Transcript of Deconstruction of Dangerous Structure
Deconstruct UK case study for Emergency Dangerous Structures.
Client: LinbrooksLocation: Enfield Sony Centre
Contractor: Deconstruct UK LtdCompletion Date: August 2011
Sector: Emergency Dangerous Structure
About the Project:
Deconstruct called to support the London FireBrigade to extinguish this substantial warehouse fire
following disturbances in Enfield.
Following a massive fire this structure continued to smoulder for almost three weeks.
Due to the nature of the content of the warehouse and the fact the structure collapsed into itself, it prevented access for London Fire Brigade (LFB) to extinguish the flame.
Deconstruct provided specialist equipment to move collapsed structures, enabling LFB to access and douse the remaining hotspots.
Project Challenges:
The removal of fundamental elements of thestructure to enable LFB access into the heart ofthe 200m x 100m warehouse was key.
These works were carried out by 25 and 45 tonne excavators with specialist attachments.
The works had to be coordinated with the LFB incident controller and involved accessing the heart of the site, removing structural elements and then retracting to permit safe LFB access.
These works took two weeks to complete.
Services provided by Deconstruct UK:
Our services:
Deconstruction Services ✓
Demolition Services ✓
Enabling Works
Asbestos Removal Services
Asbestos Surveying Services
Ground Works Services
Piling Services
Steelwork Installations
Builders Works
Emergency Dangerous Structures ✓
Temporary Works
Contact Details:
Deconstruct (UK) LimitedSilver House, 31-35 Beak StreetLondonW1F 9DPTel: 020 7734 6655Fax: 020 7734 6626
Email [email protected] Address www.deconstructuk.com
For more information about this case study, visit our case studies page here: www.deconstructuk.com