Name : Ahmed Lotfy gebrael D.O.B: 27 November. 1979 Nationality: Egyptian. Languages: Arabic & English. Mobil 00966 508826845 Emil Ad. [email protected] Key Qualifications: Calibration of Concrete Batch Plants, Quality Control for Concrete Quality Tasting of Construction Materials, in Situ Density Test & Field Compaction Test, as Well as Concrete& Asphalt Super Pave & Computer Win Word, Excel , Internet. Education : Diploma of Industrial School, in 1998 Work Experience 1999 to up. Date Record Ardaman Ace Company, Saudi Pan Kingdom (Sapac) Company, DAR AL RIYADH CONSULTANT ENGINEERING Field & Laboratory Technician Performing Soil,Concrete & Asphalt Quality Tasting Asphalt Super Pave& Computer Win Word, Excel, Internet InThe Following Projects :

Transcript of CVAHMEDLOTFYCODNOA2135

Page 1: CVAHMEDLOTFYCODNOA2135

Name : Ahmed Lotfy gebrael

D.O.B: 27 November. 1979

Nationality: Egyptian.

Languages: Arabic & English.

Mobil 00966 508826845

Emil Ad. [email protected]

Key Qualifications:

Calibration of Concrete Batch Plants, Quality Control for Concrete

Quality Tasting of Construction Materials, in Situ Density Test & Field

Compaction Test, as Well as Concrete& Asphalt Super Pave &

Computer Win Word, Excel , Internet.

Education :

Diploma of Industrial School, in 1998

Work Experience 1999 to up. Date

Record Ardaman – Ace Company, Saudi Pan Kingdom (Sapac)

Company, DAR AL RIYADH CONSULTANT ENGINEERING

Field & Laboratory Technician Performing Soil,Concrete & Asphalt

Quality Tasting Asphalt Super Pave& Computer Win Word, Excel,

Internet InThe Following Projects :

Page 2: CVAHMEDLOTFYCODNOA2135

Work projects :

1 - Military base Vl , Phase Ill, Gianaclis Air Base .

From 6/ 1999 To 4/2002

2 - Military base Fayid Air Base .

From 5/2002 To 7/2004

3 - Nubaria Power Station .

From 8/2004 To 8/2005

4 - Talkh Power Station .

From 8/2005 To 12/2006

5 - Dualization Of Tabouk - Almadina Part (I) Rd.

181km. 14 Bridges . In Saudi Arabia

From 6002/26 To 6020/3

6 – Hurghada International Airport Terminal Building

And Land Side Facilities.

From 6020/4 To 6023/6

7- The completion of some of the ways in Assir (Twenty Group ).

Dar Al Riyadh Consultant Engineering

From 3/2013 To Work is underway