Endcap Integration Workshop: June 11-14, 2001 1
CSC CommissioningCSC Commissioning
Andrey Korytov
Endcap Integration Workshop: June 11-14, 2001 2
• CMS schedule v31CMS schedule v31
• EMU scheduleEMU schedule
• EMU installation windowsEMU installation windows
• Shipping containerShipping container
• Tests on arrival at CERNTests on arrival at CERN
• Quick pre-installation testQuick pre-installation test
• Installation/commissioning sequenceInstallation/commissioning sequence
• On-disk local commissioningOn-disk local commissioning
• Station commissioningStation commissioning
• CMS schedule v31CMS schedule v31
• EMU scheduleEMU schedule
• EMU installation windowsEMU installation windows
• Shipping containerShipping container
• Tests on arrival at CERNTests on arrival at CERN
• Quick pre-installation testQuick pre-installation test
• Installation/commissioning sequenceInstallation/commissioning sequence
• On-disk local commissioningOn-disk local commissioning
• Station commissioningStation commissioning
OutlineOutline
Endcap Integration Workshop: June 11-14, 2001 3
V31: March 2001V31: March 2001
Endcap Integration Workshop: June 11-14, 2001 4
V31: May 6, 2001V31: May 6, 2001Muon system installation windows v31: Austin Ball, May 6, 2001 ENDCAP:=========================================================================================
start finish comments=========================================================================================YE-1 23 Jul 02 14 Oct 02 free accessYE-1 22 Oct 02 23 Apr 03 share with YB- (no YB- work planned)YE-1 23 Apr 03 15 Sep 03 shared with vac tank & coilYE-1 12 Jan 04 18 Feb 04 free accessYE-1 12 Jul 04 03 Dec 04 crane shared with UX supply YE-2 18 Jun 02 14 Oct 02 free accessYE-2 22 Oct 02 23 Apr 02 share with YB- (no YB- work planned) YE-2 23 Apr 03 15 Sep 03 shared with vac tank & coilYE-2 12 Jan 04 18 Feb 04 free accessYE-2 12 Jul 04 10 Dec 04 crane shared with UX supply YE-3 09 Jul 02 14 Oct 02 free accessYE-3 22 Oct 02 23 Apr 02 share with YB- (no YB- work planned) YE-3 23 Apr 03 15 Sep 03 shared with vac tank & coilYE-3 12 Jan 04 18 Feb 04 free accessYE-3 12 Jul 04 17 Dec 04 crane shared with UX supply=========================================================================================YE+1 27 Jan 03 15 Nov 03 free accessYE+1 17 Dec 03 02 Mar 03 free accessYE+1 12 Jul 04 30 Aug 04 crane shared with UX supply YE+2 14 Oct 02 15 Nov 03 free accessYE+2 17 Dec 03 02 Mar 03 free accessYE+2 12 Jul 04 02 Sep 04 crane shared with UX supply YE+3 28 Oct 02 15 Nov 03 free accessYE+3 17 Dec 03 02 Mar 03 free accessYE+3 12 Jul 04 15 Sep 04 crane shared with UX supply=========================================================================================
Endcap Integration Workshop: June 11-14, 2001 5
V31: May vs. March 2001V31: May vs. March 2001
Endcap Integration Workshop: June 11-14, 2001 6
FNAL--UC/UF ScheduleFNAL--UC/UF Schedule
Chambers Assembled per Month 4 4 4 4 5 5 5 5 5 4 5 5 5 5 5 5 5 5 5 5 5 4 6 6 6
Chambers Assembled (Cumulative) 30
32
34
36
38
40
42
44
47
49
52
54
57
59
62
64
67
69
71
73
76
78
81
83
86
88
91
93
96
98
101
103
106
108
111
113
116
119
121
124
126
129
130
133
136
139
142
145
148
Shipments to FAST sites 2 10 20 10 10 10 10 10 10 10 10 10 10 10 6Chambers stored at Fermilab 22 24 26 28 30 33 15 17 20 22 25 26 20 22 25 27 29 21 23 21 19 21 24 16 18 16 14 16 19 11 13 11 9 11 14 7 9 7 4 7 8 1 4 7 0 3 0
DAQ finalization
FAST site (HV test, then assembly&test) 5 5 10…
10
5 15 30
5
5
5 15 30chamber assembly
5 5 10shipping chambers from FNAL
5arrival of chambers to each of the two FAST sites
5long term HV test at FAST
5 15 30assembly with electronics and commissioning at FAST
5shipping to CERN
5arrival to CERN
5
3
CFEB 50
50
50
150
150
150
150
150
150
200
200
200
200
200
250
250
250
300
300
300
350
350
350
400
400
400
450
450
450
500
500
500
550
550
550
600
600
600
650
650
AFEB 240
240
240
720
720
720
720
720
720
960
960
960
960
960
1200
1200
1200
1440
1440
1440
1680
1680
1680
1920
1920
1920
2160
2160
2160
2400
2400
2400
2640
2640
2640
2880
2880
2880
3120
3120
LVDB 10
10
10
30
30
30
30
30
30
40
40
40
40
40
50
50
50
60
60
60
70
70
70
80
80
80
90
90
90
100
100
100
110
110
110
120
120
120
130
130
ALCT-384 10
10
10
30
30
30
30
30
30
40
40
40
40
40
50
50
50
60
60
60
70
70
70
80
80
80
90
90
90
100
100
100
110
110
110
120
120
120
130
130
ME23/2: harness/mechanics 10
10
10
30
30
30
30
30
30
40
40
40
40
40
50
50
50
60
60
60
70
70
70
80
80
80
90
90
90
100
100
100
110
110
110
120
120
120
130
130
2001 2002 2003J F M A M J J A S O N D J F M A M J J A S O N D J F M A
Deliv
ery
of
on
-ch
am
ber
bo
ard
s/c
ab
les a
nd
mech
an
ics
M
Endcap Integration Workshop: June 11-14, 2001 7
PNPI SchedulePNPI Schedule
Assembled chambers per month ME2/1 2 4 4 4 4 5 5 5 5Assembled chambers (cumulative) 2 4 6 8 10 12 14 16 18 20 23 25 28 30 33 35 38Chambers needed to keep up with FAST site 6 12 18 24 30 36 38
FAST site (HV test, then assembly&test) 6 6… 6 6
6 6 206 6
6 66 6
2 2 18
ME3/1 5 5 5 5 5 5 4 45 7 10 12 15 17 20 22 25 27 30 32 34 36 38
4 10 16 22 28 34 38
4 46 6
6 6 206 6
6 66 6
4 4 18
chamber assembly ME4/1 4 5 5 5 5 5 5 44 6 9 11 14 16 19 21 24 26 29 31 34 36 38
long term HV test at FAST 2 8 14 20 26 32 38
assembly with electronics and commissioning at FAST 2 26 6
shipping to CERN 6 66 6
arrival to CERN 66
6
CFEB 30
30
30
60
60
60
90
90
90
120
120
120
150
150
180
180
180
210
210
240
240
240
270
270
300
300
300
330
330
360
360
360
390
390
390
420
420
450
450
450
480
480
510
510
510
540
540
570
AFEB 252
252
252
504
504
504
756
756
756
1008
1008
1008
1260
1260
1512
1512
1512
1740
1740
1956
1956
1956
2172
2172
2388
2388
2388
2604
2604
2820
2820
2820
3036
3036
3036
3252
3252
3468
3468
3468
3684
3684
3900
3900
3900
4116
4116
4332
LVDB 6 6 6 12
12
12
18
18
18
24
24
24
30
30
36
36
36
42
42
48
48
48
54
54
60
60
60
66
66
72
72
72
78
78
78
84
84
90
90
90
96
96
102
102
102
108
108
114
ALCT-672 6 6 6 12
12
12
18
18
18
24
24
24
30
30
36
36
36
42
42
48
48
48
54
54
60
60
60
66
66
72
72
72
78
78
78
84
84
90
90
90
96
96
102
102
102
108
108
114
ME2/1: harness/mechanics 6 6 6 12
12
12
18
18
18
24
24
24
30
30
36
36
36
38
ME3/1: harness/mechanics 4 4 10
10
10
16
16
22
22
22
28
28
34
34
34
38
ME4/1: harness/mechanics 2 2 2 8 8 14
14
14
20
20
26
26
26
32
32
38
M J J A S OF M AO N D JJ J A SF M A MO N D JJ J A S
Deliv
ery
of
on
-ch
am
ber
bo
ard
s/c
ab
les a
nd
mech
an
ics
2001 2002 2003J F M A M
Endcap Integration Workshop: June 11-14, 2001 8
IHEP ScheduleIHEP Schedule
Assembled chambers per month ME1/2 2 4 4 4 5 5 5 5 5 5 5 5 5 5 5 5
Assembled chambers (cumulative) 6 8 10 12 14 16 19 20 24 25 29 30 34 35 39 41 44 46 49 51 54 56 59 61 64 66 69 71 74
Chambers needed to keep up with FAST site 6 12 18 24 30 36 42 48 54 60 66 72 74
FAST site (HV test, then assembly&test) 6 6
… 6 66 6 18
6 66 6
6 6 186 6
6 66 6 18
6 66 6
6 62 2
Assembled chambers per month ME1/3 4 6 6 6 6 6 6 6 6 6
Assembled chambers (cumulative) 2 4 6 10 12 16 18 22 24 28 30 34 36 40 42 46 48 52 54 58
Chambers needed to keep up with FAST site 4 10 16 22 28 34 40 46 52
FAST site (HV test, then assembly&test) 4 4 18
… 6 6
chamber assembly 6 6
6 6 18
long term HV test at FAST 6 6
6 6
assembly with electronics and commissioning at FAST 6
6
shipping to CERN
arrival to CERN
CFEB 30
30
30
60
60
60
90
90
90
120
120
150
150
150
180
180
210
210
210
240
240
270
270
270
300
300
330
330
330
360
360
386
386
386
410
410
434
434
458
458
482
482
506
506
530
530
554
554
AFEB 144
144
144
288
288
288
432
432
432
576
576
720
720
720
864
864
1008
1008
1008
1152
1152
1296
1296
1296
1440
1440
1584
1584
1584
1728
1728
1824
1824
1824
1896
1896
1968
1968
2040
2040
2112
2112
2184
2184
2256
2256
2328
2328
LVDB 6 6 6 12
12
12
18
18
18
24
24
30
30
30
36
36
42
42
42
48
48
54
54
54
60
60
66
66
66
72
72
78
78
78
84
84
90
90
96
96
102
102
108
108
114
114
120
120
ALCT-384 6 6 6 12
12
12
18
18
18
24
24
30
30
30
36
36
42
42
42
48
48
54
54
54
60
60
66
66
66
72
72
74
ALCT-288 4 4 4 10
10
16
16
22
22
28
28
34
34
40
40
46
46
ME1/2: harness/mechanics 6 6 6 12
12
12
18
18
18
24
24
30
30
30
36
36
42
42
42
48
48
54
54
54
60
60
66
66
66
72
72
74
ME1/3: harness/mechanics 4 4 4 10
10
16
16
22
22
28
28
34
34
40
40
46
46
M J J A S OF M AO N D JJ J A SF M A MO N D JJ J A S
Deliv
ery
of
on
-ch
am
ber
bo
ard
s/c
ab
les a
nd
mech
an
ics
2001 2002 2003J F M A M
Endcap Integration Workshop: June 11-14, 2001 9
EMU Installation/CommissioningEMU Installation/Commissioning
March V31 version
Endcap Integration Workshop: June 11-14, 2001 10
Shipping ContainersShipping Containers
– stacks of 5 boxes (easily re-stackable)– chambers are assembled and tested with electronics:
• once cover is taken off, one can connect and readout all electronics without extracting a chamber
– HV and Gas connectors accessible without opening boxes:• test for gas leaks• test for broken wires and HV disconnections in air• test dark current at nominal HV and nominal gas mixture
Endcap Integration Workshop: June 11-14, 2001 11
CSCs will arrive to ISRCSCs will arrive to ISRCMS Muon Hall Space In 1997 CERN proposed to usea quadrant of the ISR ring for all CMS Muonactivities: Memorandum CMS/1997-22.Updated proposal in 1999.
Gas pipes?
Endcap Integration Workshop: June 11-14, 2001 12
Handling on ArrivalHandling on Arrival
1) Truck enters here
2) Unloading Stacks of 5 CSCs
3) Stacks are moved to the tunnel
Semi-clean rooms?
Endcap Integration Workshop: June 11-14, 2001 13
ISR: storage hallISR: storage hall
5) Pre-installation Test:– dark current test (nominal mix)– un-stack, spread, and open– use portable mini-FAST DAQ:
• LVDB mezzanine board • ALCT self-test• CFEB connectivity• CFEB noise• CFEB calibration• AFEB connectivity• AFEB noise• ALCT/CLCT Self-trigger• Glue alignment pads (?)
– close and stack again– gas: Ar+CO2
Figure 7 Proposed storing configurationDifferent types of Muon Endcap chambers.Notes:Italic--we may want to skip laterME1--may require pre-installation tests conducted twice (on arrival and before installation)
4) HV and Leak Test in boxes4*) Broken CSCs go to semi- clean room for repair
Endcap Integration Workshop: June 11-14, 2001 14
SX5: installation/commissioning:SX5: installation/commissioning:tentative sequence under scrutinytentative sequence under scrutiny
ME2 (example): 36+18=54 CSCs– deliver to SX5 30 chambers (6 stacks) = (5 days)
– (gas leak in FY02-03 when we have time) = (6 days)
– burst of installation of “back” chambers @ 4 CSC/day = 7 days XY
– check for gas leak, in parallel with
– burst of cabling/piping for back chambers @ 4 CSC/day = 7 days Y
– commission “back” CSCs @ 4 CSC/day (portable HV and DAQ) = 7 days Y
– at the same time deliver to SX5 another 30 chambers = (5 days)
– burst of installation of “front” chambers @ 4 CSC/day = 7 days XY
– check for gas leak, in parallel with
– burst of cabling/piping for “front” chambers @ 4 CSC/day = 7 days Y
– commission gas/water for the station = 1 day Y
– commission “front” CSCs @ 4 CSC/day (portable HV and DAQ) = 7 days Y
– alignment photogrametry = 2 days Y
-------------
= 45 days
– after that maintain Ar+CO2 gas flow, monitor gas leaks, test HV periodically
X - need for crane, Y - need for cherry picker
Endcap Integration Workshop: June 11-14, 2001 15
Commissioning Tests to be based Commissioning Tests to be based on FAST site DAQon FAST site DAQ
MINIMAL COMMISSIONING TESTS are in BOLD 1 Assembly 2 Water leak 3 LV electronics turn-on 4 HV turn on (current and cabling) 5 ALCT self-test 6 AFEB Noise test 7 AFEB Connectivity & Alive 8 AFEB Threshold and Analog Noise 9 AFEB Time Delay10 CFEB Noise11 CFEB Connectivity and Alive12 CFEB Calibration13 Comparator Noise14 Comparator Threshold15 Left/Right Comparator Logic16 Left/Right Comparator Offset17 Neighbor Comparator Offset18 Comparator Timing19 Chamber gain map20 ALCT self-trigger on cosmics (need gas+HV)21 CLCT self-trigger on cosmics (need gas+HV)22 High-statistics cosmics (strip analysis)23 Performance vs HV24 High-rate test
Endcap Integration Workshop: June 11-14, 2001 16
Commissioning ManpowerCommissioning Manpower
Overall Coordination: 1 FTE (senior)
DAQ Expert: 1 DAQ software expert
ISR: 1 expert, 2 techs– Receiving, quick check on arrival
– Pre-installation tests
– Repairs, replacement of boards
SX5: 2 experts, 2 techs– Signal cable dressing/tests (on disks)
– Service cables (HV, LV, slow control), pipes, hoses…
– Post-installation commissioning
Endcap Integration Workshop: June 11-14, 2001 17
Summary: 2001-2002Summary: 2001-2002
• 2001: – next 6 mo: start forming a core of CERN-residing physicists
define all steps and procedures both at ISR and SX5
• 2002:– January: First 10 CSCs will arrive to CERN-ISR
– January: Portable DAQ and Equipment at CERN-ISR
Test environment (gas, outlets, Ethernet, etc.)
Working place (desks, phones, cabinets, etc.)
CSC test and repair tooling, clean room
– Jun-Aug: Pre-installation tests of 36 ME23/2 and 18 ME2/1
– June: One more portable DAQ and Equipment at SX5
Test and work environment
– August: Finish YE-2 infrastructure
– Sep-Dec: Installation/commissioning of ME-2
Endcap Integration Workshop: June 11-14, 2001 18
Summary: 2003-2004Summary: 2003-2004
• 2003: – Jan-Feb: Pre-installation tests of 36 ME23/2 and 18 ME2/1
– Mar-Apr: Installation/commissioning of ME+2
– May-Jun: Pre-installation tests of 36 ME23/2 and 18 ME3/1
– Jul-Aug: Installation/commissioning of ME-3
– Sep-Oct: Pre-installation tests of 36 ME23/2 and 18 ME3/1
– Nov-Dec: Installation/commissioning of ME+3
• 2004: – Jan: Pre-installation tests of 18 ME4/1
– Feb: Installation/commissioning of ME+4/1
– Mar-Jun: Pre-installation tests of 74 ME1/2, 54 ME1/3, 18 ME4/1 (Magnet test at SX5)
– Jul-Aug: Installation/commissioning of ME+1/2 and +1/3
– Sep: Installation/commissioning of ME-4/1
– Sep: Pre-installation tests of 18 ME1/3
– Oct-Nov: Installation/commissioning of ME-1/2 and -1/3