Design Sprint Methodology

17
1 Design Sprints !

Transcript of Design Sprint Methodology

Page 1: Design Sprint Methodology

1

Des ign Spr ints!

Page 2: Design Sprint Methodology

2

HELLO, MY NAME IS BROOKE

I am a UX Lead. And I’m here to talk to you about design sprints.

Page 3: Design Sprint Methodology

3

Great design happens within constraints. And those constraints are good because it helps narrow your focus. There’s something about the pressure , and in many cases, conflict that create good things.

Page 4: Design Sprint Methodology

4

Ideo’s David Kelly talks about how to best introduce change

within an organization.

HOW TO IMPLEMENT CHANGE

"Start Small

#Double Deliver

$Volunteer

%Innovation Lab

Page 5: Design Sprint Methodology

5

A design sprint is a constrained 5-day process that has been refined by Google Ventures. Their methodology is a

mix of the agile framework and design thinking. Specifically, design sprints answer critical business

questions up-front to reduce risk. The process includes problem framing, solutioning, prototyping and testing.

WHAT IS A DESIGN SPRINT?

Page 6: Design Sprint Methodology

6

WHEN TO RUN A SPRINT

It is important to pick the right scenario for a sprint. Some examples are:

!Big Problems

&Research

'Validation

(Iterative Design

Page 7: Design Sprint Methodology

7

WHEN NOT TO RUN A SPRINT

Conversely there are times when design sprints are not the best tool.

)Broad Scope

○␣Narrow Scope

◎Well-defined Product

,Execution

Page 8: Design Sprint Methodology

RenoWalk Design Sprint 8

SPRINT TEAM MEMBERSThe sprint team should consist of 5-7 members. The 5

core roles are below, along with the facilitator.

Decider

-

Customer Rep

&

Designer

.

Engineer

/

Marketing

!

0

Facilitator

Page 9: Design Sprint Methodology

9

1'Sticky Notes

'Pens

'Whiteboards

'Dot stickers

' Paper

' Tape

' Timers

' Snacks

SPRINT SUPPLIES

Your sprint essential toolkit.

Page 10: Design Sprint Methodology

10

SPRINT DAYS

A design sprint is made up of 5 days.

2

Map

3

Sketch

-

Decide

.

Prototype

&

Test

Page 11: Design Sprint Methodology

11

MONDAY

Monday’s Key Points

4Business Opportunity

☼Long-term Goal

Sprint Questions ?

7 Make a Map

& Ask the Experts

Pick a Target8

Page 12: Design Sprint Methodology

12

TUESDAY

Tuesday’s Key Points

!Lightning Demos

◎Divide or Swarm

3 Four-step Sketch

& Work Alone Together

Page 13: Design Sprint Methodology

13

WEDNESDAY

Wednesday’s Key Points

-Sticky-decision 7 Storyboard

Page 14: Design Sprint Methodology

14

THURSDAY

Thursday’s Key Points

.Build Prototype 3 Write Interview Script

Page 15: Design Sprint Methodology

15

FRIDAY

Friday’s Key Points

&Conduct Interviews 3 Synthesize Findings

Page 16: Design Sprint Methodology

16

9GOOD INVOLVEMENT

☼DEFINED ROLES

8SUBSEQUENT SPRINT(S)

&BALANCED TEAM

SPRINT RETRO

Things to keep in mind for the next sprint.

Page 17: Design Sprint Methodology

17

♥ THANK YOU