Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
Technical DescriptionFrancis Turbine
Page 1 of 21
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 2/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
TABLE OF CONTENTS
1. Scope of Supply.................................................................................................................................... 3
1.1 Supply limits with civil work.................................................................................................................... 3
2 General Information................................................................................................................................ 3
2.1 Design Parameters................................................................................................................................ 3
2.1.1 Main Data......................................................................................................................................... 3
2.1.2 Operating Conditions.......................................................................................................................... 3
2.1.3 Output and Efficiency.......................................................................................................................... 4
2.1.4 Hydraulic Engineering Codes.............................................................................................................4
2.2 Design and Construction Requirements................................................................................................4
2.2.1 General............................................................................................................................................... 42.2.2 Applicable Standards and Codes....................................................................................................... 5
2.2.3 Allowable Stresses and Load Cases.................................................................................................. 5
2.2.4 Surface Finish.................................................................................................................................... 6
2.2.5 Painting and Surface Treatment........................................................................................................ 6
3 Equipment Description........................................................................................................................... 6
3.1 Runner................................................................................................................................................... 6
3.2 Shafts.................................................................................................................................................... 7
3.2.1 Turbine Shaft..................................................................................................................................... 7
3.2.2 Couplings........................................................................................................................................... 7
3.3 Inlet Parts............................................................................................................................................... 8
3.3.1 Spiral Case with inlet pipe .................................................................................................................8
3.3.2 Stay Ring and Support Ring ............................................................................................................ 9
3.3.3 Pit Liner.............................................................................................................................................. 9
3.4 Distributor............................................................................................................................................ 10
3.4.1 Wicket Gate and Bearings................................................................................................................10
3.4.2 Wicket Gate Mechanism with Operating Ring..................................................................................11
3.4.3 Servomotor...................................................................................................................................... 13
3.4.4 Head Cover...................................................................................................................................... 13
3.4.5 Bottom Ring .................................................................................................................................... 14
3.5 Shaft Seal............................................................................................................................................ 15
3.5.1 Operating Seal (Hydrostatic)............................................................................................................ 15
3.5.2 Standstill Seal.................................................................................................................................. 16
3.6 Draft Tube............................................................................................................................................ 173.7 Bearing................................................................................................................................................ 18
3.7.1 Guide bearing ................................................................................................................................. 18
3.8 Accessories.......................................................................................................................................... 19
3.9 Installation Device................................................................................................................................ 19
4 Materials................................................................................................................................................ 19
5 Spare Parts............................................................................................................................................ 20
6 Tests....................................................................................................................................................... 20
6.1 Shop Assembly and Tests....................................................................................................................20
6.2 Field Tests............................................................................................................................................ 20
6.3 Field Efficiency Tests........................................................................................................................... 20
7 Operation and Maintenance.................................................................................................................21
Page 2 of 21
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 3/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
1. Scope of Supply
This proposal document provides an overview to the works and services performed by Voith
Hydro. Particular emphasis is given to those aspects of the product scope which demonstrate
the superiority of many of the special features incorporated into today’s design.
The turbines will be complete with spiral case, stay ring, pit liner, head cover, Wicket gates with
operating mechanism, bottom ring, draft tube, runner, shaft, shaft seal, guide bearing, and
accessories.
Supports, stiffeners and other packing material necessary for transportation and erection are
included.
Special tools and devices required for installation, disassembly and maintenance of the
equipment will be supplied as well as piping, instrumentation, cabling and wiring.
The scope comprises design, manufacture, shop testing, transportation, erection at site, site
testing, commissioning and reliability run of the unit.
The documentation of supplied equipment contains assembly drawings, calculations, as-built
drawings and operation & maintenance manuals.
1.1 Supply limits with civil work
Aligning, fixing and bracing of turbine structures and parts which will be embedded and/or
grouted in different concrete stages are included in the turbine scope of supply.
Concrete and grouting material for embedment of all components, i.e. supply, placement,
monitoring and verification of the concreting process is responsibility of the civil works
contractor.
Piping to be embedded in the concrete for pressure measurement and Winter-Kennedy-
connections are included.
2 General Information
2.1 Design Parameters
2.1.1 Main Data
For main data see document - “Technical Data Sheets” (GTP).
2.1.2 Operating Conditions
For operating conditions data see document - “Technical Data Sheets” (GTP).
Page 3 of 21
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 4/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
2.1.3 Output and Efficiency
For turbine output and efficiency data see document - “Technical Data Sheets” (GTP).
2.1.4 Hydraulic Engineering Codes
• International Code for Hydraulic Turbines, Storage Pumps and Pump-Turbines - Model
Acceptance Test, IEC Publication 60193 (1999)
• Field acceptance tests to determine the hydraulic performance of hydraulic turbines,
storage pumps and pump-turbines; IEC Publication 60041 (1991)
• Cavitation Pitting Evaluation in Hydraulic Turbines, Storage Pumps and Pump-Turbines;
IEC Publication 609 (1977)
2.2 Design and Construction Requirements
2.2.1 General
The turbines will be of the Francis type with vertical shaft arrangement. The turbine is designed
to run safe and stable considering multiple daily start-stop-cycles.
The turbines are rotating counter clockwise when seeing from top. The turbine shaft is directly
coupled to the generator shaft.
The power unit will be equipped with three guide bearings, one close to the runner on the head
cover, other below the generator and third on top of the generator.
The thrust bearing, for carrying the weight of the rotating parts of the turbine and the generator
as well as the hydraulic thrust, will be part of the generator.
The uniform water inlet to guide apparatus is performed by a full spiral case with stay ring and
stay vanes. The water discharge from runner to tail race is done by an elbow-type draft tube
with steel lining up to the location where flow velocity of 4m/s arises. Thereafter, liner shape will
be formed in the concrete as per the suppliers drawing.
The flow is regulated by Wicket Gates operated by two servomotors supported on the civil
structure of the turbine pit. Reliable operation including Safe closing of the Wicket gates shall be
achieved by a nitrogen/oil pressure accumulator.
The turbine will be designed and constructed to provide clearances for axial movement of its
rotating parts as required by the generator design for inspection, adjustment and dismantling of
the thrust bearing.
The maximum turbine internal pressure resulting from pressure surge and water hammer for
emergency closing of the units against the maximum flow at maximum head water level will be
calculated. The design pressure for spiral case, stay ring, head cover, distributor and other pressure parts will be equal to the calculated maximum internal pressure.
Page 4 of 21
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 5/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
For the arrangement of the turbine please refer to the drawing - Cross section - Turbine (2734-
510232)
For further technical data refer to “Technical Data Sheets” (GTP).
Design modifications (if any) and improvements/optimization wherever required shall be
discussed and carried out during detail engineering of machines by Voith after necessary
approval from the customer.
2.2.2 Applicable Standards and Codes
The standards, codes and manuals cited throughout this technical description are used to
establish the level of safety, precision, quality, class of materials, acceptability, tolerances etc.,to which the work is to be performed. Where these are cited, the latest revision or edition will
prevail. Other standards, codes and manuals that will provide an equivalent level of safety,
precision, quality, class of materials, acceptability, tolerances, etc. may be substituted.
Specific standards, codes and manuals are referred in the appropriate parts of this specification
documents. Following is a list of references to sources for some general codes and manuals
cited in the specification documents.
IEC and ISO are the leading Standards.
● ANSI - American National Standard Institute
● ASTM - American Society for Testing and Materials
● ASME - American Society of Mechanical Engineers
● AWS - American Welding Society
● AISC - American Institute of Steel Construction
● ISA - Instrument Society of America
● VDE - Verband Deutscher Elektrotechniker
● DIN - Deutsche Institut für Normung
● IS - Indian Standards
● ISO - International Standardization Organization
● IEC - International Electro-technical Comission
● NEMA - National Electrical Manufacturers Association
● IEEE - The Institute of Electrical and Electronic Engineers, Inc.
In addition to the application of many international accepted standards Voith turbines are
subject to several internal standards, which are more detailed and more specific for hydraulic
machines than contemptible general standards.
2.2.3 Allowable Stresses and Load Cases
The turbines will be able to withstand all stresses arising in continuous operation or occurring
occasionally without being endangered or damaged.
The turbine components will be sized in accordance with the proven Voith internal “TurbineDesign Guidelines”, on which our components’ design and dimensioning is based. This internal
Page 5 of 21
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 6/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
standard defines precisely the allowable stresses for different load cases and takes into
consideration the availability of finite element calculations.
The Voith Hydro standard for allowable stresses and the definition of the loading cases are
summarized in document “Summarization of Design Guidelines of Allowable Stress Levels for
Turbine and Butterfly Valve”.
2.2.4 Surface Finish
All surfaces of the turbine water passage area will provide a smooth-contoured hydraulic
surface.
The surface finish roughness will be indicated on the component drawings and Voith standards
will be at least in accordance with ISO 4287, Roughness comparison specimens.
2.2.5 Painting and Surface Treatment
All equipment furnished and installed will be completely painted for final use, with the exception
of those parts or surfaces that are specifically designated as unpainted.
Surfaces to be painted will receive the preparatory treatment and coating according to Voith
Hydro Technical Group Standards - “General Application for Paints, Coatings and related
materials in Hydro Power Plants”. (Attached along with offer)
All paint materials, supplies and articles furnished will be standard products of recognized
reputed manufacturers.
The paint used for touch-up in the field will be of the same quality and colour as used in shop
painting. The touch-up painting will be done with material corresponding to each coat shown in
the painting schedule.
3 Equipment Description
3.1 Runner
The runner will be cast welded of high strength stainless steel composed of 13% chromium and
4% nickel and will consist of the crown, the blades, the band and the labyrinth rings. The runner
cone will be an integral part with the runner crown. The rotating labyrinth rings will be bolted with
the runner.
Numerically controlled machining of runner entrance and discharge creates perfect hydraulic
passage. Runner inspection and quality control regarding hydraulic surface are according to
IEC 60193. The surface finish of the hydraulic passages will be ground smooth to minimize the
hydraulic friction losses.
The runner will be designed to allow axial movement.
Page 6 of 21
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 7/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
The runner will have a bolted flange connection for attaching to the shaft.
The runner will be statically balanced according to ISO1940-1 class G6, 3. The finished runner
is supplied in one piece from the manufacturing works.
3D view of Typical Runner
3.2 Shafts
3.2.1 Turbine Shaft
The shaft will be of forged steel and will be provided with flanges on both ends suitable for the
attachment with the generator shaft at one end and turbine runner at the other end.
The turbine shaft will be designed to operate safely without excessive vibration and at maximum
torque without exceeding the allowable stresses.
3.2.2 Couplings
The coupling between runner, turbine shaft and generator will be preferably of friction type with
pre-stressed bolts. However, based on detailed calculations of transmittable friction torque, final
decision regarding type of coupling shall be discussed and agreed during detailed engineering.
Based on final coupling type, shaft alignment shall be decided and also discussed during
detailed engineering.
Page 7 of 21
2
3
1 1 - Crown
2 - Blade
3 - Band
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 8/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
3.3 Inlet Parts
The complete spiral comprises the inlet pipe, the spiral case and the stay ring.
Although the spiral will be embedded in concrete, it will be designed to withstand, without any
support from concrete, the internal design pressure, given by the water hammer calculation. The
design stresses for this condition will not exceed the maximum allowable stresses.
The spiral case together with the inlet pipe and the stay ring will be pressure tested at site prior
to concrete embedment. Bulkhead for inlet pipe will be supplied.
Embedment will be done with partial internal pressure (approx. 50 % of static head).
The spiral case will be dewatered by a piping system leading from the inlet pipe to the draft
tube. The piping will be opened and closed by a manual operated valve.
3.3.1 Spiral Case with inlet pipe
The spiral case will be factory welded to the stay ring assembly as far as practicable and
suitable for transportation.
The spiral case will be made as a welded steel plate construction. The spiral case will be
designed for fabrication in radial sections. Field joints will be kept to a necessary minimum in
order to allow transportation of the maximum possible assembly. The use of longitudinal joints
between spiral case plates will be avoided as far as practicable. Where longitudinal joints are
necessary, their location will be carefully selected to facilitate welding and weld examination.
The connection joint between the spiral case and the inlet pipe will be field welded. Sufficient
adjustment allowance will be provided to align the segments before field welding.
All necessary stiffener rings, pads or brackets and connections for the application of jacks and
tie rods during field erection will be supplied. These appendices will be designed to support and
position the spiral case during all conditions of installation and concreting. The spiral case will
rest on solid foundation and bracing during embedment.
Four pressure taps with pipe connection will be installed on the inlet section of the spiral case,
suitably located and arranged for head measurements and for connection to the spiral case
pressure gauge.
The pressure taps with pipe connection will be installed at points where conditions are most
favorable for measurement of flow. The type, number, construction and location are as to meet
the requirements of the Winter-Kennedy method of determining discharge, for use in index
tests.
A spiral case drain connecting the lowest point of the spiral case extension with the draft tube
will be provided. The piping will be flanged on-site to the prepared spiral case drainageconnection.
Page 8 of 21
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 9/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
3.3.2 Stay Ring and Support Ring
The stay ring will consist of the upper and the lower ring shaped deck, connected by the stay
vanes forming a rigid tie across the throat of the spiral case. The streamlined stay vanes will be
of suitable number. The stay vanes will be shaped and positioned to guide the water to the
Wicket gates.
The stay ring will be made of steel; either integrally cast or fabricated of plate and/or cast
components welded together.
It will also withstand the tension due to the internal design pressure of the spiral case.
At the bottom of the stay ring a support ring will be arranged in order to provide support during
erection and to transmit the forces into the concrete structure.
3.3.3 Pit Liner
The pit liner will be made as a welded steel plate construction. Field joints where necessary, will
be kept to a minimum in order to allow transportation within transport limits. The connection joint
between the pit liner and the stay ring will be field welded. The pit liner serves as steel cladding
of the turbine pit. It will have recesses for two servomotors for driving of wicket gate mechanism
of the distributor.
Page 9 of 21
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 10/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
3.4 Distributor
3D view of Typical Distributor
1 - Bottom Ring 4 - Operating Ring
2 - Wicket Gate 5 - Servomotors
3 - Head Cover
The distributor will consist of a suitable number of moveable Wicket gates, each consisting of a
streamlined body with stems supported through the bearings on to the head cover and thebottom ring. The Wicket gates will control and guide the water to the runner. The gates will be
linked via levers and links to the operating ring which will be operated by 2 oil-servomotors. The
anchorage of the servomotors is supported in the turbine pit. The gate locking arrangement
provided will ensure the position of the Wicket gates for maintenance purposes.
3.4.1 Wicket Gate and Bearings
The Wicket gates will be high strength chrome-nickel (13% chrome, 4% nickel) stainless steel
castings with integral stems. Each gate is supported in 3(three) self-lubricating guide bearings,
1(one) located in the bottom ring in a removable cartridge and 2(two) in a removable cartridge
block in the head cover together with the trunnion seals. The cartridges allow a fast disassemblyduring maintenance services.
Page 10 of 21
1
2
3
4
5
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 11/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
3D view of Typical Wicket gate with bearing
1 Bottom bearing 4 Gate lever 2 Wicket gate 5 Top bearing3 Middle Bearing
3.4.2 Wicket Gate Mechanism with Operating Ring
The wicket gate mechanism will consist of the gate levers, bending links, operating ring and
gate servomotors with anchorage.
The gate lever will be firmly attached and dowelled to the wicket gate stem. A bending link
between the lever and operating ring will transfer the force for all considered operation loads.
The operating ring is actuated by two servomotors and will distribute the forces and movements
to all of the Wicket gates simultaneously.
Page 11 of 21
2 1
11
31
41
5 1
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 12/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
Sketch of Typical Lever and bending link arrangement
In case of foreign object is jammed between the closing edges of two consecutive wicket gates,
two wicket gates can’t be closed. In order to protect the linkage and the gates and so as to
avoid possible cascade failure, the two related bending links will be subject to plastic
deformation due to the excessive force while distributor is closing. After removing the jammed
object, the deformed bending links have to be replaced. Due to the use of the bending linksthere is no other damage caused. The major advantage of the gate mechanism with bending
link is that the wicket gate will never be free and collide with rotating runner because even after
the related bending link undergoes plastic deformation, remains attached with operating ring.
Each gate link shall be provided with one limit/proximity switch to provide indicating signal for an
occurrence of bending link deformation.
Schematic of bending link plastic deformation
The operating ring shall be supported on head cover through axial and radial self lubricating
bearings. The sliding surfaces of operating ring with the bearings shall be of stainless steel. The
operating ring shall be designed to withstand rigidly the unbalance forces from servomotor as
well as in event of bending link(s) failure.
Page 12 of 21
Plastic deformation of Bending
Link due to excessive force.
Excessive force from Servomotor through Operating
Ring due to jammed object between wicket gates.
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 13/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
3D view of Typical Operating Ring.
The position of the operating ring will be monitored by limit switches. For visual check a position
scale will be installed on the operation ring and the head cover.
All gate mechanism bearings will be self-lubricating bushings.
3.4.3 Servomotor
Double-acting, oil-pressure operated hydraulic servomotors will be supplied, provided with
connections for the oil piping.
The servomotors will provide the necessary forces to maintain the distributor in different openingpositions as required by the turbine regulating system during operation and to safely close the
distributor under any operating condition of head and load.
One number of linear transducer shall be mounted on one of the servomotors to get feedback of
servomotor guide vane movement.
The servomotor support will be integrated with the pit liner. The reaction from the servomotor
will be transmitted to the surrounding concrete.
For the safety during maintenance, the gate locking arrangement, capable of withstanding full
operating force from servomotor, shall be provided for locking of the wicket gates in fully openand fully closed positions.
3.4.4 Head Cover
The head covers will be fabricated from steel plates. It will be of rigid construction, substantially
ribbed and designed to minimize deflections and vibration and to prevent distortion and
interference with the wicket gates and the gate operating mechanism under the maximum water
pressure and other forces acting including those from turbine guide bearing.
The head cover will be bolted to the machined flange of the stay ring upper deck using a
stationary seal which will seal against the stay ring upper deck.
Page 13 of 21
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 14/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
3D model of typical head cover
The head cover will support the turbine guide bearing and shaft seal.
Provisions will be made for lifting the head cover in one piece from the turbine pit through the
generator stator bore by the power house crane.
Thrust relief pipes are attached to the head cover in order to minimize the hydraulic thrust on
the runner.
Sufficient clearance for moving the runner axially will be provided.
The head cover will contain the removable cartridges for the bearings and seals of the upper
wicket gate stems.
Suitable drainage passages along the nose vane will be provided in the head cover to permit
leakage water from the seals to the drainage system. Additionally, a headcover drainage pump
with all accessories will be supplied to remove any water collecting in the lower part of the head
cover.
The head cover will also be equipped with a stationary wearing ring as a counter-part to the
upper runner labyrinth seal. In the area adjacent to the wicket gate end surfaces, stainless steelfacing plates will be provided on the head cover.
3.4.5 Bottom Ring
The bottom ring will be fabricated from steel plates
The bottom ring will be flanged to the lower deck of the stay ring. The bottom ring will contain
the cartridges for the bearing and seal of the lower wicket gate stems. The bottom ring will be of
enough strength and stiffness, that the maximum deflection will not interfere with the wicket
gates or reduce the gaps of bearings to inappropriate values.
Page 14 of 21
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 15/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
The bottom ring will also be equipped with a stationary wearing ring as a counter-part to the
lower runner labyrinth seal.
In the area adjacent to the wicket gate end surfaces, stainless steel facing plates will be
provided on the bottom ring.
3.5 Shaft Seal
The shaft sealing system will comprise the operating seal and the standstill seal, intended to
prevent water from entering to the turbine pit, through the shaft / cover clearance.
3.5.1 Operating Seal (Hydrostatic)
A water sealing system of the self-compensated hydrostatic axial type will be designed around
the shaft, positioned below the lower guide bearing, to limit the water leakage between the head
cover and the shaft.
3D view of Typical Shaft Seal
Page 15 of 21
10 8 7
1
2
6
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 16/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
1 - Water collecting pan2 - Support ring
3 - Holding/retaining ring
4 - Compression spring
5 - Indicating pin
6 - Seal ring
7 - Seal ring inserts
(synth. material impregnated
with molybdenum)
8 - Sliding ring
9 - Shaft
10 - Stand still seal
The hydrostatic operating seal consist basically of a seal support ring, a static seal ring with a
synthetic seal ring insert and a metallic sliding ring (fixed to the turbine shaft). The static seal
insert will axially seal against the sliding ring. Filtered water will be fed into the seal ring insert
chamber between the two seal surfaces and creates a water film which acts as a hydrostaticbearing separating the rotating sliding ring and the stationary seal ring. There is no physical
contact between the two rings and therefore theoretically no wear occurs. Flushing purified
water will prevent any sand from entering the shaft seal surfaces, so that the wear rate for the
seal ring is very low.
The seal ring is pressed against the sliding ring by a number of stainless steel springs which
also ensure the seal function if the unit is at standstill and the lubrication water supply is
switched off. The seal is able to move axially. The diameter of the seal ring is designed to
equalize forces from the water pressure acting on the seal ring; therefore the seal is not
sensitive to changing water pressures. The seal support will be bolted to the head cover.
The design will allow the inspection and replacement of the sealing components.
A wear indication for the seal ring insert shall be provided to supervise the wear, without the
disassembling of any part of the sealing housing.
3.5.2 Standstill Seal
The standstill seal will be installed between the water passage and the Operating seal. It is
intended to protect the operating seal during extended periods of standstill.
The standstill seal consists of an inflatable rubber profile which applies to the shaft whenpressurized, thus sealing off the water passage. When being relieved, the water pressure of the
water passage pushes back the sealing lips from the shaft.
Page 16 of 21
Schematic view of Typical Shaft Seal
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 17/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
The seal must be applied only when the turbine is stopped. It is applied manually by operatingthe control valve. A limit switch on the operating valve prevents the turbine from being started,
when the standstill seal is applied. The operating valve will be secured with a padlock.
The air to inflate the standstill seal will be taken from the compressed air system. If necessary a
pressure reducing valve will be provided to reduce the air pressure to a value applicable for the
standstill seal.
3.6 Draft Tube
The draft tube will be of the elbow type. The draft tube will consist of the draft tube cone, the
draft tube liner and the concrete portion. The draft tube cone will be bolted to the bottom ring atupper side and to the draft tube liner at lower side.
The draft tube lining will be a welded steel plate assembly. To facilitate transportation it may be
sectionalized for field welding. Because of its rigid design with outside stiffening rings and ribs
and concrete reinforcements the draft tube will withstand safely pressure variations and
pulsations under all operation conditions.
The draft tube liner will have a suitable number of pads and connections for the application of
jacks or leveling screws and tie rods for anchoring during field erection. The draft tube will have
a steel lining until the location where flow velocity of 4m/s arises. From there the draft tube will
be shaped in concrete according to the requirements given by the hydraulic neat line.
The draft tube will rest on solid foundation and bracing during embedment. Fixations will be
designed to support and position the draft tube during all conditions of installation and
concreting.
The cone will be split in two parts with dismantling joint to facilitate runner removal from bottom.
The draft tube cone will also provide access to the draft tube inside via a man-door to enable
inspection and maintenance service. The inner surface of the man door cover will conform to
the interior contour of the draft tube liner. A test cock will be provided below the sill of the door.
The upper portion of the draft tube cone directly below the runner will be made from stainlesssteel with an extension of approx. 650 mm.
A drain box will be made at the lowest point of the draft tube, protected by a suitable and
removable inlet grating. A connection for the spiral case drain pipe will be provided.
One set of pressure taps with pipe connection will be installed.
Page 17 of 21
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 18/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
3.7 Bearing
3.7.1 Guide bearing
The turbine guide bearing will support the turbine shaft and will be designed for radial forces
originated from the turbine runner. The radial forces will be transferred via bearing housing,
head cover and stay ring into the civil structure.
The turbine guide bearing will be of the segmented, adjustable, multiple-shoe, self-lubricated
type. The shaft is running on the bearing pads. The segments are machined in a way to self
adjust to the optimum position with respect to load and circumferential speed.
The bearing elements are lined with a high-grade anti-friction Babbitt metal securely anchoredto the bearing backing.
The guide bearing will be located above the shaft seal and will be as near as possible to the
runner and will consist of a bearing support or housing and removable bearing elements.
It will permit axial movement of the shaft.
Fig. 11- Typical 3D section view for turbine guide bearing
01 - Segment Support 06 - Oil Pan Cover
02 - Oil Pan 07 - Support Ring
03 - Splash Ring 08 - Seal Ring
04 - Bearing Pad 09 - Oil Cooler with Piping
05 - Oil Discharge Pipe 10 - Seal Washer
Page 18 of 21
1
2 34
5
6
7 8
9 10
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 19/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
The oil circulation will be of the self-pumping type by the action of the rotating oil pan mountedon to the turbine shaft. An oil reservoir of sufficient capacity to contain all the oil required by the
bearing lubrication system is provided around the bearing. The bearing reservoir is an integral
part of the bearing housing.
Cooling of bearing oil will be done by an external cooler as well as air cooling due to the
convective heat transfer from rotating oil pan surface to the ambient air. Such air cooling is an
added advantage of this type of bearing. This air cooling effect is always available when water
cooling stops due to cooling water failure which decrease rate of temperature rise.
3.8 Accessories
Working, operating and inspection walkways and platforms complete with non-slip type floor
plates, stairs, ladders and hand railings will be furnished where necessary or desirable in the
turbine pit. All pit walkways, platforms, stairways and equipment will be easily removable.
A circular manual hoist will be supplied inside the turbine pit, for assembly and disassembly of
turbine components. The hoist girder will be located below the generator lower bracket and will
be integrated by a manual chain hoist, a manual trolley and a steel structure that allows the
movement of the hoist over the entire turbine pit area.
A runner trolley will be supplied to facilitate runner removal from bottom side.
An inspection platform will be furnished to facilitate inspection and maintenance of the runner.
The platform will extend over the cross-sectional area of the draft tube where it is installed. It will
be made of prefabricated, light weight components in suitable sections so as to be easily
transported into the draft tube. Provisions will be provided on the draft tube cone for supporting
the maintenance platform.
Parts for pressure tests will be included in the scope of supply as far as required for field tests.
Oil for first filling of the governor pressure oil systems and for the turbine bearings with 10% as
extra will be supplied.
3.9 Installation Device
All special tools required for normal operation and maintenance will be supplied. It shall be as
per tender specifications (PTS-Turbine and accessories). However, those which are common
with other part of specifications shall not be doubled unless it necessitates for scheduled
erection and commissioning.
4 Materials
For all major parts, materials are listed in turbine datasheet submitted with bid. The materials
might be subject to changes according to market availabilities. Equivalent materials may beused. All used materials will be of accepted national or international standards and of proven
reliability for the intended purpose.
Page 19 of 21
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 20/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
5 Spare Parts
All spare parts to be supplied will be identical to the ones originally installed, of the same
material and manufacture process. All spare parts will be packed not to be damaged during
storage. All boxes will be marked for identification.
All applicable spare parts as listed under “mandatory spare parts” of tender document shall be
included in scope.
6 Tests
6.1 Shop Assembly and Tests
The turbines will be assembled in the shop to verify the design, construction, machining for
proper alignment, fits and clearances to the extent practical. Parts will be properly match-
marked, identified and doweled to assure correct assembly and alignment in the field.
Critical dimensions and small clearances of the assemblies will be measured and recorded on a
shop inspection sheet.
6.2 Field Tests
The pre-commissioning tests will include, but not be limited to:
● Pressure tests on all pressure oil piping shall be done as per agreed Inspection and Test
Plan ( if not done at works).● Measurement of mechanical clearances, levels, strokes and other measurements
● Functional tests of all auxiliaries and protective devices as necessary
● Operation with governor hydraulic units.
● Functional operation of the gate operating mechanism in the dry condition
● Operational tests of turbine bearings
● Start - stop sequences test in the dry condition
The commissioning tests will include, but not be limited to:
● Alignment and rotation checks in the dry condition
● Mechanical run
● Governor operation● Guide Vane function test
● Timing tests including measurement of guide vane openings
● Initial no-load wet run to ensure satisfactory operation of auxiliary equipment
● Bearings test run
● Checking of interlocks and indications
● Tripping tests for turbine
● Load rejection and load acceptance tests
6.3 Field Efficiency Tests
A thermodynamic test at one turbine will be carried out to test hydraulic efficiency of the turbine
as per the IEC 60041.
Page 20 of 21
7/30/2019 DIBN TFV00 0000 PRS Technical Description Turbine
http://slidepdf.com/reader/full/dibn-tfv00-0000-prs-technical-description-turbine 21/21
Dibbin H.E. Project (120 MW),Electro Mechanical Works – EPC Contract PackageKSK Dibbin Hydro Power Private Limited, West Kameng,Arunachal PradeshIFB No. : KSKDHPPL – 1360105 – E&M – 01 Dated : 16-05-2011
Offer Ref. No.: VHN – 11 – 001 RO
The power output and efficiency tests on the turbine will be made at net effective head as near
as practicable to the rated head if actual conditions allow. The turbine capacity will bedetermined from electrical measurements of generator output corrected for generator losses.
The generator losses will be determined from generator efficiency curves and verified by
measurement of air cooler and bearing heat loads.
7 Operation and Maintenance