tools
Discussion for EU deployment planDiscussion for EU deployment planDiscussion for EU deployment planDiscussion for EU deployment plan
And what about the industry ability to And what about the industry ability to offer the adequate services ?offer the adequate services ?
European Commission
1010
Discussion for EU deployment planDiscussion for EU deployment planDiscussion for EU deployment planDiscussion for EU deployment plan
3/ Proposals3/ Proposals
- to adopt an iterative approach mixing national deployment plans for HS, EU guidelines, national deployment plans for CR (see slide …) to finalize an European HS and CR
deployment plan in 2005-2006
- to create an “ERTMS coordonateur” (according to legal provisions of the Decision …/2004/EC amending Decision 1692/96/EC) to facilitate relations between project
promoters, ERA, the Commission and Member States;
• ERTMS coordonateur?
• corridor coordonateur?
- to propose a better and increased use of the TEN budget line in the framework of the new EU financial perspectives (on-board and on track equipments in a package) – 50 % of EU co-financing