Problem introduction

Efforts to date

Draft Preliminary Engineering Report (PER) discussion

Moving forward

Questions

Agenda

Page 3: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Flooding problems

Williamson Overflow Gaines Tributary of

Barton Creek

Page 4: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Flooding ComplaintsClose to 100 Parcels at Risk of Flooding No. 1 Local Flood Priority No. 20 Creek Flood Priority

Page 5: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Gaines tributary study - Williamson overflow estimate, floodplain map

Previous neighborhood meetings – August 2012, September 2013, March 2015

Harper Park development coordination

St. Andrews development coordination

Field Operations work

Efforts to Date

Page 6: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Mitigate flooding from local runoff and Williamson overflow

City of Austin Drainage Criteria Manual

Stormdrain

Runoff from 25-year storm (7.6 inches in 24 hours) below ground

Runoff from 100-year storm (10.2 inches in 24 hours) within Right of Way

Roadway crossings

No overtopping in 25-year storm

Maximum 6 inches overtopping in 100-year storm

Minimum impact to environmentally sensitive areas (trees, recharge features)

No downstream adverse impact

Preliminary Engineering Report Goals

Page 7: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Two design options

Option 1 requires some property acquisition

Affected property owners contacted

WPD requested another option with fewer property acquisition

Option 2 eliminates need of any property acquisition

Include some easement acquisition

Project sponsors leaning toward Option 2

Download draft report from project website

www.austintexas.gov/oakpark

Draft Preliminary Engineering Report

Page 8: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Improvement Option 1

Drainage Swales

Page 9: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Improvement Option 1

Channel and Culvert Improvements

Page 10: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Improvement Option 1Proposed Stormdrain System

Page 11: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Improvement Option 1

Southern Swale drains to proposed Stormdrain

Page 12: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Improvement Option 1

Gaines Channel and Culvert Improvements

Page 13: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Improvement Option 1

Proposed Stormdrain System

Existing Stormdrain System

Page 14: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Improvement Option 1

Page 15: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Improvement Option 1

Gaines Channel and Culvert Improvements

Page 16: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Potential Property Acquisition

Improvement Option 1

Page 17: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Existing Floodplain Existing 100-year floodplain

Page 18: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Existing 100-year floodplain

Proposed 100-year floodplain

Floodplain change with Option 1

Page 19: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Improvement Option 2

Drainage Swales

Page 20: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Improvement Option 2

Proposed Inlet Structure

Proposed Box Stormdrain

Page 21: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Improvement Option 2

Gaines Channel and Culvert Improvements

Extended and Angled Culverts

Page 22: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Improvement Option 2

Southern Swale Drains to Proposed Stormdrain

Page 23: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Improvement Option 2Proposed Stormdrain Systems

Existing Stormdrain Systems to remain in place

Page 24: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Improvement Option 2

Roadside Channel and Culvert Improvements

Page 25: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Improvement Option 2

Gaines Channel and Culvert Improvements

Extended Culverts

Lower Channel Flowline by 2ft

Page 26: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Existing 100-year floodplain

Existing Floodplain

Page 27: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Floodplain Change with Option 2Existing 100-year floodplain

Proposed 100-year floodplain

Page 28: John Middleton, P.E. RPS Group Rupali Sabnis, P.E.

Selection of most feasible option Project sponsors leaning toward Option 2

Internal Watershed Protection Department review

Stakeholder feedback

Work to minimize property and easement acquisition

Secure funding (both options are ~$12M)

Implementation Starting from downstream

Phased implementation

Smaller projects to speed up the process

Timeline Selection of option and Preliminary Phasing Plan by Summer 2017

Moving Forward