CSC commissioning

5
11 Jan. 2007 G. Rakness (UCLA) 1 CSC commissioning Before Christmas break Turned on and checked communication with TMB, DMB, ALCT, and CFEB for 6 peripheral crates (180 o in ) on station 1: VME+1/[4-9]… Problems (representative of those which will be seen by “Team-A”): PROM ID readback 0 and F on two CFEBs likely skew-clear cable problems One DMB reading back all zero’s likely firmware reloading One LVMB temperature readback problem All ME1/3 and ME1/1 ALCTs read 0 from on-board ADC +5.5V_B line (N.B. values were OK as read by LVMB) Found/fixed one set of swapped crate controller fibers at GBit switch in counting house (VME+1/67) Found/fixed one crate controller rx/tx swap

description

CSC commissioning. Before Christmas break Turned on and checked communication with TMB, DMB, ALCT, and CFEB for 6 peripheral crates (180 o in ) on station 1: VME+1/[4-9]… Problems (representative of those which will be seen by “Team-A”): - PowerPoint PPT Presentation

Transcript of CSC commissioning

Page 1: CSC commissioning

11 Jan. 2007 G. Rakness (UCLA) 1

CSC commissioningBefore Christmas break• Turned on and checked communication with TMB, DMB, ALCT, and

CFEB for 6 peripheral crates (180o in ) on station 1: VME+1/[4-9]… • Problems (representative of those which will be seen by “Team-A”):

• PROM ID readback 0 and F on two CFEBs likely skew-clear cable problems

• One DMB reading back all zero’s likely firmware reloading• One LVMB temperature readback problem• All ME1/3 and ME1/1 ALCTs read 0 from on-board ADC +5.5V_B

line (N.B. values were OK as read by LVMB)• Found/fixed one set of swapped crate controller fibers at GBit

switch in counting house (VME+1/67)• Found/fixed one crate controller rx/tx swap

• Otherwise: successful communication with all components with final fibers, patch panels, cabling, cooling, LV power...

Page 2: CSC commissioning

11 Jan. 2007 G. Rakness (UCLA) 2

CSC commissioning (cont.)Yesterday…• Online computers switched on• Power enabled to Maratons• LV control computer switched on and appears to be operational• Software + GBit driver (used for VME communication) is updated to SLC4

with updates for station 1 (see next slide)

Today…• Cooling began running• Gas began flowing• ME-2 disk was lowered (i.e., no access allowed)

Weekend…• Access tests disables access to experiment (would be breaking interlock,

otherwise)

Recommence commissioning Monday by “Team-C” (i.e., me)

Step A: download new firmware to all components…

Page 3: CSC commissioning

11 Jan. 2007 G. Rakness (UCLA) 3

Updates to Online SoftwareUpdates by Jinghua and me include…

• Multiple crates in single xml file

• Remap user access to AFEBs to be from 1 to 18, regardless of how AFEBs are connected to the ALCT

AFEB 1(always)

On ME1/1…

• AFEBs count from 1 to 18 (inner to outer)

• ALCT always mounted with the same orientation (AFEB input #1 to right)

• ALCT slow control firmware the same on all

• ME1/1 mounted on disks with respect to IP as in the picture to the left….

Ordering of AFEBs reversed on

(Plus, forward) and

(Minus, backward)

AFEB 18(always)

AFEB input #1

AFEB input #18

#18

#18#18

#1#1

#1

ME1/1

Page 4: CSC commissioning

11 Jan. 2007 G. Rakness (UCLA) 4

Updates to Online Software (cont.)Added xml parameters for TMB

1. clct_stagger = 1/0 = do/don't stagger strip layers (staggering needed for ME1/1)

2. clct_blanking = 1/0 = do/don't blank CLCT output if no valid pattern flag

3. clct_pattern_id_thresh = [0-8] = minimum pattern ID value for CLCT pretrigger

4. aff_thresh = [0-6] = minimum number of hits needed on CLCT pretrigger pattern to send Active FEB Flag to DMB

5. min_clct_separation = [0-255] = minimum 1/2-strip      separation between two CLCTs

• Removed clct_distrip_pretrig_thresh (since no di-stripness left…)

Page 5: CSC commissioning

11 Jan. 2007 G. Rakness (UCLA) 5

To do…• Clean up simulation drift time analysis for muons

• Remove delta-electrons

• Point source from vertex

• Bin in understandable unit

• Cleanly separate:

• drift time to wire

• minimum drift time to wire for events with multiple wires hit

• drift time from wiregroup

• Make plots in code, not PAW…

• Commission ME+1 chambers

• Write documentation for Team-A