Critical Importance of Site Design

52
Importance of Site Design To pervious concrete pavements By scott erickson

Transcript of Critical Importance of Site Design

Page 1: Critical Importance of Site Design

Importance of Site DesignTo pervious concrete pavementsBy scott erickson

Page 2: Critical Importance of Site Design

Why site design matters to you

So What if Site Design Sucks?Who gets the blame?ContractorsSuppliersPervious Industry

Page 3: Critical Importance of Site Design

Presentation Teaching Goal

How to Avoid Site Design DisastersHow to Prevent bad site designsHow to Communicate and change a

bad designHow to Protect the enormous New

Market From Extinction

Page 4: Critical Importance of Site Design

Presentation Teaching Goal

What to do about it!Recognize site designsEducate designers well in advanceCommunicate instead of litigate!!!Know your allies, Use team

approach

Page 5: Critical Importance of Site Design

Swapping Pervious Surface from AC

BAD PERVIO

US DESIGN

Page 6: Critical Importance of Site Design

BAD PERVIO

US DESIGN

Pervious Clogs

Page 7: Critical Importance of Site Design

BAD PERVIO

US DESIGN

Pervious Clogs

Blame Pervious

Page 8: Critical Importance of Site Design

BAD PERVIOU

S DESIGN

Pervious Clogs

Blame Pervious

Sue Contract

or

Page 9: Critical Importance of Site Design

BAD PERVIOU

S DESIGN

Pervious Clogs

Blame Pervious

Sue Contract

or

PerviousMarket

Dries Up

Page 10: Critical Importance of Site Design

Really Bad Pervious Design

Photo courtesy of Dr. Heather Brown, Middle Tennessee State University

Do Not Use Pervious As A Trench Drain!

Page 11: Critical Importance of Site Design

Failed Design AC/Pervious Blend

Page 12: Critical Importance of Site Design

2900 SF Pervious ConcreteNo back up or overflow

Page 13: Critical Importance of Site Design

Nearly 15,000 SF Impervious

Page 14: Critical Importance of Site Design
Page 15: Critical Importance of Site Design
Page 16: Critical Importance of Site Design

Site & Grading Design

Asphalt tailings clog pervious

Inadequate backup. Use planter for backup

storage!

Page 17: Critical Importance of Site Design

Recognize sediment exposure?

!

Prevention better by far!

Page 18: Critical Importance of Site Design

Asphalt tailings

Page 19: Critical Importance of Site Design

Oily Grit from AC flows onto pervious

Page 20: Critical Importance of Site Design

Failed design. No sediment control No back up drainage. Big Lawsuit.

Page 21: Critical Importance of Site Design

Proper Pervious Design

Have back up drainage Over flow System

Bio SwaleDrain to secondary detention

Grade separationStructures

Page 22: Critical Importance of Site Design

Drainage Backup SystemsSwale with elevated drain

Page 23: Critical Importance of Site Design

Drainage Backup SystemsSwale with elevated drain

Page 24: Critical Importance of Site Design

Site Designs

Grade separation & Overflow

Page 25: Critical Importance of Site Design

Site Designs

Grade separation & Overflow

Page 26: Critical Importance of Site Design

Site Designs

Sediment Walls

Page 27: Critical Importance of Site Design

Site Designs

Curb cut backup drainage

Page 28: Critical Importance of Site Design

More Pervious Friendly Designs

Isolate Sediment: Sediment trapsFrench DrainLarge non-woody ground cover

Page 29: Critical Importance of Site Design

Grassy SwaleGrade separation

Barrier curb with grade separation

Design to Protect from Sediment

Page 30: Critical Importance of Site Design

Retrofitted Asphalt Lot

Page 31: Critical Importance of Site Design

Replaced with pervious concrete

Page 32: Critical Importance of Site Design

Sub-Grade Grading Plan

Page 33: Critical Importance of Site Design

Drainage Backup Systems• Install drainage along steep

slopes.1. Assist drainage down slope2. Minimizes erosion of sub-grade soil

Page 34: Critical Importance of Site Design

Site Design

Isolate sediment sources

•Bark chips on embankment•Curb and French Drain•Redundancy when able

Page 35: Critical Importance of Site Design

Intercept Sediment Runoff

French drain used in this application.

Page 36: Critical Importance of Site Design

Bio swale

Back up Infiltration

Page 37: Critical Importance of Site Design

Four feet of amended soil below pavement

Bio swale

Page 38: Critical Importance of Site Design

Trench Drain Isolates Sediment

Impervious

Concrete

Pervious Concrete

Trench

….Drains

Page 39: Critical Importance of Site Design

Large Scale Sediment Isolation

Page 40: Critical Importance of Site Design

Large Scale Sediment Isolation

Page 41: Critical Importance of Site Design

Pervious Alley is Only Collection Point26’ Alley collects water from entire site

Page 42: Critical Importance of Site Design

Subbase Infiltration vaults/cleanout

Page 43: Critical Importance of Site Design

Sediment Collection & Cleanout

Page 44: Critical Importance of Site Design
Page 45: Critical Importance of Site Design

Stormwater Collection Alley

Page 46: Critical Importance of Site Design

Mix DesignDependent on; • Owner’s desired look• Function of application

1/4” Crushed 3/8” Round1/8” Crushed

Page 47: Critical Importance of Site Design

Mix DesignDetermine Application

Sidewalks Pathways

Parking Stalls

Streets

Page 48: Critical Importance of Site Design

OK to say not a good site

Page 49: Critical Importance of Site Design

Isolate Sediment

Page 50: Critical Importance of Site Design

Add landscape fill before pervious• Fill added

before Pervious• Trench drain

isolates impervious from pervious surface

Page 51: Critical Importance of Site Design

What if bad design already bid?

Notify the Project Engineer of deficiency Recommend NRMCA/ACI standard Contact Local Sponsoring Group or consultant Paulette Salisbury 925-918-0982

Technical Specialist at CA NV Cement Assoc.

Don’t ignore bad design, engineers want it right too!

Page 52: Critical Importance of Site Design

Importance of Site Design To pervious PavementBy Scott Erickson, NRMCA Pervious Craftsman

[email protected] 415-852-0638