DELIVERING ENERGY INNOVATIONS AT SCALE THE IMPORTANCE OF DATA FOR ENERGY EFFICIENCY BRETT GOODYEAR...

22
DELIVERING ENERGY INNOVATIONS AT SCALE THE IMPORTANCE OF DATA FOR ENERGY EFFICIENCY BRETT GOODYEAR – HEAD OF OPERATIONS 11.04.13

Transcript of DELIVERING ENERGY INNOVATIONS AT SCALE THE IMPORTANCE OF DATA FOR ENERGY EFFICIENCY BRETT GOODYEAR...

DELIVERING ENERGY INNOVATIONS AT SCALE

THE IMPORTANCE OF DATA FOR ENERGY EFFICIENCY

BRETT GOODYEAR – HEAD OF OPERATIONS

11.04.13

THE DRIVERS

DRIVERS

Compliance

Investors

Occupiers

Future proofing

COMMERCIAL IMPERATIVE

Source: GVA ‘Green to Gold’ Report 12/13

DRIVERS

Capital Values

Brown Discount

Marketing Challenges

Occupier satisfaction

THE RISKS

Source: GVA ‘Green to Gold’ Report 12/13

WHO HAS RESPONSIBILITY FOR ENERGY

*Source: British Land

AWARD-WINNING RESULTSOUR CLIENTS HAVE ACHIEVED:

• World #1 status in the Dow Jones Sustainability Index for Real Estate for four consecutive years

• No1 status in the 2012 Global Real Estate Sustainability Benchmark (GRESB) for both office and retail categories – Oceania Region

• 4 CIBSE Building Performance Awards in the last 3 years for energy efficiency

CURRENT CHALLENGES

CURRENT CHALLENGESUSING DATA FOR ENERGY EFFICIENCY

• Sustainable Design perceived as a panacea• CHP/District heating schemes poorly metered• Bad implementation = bad data = no savings• Fit for purpose systems and metering• Lack of FM expertise• Big data

BIG DATA

COLLECTING GOOD DATA

COLLECTING BIG DATA

• Multiple User Remote Access via Internet

• Water Meters (Pulse) • Gas Meters (Pulse)

• Direct Access

• Temperature Senso

r

• BTU Meters

• (pulse)

• Chiller 1

• Pumps

• Cooling Towers

• Chiller 2

• Pumps

• Tenant Light

• Tenant Power

• Car Park Lights

• Car Park Exhaust

• Supply &

Exhaust Fans

• Lifts

• Tenant BTU

Meters (Pulse)

• Tenant

• BM

CS interface

• Client Metering System interface

• Existing Energy Meters (Pulse)

• Existing Energy Meters (HLI)

SYSTEM ARCHITECTURE

G4 Meter Memory Module Server Daily Backup

2 YearsStorage

1-15 min data

2 MonthsStorage

0.2% Accuracy

7 YearsStorage

Dual Server - RAID

20 YearsStorage

ServiceTeam

Data Repair

DATA PURITY™

DYNAMIC MONITORING VERSUSFIX AND FORGET

Repair & Maintenance

Implement CAPEX

Low spend CAPEX projects System upgrades

8-20% from Baseline Up to 30% Up to 60%

En

erg

y C

on

sum

pti

on

Delivering Dynamic Monitoring (MARS)

Building ManagersClient Senior

ManagementPortfolio ManagerAsset Manager Sustainability Manager

MARS Reports

Global Reports

Performance Tracking

Monthly Teleconferencing

Remote Operations Centre (ROC)

Portfolio 2

Portfolio 3

CASE STUDY

PORTFOLIO CASE STUDYBRITISH LAND

Data Sharing

Common System

Collaborative Working

MARS EXAMPLE

Issue:

Extended plant run time

Solution:

Building EM & FM team present case

study to occupiers demonstrating

opportunity

Savings:

Energy: 104,000kWh per year

Cost: £6,303 per year

Emissions: 56,686 kg/CO2-e

EXCHANGE HOUSE

Items raised:

64Total avoided cost:

£219,980

MARS EXAMPLE

Issue:

3 chillers and associated condenser pumps

running 24/7

Solution:

Inaccurate BMS not returned to auto, VSDs

not programmed

Savings:

Energy: 900,380 kWh per year

Cost: £72,030 per year

Emissions: 490,707 kg/CO2-e

ROPEMAKER PLACE

Items raised:

66Total avoided cost:

£351,344

CASE STUDYOCCUPIER OUT OF HOURS

CONCLUSIONS

CONCLUSIONDATA IS IMPORTANT

• High Accuracy and available data is critical for energy efficiency• Invest accordingly• Challenge the current EMS metering strategy on development• Involve monitoring expertise when planning CHP projects• Move towards cloud-based systems • Have a strategy for managing big data

THANK YOU

BRETT GOODYEAR

WWW.EPTGLOBAL.CO.UK