![Page 1: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/1.jpg)
Caltrans Engineering Services
Department Initiatives
25 April 2012
Bob Pieplow, P.E.Acting Chief Engineer
![Page 2: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/2.jpg)
Caltrans Engineering Services
Focus Areas
• Transportation budgeting• Department Initiatives• Department Org Chart• Pavement Program Steering Committee• Caltrans-Industry relations through RPC
![Page 3: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/3.jpg)
Caltrans Engineering Services
Transportation Budgeting
• Status for FY12-13• Areas of Emphasis• Overall Budget Trends
![Page 4: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/4.jpg)
Caltrans Engineering Services
BudgetingDiminishing Funding - Increased Construction Costs
1970 1973 1976 1979 1982 1985 1988 1991 1994 1997 2000 2003 2006 2009 20120
20
40
60
80
100
120
Construction Cost Index - 1972 through 2010
Year
Cos
t In
dex
1972- 2003 Average Growth = 4.6%/year
![Page 5: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/5.jpg)
Caltrans Engineering Services
2012
-13
2013
-14
2014
-15
2015
-16
2016
-17
2017
-18
2018
-19
2019
-20
2020
-21
2021
-22
Cost of Mandates, Safety, and Damage Restoration
Funding Available for Rehabilitation of the System
Loss of Buying Power (inflation)
BudgetingExternal Factors Limit Available Funding
![Page 6: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/6.jpg)
Caltrans Engineering Services
00-0
1
01-0
2
02-0
3
03-0
4
04-0
5
05-0
6
06-0
7
07-0
8
08-0
9
09-1
0
10-1
1
11-1
2
12-1
3
13-1
4
14-1
5
15-1
6
16-1
7
0
1,000,000
2,000,000
3,000,000
4,000,000
5,000,000
6,000,000
Local Bond Other Capacity Increasing SHOPP
Allo
ca
tio
ns
($
1,0
00
s)
SHOPP
Other
Bond
Local
Actual Projected
BudgetingOn-System Allocations and Projected Allocations
(Adjusted for Construction Cost Index, in 11-12 dollars)
![Page 7: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/7.jpg)
Caltrans Engineering Services
Department Initiatives
• Strategic Planning• Program Review• Enterprise Risk Management
![Page 8: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/8.jpg)
Caltrans Engineering Services
Department Organization Chart
![Page 9: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/9.jpg)
Caltrans Engineering Services
Pavement Program Steering Committee
• Leadership and commitment to assure quality Pavements
• Desired goals of the PPSC:• Assure Pavement Initiatives reflect Goals• Provide Clear Direction on Initiatives• Assure Implementation of Policies• Recognize employees
![Page 10: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/10.jpg)
Caltrans Engineering Services
Rock Products Committee Mission and Goals
• Forum for Caltrans and Industry• Develop Mutual Understanding of Viewpoints• Helps Prioritize Work
![Page 11: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/11.jpg)
Caltrans Engineering Services
Rock Products Committee Initiatives
25 April 2012
Dan Speer, P.E., G.E.Office of Structural MaterialsMaterials Engineering Testing ServicesDivision of Engineering Services
![Page 12: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/12.jpg)
Caltrans Engineering Services
• The new charter was established on December 2010
• Three STGs – Deal with various concrete issues
RPC
Pavement Preservation
ConcreteAsphalt Pavement Foundations
Materials & QA
CIP Pavement
Precast
Rock Products Committee (RPC) and Concrete Products Task Group
![Page 13: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/13.jpg)
Caltrans Engineering Services
Working with Industry at Various Levels
• STGs Co-chaired by Senior Bridge Engineers• Involvement from all relevant functional
groups• Some Key RPC Participation:
• Charley Rea• Ron Stickel• Mark Hill• Cliff Ohlwiler• Craig Hennings
![Page 14: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/14.jpg)
Caltrans Engineering Services
Vision for the RPC Concrete Task Group
• Develop Strong Relationships• Greater Contractor Responsibilities
• QC Requirements for Concrete• Long Term - End Product Specifications
• Movement to National Standards• New and Innovative Processes
• Smog-Eating Concrete• Precast Pavement
![Page 15: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/15.jpg)
Caltrans Engineering Services
Items Completed Over the Last Year
• Clarification of “Equation 2” issues through the “MC for Pavement” Activity
• Clarification of Adding Water at the Jobsite• 2010 “Plain Language” Review• Evaluating CTM 515 • Clarification of Self-Consolidating Concrete Mock-Up
requirements for Precast Concrete
![Page 16: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/16.jpg)
Caltrans Engineering Services
Key Initiatives Underway
• QC Requirements for Structural Concrete Specs• Statewide Aggregate Database• Recycled Concrete specifications• Precast Pavement Standards
![Page 17: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/17.jpg)
Caltrans Engineering Services
Process Control (QC)Independent Assurance
Acceptance
Quality Control – Quality Assurance
QA
Caltrans goal – shift quality/process control responsibilities to Contractor
![Page 18: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/18.jpg)
Caltrans Engineering Services
QA Specification – Federal Requirements
• Title 23, CFR637• Contractor QC test results
can be used for acceptance• Department’s QA test in addition
to the contractor’s QC test• Discrepancies follow resolution
process.• Independent Assurance
Program (IA) is required
Statistics
Testing Procedures
![Page 19: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/19.jpg)
Caltrans Engineering Services
QA Specification Task Progress
• Review of State Highway Agency Quality Assurance Programs- June 2011
• Draft specifications: Tentatively ready by May 2012
• Pilot Projects: FY 12/13
Reviewed & approved by FHWA & other stakeholders
complete
complete
![Page 20: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/20.jpg)
Caltrans Engineering Services
Online Submission of QC Test Data
Timely data collectionfrom 10 Pilot Projects
![Page 21: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/21.jpg)
Caltrans Engineering Services
Data Interchange for Materials Engineering (DIME)
• Standard IT protocol for data transfer• QC Lab manages their test data and access rights
![Page 22: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/22.jpg)
Caltrans Engineering Services
Statewide Database of Aggregate Testing
• DIME expanded• To share the data among Districts• Statewide, Automated and Paperless system• User friendly tool • Flexible and expandable
![Page 23: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/23.jpg)
Caltrans Engineering Services
Phases of Aggregate Database Development
2011
Database Platform Development
Test Input Schema
Understand Practices
of District Labs
Developing the System
Beta Testing
Procurement of Necessary
EquipmentPilot Districts Participation
Rollout of Database
Ph
ase
and
Du
rati
on
2012 2013
![Page 24: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/24.jpg)
Caltrans Engineering Services
Overview of Recycled Concrete Initiatives
• Explore potential re-use of green or fresh concrete
• Development of new and revised standards• Use of available materials
![Page 25: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/25.jpg)
Caltrans Engineering Services
Recycled Concrete Initiatives – Ongoing Work
• Pavement TAP Research• Materials/QA STG• Working in conjunction with:
• Charley Rea• Don Vivant• Mike Donovan
• Identification of Testing Requirements and QA Mechanisms
![Page 26: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/26.jpg)
Caltrans Engineering Services
Overview of Precast Pavement Initiatives
• Full-Lane replacement and Individual Slab Replacement
• Allows for Prestressing of Pavement (both before and after placement at project site)
• In conjunction with METS and Pavement Program
![Page 27: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/27.jpg)
Caltrans Engineering Services
New Technologies Through RPC
• Roller Compacted Concrete• Precast Pavement• Development of Materials Engineering
Database• Smog-Eating Concrete (Titanium Dioxide)
![Page 28: Department Initiatives 25 April 2012 Bob Pieplow, P.E. Acting Chief Engineer.](https://reader038.fdocuments.net/reader038/viewer/2022103015/551a124f55034619378b4ed5/html5/thumbnails/28.jpg)
Caltrans Engineering Services
Questions and Feedback