Curriculum Vitae - Manager-Projects, Oil and Gas Pipelines Petrochemical - Refinery Power...

6

Click here to load reader

Transcript of Curriculum Vitae - Manager-Projects, Oil and Gas Pipelines Petrochemical - Refinery Power...

Page 1: Curriculum Vitae - Manager-Projects, Oil and Gas Pipelines Petrochemical - Refinery Power Exploration and Production

Curriculum Vitae - Manager-Projects, Oil and Gas Pipelines Petrochemical - Refinery Power Exploration and Production Year of birth 1966

Permanent/Home Location/Address

City or Tow n Faridabad

State Haryana

Country INDIA

Current Location/Address

State Haryana

Country INDIA

Languages

Primary Language Fluency

English Read, w rite and speak f luently

Nationalities

Main Nationality INDIA

Other Nationality INDIA

Experience Classification

Job Function Years Experience

Commissioning 5

Project

Management/Coordination

10

Construction Manager 12

Cost Engineer 5

Project Services 15

Industry Years Experience

Oil and Gas 12

Pipelines 6

Petrochemical - Refinery 2

Pow er 4

Exploration and Production 4

Qualifications

Highest Qualif ications HND/Diploma

Qualification Subject Establishment/Country Year

HND/Diploma Mechanical India 1985

Computer Skills and Software Used

•MS-Off ice, Ms-Word, MS-Excel.

•Pipeline Softw are PIPESIM,PIPENET,ARIEL-COMP, PIPELAY

HYSIS, FLARENET ,PRimevera planning Package ( Not much Fluent)

Work Locations

Are you w illing to move or relocate?

Yes - I w ill travel domestically

Yes - I w ill travel internationally

Yes - I w ill relocate internationally

Availability

Earliest Start Date Given 12 w eeks notice

Ideal Next Job

Looking for Project or Construction managment in E&P Compaines specially for new projects ,project developments& major revamps.

Open to all offers w hich are good

open to all offer w ith on-off duty cycle 28 days duty,21 day off ( min)

Required Salary & Conditions

Minimum salary USD 9,500 per month plus paid housing and schooling for my daughter plus medical for self and family plus travel yearly+

Employment History

Total Years of Work

Experience:

26

Commenced Full Time Work: 1985

14-03-2011 Curriculum Vitae - Manager-Projects, …

engineeringjobs.net.au/cv.nsf/v/js69817 1/6

Page 2: Curriculum Vitae - Manager-Projects, Oil and Gas Pipelines Petrochemical - Refinery Power Exploration and Production

Name Larsen & Toubro Ltd

Job Title: Manager-Projects

Duration From : 2005 To:

Summary

Duration Organization

June-2005 – till date: Manager –Projects Larsen & Toubro Ltd, Design Engineering Centre New Delhi

Job Profile

•Project Planning; job Schedule, Implementation, and Monitoring of the Project & Preparation of Various Reports for Various Field Activities.

•Construction management, Material planning & Techno-commercial details, Settlement of Contractual matters, Billing reconciliation & co-ordination.

•Review & Approval of job Execution Procedure.

•Preparation of Pre-Bid Material Requisitions for various Tender Jobs.

•Technical Evaluation & Review and approval of Vendor draw ings/ documents.

•Review of detail engineering draw ing & Interface Engineering.

•Preparation / Standardization of various Engineering Standards and Data sheets.

•Field engineering w orks and documentation w ork for as built.

•Erection supervision for Heavy Eqpts and Transportation of ODC Eqpt

Previous Organization: -

Duration Organization

March-2005 to June-2005 Chief Manager( Construction )

Simon India Ltd, New Delhi

Aug-1992 to March-2005 Sr.Manager (Projects & Construction)

Triune Projects Pvt Ltd., New Delhi

Sep-1991 to July1992 M/s Container Corporation of India Ltd

New Delhi

Jan-1990 to Aug-1991 M/s SRF Ltd, (Fluro Chemical Division)

New Delhi

June-1986 to Dec-1989 M/s Gammon Turnkeys Ltd

(Subsidiary of Gammon India Ltd)

Mumbai

Work Experience

Summary of Skills and Experience

Project Construction Management

•Anchoring end to end execution of activities from construction to commissioning of

-Gas Processing Complexes and

-Petrochemical Plants

•Preparing the tender bid documentation and evaluation of w ork estimates,

•Looking after project planning / conducting cost benefit analysis of the project, and w ork out schedules for material planning inventory control &

construction activities as per the contractual terms and scheduled completion dates.

•Finalization of Technical specif ications in co-ordination betw een the Design & Engineering Dept, Client & Consultants.

•Generating Project Progress Reports.

•Project Planning; job Schedule, Implementation, and Monitoring of the Project & Preparation of Various Reports for Various Field Activities.

•Construction management, Material planning & Techno-commercial details, Settlement of Contractual matters, Billing reconciliation & co-ordination.

•Review & Approval of job Execution Procedure.

•Preparation of Pre-Bid Material Requisitions for various Tender Jobs.

•Technical Evaluation & Review and approval of Vendor draw ings/ documents.

•Review of detail engineering draw ing & Interface Engineering.

•Preparation / Standardization of various Engineering Standards and Data sheets.

•Field engineering w orks and documentation w ork for as built.

•Erection supervision for Heavy Eqpts and Transportation of ODC Eqpt Handling logistics for transporting heavy equipment and Over Dimension Cargo.

Construction Supervision, Inspection & Testing

•Stage by stage inspection of fabrication, erection, alignment and testing including third party inspections in coordination w ith Clients, contractors and

Vendors

•Review & validation of pre-commissioning & commissioning procedures.

•Review & validation of various Quality Assurance Plans/ testing procedures in compliance w ith ASME/API/ANSI/IS/BS/DIN codes & ensuring adherence to

quality standards.

•Implementation of various Quality Assurance Plans/ testing procedures in compliance w ith ASME/API/ANSI/IS/BS/DIN codes & ensuring adherence to quality

standards.

•Carrying out various f ield tests such as NDT, Hydro test, Air test, Vacuum test and leak test.

•Carrying out Construction supervision Fabrication, Erection for

-Tankages such as f ixed roof, f loating roof, f loating roof and dish end tanks.

-Plant piping and cross-country pipelines.

-Heavy Steel Structures.

-Static and Rotary Equipment.

-Damage/corroded items.

-Repair procedures.

-Plant Hook-ups & Hot w ork

14-03-2011 Curriculum Vitae - Manager-Projects, …

engineeringjobs.net.au/cv.nsf/v/js69817 2/6

Page 3: Curriculum Vitae - Manager-Projects, Oil and Gas Pipelines Petrochemical - Refinery Power Exploration and Production

Organizational Experience

Present Organization: -

Duration Organization

June-2005 – till date: Manager –Projects Larsen & Toubro Ltd, Design Engineering Centre New Delhi

Previous Organization: -

Duration Organization

March-2005 to June-2005 Chief Manager( Construction )

Simon India Ltd, New Delhi

Aug-1992 to March-2005 Sr.Manager (Projects & Construction)

Triune Projects Pvt Ltd., New Delhi

Sep-1991 to July1992 M/s Container Corporation of India Ltd

New Delhi

Jan-1990 to Aug-1991 M/s SRF Ltd, (Fluro Chemical Division)

New Delhi

June-1986 to Dec-1989 M/s Gammon Turnkeys Ltd

(Subsidiary of Gammon India Ltd)

Mumbai

Jobs handled in L&T , New Delhi

GONGC- Assam Asset Jorhat Crude pipelines 80 Km and 30 kms Gas pipelines & GGS Modifications as Project Manager

GPreparation of all Standard Operating Procedures ,(SOP) , Engineering standards, Quality managements Systems Procedures (QMS), DACP etc for L&T

Engineering ,

GONGC- Offshore Pipeline Replacement Project (PRP) – Pipeline Route & Location & Coordinate f inalization . Pre –Engineering Route Survey for PRP lines.

Pipeline Approach & Departure , Raiser Location for 17 Platforms .

GPreparation of MR,&TBA , MTO, BOQ for 4 w ell Platform and Pipelines for ONGC . ( Pipelines , Pig Launchers & receivers)

G Rajasthan Cairn Energy – Mangala Field & Raggaesw ar Field Crude, Gas, Water Injection Pipelines, – as Engineering Coordinator.

GRajasthan Well Head Flow Lines for 18 Well pads( Crude) and 12 Well pads for Gas Fields

GPre-bid Engineering for GASCO –Project –Abu-Dhabi .

GCurrently Project Manager for Assam Renew al projects about 59 Installations and 1450 Kms of pipelines (feeder/Trunk/Flow lines)- Proposal & Pre-Bid

Engineering, Estimation & Costing for ARP –ONGC .

GPre-bid Engineering for Amine Regeneration Units (ARU) –IOCL-Panipet and IOCL-Gujarat for SWS units .

G Proposal Manager: Proposal & Pre-Bid Engineering, Estimation & Costing for Assam Renew al Projects –ONGC . ( 13 GGS,8 GCP, 8 WIP , 8 ETP, 5 CTF and

about 1700 KM pipelines )

Overseas Deputation & Other Deputations w ith Triune & JP Kenny

Deputed to JP Kenny Triune Engineering Pvt Ltd New Delhi (JV Company of Triune and JP Kenny Australia/UK) for Pipeline jobs.

•City Gas Distribution Project for Kanpur, 80 Kms of Gas Pipeline, 35 Kms of MDPE Pipelines for Industrial, Commercial & Domestic, 12 CNG Stations

•Estimation and Proposal for BPCL – Mumbai - Pune Pipelines-165 Kms , HPCL- Mundra-Delhi Pipeline-1137 Kms, HPCL- Mumbai-Pune- Loni-Pakni Pipeline and

Terminal – 350 Kms

•Estimation and Proposal for GAIL Dhaej-Jamnagar-Porbandar –800 Kms,

•Estimation, Pre-bid Engineering, Project Costing for 790 Kms Sudan Pipelines for ONGC.

GAIL C2-C3 Pipeline From Vijaipur-Pata Complex- 370Kms , NG Pipeline Vijaipur –Auriya -Jagdishpur Pipeline -550kms, Chennai-Kakinada – NG Pipeline -680

Kms

•Route Selection and Route Finalization

14-03-2011 Curriculum Vitae - Manager-Projects, …

engineeringjobs.net.au/cv.nsf/v/js69817 3/6

Page 4: Curriculum Vitae - Manager-Projects, Oil and Gas Pipelines Petrochemical - Refinery Power Exploration and Production

•Pipeline sizing, System Phasing

•Intermediate Pumping Station, Booster Pumping Station for C2-C3 Pipelines( Basic Engineering & FEED)

•Compressor Stations ( Basic Engineering & FEED)

•IP Stations , SV Station ( Location , Basic Engineering & FEED)

•Project Cost Estimation, Project Phasing .

Preparation of DFR for City Gas Distribution Project for Indore (MP) and Kota (Rajasthan). (May2004 to November 2004)

•Route Selection and Route Finalization

•Calculation of Gas volume Sale vis Demand

•CGS and Pipeline sizing, System Phasing

•Project Cost Estimation

•Preparation of Layout Dgs, Route Drgs,

•Indore –90 Kms of feeder Line, 160 Kms of MDPE line, 70 Kms of Steel Grid Line, 55 CNG Stations

•Kota –25 Kms of feeder Line, 120 Kms of MDPE line, 55 Kms of Steel Grid Line, 35 CNG Stations

Major Offshore Platforms Modification, Shutdow n supervision, Inspection for ONGC Mumbai High (Dec-2003 to Feb-2004)

•Un-manned Well Head Platforms ICD, SN, SM, SQ, SY

•Shut dow n Activities for GDU, Production separators, Water Injection system for SH Complex, BHN, BHS

•Un-manned Well Head Platforms N1, N3, N6, N9, N11.

•ONGC- Offshore- Heera – Process complex. Replacement of Fuel gas system, Replacement of internals for GDU, Separators

Major Offshore Platforms Modification, Shutdow n supervision, Inspection For Carin Energy Rava Block (AP) for RA, RC, RE Un-manned Platforms and

Onshore Complex (Feb-2004 to March-2004)

From July 2003 to Nov 2003 deputed to AT Kearney, USA for ‘IMPETUS’ Project at ONGC as Maintenance Management Consultant. For offshore Platforms

(Process complex & unmanned w ellhead Platforms & Offshore Rigs)- Process Complex of ONGC Mumbai – BHN, Heera, SCA, BPB, BPA, Sagar Lakshmi, Off

Shore Rigs Sagar Vijay, Ratna, Jothi, Uday, Karin

August –2002 to July – 2003 deputed to ATKEARNEY, USA as Maintenance Management Consultant for Western Region Onshore Installations - (Wellheads,

Rigs, Workover rigs, & Process complex). Oil & Gas fields of ONGC Meshana, Kadi, Santhal, Bechraiji, Kadi, Navagam, Ahmedabad, Ankleshw ar, Gandhar.

July 2001 to June-2002 deputed to AT Kearney, USA for ‘IMPETUS’ Project at ONGC as Maintenance Management Consultant. For of fshore Platforms

(Process complex & w ellhead Platforms) - Process Complex of ONGC Mumbai - IC Complex, SH, Neelam, BHS, BHN, NQ Complex.

June -1999 to Aug - 2000 deputed to North Refinery Company, Iraq for rehabilitation /Major Repairs, Major Overhauling of Rotary and Static eqpts of Hydro

cracker unit (30,000 BPD), Hydrogen generating unit 74000 Sm3/hr and Vacuum distillation unit 32,000 BPD as Senior Technical Manager.

Sep-2000 to June-2001 w orked as “Field Engineering Coordinator” for EPCC-IV Package, LSTK Contractor L&T, for IOCL Baruni Offsite & utilities, Tankages

and Hydrogen units.

•Offsite& Utilities Pipe racks

•Crude Storage Tankages

•CS, AS piping

•Hydrogen Unit Piping

Successfully completed the follow ing projects as Engineer-In-Charge

Oil India Ltd. - Jodhpur (Project Value-Rs110 Crores). (1994-Aug 1996)

•Western Rajasthan Gas Processing Complex 10 MM SCUMD,

•Gas Gathering Station 1.0 MMSCUMD

•Flow Lines for Gas Wells more than 185 Kms w ith Well Head Facilities

•Gas Main Trunk Line From DND to Ramgrah -66 Kms & 14 Kms

•Gas metering Terminal

•Office cum Residential Complex

Successfully completed the follow ing projects as Resident Construction Manager

Oil & Natural Gas Corporation Ltd – Meshana ( Aug 1996- May1999)

•Pilot in-situ Combustion project – Bechraji comprising Three trains of Air compressor capacity 4600 MG/ hr, Surge vessels, w ater injection pump, cooling

tow er.

•Water Injection Pipelines for 60 w ell Heads – about 270 Kms

•Air Injection Pipelines for 29 w ells Heads about 125 Kms

•66 kV sub station.

•Flare stack for Gas gathering Station Balol I, II, III, IV, North Santhal and South Santhal of the capacity 1.5 MM SCUMD each.

•North Santhal CTF- Upgradation & Modifaction to process oil f rom 3000cumd to 6000cumd (Heater-Treater, Separators, Pumping Stations & Crude Storage

Facilities)

•South Santhal CTF- Upgradation & Modification to process oil from 3000cumd to 6000cumd. (Heater-Treater, Seperators, Pumping Stations & Crude Stroage

Facilities)

•Group Gathering station-GGS-II & GGS-I Bechariji – Plant Capacity-1500m3/day. (Heater-Treater, Seperators, Pumping Stations & Crude Stroage Facilities)

•In-situ Combustion Project- North Santhal comprising three trains of Air compressor capacity 8600 MG/ hr, Surge vessels, w ater injection pump, cooling

tow er.

Other Projects Handled- Various shutdow ns, maintenance & New process Plant.

•Sulphur Recovery units & Merox Plants for BPCL - Mumbai.

14-03-2011 Curriculum Vitae - Manager-Projects, …

engineeringjobs.net.au/cv.nsf/v/js69817 4/6

Page 5: Curriculum Vitae - Manager-Projects, Oil and Gas Pipelines Petrochemical - Refinery Power Exploration and Production

•Sulphur Recovery units & Merox Plants for BPCL - Mumbai.

•CCU & Oil Metering station for HPCL - Mumbai.

•ONGC- Desalter Plant – Plant Capacity- 6500m3/day 3 trains.

• H2SO4 Plant, Methane gas Plant, Chloroform Recovery Unit for Daurala Organic Ltd - Meerut.

•Offsite & utilities piping, Tankages, (22” to 42” CS pipes, and Tankages) for Tata Chemicals Ltd (Fertilizer Division).

•Shutdow n jobs for Offshore ONGC IC Complex – HP, LP Separators, GDU & Fuel gas system, Hookup for new w ellhead.

•ONGC Offshore-NQ Process complex Dismantling, Replacement of Fuel gas system, PWC for NQO platform. Replacement of internals for GDU, Separators

at NQO, NQD- Platforms.

•ONGC Off shore –Neelam Complex - Major Complete overhauling of Water Injection Platform & Production Platform

•ONGC- Offshore- SHG – Process complex. Replacement of Fuel gas system, PWC for NQO platform. Replacement of internals for GDU, Separators.

•ONGC Unmanned Well Head Platform – LA, LB, LC, LE - Hookup, & Commissioning.

At Container Corporation of India Ltd.

Successfully commissioned the follow ing projects

•Inland container Depot at New Delhi.

•Inland container Depot at Nagpur.

•Inland container Depot at Madras.

•Inland container Depot at Bangalore.

At SRF Ltd. (Fluro-Chemical Division)

Successfully commissioned the follow ing projects

•32 TPD Hydrofluoric Plant.

•64 TPD Reformation Gas Plant.

•60 TPD Dilute Hydrofluoric Plant.

•30 TPD 30% HCL purif ication Plant.

At Gammon Turnkey Ltd.

Successfully commissioned the follow ing projects for

•Indian Charge Chorme Ltd.

-Captive Pow er Plant 27 MW x 4 units, Choudw ar, Orissa

-Captive Pow er Plant 120 MW x 6 units, Nalco, Angul, Orissa

-500 MW Boiler NTPC Shakti Nagar.

-210 MW Boiler NTPC Vindyachal.

-210 MW NTPC Panipat.

-Johrat Bridge (Tw o tier).

Courses/Training programmes attended:

Operation and maintenance of 3000 HP, 4600 HP Locomotive Diesel Engine at Northern Railw ay Workshop, New Delhi.

Operation and maintenance of Forklift and other equipment at M/s. Sw araj Motors, Chandigarh.

Operation and Maintenance of Terminal Tractor and Trailer at M/s. Ashok Leyland, Bangalore and M/s. Mahindra and Mahindra, Pune.

Operation and Maintenance of Auto transmission Gear box at M/s. Hindustan Power Plus, Bangalore.

Operation and Maintenance of Earth Moving equipment like Cranes, tractors/trailers, pay loaders/containers lif ting cranes at M/s. Gammon India Ltd., Ranchi –

Central Workshop.

Operation and Maintenance of Escorts Cranes at Delhi.

Operation and Maintenance of container handling cranes like FELS, HITACHI, MIJACK etc. at Madras Port Trust and JNPT Bombay.

Major Achievements

GNominated by ONGC as “Enquiry Committee Member”, to investigate the explosion of emergency Air Compressor (high pressure) during commissioning at

Mehsana.

GNominated by TPPL & OIL as “Engineer-In-Charge” for Western Rajasthan Gas Field Project.

GNominated by TPPL & ONGC as “Resident Construction Manager” for ONGC Meshana Asset Project.

Last Updated on 28-Feb-11

-- End of CV/Resume --

Full CV/Resume available to paid companies/recruiters as an attachment

If you would like to contact this person, you will need to purchase

access to our CV/Resume database.

14-03-2011 Curriculum Vitae - Manager-Projects, …

engineeringjobs.net.au/cv.nsf/v/js69817 5/6

Page 6: Curriculum Vitae - Manager-Projects, Oil and Gas Pipelines Petrochemical - Refinery Power Exploration and Production

Please contact our sales department for pricing

[email protected]

' ExpatJob.net| ExpatEngineer.net| Engineering Jobs Australia| Engineer Jobs North Americal| Engineering Jobs Europe | Mining Jobs

Medical and Nursing Jobs| Finance Jobs| Teaching Jobs| IT Jobs

www .engineeringjobs.net.au, Australia and New Zealand Engineering Jobs | Engineering Job Vacancies | Site Map

14-03-2011 Curriculum Vitae - Manager-Projects, …

engineeringjobs.net.au/cv.nsf/v/js69817 6/6