Deconstruct UK case study for Emergency Dangerous Structures. Client: Linbrooks Location: Enfield Sony Centre Contractor: Deconstruct UK Ltd Completion Date: August 2011 Sector: Emergency Dangerous Structure

description

Deconstruct called to support the London Fire Brigade to extinguish this substantial warehouse fire following disturbances in Enfield.

Transcript of Deconstruction of Dangerous Structure

Page 1: Deconstruction of Dangerous Structure

Deconstruct UK case study for Emergency Dangerous Structures.

Client: LinbrooksLocation: Enfield Sony Centre

Contractor: Deconstruct UK LtdCompletion Date: August 2011

Sector: Emergency Dangerous Structure

Page 2: Deconstruction of Dangerous Structure

About the Project:

Deconstruct called to support the London FireBrigade to extinguish this substantial warehouse fire

following disturbances in Enfield.

Following a massive fire this structure continued to smoulder for almost three weeks.

Due to the nature of the content of the warehouse and the fact the structure collapsed into itself, it prevented access for London Fire Brigade (LFB) to extinguish the flame.

Deconstruct provided specialist equipment to move collapsed structures, enabling LFB to access and douse the remaining hotspots.

Page 3: Deconstruction of Dangerous Structure

Project Challenges:

The removal of fundamental elements of thestructure to enable LFB access into the heart ofthe 200m x 100m warehouse was key.

These works were carried out by 25 and 45 tonne excavators with specialist attachments.

The works had to be coordinated with the LFB incident controller and involved accessing the heart of the site, removing structural elements and then retracting to permit safe LFB access.

These works took two weeks to complete.

Page 4: Deconstruction of Dangerous Structure

Services provided by Deconstruct UK:

Our services:

Deconstruction Services ✓

Demolition Services ✓

Enabling Works

Asbestos Removal Services

Asbestos Surveying Services

Ground Works Services

Piling Services

Steelwork Installations

Builders Works

Emergency Dangerous Structures ✓

Temporary Works

Page 5: Deconstruction of Dangerous Structure

Contact Details:

Deconstruct (UK) LimitedSilver House, 31-35 Beak StreetLondonW1F 9DPTel: 020 7734 6655Fax: 020 7734 6626

Email [email protected] Address www.deconstructuk.com

For more information about this case study, visit our case studies page here: www.deconstructuk.com