Dbe sept 6 presentation final on 09 05-13

20
Projects CityArchRiver 2015 Projects

Transcript of Dbe sept 6 presentation final on 09 05-13

Page 1: Dbe sept 6 presentation final on 09 05-13

Projects

CityArchRiver 2015

Projects

Page 2: Dbe sept 6 presentation final on 09 05-13

Purpose of the Meeting

• We are seeking your assistance in

communicating the opportunities

available for the CityArchRiver

Projects.

• CityArchRiver Projects will be built

through partnerships

• All projects must meet federal

requirements:

• Dept. of Transportation

• Dept. of Interior - National

Park Service

Page 3: Dbe sept 6 presentation final on 09 05-13

CityArchRiver 2015 Projects

Federal Highway Administration

Transportation Projects

• Park Over the Highway

• Central Riverfront

Department of Interior (DOI) &

National Park Service (NPS) Projects

• Luther Ely Smith Square

• Old Courthouse

• Museum/Visitor Center

• Arch Grounds

• Reflecting ponds

• East Slopes

• Processional Allees

• North Gateway Park

City of St. Louis, Great Rivers Greenway &

CityArchRiver 2015 Foundation Project

• Kiener Plaza

Page 4: Dbe sept 6 presentation final on 09 05-13

Great Rivers Greenway District

• Who we are– Mission & Vision

– The River Ring

• Our Role– Central Riverfront

Project

– Prop P funding for Arch grounds landscape projects

• Commitment to the St. Louis Community

Page 5: Dbe sept 6 presentation final on 09 05-13

Central Riverfront ProjectFederal Highway Administration

Regulations

Page 6: Dbe sept 6 presentation final on 09 05-13

Central Riverfront Today

Page 7: Dbe sept 6 presentation final on 09 05-13

Central Riverfront 2015

Page 8: Dbe sept 6 presentation final on 09 05-13

Central Riverfront 2015

Page 9: Dbe sept 6 presentation final on 09 05-13

Central Riverfront 2015

Page 10: Dbe sept 6 presentation final on 09 05-13

Central Riverfront 2015

Page 11: Dbe sept 6 presentation final on 09 05-13

Central Riverfront Project

• A Federal Transportation Project

• 10 Bid Packages

• Bid and Construction Schedule

• Meetings/Mixer

Page 12: Dbe sept 6 presentation final on 09 05-13

Central Riverfront Project

• Federal Transportation Goals

• DBE bidders must be certified by

• Missouri Regional Certification Committee

(MRCC) which is the Unified Certification

Program. The MRCC includes firms who have DBE certification

with MoDOT, St. Louis Lambert Airport Authority, Metro, City of

Kansas City, and Kansas City Area Transportation Authority.

• There is a compiled DBE Directory of the MRCC on MoDOT’s Website. http://contribute.modot.mo.gov/business/contractor_resources/External_Civil_Rights/mrcc.htm

Page 13: Dbe sept 6 presentation final on 09 05-13

Central Riverfront Project• 10 Bid Packages & DBE Goals

Total project cost estimated at $27,000,000– Demolition/Earthwork: 12%

– Asphalt Paving: 19%

– Landscaping: 20%

– Concrete Base Bid: 19%, Concrete Bid Alternate: 20%

– Pavers (Historic Cobbles): 12%

– Metals/Rails Base Bid & Bid Alternate: 19%

– Signage: 20%

– Sewers/Plumbing: 19%

– Electrical Base Bid: 22%, Electrical Bid Alternate: 26%

– Temporary Flood Protection: 9%

Workforce Diversity– 2 On The Job Training each 1,000 hours (Concrete & Electrical)

– The DOL Federal Workforce Goals for St. Louis City is 14.7% Minority and 6.9% Female per craft.

Page 14: Dbe sept 6 presentation final on 09 05-13

Transportation Resources & SupportMissouri Procurement Technical Assistance Center (PTAC)5988 Mid Rivers Mall Drive, Suite 111 | St. Charles, MO 63304Carolyn Jones | [email protected] | (314) 643-7684

Missouri Regional Certification Committee (MRCC)707 N. First Street | St. Louis, MO 63102(314) 982-1400 x 1352www.MetroStLouis.org/DBE

U.S. Department of Transportation Small Business and Disadvantaged Business Utilization1200 New Jersey Avenue SE | Washington, D.C. 20590(800) 532-1169 or (202) 366-7228 | www.dot.gov/osdbu

Missouri Office of Equal OpportunityTruman State Office Building | 301 West High Street, Room 360Jefferson City, MO 65102 | (877) 259-2963 | www.oeo.mo.gov

Page 15: Dbe sept 6 presentation final on 09 05-13

Arch Grounds ProjectsFederal Department of Interior (DOI),

National Park Service (NPS)

Regulations

Page 16: Dbe sept 6 presentation final on 09 05-13

National Park Service

• Jefferson National

Expansion Memorial

• NPS Denver Service

Center

– Construction Oversight

– Contracting Services

– Project Management

Page 17: Dbe sept 6 presentation final on 09 05-13

Arch Ground Projects

• Federal Landownership

• Federal Requirements

• Subcontracting opportunities

• SBA 8(a) Program

• Next Steps• Design Completion

January 2014

• Early 2014 bid

Page 18: Dbe sept 6 presentation final on 09 05-13

National Park Service Resources & Support

Missouri Procurement Technical Assistance Center (PTAC)5988 Mid Rivers Mall Drive, Suite 111 | St. Charles, MO 63304Carolyn Jones |[email protected] | (314) 643-7684

Missouri Regional Certification Committee (MRCC)707 N. First Street | St. Louis, MO 63102(314) 982-1400 x 1352 | www.MetroStLouis.org/DBE

Small Business Administration (SBA)1222 Spruce St Suite 10.103St. Louis , MO 63103 | (314) 539-6600 x231Gary Alexander | [email protected]

Page 19: Dbe sept 6 presentation final on 09 05-13

General Resources & Support

Missouri Office of Equal OpportunityTruman State Office Building | 301 West High Street, Room 360Jefferson City, MO 65102 | (877) 259-2963 | www.oeo.mo.gov

National Park Service – Denver Service Center12795 W. Alameda Parkway | P.O. Box 25287Denver, CO 80225-0287 | (303) 969-2112Rosemary Ortz | [email protected]

Page 20: Dbe sept 6 presentation final on 09 05-13

Questions?

Connect with us for more at:

www.GreatRiversGreenway.org

www.CityArchRiver.org

www.NPS.gov/Jeff

www.MoDOT.org