  Jamaica Energ y Partne rs Doctor Bird Power Plant Engineering Report. Report No. 20140228-DG2_FR  Report on DG #2 Generator Failure and Repair February 28, 2014 Prepared By: Carlos Mohan DG#2 was taken off-line at 0001hrs today Feb 28, 2014 for mechanical maintenance and generator insection! "he generator insection reealed two broken amortisse$r connections for

description

failure report

Transcript of DG#2 Failure Report 20140228 Prelim

Jamaica Energy Partners Doctor Bird Power Plant Engineering Report. Report No. 20140228-DG2_FR

Report on DG #2 Generator Failure and Repair

February 28, 2014

Prepared By: Carlos Mohan

DG#2 was taken off-line at 0001hrs today Feb 28, 2014 for mechanical maintenance and generator inspection. The generator inspection revealed two broken amortisseur connections for poles 10-11 and poles 11-12 at the generator non- drive end, and six on the drive end side for poles 2-3, 3-4, 4-5, 5-6, 11-12 and 1-12, all failures occurred at the fastener hole (see pictures). The failure of these connections did not result in any damages to the generator.The broken connection pieces were all replaced with fabricated piece (done in-house). Using a copper alloy that is softer.

The material used by TAW to fabricate these connection pieces appear to be too brittle and not suitable for this application, JEP therefore will embark on replacing all of these connections with a better suited copper alloy, and in addition applying a suitable Loctite adhesive to the fasteners.