Stormwater Management
Regulation Roll Out
Regional Outreach
Meeting
Front Royal, VA
August 6, 2012
1
![Page 2: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/2.jpg)
Presenters & Agenda
• Introductions – Ginny Snead, PE; Office of
Regulatory Programs Manager
• Stormwater Regulatory Overview &Update -
Ginny Snead, PE
• Local SWM Program Elements & Tools –
Joan Salvati, Guidance and Program
Development Manager
• Virginia E-Permitting - Gerry Seeley, DCR
Website Development Coordinator
2
![Page 3: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/3.jpg)
Commonwealth of Virginia
Stormwater Regulatory Update
Ginny Snead, PE
Office of Regulatory Programs Manager
July 17, 2012
3
![Page 4: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/4.jpg)
Office of Regulatory ProgramsRegulation
• Erosion & Sediment Control Act
• Chesapeake Bay Preservation Act
• VA SW Management Permit (VSMP)
– Construction General Permit
• Municipal Separate Storm Sewer
System (MS4)
– Phase I Individual Permits
– Phase II (Small) General Permit
• Chesapeake Bay Total Maximum
Daily Load (TMDL) Watershed
Implementation Plan (WIP)
Applicability threshold
10,000 sq ft
2,500 sq ft
1 acre
4
![Page 5: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/5.jpg)
Virginia Stormwater
Management Program (VSMP)
• Currently State Run
• Compliance = Water Quality
– Current Compliance @ 40%
– Local vs. State confusion
• Simplification: Local Programs = Local Control
= Improved Compliance
• Consistency: Facilitates uniform program
oversight and enforcement.5
![Page 6: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/6.jpg)
• Virginia Soil and Water Conservation Board adopted regulations May 24, 2011
• Regulations became effective September 13, 2011 and Published on DCR website
• Implementation date = July 1, 2014 through State Construction General Permit and Local Ordinances
• Before July 1, 2014, Local Gov’tsDevelop and Adopt Ordinances and Programs
VSMP Regulations Timeline
6
![Page 7: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/7.jpg)
Chesapeake Bay Preservation Act localities and Municipal Separate Storm Sewer System (MS4) permitted localities
Likely that no stormwater program exists currently (but do have E&S)
Statewide Implementation
7
![Page 8: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/8.jpg)
Program Development Timeline
• Regulations effective September 13, 2011
• Local program development timeframe
January through June 2013 (15 - 21 months of
effective date of regulations)
– One year extension to July 1, 2014
– Compliance = Water Quality Protection
• Local Program Development NOW
– Outreach, Outreach, Outreach
– Tool Development
– Stormwater Local Government Advisory Committee
(SLGAC)8
![Page 9: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/9.jpg)
Local Program Benefits
• Developers– Eliminates local vs. state
confusion– More effective options– Greater compliance=better
protection of local natural resources
• Local Control– Speed of plan review and
approval – Economic development
advantage– Address local issues
9
![Page 10: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/10.jpg)
DCR Assistance Timeline
• Establish Local Government Advisory Team – Began March 2012
• Program Requirement Checklist –Final May 2012
• Model Ordinance development –underway (end of summer)
• Training Plan
• Administrative Tools
10
![Page 11: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/11.jpg)
Relevant 2012 Legislation
• Budget (local financial assistance)
• Integration Bill (HB1065, SB407)
– Statewide Reach and Streamlines Programs
• Nutrient Trading Bill (HB176, SB77)
– Expansion of Current Programs
• CAFOs, MS4s, Industrial SW
– Cost Effective Compliance
– Stormwater Offsets
• Necessitates several exempt regulatory actions 11
![Page 12: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/12.jpg)
General Permit Reissuance
• Small MS4 General Permit
– RAP Meetings June, July, August
– Proposed Regs to Board this
September (2012)
– Effective July 2013
• Construction General Permit
– May 21 - June 20 Initial Public Comment
– RAP Meetings August, September, October
– Proposed Regs to Board December 2012
– Effective July 20141212
![Page 13: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/13.jpg)
Question and Answer
13
![Page 14: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/14.jpg)
Introducing Runoff Volume Reduction
• The Virginia Runoff Reduction Method (RRM) was developed by the Center for Watershed Protection (CWP) and the Chesapeake Stormwater Network (CSN) for DCR.
• The method focuses on determining a BMPs' capacity to capture/reduce the overall volume of runoff as well as mass pollutant removal. Goal = mimic pre-development site hydrology.
• The method also incorporates built-in incentives for forest preservation and the minimization of impervious surfaces.
• The RRM is a tool for planning and measuring compliance. It is not a design tool. 14
![Page 15: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/15.jpg)
• “Traditional” BMP pollutant removal efficiencies do not take
into account the removal that occurs when the runoff
volume is reduced.
• Many BMPs, such as ponds and filters, do not reduce
runoff volume at all.15
![Page 16: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/16.jpg)
• Using BMPs that also provide volume reduction provides greater overall pollutant (mass load) removal
• This reflects a “Mass Balance” Approach 16
![Page 17: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/17.jpg)
The Key Differences in Application
Existing Rules
Impervious Surface (IC) only
0.5 inches of Runoff from the IC only
Average land condition/
technology based
10% reduction TP
Simple Method
Modified Rules
IC + Forest/Open Space + Managed Turf
1.0 inches of Rainfall from the whole site
0.41 lbs./ac/yr TP
<1 acre = 10% red. TP,
>1 acre = 20% red. TP
Runoff Reduction Method (RRM = enhanced
Simple Method)
Land Use(s)
Event
New Design Criteria
Redevelopment
Criteria
Compliance
Methodology
17
![Page 18: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/18.jpg)
0.41 lbs/ac/yr Total Phosphorus Threshold
associated with the Impervious Cover ModelStatewide requirement based on three types of land cover and NRCS hydrologic soil groups of soil on site
Threshold assumes 10% impervious cover, 30% turf, 60% forest
The Impervious Cover Model focuses on protecting water quality
in local streams.
18
![Page 19: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/19.jpg)
19
Use Environmental Site Design(Think about this early in the design process)
• Fit the design to terrain
• Locate development in less sensitive areas
• Reduce the limits of clearing and grading
• Use open space design (clustering) techniques
• Reduce impervious cover
If designers wait until site plans are completed and then apply
SWM solutions afterwards, SWM solutions are likely to be more
constrained, less effective, and more costly.
![Page 20: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/20.jpg)
Typical Development Site Plan
15 Acres
25 0.6 acre lots
Treatment Volume = 18,100 cubic feet
20
![Page 21: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/21.jpg)
Example Runoff Reduction Site Plan
15 Acres
25 ¼ acre lots
Treatment Volume = 13,600 cubic feet
25% reduction before BMPs applied
21
![Page 22: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/22.jpg)
Water Quantity Control
The new paradigm is Volume-Based Hydrology (VBH),
focused on:
Volume
Peak Flow
Velocity
Flooding
22
![Page 23: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/23.jpg)
Channel Protection Criteria are now
Situational
Manmade Stormwater Conveyance Systems
Restored Stormwater Conveyance Systems
Natural Stormwater Conveyance Systems
23
![Page 24: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/24.jpg)
The Energy Balance Method
• The new ENERGY
BALANCE METHOD
is based on the
interaction of both flow
volume and peak
discharge, which
determine the stream
channel configuration
24
![Page 25: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/25.jpg)
25
Runoff Reduction Method Spreadsheet Compliance tool, NOT a
design tool:
• Calculates treat. volume &
pollutant reduction requirement
• Tracks & totals BMP pollutant
removals
• CN adjustments for quantity
control
![Page 26: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/26.jpg)
Grandfathered Projects (4 VAC 50-60-48)
Land-disturbing activities where the following was approved by a locality prior to July 1, 2012:
– a currently valid proffered or conditional zoning plan,
–preliminary or final subdivision plat,
–preliminary or final site plan or
–zoning with a plan of development,
–or any document determined by the locality as being equivalent
and–Coverage under the Virginia Stormwater Management Program (VSMP) General Permit was not obtained prior to July 1, 2014.
The land disturbance activity must be complete by June 30,
2019 or portions not under construction shall become
subject to the new regulatory design criteria.26
![Page 27: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/27.jpg)
Grandfathered Local, State and
Federal ProjectsA local, state or federal project is grandfathered until June 30, 2019 when:
There has been an obligation of locality, state, or federal funding, in whole or in part, prior to July 1, 2012, or for which the department has approved a stormwater management plan prior to July 1, 2012
If bonds or public debt financing has been secured prior to July, 1 2012, projects shall be grandfathered
Additional discussion is required on what this means
for state college and university master plans.
27
![Page 28: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/28.jpg)
Time Limit on Applicability of Approvals
(4 VAC 50-60-47.1)The approved post-development SWM design is valid for construction only for the remaining portion of the General Permit cycle under which it was originally permitted (up to 5-years) PLUS two additional permit cycles (10-years) unless:
VSMP permit coverage lapses (failure to reapply)
or
Two additional permit cycles have passed
In that event, portions of the project not under construction are required to meet any new technical criteria adopted since the original permit coverage was issued.
28
![Page 29: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/29.jpg)
Example Time Limit on an Approved Plan
A subdivision registers under the VSMP General Permit on July 12, 2013.
The post-development criteria applicable to the subdivision remains applicable for the remaining portion of that permit cycle (until 2014) plus two additional permit cycles (2014-19, 2019-24).
Any portions of the sub-division not under construction by July 1, 2024 must meet the post-development design criteria in the regulations at that time.
29
![Page 30: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/30.jpg)
30
Resources Available in the New (Revised
and Updated) Virginia Stormwater
Management Handbook
![Page 31: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/31.jpg)
31
Background
• The existing Virginia SWM Handbook (nicknamed
the “Blue Book”) was released in 1999.
• Many new technologies, practices, and design
techniques developed since then, but NOT
reflected in the existing Handbook.
• New Handbook reflects quantum leaps in
research and in knowledge of how to do SWM
well.
![Page 32: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/32.jpg)
32
Handbook Organization
• The Handbook organized in 3 Parts.– Part 1: Laws, Regulations and Program Implementation
(Chapters 1-3)
– Part 2: Understanding Stormwater Management (Chapters 4-7)
– Part 3: Tools, Methods and Examples (Chapters 8-14)
• Most chapters have multiple Appendices that provide specific guidance, useful tools, case studies, etc.
• Handbook has many more helpful photos and graphics.
![Page 33: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/33.jpg)
Virginia Stormwater BMP Clearinghouse
Design standards and specifications of BMPs approved for use in Virginia to control the quality and/or quantity of stormwater runoff.
33
![Page 34: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/34.jpg)
Traditional Runoff Treatment BMPs
34
![Page 35: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/35.jpg)
Runoff Volume Reduction/LID BMPs
35
![Page 36: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/36.jpg)
Manufactured (Proprietary) BMPs
Clearinghouse website disseminates the results of Virginia’s process to evaluate
and certify the performance claims of manufactured/proprietary BMPs using the
Virginia Technology Assessment Protocol (VTAP) 36
![Page 37: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/37.jpg)
37
LEED Credits for BMP Use
• Site Reforestation: SS5.1, SS5.2, SS6.2; maybe SS7.1, WE1.1, WE1.2
• Rooftop Disconnection: SS6.1, SS6.2; maybe WE1.1, WE1.2
• Filter Strips: SS5.2, SS6.1, SS6.2; maybe WE1.1, WE1.2
• Grass Channel: SS5.1, SS5.2, SS6.1, SS6.2
• Vegetated Roofs: EA pre-1 & EA1; maybe SS5.1 and/or SS5.2 if get SS2; maybe SS6.1, SS6.2, SS7.1, WW7.2
• Rainwater Harvesting: SS6.1, SS6.2, WE1.1 & WE1.2 or WE2 or WE3
• Permeable Pavement: SS6.1, SS6.2; maybe SS5.1, SS7.1, WE credits, MR credits
• Infiltration: SS6.1, SS6.2
• Bioretention: SS5.1, SS5.2, SS6.1, SS6.2, WE1.1, WE1.2
• Wet Swale/Wet Ponds: SS5.1; maybe SS5.2, SS6.1, SS6.2
• Filtering Practices: SS6.2; maybe SS5.1, SS6.1
• Constructed Wetlands: SS5.1; maybe SS5.2, SS6.1, SS6.2
KEY: SS = sustainable sites; WE = water efficient landscaping;
EA = energy and atmosphere; MR = materials and resources
![Page 38: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/38.jpg)
Additional Information
Draft Stormwater Handbookhttp://www.dcr.virginia.gov/lr2i.shtml
BMP Clearinghouse Websitehttp://vwrrc.vt.edu/swc/
Runoff Reduction Methodologyhttp://www.dcr.virginia.gov/lr2f.shtml
Modified Regulationshttp://lis.virginia.gov/000/reg/TOC04050.HTM#C0060
Stormwater Local Government Advisory Committee (SWLGAC) Information
http://www.dcr.virginia.gov/lrswlgac01.shtml
38
![Page 39: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/39.jpg)
39
RRM on DCR Website
![Page 40: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/40.jpg)
40
![Page 41: Dcr swm pgm rollout regional meetings 1](https://reader033.fdocuments.net/reader033/viewer/2022052413/559e48971a28abf0728b468e/html5/thumbnails/41.jpg)
41
QUESTIONS?