CURRICULUM VITAE - Universidad del Istmo€¦ · curriculum vitae página 2 curriculum vitae página 3
Curriculum Vitae
description
Transcript of Curriculum Vitae
T O M M Y J O O
CURRICULUM VITAE, APRIL 2014PORTFOLIO REDUCED VOL. 1LETTER OF REFERENCE
T O M M Y J O O
4
Contents
Forward
Curriculum Vitae
Professional Work
Professional Work
Academic Work
Teaching Work
Letter of Reference
Profile: 2014
Updated: JANUARY 2014
Portfolio: BATES SMART
Portfolio: ANDREW MAYNARD ARCHITECTS
Portfolio: MASTER OF ARCHITECTURE
Portfolio: MASTER OF ARCHITECTURE
05 /
07 /
14 /
26 /
32 /
36 /
43 /
5
Tommy is an architect and teacher with 6 years of professional experience. He has worked as an Associate at Bates Smart, undertaking design role, actively involved and contributed to a broad range of projects including early design and planning stages. He dedicated commitment to the highest standard in the initiation of design concepts establishing the design methodology and systems for others to assist in developing at later stages. He has a strong sense of conceptualisation and expression together with a honed ability to translate design ideas into physicality.
Along with his employment at Bates Smart, Tommy has continually worked as a freelance on a number of small scale projects including residential and retail fit-outs. Soon after his graduation, Tommy worked at Andrew Maynard Architects, from concept design, construction documentation through to its building completion. Further to his work as a practicing architect, Tommy has been teaching at university for the past 6 years. He has held many successful exhibitions and participated as jury on a number of students’ awards.
He is motivated by the artistic and social aspect of architectural design. He has a strong interest in time-based architecture within broad background in digital technology and phenomenology. His focus is to expand the understanding of architecture in order to construct proposals that are developed through the realms of the phenomenal and atmospheric, engendering an architecture that is focused on the magic of the experiential, as much as the logic of the constructional. In parallel with this approach is the understanding of the necessity to develop new tools and approaches to architectural drawing and representation required to project forward into this condition.
Design M. Arch (Hons.)B. Arch (Hons)
B. Planning and Design
ARBV, RAIA
T O M M Y J O O
BATES SMART CURRICULUM VITAE
EDUCATION/ University of Melbourne Master of Architecture (Hons) Bachelor of Architecture (Hons) Bachelor of Planning and Design
LICENCES/ Registered Architect,Victoria
PROFESSIONAL EXPERIENCEPrior to joining Bates Smart: / Andrew Maynard Architects, 2008-2010 / Studio 505, 2007 / COX Architects, 2006 / Edmond and Corrigan Pty. Ltd., 2005
Tommy joined Bates Smart in 2010, and became an Associate in 2012.
SYNOPSISTommy is a talented architect, who has been actively involved in and contributed to a broad range of projects including in the early design and planning stages. He has a dedicated commitment to the highest standard in the initiation of design concepts establishing the design methodology and systems for others to assist in developing in later stages.Tommy is particularly motivated by the artistic as well as the social aspects of architecture. His strong sense of conceptualisation and expression together with a honed ability to translate design concepts into 3D.
PROJECT EXPERIENCE
COMMERCIAL / MIXED USE / Confidential mixed use development / Chadstone Office and Hotel development (design competition), Chadstone, Melbourne
RESIDENTIAL / The Age Site, Spencer Street Development, Melbourne
/ Freemason Development, East Melbourne / StKilda Road Development, South Yarra, Melbourne
/ Queensbridge Tower, Southbank, Melbourne
HOSPITALITY / Larundel Resort, Bundoora / Crown West End development, Southbank, Melbourne
/ Crown Port Cochere redevelopment, Southbank, Melbourne
Prior to joining Bates Smart:
RESIDENTIAL / Butler Residence, Collingwod, Melbourne / Stamford Residence, Clifton Hill, Melbourne / Hill House, Clifton Hill, Melbourne / Nicholsdale Prefab House, Camberwell, Melbourne
/ U31 Masterplan, India
TOMMY JOO B Planning & Design M Arch
ASSOCIATE ROLE [PROJECT SPECIFIC ONLY]
UPDATED JANUARY 2014
C U R R I C U L U M V I T A E
8
+61 403 300 817
TOMMY.JOO
http://cargocollective.com/tmyjoo
E:
T:
S:
W:
QUALIFICATION
Master of Architecture With Honours, The University of MelbourneGraduated as a Top Design Student from Thesis Studios across the year level in 2008 with score of 96/100. Achieved high distinctions in all design studios at The University of Melbourne for entire academic duration.
Bachelor of ArchitectureWith Honours, The University of MelbourneCompleted the fourth year at honours level and was invited and to undertake Master Program at The University of Melbourne.
Bachelor of Planning and DesignThe University of Melbourne
LICENSE
Registered Architect I ARBV 17656 I Victoria, Australia
WORK EXPERIENCE
Bates SmartAssociate, Project Leader, Design Architect
Undertaking design role, actively involved in and contributed to a broad range of projects including the early design and planning stages. Dedicated commitment to the highest standard in the initiation of design concepts establishing the design methodology and systems for others to assist in developing at later stages.
FreelanceWorking on small scale projects including residential alteration & addition, retail fit-outs and furniture design.
Andrew Maynard Architects Project Architect, Graduate Architect
Full-time employment in a small size studio environment. Involved in every stages of architectural building process from feasibility through to the completion of the building contract. Responsible for a great deal at an executive experience capacity. Dynamic interaction with clients and contractors throughout the building process.
Studio 505, Student Architect / Internship
COX Architects, Student Architect / Internship
Edmond and Corrigan, Student Architect / Internship
2006-2007
2005
2003-2005
2011 - 2014Melbourne, Australia
2013 - 2014Melbourne, AustraliaKuala Lumpur, Malaysia
2008 - 2011Melbourne, Australia
2007Melbourne, Australia2006Melbourne, Australia2005Melbourne, Australia
9
+61 403 300 817
TOMMY.JOO
http://cargocollective.com/tmyjoo
E:
T:
S:
W:
COMMUNICATION AND WORKING STYLE
‧ Articulate and fluent in English and Korean. ‧ Excellent communication and organisational skills. ‧ Able to work independently as well as a team. ‧ Able to coordinate design team during planning process. ‧ Confident working in a complex working environment. ‧ Self-disciplined with great management skills. ‧ Able to handle multiple assignments simultaneously. ‧ Great knowledge of design processes and scope of works. ‧ Good knowledge in preparing EOI and financial submission.
SOFTWARE SKILLS
Excellent in 2D drafting: AutoCAD and VectorWorks.Excellent in 3D modeling: Sketch Up and Rhinoceros.Excellent graphics and presentation skills in Adobe Creative Suite.Excellent in MS Office.
SELECTED ARCHITECTURAL PROJECTS
447 Collins Street, International Design CompetitionDesign Architect, Bates Smart + SnøhettaResearch-based Mixed Use Design Competition in collaboration with Snøhetta
Queensbridge Mixed Use DevelopmentProject Leader and Design Architect, Bates SmartA complex precinct-based master plan for residential, hotel and commercial project, Melbourne, Australia.
Queensbridge Tower, Project Leader and Design Architect, Bates SmartA 276 meters residential tower located above a dynamic multi-level showroom and car paring podium, which achieved a major planning permit on Southbank, Melbourne, Australia.
250 Spencer StreetProject Leader and Design Architect, Bates Smart3000 units Residential Development on the site of The Age newspaper headquarter on Spencer Street, Melbourne, Australia involving complex negotiations with States and City authorities.
Queensland Mixed Use DevelopmentProject Leader and Design Architect, Bates SmartA complex mega master plan for urban infrastructure, hotel, hospitality, residential and commercial project, Queensland, Australia.
Carlton ConnectDesign Architect, Bates SmartInstitutional development to the campus of The University of Melbourne, Australia.
2014
2012 - 2013
2011 - 2012
2011 - 2013
2012
2012-2013
10
+61 403 300 817
TOMMY.JOO
http://cargocollective.com/tmyjoo
E:
T:
S:
W:
Jisu Design StudioConcept to Completion, FreelanceDesign of 120sqm Boutique Hair Salon and Photograph Studio in the heart of Melbourne City. Fully documented and administered the construction contract.
Butler ResidenceConcept to Completion, Andrew Maynard ArchitectsInvolved from the start of pre-design through to contract administration. Fully documented and assisted in administering the construction contract.
Hill HouseConcept to Completion, Andrew Maynard ArchitectsFully produced the documentation at an executive capacity. Involved from early stage of the design process to tender.
Stamford ResidenceConcept to Building Documentation, Andrew Maynard ArchitectsFully produced documentation drawings unassisted with high degree of control of the process and management of the project including coordinating consultants, contractors & meeting and discussions with clients.
ACHIEVEMENTS AND INVOLVEMENT
AIA Bates Smart Award, Participating JuryNominated for RIBA - ‘The President’s Medals Student Awards’Winner- ‘Growing Up’, Rooftop Design Idea CompetitionFinalist - ‘The Dialectic Bridge Competition’, AIA
Shortlist - ‘Faster and Bigger’ Shortlist - ‘The Bell Tower’
Participated - ‘Santiago De Chile’Participated - ‘Hobart Waterfront International Competition’Participated - ‘Seoul Performing Art Centre’
TEACHING WORK
Design Thesis Studio - ‘Archipelago’Design Tutor, Studio Leader, Coordinator: Prof. Phillip Goad
Compositional AnalysisTutor, Seminar Leader, Coordinator: Associate Prof. Andrew Hutson
21 Century ArchitectureArchitectural Theory Tutor, Coordinator: Dr Annmarie Brennan
Asia Pacific ModernitiesHistory Tutor, Coordinator: Associate Prof. Anoma Pieris
Master Design Studio CDE - ‘Videogame’Design Tutor, Studio Leader, Coordinator: Chair Donald Bates
2012
2008 - 2011
2009 - 2011
2010 - 2011
2008 - 2011
2011-2012, Australia2009, United Kingdom2009, Australia2008, Australia
2006, South Korea2004, Australia
2010, Chile2008, Australia2006, South Korea
Semester 2 - 2013Melbourne School of Design
Semester 2 - 2013Melbourne School of Design
Semester 2 - 2013Melbourne School of Design
Semester 2 - 2013Bachelor of Environment, UoM
Semester 1 - 2013Melbourne School of Design
11
+61 403 300 817
TOMMY.JOO
http://cargocollective.com/tmyjoo
E:
T:
S:
W:
Design Thesis Studio - ‘Head Trip’Design Tutor, Studio Leader, Coordinator: Prof. Phillip Goad
Master Design Studio - ‘Hotel for Inhabitants’Design Tutor, Studio Leader, Coordinator: Dr Alex Selenitsch
Compositional AnalysisDesign Tutor, Studio Leader, Coordinator: Associate Prof. Andrew Hutson
Architectural Design Studio 3 - ‘Air’Design Tutor, Coordinator: Associate Prof. Anoma Pieris
Architectural Design Studio 1 - ‘Earth’Design Tutor, Coordinator: Dr Janet McGaw
PUBLICATION AND EXHIBITION
Design Thesis Exhibition - ‘Archipelago’Dear Patti Smith Gallery, Fitzroy, Victoria, Australia
Design Studio Exhibition - ‘Game Over’Architecture Faculty, The University of Melbourne, Victoria, Australia
Design Studio Exhibition - ‘Videogame’Architecture Faculty, The University of Melbourne, Victoria, Australia
Design Thesis Exhibition - ‘Head Trip’Atrium, Architecture Faculty, The University of Melbourne, Victoria, Australia
BATES SMART - ‘Journal’Online Publication
RAIA National Architecture Conference - ‘Critical Vision’, 2008EYES 2008 - ‘Hotel for Inhabitants’, Advanced Design Studio CEYES 2007 - ‘Temptation Island’, Advanced Design Studio AEYES 2006 - Architectural Design Studio 4AEYES 2005 - Architectural Design Studio 3A
REFEREES
Roger Poole - Chairman, Bates Smart
Kristen Whittle - Design Director, Bates Smart
Andrew Maynard - Director, Andrew Maynard Architects
Mark Austin - Director, Andrew Maynard Architects
Andrew Hutson - A/Prof, The University of Melbourne
Anoma Pieris - A/Prof, The University of Melbourne
Peter Raisbeck - Dr, The University of Melbourne
Semester 2 - 2012Melbourne School of Design
Semester 1 - 2012Melbourne School of Design
Semester 2 - 2011Melbourne School of Design
Semester 1 - 2011Bachelor of Environment, UoM
Semester 1 - 2010, Bachelor of Environment, UoM
November, 2013 Design Thesis Studio, MSD
June, 2013Design Studio, MSD
April, 2013 Design Studio, MSD
November, 2012Design Thesis Studio, MSD
October, 2012 Academic Achievement
April, 20082008200720062005
REDUCED VOL. 1
P O R T F O L I O
B A T E S S M A R T
REDUCED VOL. 2
16
BATES SMART
17
PROFESSIONAL WORK
Left / 446 COLLINS STExternal Visualisation
Right Top / 446 COLLINS STExternal Elevation
Right Bottom / 446 COLLINS STConcept Diagram
queensbridge tower
VisuALisAtion
79
queensbridge tower
ModeL
84
queensbridge tower
VisuALisAtion
81
19
PROFESSIONAL WORK
Left / QUEENSBRIDGE TOWERExternal Visualisation
Right Top / QUEENSBRIDGE TOWERPhysical Model
Right Bottom / QUEENSBRIDGE TOWERExternal Visualisation
20
BATES SMART
Iw illse eif itsp ossib leo npen tho usea nda men itie slev els,b utfr om initia lstu dy� we need abo ut2sta irs( @m ax19 0hi ghri ser) tore ach 4mf tof and beca use that sove r18 rise rs,w ene eda land ing75 0mi nlon gin the midd le... I�llh avea loo kan d
QUEENSBRIDGE TOWER
BUILDING CONCEPT
3.7PROPOSED AMENITIESLOWER AMENITIES - LEVEL 10
62
queensbridge tower
buiLding ConCePt
3.14PROPOSED APARTMENTTYPICAL APARTMENT FLOOR PLAN
74
Left Top / CHADSTONEMassing Diagram
Left Middle / QUEENSBRIDGE TOWERAmenities Floor Plan
Left Bottom / QUEENSBRIDGE TOWERTypical Residential Tower Plan
MASSING
21
PROFESSIONAL WORK
Top / CARLTON CONNECTInternal Visualisation
Bottom / CARLTON CONNECTExternal Visualisation
250 SPENCER STREET 108 108
6.0 VISUALISATION
Left / 250 SPENCER STREETExternal Visualisation
Right Top / 250 SPENCER STREETConcept Sketch
Right Top / 250 SPENCER STREETMasterplan Ground Floor
250 SPENCER STREET 5� 5�
�.0 PERMEABILITY
FOCUSED ON THE PEDESTRIAN EXPERIENCE
3.6PROPOSED GROUND FLOOR
SCALE 1:500 @ A3
250 SPENCER STREET 7� 7�
5.0 TOWER / 5.2 CONCEPT SKETCH
5.2CONCEPT SKETCH
Top / LARUNDELExternal Visualisation of Villa
Bottom / LARUNDELInternal Visualisation of Villa
Left / LARUNDELMasterplan
Right / LARUNDELVilla Plan
Right Bottom / LARUNDELExternal Visualisation of Villa
REDUCED VOL. 2
A N D R E W M A Y N A R D A R C H I T E C T S
Previous / HILL HOUSEExternal View
Left Top / HILL HOUSEView of Living and Kitchen Area
Left Middle / HILL HOUSEView towards Living and Kitchen Area
Left Bottom / HILL HOUSEView of Roof Deck
Right Top / HILL HOUSEConstruction Documentation
Right Bottom / HILL HOUSEConstruction Documentation
artificial turfover natural ground batten out to create fall on steel plate
aggie drainin crushed rock
water proof membranelaps down over
tale of slab
substratesteel awining
artificial turfover drainage
aggie drainin crushed rock
fall on concrete slab
DETAIL 14 scale 1:10 DETAIL 15 scale 1:10 DETAIL 16 scale 1:10
concrete slab toengineer's detail
natural ground line
reinforcedconcrete slabto engineer's
detail
extruded polustyrne insulationbehind plastic wrap & geotech fabric
top hat to manufacturer's detail
15
0
Alucobond cladding
Colorbond flashing
artificial truf overwaterproof membrane
as per manufactuere's detail
refer to engineeringfor structural detail
refer to engineering
DETAIL 11 scale 1:10 DETAIL 12 scale 1:10 DETAIL 13 scale 1:10
Colorbond flashing
Kliplock Colorbond roofing
Alucobond cladding warps around fascia & opening revealrefer to manufacturer's detail
f/c sheetpaint finish
Alucobond cladding warps aroundfascia & opening reveal
refer to manufacturer's detail
Alucobond cladding to underside of structure
W06
floor structure to engineer's detail.
DRAWING No.
SHEET No. REV
SCALES DATE
DRAWN
Andrew Maynard Architects
CH
EC
KED
MA
TJThese drawings are the copyrightof Andrew Maynard Architects PtyLtd and are not to be reproduced
without written approval.Figured dimensions takeprecedence over scaled.
If required, refer to architects forfurther information.
PROJECT
CLIENT
ABN: 1911 74 80 636SUITE 12, 397 SMITH ST
FITZROY, VICTORIA, 3065 t :+613 9939 6323 f : +613 8640 0439
[email protected]...|..|.||..::.|-||...|.|...::|||:...||...|-||..
REVISIONNo. DATE
STAGE
DRAWING TITLE
PROJECT No.MELWAYS
ALTERATION & ADDITION TO76 THOMSON STREET
NORTHCOTE
090202
Alister & Leisa Bayston
architectsmaynardandrew cissued to Quantity Surveyor
CONSTRUCTION DOCUMENATION
.. 27.04.1013.10.10
/13 ..
existing
+16.87FFL of proposed addition
+16.51FCL of proposed addition+14.11FFL of proposed addition+13.52FCL of proposed addition+12.42RL of proposed roofparapet+10.47FFL of proposed addition
+16.8
7F
FL
of p
ropo
sed
addi
tion
+16.5
1F
CL
of p
ropo
sed
addi
tion
[fir
st f
loor
]
+14.1
1
FF
L of
pro
pose
d ad
diti
on[f
irst
flo
or]
+13.5
2F
CL
of p
ropo
sed
addi
tion
[liv
ing/
kitc
hen]
+12.4
2R
L of
pro
pose
d ro
ofpa
rape
t
+10.4
7F
FL
of p
ropo
sed
addi
tion
+10.1
1F
FL
[con
nect
or]
+12.4
2R
L of
prop
osed
roof
par
apet
+10.1
1F
FL
[con
nect
or]
existingexisting
wat
erta
nkre
fer
to s
pec
s.
titl
e bo
unda
ry
kitchen
11
entry
08
JOIN 04
RL of proposed roof parapet [connector]+12.42
FCL of proposed addition+13.52
FFL of proposed addition +14.11
FCL of proposed addition +16.51
RL of proposed addition+16.87
FFL of proposed addition +10.47
drainage in crushed rockall run-off to be directed to
existing local point of discharge
footing to engineer's detailfooting to engineer's detail
natural ground line
21
00
30
50
21
0024
00
floo
r to
cei
ling
floo
r to
cei
ling
open
ing
open
ing
JOIN 02kitchen overhead unit
JOIN 03island bench
AT
SR
CONCON
MSsteel reveal
AT
joinery 01 behind
structure behindshown dashed
D03
W06a
adjoining neighbour's property
provide room for weep hole drainagebetween new & adjoining masonry wall
MR
FC02
aluminiumlouvres
PB
20
00
22
50
masterbedroom
07
w/c
09
en-suite
08
AC
PB
CP
PB PB PB VIN VIN VIN VIN
PB PB
VIN VIN
KL
21
00
AT
PLY
FC03
MS
D12D13
D15 D16D17
PLY
lintel to engineer's detail
fall on slab
Kliplock spring roofrefer to specs. for details
D11
slab & insulation undersideto engineer's detail
spiral staircase 250
MATERIAL & FINISHES KEYGSRKLACCONATFC
- clear glass- flat steel roofing, colorbond [black] finish- Lysaght Kliplock colorbond [black] finish- Alucobond cladding- polished concrete floor- artificial turf- compressed sheet, paint finish
MRPLYVYLPBTFMSCP
- masonry wall- plywood, clear finish- vinyl finish- plasterboard, paint finish- strip timber t&g flooring- mild steel, penetrol finish- carpet
detail section 02scale 1:50
proposed detail section
1:50
CD10
DETAIL 17 scale 1:5
drop boltfall
on slab
D03
pivot hinge box
concrete floorpolished finish
outside inside
DRAWING No.
SHEET No. REV
SCALES DATE
DRAWN
Andrew Maynard Architects
CH
EC
KED
MA
TJThese drawings are the copyrightof Andrew Maynard Architects PtyLtd and are not to be reproduced
without written approval.Figured dimensions takeprecedence over scaled.
If required, refer to architects forfurther information.
PROJECT
CLIENT
ABN: 1911 74 80 636SUITE 12, 397 SMITH ST
FITZROY, VICTORIA, 3065 t :+613 9939 6323 f : +613 8640 0439
[email protected]...|..|.||..::.|-||...|.|...::|||:...||...|-||..
REVISIONNo. DATE
STAGE
DRAWING TITLE
PROJECT No.MELWAYS
ALTERATION & ADDITION TO76 THOMSON STREET
NORTHCOTE
090202
Alister & Leisa Bayston
architectsmaynardandrew cissued to Quantity Surveyor
CONSTRUCTION DOCUMENATION
.. 27.04.1013.10.10
/13 ..
proposed door/window schedule
1:50
CD17
bottom unit - steel plate
90
02
00
30
01
50
30
0
CL
2100
2500
1800
SEC 01
JOIN02
top of island bench
CL
tap mixerlocation TBC on site
plan 02
PLN
01
JOIN
02
PLN
02
JOIN
02
steel flat
laminate
eq eq 545915
plan 01
CL
150
45
0
top unit
bottom unit - cupboard
2100
bottom steel plate
01
08
17 17
exposed flex
17
17
exposed flex
08
17
17
17
1708
18
18
18 18
set-
out
from
edg
e of
is
land
ben
ch
island bench belowshown dashed
JOIN 02 [kitchen overhead unit]
line of ceiling
ele
JOIN 02 _perspective[kitchen overhead unit]
18
JOIN 03[kitchen island bench]
drawer
dishwasher
drawerOB
dishwasher bin bin
dishwasher
switch forwall & overhead
pendant light
OB
dishwasher
08
NOTE:Radius of all curves - 300mm throughout
18
2800
upper steel benchtop
75
011
00
uppe
rlow
er
2700
lower steel benchtop
200
100
20
0
2300 140260
switch for entry downlight& spiral stair pendant light
67
03
90
40
87
04
0
600160 820 300 420 270110 600 1120 110420
30
07
60
40
90
0
58
04
52
00steel rod
GPO & switch for wall lightsGPO & switch for entry downlight& spiral stair pendant light
02
10
04
08
18
02
20mm shadow gapsbetween steel plates & laminex cupboards
20mm shadow gapsbetween all steel plates & laminex cupboards
undermount double sinks
2 no. pull-out bins
45mm kicker
switch forwall & overhead
pendant light
steel plate wraps around the dishwasher switch for entry downlight& spiral stair pendant light
steel rod
undermount double sinks
mixer tap
JOIN 03 _perspective 01[kitchen bench]
perspective 02
perspective 03
plan 01[upper steel benchtop]
plan 02[upper cupboards]
plan 03[lower cupboards]
line of lower steel plate shown dashed
1
2
3 4
elevation 03 elevation 01 elevation 02 elevation 04
- melamine drawer
01 - fixed shelf
02 - adjustable shelf
03
04
05
06
07
08
09
10
11
12
- stainless benchtop
- stone benchtop
- laminate benchtop
- shelves overhead
- steel plate
- chrome hanging rail
- kicker
- no kicker [20mm allowance]
JOINERY KEY
- timber veneer
13 - paint finish
14 - mirror
15 - coloured mirror splashback
16 - fluro light
17 - steel rod
18 - fixed curve section
NOTES:
- Hinges: Hafele, Blum, Hettich [or similar quality], concealed joinery hinged with a minimum 165 degree opening- Handles: finger pulls or cut-outs TBC- Drawer runners: to match Blum 'motion softclose runners'- Carcass: to be 18mm melamine faced board, colour TBC
*all design & details for joinery to be discussed with cabinet maker at appropriate time
09 - chrome hanging rail 18 - fixed curve section
NOTES:
- Hinges: Hafele, Blum, Hettich [or similar quality], concealed joinery hinged with a minimum 165 degree opening- Handles: finger pulls or cut-outs TBC- Drawer runners: to match Blum 'motion softclose runners'- Carcass: to be 18mm melamine faced board, colour TBC
*all design & details for joinery to be discussed with cabinet maker at appropriate time
DRAWING No.
SHEET No. REV
SCALES DATE
DRAWN
Andrew Maynard Architects
CH
ECK
ED
MA
TJThese drawings are the copyright
of Andrew Maynard ArchitectsPty Ltd and are not to be
reproduced without writtenapproval. Figured dimensions
take precedence over scaled. Ifrequired, refer to architects for
further information.
PROJECT
CLIENT
ABN: 1911 74 80 636SUITE 12, 397 SMITH ST
FITZROY, VICTORIA, 3065 t :+613 9939 6323 f : +613 8640 0439
...|..|.||..::.|-||...|.|...::|||:...||...|-||..
No. DATE
STAGE
DRAWING TITLE
PROJECT No.MELWAYS
ALTERATIONS TO368 Gore Street
Fitzroy , VIC 3065
080721
Andrew and Jennifer Butler
architectsmaynardandrew c
CONSTRUCTION DOCUMENTATION
.. 10.06.09..
key [materials & finishes]:
BM - Butynol watermembraneG - clear glazingPLY - plywoodAT - artificial turf
D -
ROO
F / 0
3[p
ropo
sed
stru
ctur
e]
PRELIMINARYnot for construction
Proposed (roof perspective)not to scale
last truss to remain
existing corrugated ironroof sheeting to remainwhere possible
proposed stud framed wall
existing timber battensto remain
proposed roof deck structure
existing ridge beam to remain
trim existing trussand make openingto provide access
truss strenghtening memberrefer to engineer's detail
no works to front partof the roof
CD 1414/24
Roof - Proposed Perspective
N.T.S.
proposed roof structure
Sectional Perspectivenot to scale
mezzanine
first floor level
ground floor
proposed fixed glassbalustrade in-fill
existing balustrade
nom.
3000
nom
. 100
00
new opening
nom
. 600
0
carpet finishto existing wall
remove existingbalustrade
make goodsteel stringers
first floor
roof level
carpet continuesto ground floor level
extent of carpet on floor to be determined on site
DRAWING No.
SHEET No. REV
SCALES DATE
DRAWN
Andrew Maynard Architects
CH
ECK
ED
MA
TJThese drawings are the copyright
of Andrew Maynard ArchitectsPty Ltd and are not to be
reproduced without writtenapproval. Figured dimensions
take precedence over scaled. Ifrequired, refer to architects for
further information.
PROJECT
CLIENT
ABN: 1911 74 80 636SUITE 12, 397 SMITH ST
FITZROY, VICTORIA, 3065 t :+613 9939 6323 f : +613 8640 0439
...|..|.||..::.|-||...|.|...::|||:...||...|-||..
No. DATE
STAGE
DRAWING TITLE
PROJECT No.MELWAYS
ALTERATIONS TO368 Gore Street
Fitzroy , VIC 3065
080721
Andrew and Jennifer Butler
architectsmaynardandrew c
CONSTRUCTION DOCUMENTATION
.. 10.06.09..
key [materials & finishes]:
BM - Butynol watermembraneG - clear glazingPLY - plywoodAT - artificial turf
B -
STAI
RS /
04[p
ropo
sed
sect
iona
l per
spec
tives
/ de
tails
]
existingchannelto edge
of existingfloor
supporting square rodsunderside of ply panels
existingchannel
steel rods
150
150
recess in ply to fitsquare steel rods
existing timber beam
carpet finishto existing wall(refer to specs.)
proposed steel platefixed undersideexisting timber beam
existing wall
PROPOSEDROOF STRUCTURE
ROOFFLOOR
STRUCTURE
detail 01 - ground floor (perspective)not to scale
detail 01 - ground floor (section)scale 1:10
detail 02 - first floor (perspective)not to scale
detail 02 - first floor (section)scale 1:10
detail 03 - first floor (section)scale 1:10
detail 04 - roof level (perspective)not to scale
detail 05 - roof (section)scale 1:10
detail 04 - roof level (section)scale 1:10
existingf loor
tensioning bolt
fixed glass
glazing channelrecessed intoceiling
tensioning bolt fixed glass
tensioning bolt
ROOFFLOOR
STRUCTURE
tensioning bolt
fixed glass
steel plate
double joists
150 PFCto engineers detail
proposed steel plateto match heightof existing channel
tensioning bolt
tensioningbolts
PRELIMINARYnot for construction
CD 0909/24
Sairs - Sectional perspective / Details
1:10N.T.S.
Left Top / BUTLER RESIDENCEConstruction Documentation
Left Bottom / BUTLER RESIDENCEConstruction Documentation
Right Bottom / BUTLER RESIDENCEView of Roof Terrace
Top Left / BUTLER RESIDENCEView of Kitchen towards Roof Terrace
Top Right / BUTLER RESIDENCEView of Kitchen towards Roof Terrace
REDUCED VOL. 2
A C A D E M I C W O R K
ACADEMIC WORK
Program
01_community garden02_children’s play deck03_train waiting area
04_entrance to train station05_community workshop06_convenient store07_car accessible lane08_sports deck09_public laundry10_extended outdoor living11_BBQ area
12_street parking13_new underground access14_backyard15_public toilet001_grass
002_stone paving
003_sand004_timber deck
Top / THE ISLANDAdvanced Design Studio A
Middle / BALACLAVA HOUSINGAdvanced Design Studio B
Bottom / BALACLAVA HOUSINGAdvanced Design Studio B
_b _c_a
Top / HOTEL FOR INHABITANTSDesign Thesis Exhibition, RIBA Presidents Medal Nominee
Bottom / HOTEL FOR INHABITANTSElevation, Section, RIBA Presidents Medal Nominee
TUTOR: DENNIS PRIOR
Sometimes we wish that we can travel back the time and revisit the past, to restore our lost memories. 2046 is a future city, where these lost memories can be recaptured. It does not fit into any time zone because it is not important anymore. And this city has a unique and mysterious separation from the rest of the world that has layers of history and architecture.
The design proposal is a hotel for inhabitants; where these people come and stay permanently, in search of their memories. It is located in Hong Kong and the hotel associates with an old existing building ‘Chungking Mansion’ that have feeding urban legend and rumors – both good and bad. Because of its isolation of the city ‘2046’ and its alienation from the outside the world, the hotel itself is disappearing from the context, hiding itself inside the Chungking Mansion.
The hotel ‘2046’ is about corridors and the horizontal motion. The Corridors are no longer a circulation or a journey, but it is the desired place and a destination. Every action, behaviour and programs take its place in the corridors, and this linear spaceprovokes and stimulates the inhabitants in searching their memories inside the Chungking Mansion in many different aspects. These are placed, in-‐between and even penetrate through the existing as another series of an urban fabric as well as controlling views and overlooking to the ‘past’.
Past and nostalgia comes from a definition of longing for something unattainable. The more things change, the more we try to stay the same. We desire to recapture our memories in this ever changing world. This is the universal truth of our life that we long to fix what has already become unfixable. There is a great level of intimacy between the 2046 and the Chungking Mansion, however is distinctively separated. Inhabitants of the hotel want to recapture their memories of the past, and will soon realize this is unattainable; that is why no one has ever come back from 2046.
ADVANCED DESIGN STUDIO C
Top / HOTEL FOR INHABITANTSVisualisation, RIBA Presidents Medal Nominee
Bottom / DIALECTIC BRIDGEPhysical Model, RAIA Student Competition Finalist
REDUCED VOL. 2
T E A C H I N G W O R K
ARCHITECTURE DESIGN THESIS EXHIBITION - ‘ARCHIPELAGO’Dear Patti Smith Gallery, Victoria, Australia
MELBOURNE SCHOOL OF DESIGN, THE UNIVERSITY OF MELBOURNE
ARCHITECTURE DESIGN THESIS EXHIBITION - ‘HEAD TRIP’Atrium, Architecture FacultyMELBOURNE SCHOOL OF DESIGN, THE UNIVERSITY OF MELBOURNE
ARCHITECTURE EXHIBITION - ‘VIDEOGAME’
Architecture Faculty,MELBOURNE SCHOOL OF DESIGNTHE UNIVERSITY OF MELBOURNE
201200
JADE SHIE MING YEW
POET’S WALK
135134
HEID
I KW
AN
PALI
MPSE
ST C
ITY
Top Left / POET’S WALKJade Yew, Design Thesis
Top Right / PALIMPSEST CITYHeidi Kwan, Design Thesis
Bottom / PERCOLATEJack Pu, Design Thesis
139138
RAYA
L AN
AND
YELA
MATH
I
EPILOGUE
“Reality is an influence of our mind our mind through the sense of perception”Ayn Rand
Reality is what we make it.
Out internal state of mind transforms our vision of the outside world.
The capacity to realise that reality exists outside of our mind.
The mind has a way to shape one’s vision of things, making us take sides during a situation that requires a decision.
The project begins with an attempt to understand how decisions are made, more interestingly the process of how a person makes decisisons. Initial the main idea adopted was that “reality had a way of influencing the consciousness”, this consciousness defines the internal state of mind. It allows the mind to create its own set of rules and make decisions.
The project is developed through the use of this basic logic.
Using myself as a basis to understand the logic, the project is a home for my client 30 years in future. My client is a character developed based on my personal experiences. An anatomy of the mind diagram was developed; which tries to explain how my clients mind is broken down to key words and how different things are invisioned in his mind.
EPIL
OGUE
143142
RAYA
L AN
AND
YELA
MATH
I
EPIL
OGUE
Top / THE ANAMNESIS OF BEINGBarbara Chung
Middle / EPILOGUERayal Anand Yelamathi
Bottom / EPILOGUERayal Anand Yelamathi
L E T T E R O F
R E F E R E N C E
Date 28/10/10
To Whom it may concern,
Tommy Joo worked as a graduate architect at Andrew Maynard Architects from July 2008 until to November 2010.
During his time at AMA, Tommy proved highly capable, diversifying his contribution to the business when and as required. Tommy was involved in every stages and aspects of AMA’s projects consistently showing skills and great disposition. He illustrated process and aptitude beyond his experience level, managing each project with a little guidance from the directors.
Tommy has become a well rounded architect. From early design phase, through docu-mentation to contract administration, Tommy has shown a good understanding of the challenges and responsibilities involved in the architectural process. He has a wonderful attitude towards architecture, he has excellent design skills as well as mature and me-thodical set of management skills.
Beyond his natural design talents Tommy competently expanded his areas of responsibil-ity providing client management and project support to the Directors. He has had a great deal of interaction with clients, consultants and builders and has been competent and professional throughout all these dealings. Tommy has also brought significant changes to the office and its operation by implementing new office organisation tools and sys-tems.
Tommy’s departure from AMA is a big loss. Hopefully he will one day return to us. I would be pleased to answer any questions about Tommy’s work whilst at AMA.
Kind regards,
Andrew MaynardDirector
Andrew Maynard Architects
ANDREWMAYNARDARCHITECTS
Andrew Maynard Architects
Suite 12, 397 Smith Street, Fitzroy
Melbourne, Victoria 3000
T 61 [3] 9939 6326
F 61 [3] 8640 0439
www,andrewmaynard.com.au