Developing Efficient Manufacturing Lines - ISA...
Transcript of Developing Efficient Manufacturing Lines - ISA...
![Page 1: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/1.jpg)
Standards
Certification
Education & Training
Publishing
Conferences & Exhibits
National Symposium on
Automation & Digital Transformation of
Food & Beverage Industry26th & 27th February 2016
ISA
B/F
&B
Sym
p/20
1602
26/S
lide
No.
1
Balaji Hiremagalur,Mentor,Jack n Jill Lean Mfg.SolutionsBangalore-560098E-mail : [email protected] : www.jacknjillleanmfg.com
Developing Efficient Manufacturing Lines
![Page 2: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/2.jpg)
Academic
Bachelor of Science from Mysore University
Worked : 40 years in the Packaged Food Industry.
Worked as Manager-Emerging Markets for the Global Engineering of Kellogg’s from March 2013 to Dec 31st 2014 based in Bangalore, India.
Worked as a Full time Consultant with Cadbury Kraft In India from 28th June 2010 to 28th Feb 2013. Installed, commissioned and successfully started the First “OREO” Line in India In Jan 2011.
Regional Head of Mfg. URC International from 2001 to 2010. The product categories of the company include, Biscuits, Cookies, Crackers, Wafers, Candies, Snacks, & Beverage. Responsible for Mfg.operations in the region comprising of Mfg.facilities in Thailand, Malaysia, Vietnam, Indonesia & China.
Vice President Operations With First Choice Food Corporation, Philippines from 1995 to 2001
Currently :
Working as “ Mentor” with Jack n Jill Lean Manufacturing Solutions based out of Bangalore, India. We are leading consultants to the Food Industry and have completed prestigious assignments in India, Asia and the Middle East. ( www.jacknjillleanmfg.com)
Balaji Hiremagalur
![Page 3: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/3.jpg)
Integrated Work System (IWS)
Engineering & Developing Efficient Manufacturing Lines
![Page 4: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/4.jpg)
It all started with “ this “
![Page 5: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/5.jpg)
Sl # CHALLENGES IN DEVELOPING EFFICIENT MFG.LINES
1 CAPITAL EXPENDITURE & ROI
2RESISTANCE TO CHANGE FROM OLD TECHNOLOGY TO NEW
TECHNOLOGY
3 GETTING AWAY FROM A COMFORT ZONE
4 PEOPLE DEPENDENCY vs PROCESS DEPENDENCY
5 LINE BALANCING
6 PASSING ON THE BUCK AND PLAYING THE BLAME GAME
Resistance to Change
![Page 6: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/6.jpg)
![Page 7: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/7.jpg)
So, The only YANTRA to build Efficient Manufacturing Lines is to adapt LEAN MANUFACTURING PRINCIPLES
![Page 8: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/8.jpg)
What Does ‘Lean’ Mean?
Lean gives the idea of skinny or slim. The word skinny has a negative connotation for a lot of people. There can also be a positive interpretation: ‘free of burden, healthy,
a lot of freedom of movement, muscles, etc.’ With this specific vision in mind, people went looking for techniques
that would allow a production system to function faster, cheaper,and better.
Lean Manufacturing is distinguished by: a minimum changeovertime, Just-In-Time (JIT) production, Kan Ban systems, a minimum ofsupplies and last but not least a "zero waste" attitude with eachemployee.
![Page 9: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/9.jpg)
Lean priniciples
![Page 10: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/10.jpg)
The Nature of Lean Manufacturing
The concept of Lean Manufacturing is a continuation of the mass productionsystem, known in the twenties as the ‘conveyor belt’ of automotivemanufacturer Ford.
Taiichi Ohno and Eiji Toyoda, two employees of the automotivemanufacturer Toyota in Japan, developed Lean Manufacturing after theSecond World War.
Lean Manufacturing became known worldwide thanks to the best seller "Themachine that changed the world", in which the aspects leading to thesuccess of the Toyota production system are described.
In the eighties Lean Manufacturing also got a base in America. This waspartly caused by the co-operation between Toyota and General Motors, whobuilt a factory together.
Lean Manufacturing
![Page 11: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/11.jpg)
Lean Manufacturing Basics
• The Lean approach is based on finding efficiencies and removing wasteful steps that don't add value to the end product. There's no need to reduce quality with lean manufacturing – the cuts are a result of finding better, more efficient ways of accomplishing the same tasks.
• To find the efficiencies, lean manufacturing adopts a customer-value focus, asking "What is the customer willing to pay for?" Customers want value, and they'll pay only if you can meet their needs. They shouldn't pay for defects, or for the extra cost of having large inventories. In other words, they shouldn't pay for your waste.
• Waste is anything that doesn't add value to the end product.
![Page 12: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/12.jpg)
The 8-wastes
![Page 13: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/13.jpg)
The Supply Chain Flow
![Page 14: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/14.jpg)
Tools for Lean Mfg.
5-S Principles
![Page 15: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/15.jpg)
Tools for Lean Mfg.
Value Stream Mapping Tool
![Page 16: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/16.jpg)
Tools for Lean Mfg.
OEE
![Page 17: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/17.jpg)
Overall Equipment Effectiveness = Availability x Performance x Quality rate
% Quality rate =( total output- defectives ) x 100
( total Output+defectives)
% Performance = Actual output/ hr x 100
Standard output/hr
% Availability = (Shift time – downtime) X 100
Shift Time
OEE Principle
![Page 18: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/18.jpg)
Availability x Performance x Quality rate = Overall Equipment Effectiveness
75 % X 85 % X 95.55 % = 60.91 %
% Quality rate =( 22000 - 500 ) x 100 = 95.55 %
( 22000 + 500)
% Performance = 850 x 100 = 85 %
1000
% Availability = (8 – 2) X 100 = 75%
8
OEE Example
![Page 19: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/19.jpg)
OEE Reports
![Page 20: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/20.jpg)
Breakdown Analysis
![Page 21: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/21.jpg)
![Page 22: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/22.jpg)
Case Study before Lean Mfg
![Page 23: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/23.jpg)
Integrated Work System (IWS)
Case Study after implementation of Lean Mfg
![Page 24: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/24.jpg)
The Ultimate Factory
![Page 25: Developing Efficient Manufacturing Lines - ISA …isabangalore.org.in/wp-content/uploads/2016/03/12...There can also be a positive interpretation: ‘freeof burden, healthy, a lot](https://reader034.fdocuments.net/reader034/viewer/2022042114/5e90243da563025c994bc6e7/html5/thumbnails/25.jpg)
Thank You