CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL ....

26
CREATING CONNECTIONS IN THE TOWN OF INNISFIL ANTHONY IRVING, MANAGER, COMMUNITY RELATIONS – METROLINX BRUCE SEVIER, SENIOR MANAGER, CORRIDOR INFRASTRUCTURE – METROLINX JUNE-7-2017 METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL

Transcript of CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL ....

Page 1: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

CREATING CONNECTIONS IN THE TOWN OF INNISFIL

ANTHONY IRVING, MANAGER, COMMUNITY

RELATIONS – METROLINX

BRUCE SEVIER, SENIOR MANAGER, CORRIDOR

INFRASTRUCTURE – METROLINX

JUNE-7-2017 METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL

Page 2: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

GRIDLOCK COSTS OUR ECONONY

Residents could spend 109 minutes per day in traffic

Page 3: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

REGIONAL TRANSFORMATION

Page 4: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

METROLINX

PLAN BUILD OPERATE

Page 5: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

GO EXPANSION PROGRAM

Page 6: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

6

BARRIE SERVICE IMPROVEMENTS

MORE ‘GO’ IN INNISFIL

3 Parking Structures Upgrades to 6 Stations (new platforms, accessibility, active transportation, etc.) Corridor Electrification and Substation Bridge Widenings Grade Separations 2 New Stations Davenport Diamond Grade Separation Proposed Stations

Grading and signal improvements are already underway on a six-kilometer stretch of the line between the York University and Rutherford GO Stations.

14 36 168

Trips/Day

Kirby

Mulock

Innisfil

Davenport Diamond

Kirby

Mulock

Innisfil

Davenport Diamond

Page 7: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

MORE ‘GO’ IN INNISFIL

RAIL INFRASTRUCTURE IN THE TOWN OF INNISFIL

Page 8: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

8 MORE ‘GO’ IN INNISFIL

• Bringing more transit options and new levels of service doesn’t come easy. • Metrolinx is undertaking one of the largest infrastructure projects in North

America. • There is community-level disruption required to build a region-wide, integrated

transit network.

INFRASTRUCTURE NEEDS FOR GO EXPANSION

Page 9: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

9 MORE ‘GO’ IN INNISFIL

Infrastructure Build: • Double track from Union Station to Aurora GO Station • Passing track north of Aurora GO Station • Signal improvements • Bridge structure modifications • Bradford layover expansion and modifications • Barrie layover expansion • Station modifications/parking expansion • Improved rail crossings • Grade separations • Customer experience improvements

BARRIE CORRIDOR PROGRAM OVERVIEW

Page 10: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

10 MORE ‘GO’ IN INNISFIL

ENVIRONMENTAL ASSESSMENT Barrie Rail Corridor Expansion Project TPAP

• For the past year we have been busy assessing the impacts of

adding additional track to the Barrie GO rail corridor.

• Provision of a second track between Lansdowne Avenue in the City of Toronto to Allandale Waterfront GO Station in the City of Barrie

• Upgrades to existing GO Stations along the corridor:

Rutherford, Maple, King City, Aurora, Newmarket, East

Gwillimbury, Bradford, Barrie South and Allandale

Waterfront;

• Upgrades to existing structures within the corridor including

bridges and culverts; and

• A new train layover facility within the Town of Bradford West

Gwillimbury for overnight storage of trains.

• Transit Project Assessment Process formally commenced on May

11, 2017.

• A notice was published in community newspapers and a mailer was

delivered to residents living within 200 metres of the rail corridor.

• As part of our continued community engagement, an online survey

to gain more feedback was made available from May 11 to June 1:

www.letgoknow.com/BRCE

Notice of Commencement

May 11, 2017

Notice of Completion August 8, 2017

Start of 30-Day Public Review

August 9 – September 7, 2017

Start of 35-Day Minister Review

September 8 – October 12, 2017

Statement of Completion

October 12, 2017

Page 11: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

11 MORE ‘GO’ IN INNISFIL

ELECTRIFICATION

• In order to electrify, we need to build infrastructure including traction power substations, switching stations, paralleling stations, overhead contact systems, and various safety modifications.

• This includes switching stations and paralleling stations at Maple and Newmarket.

• Design excellence is part of designing this infrastructure.

Page 12: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

12 MORE ‘GO’ IN INNISFIL

TRACK & STATION WORK

Page 13: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

13 MORE ‘GO’ IN INNISFIL

NEW TRACK AND NEW STATIONS

• New Track – Barrie Corridor • From Union Station to Aurora GO Station to support 15-minute service from Union

Station, with provision for a second track from Toronto to Barrie. • New Stations

• Innisfil • Gormley (opened December 2016) • Kirby (near Keele Street) • Mulock (near Bayview Avenue) • Bloomington (construction mobilized) • Downsview Park • Caledonia • Bloor-Davenport • Front-Spadina

Page 14: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

14 MORE ‘GO’ IN INNISFIL

INNISFIL GO STATION • Metrolinx and Town staff

are working to progress the Innisfil GO station concept.

• Proposed station on 6th

Line, approx 1 km east of 20th Sideroad.

• Aligned with Town’s vision for growth and development.

• Within the Town’s Alcona South Secondary Plan area for development.

Page 15: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

15 MORE ‘GO’ IN INNISFIL

FIRST-MILE, LAST-MILE CONNECTIONS

• Parking is a challenge near all GO stations in the network • Metrolinx is committed to working with municipalities on making those first-

mile/last-mile connections for residents and customers. • But building more and more parking isn’t a sustainable solution. As we look to the

future, customers will be using local transit, micro-transit, pedestrian access, and cycling infrastructure to get in and out of stations.

• On May 15, Town of Innisfil announced a partnership with Uber, the first of its kind in Canada, to provide rides for commuters and residents to 3 key sites: Barrie South GO Station, the GO bus line and the Innisfil Recreational Complex.

• A local solution to a local need.

Page 16: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

16 16 MORE ‘GO’ IN INNISFIL

LEVEL CROSSINGS AND

GRADE SEPARATIONS

Page 17: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

17

MORE ‘GO’ IN INNISFIL

LEVEL CROSSINGS – ROAD/RAIL INTERSECTIONS

• With over 185 level crossings in the GO network, they will continue to be a significant feature of the network.

• All level crossings on the GO network were assessed based on four criteria which included a number of components:

Usage and Existing Conditions (60%) • Exposure Index (traffic and rail

volumes) • Geometry • Accidents/Collisions • Adjacent roadways and queuing

Operations (20%)

• GO Service improvements • Special users (e.g. local transit,

emergency services) • Service reliability • Station proximity

Social & Environmental (10%)

• Visual improvement • Noise improvement • Community connectivity

Cost (10%)

• Construction • Property • Maintenance

Page 18: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

18 MORE ‘GO’ IN INNISFIL

LEVEL CROSSINGS – ROAD/RAIL INTERSECTIONS

Among high and medium priority locations, a tiered approach was adopted to inform prioritization and discussions with municipalities.

Page 19: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

19 MORE ‘GO’ IN INNISFIL

RESULTS: LEVEL CROSSINGS IN GO NETWORK Corridor Crossing Rationale Barrie Rutherford Rd. Adjacent to a station, EA completed by York Region, planning underway,

highest overall EI forecast on GO network

Barrie Wellington St. E Adjacent to a station, note heritage elements to be considered

Barrie McNaughton Rd. Adjacent to a station

Stouffville Steeles Ave E EA underway by City of Toronto, adjacent to a station

Stouffville Finch Ave. E Adjacent to a planned SmartTrack station, initial planning underway, shared highest score in assessment

LSW Kerr St. EA completed by Town of Oakville in 2009, planning underway; municipal interest, shared highest score in assessment

LSW Burloak Drive EA underway, project announced in 2015

LSE Scarborough Golf Club Rd.

EA completed, project announced in 2015

LSE Morningside Ave. EA completed, project announced in 2015

LSE Galloway Rd. EA completed, project announced in 2015

Page 20: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

20

LEVEL CROSSINGS: LONG TERM PLAN

• Metrolinx will continue to work with municipal counterparts to plan for and advance grade separations where possible.

• Metrolinx recommends a longer term plan be considered beyond the current program to move additional projects forward through planningand design, subject to approvals and funding.

• This would allow for continued progress on a pipeline of locations not proceeding immediately as part of this RER program.

RER Grade eparations

S

Recommended additional

planning and design (subject to approvals and funding)

RER Program

Municipal Partners

Federal Support

Future Projects

Beyond RER

MORE ‘GO’ IN INNISFIL

Page 21: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

21 MORE ‘GO’ IN INNISFIL

NEXT STEPS: LEVEL CROSSINGS

• Study to identify recommended improvements for at-grade crossings • Municipal input will be part of this exercise

• Launch region-wide Community Advisory Committee • Grade Separation Projects:

• Finalize municipal agreements • Complete or initiate Environmental Assessment as required

• Enhanced Safety and Education Awareness

Page 22: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

22 22 MORE ‘GO’ IN INNISFIL

COMMUNITY ENGAGEMENT

Page 23: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

23 MORE ‘GO’ IN INNISFIL

HOW WE ARE GOING TO WORK WITH YOU • Metrolinx recognizes that with new infrastructure and construction comes impacts to the

community that must be worked through with residents and their elected officials. • A regional Municipal and Community regional tour is currently underway that creates an

annual schedule for getting to every municipal council and for providing a comprehensive narrative for residents of each municipality that details what this program will look like locally.

• We are working with municipal partners to schedule local consultations on new stations. • We are developing a community charter which will commit the organization to building the

regional transportation system in a way that is respectful of the communities it touches. • This is in addition to the standard community relations support that we have traditionally

provided on the ground on projects like Georgetown South and the Eglinton Crosstown.

Page 24: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

24 MORE ‘GO’ IN INNISFIL

MUNICIPAL ENGAGEMENT • As the volume of work increases, the importance of establishing tables where we

can have regular dialogue in support of advancing capital infrastructure projects with municipal partners is critical to delivering transit to communities across the region.

• These opportunities include: • RER Capital Leaders Forum (network-wide table for executive dialogue and advice

related to GO expansion projects) • RER Regional Sessions (focus on providing regular updates for municipal staff) • Municipal Program Committees (municipal specific committees focussed on

advancing specific projects)

Page 25: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic

25

COMMUNITY ENGAGEMENT: PROJECT CYCLE

MORE ‘GO’ IN INNISFIL

Introduce the project to municipal partners & community and ask for initial feedback Work with residents to establish why the projectis needed and proposed approach Planning &

Feasibility

Formal consultation period included in the TPAP

Environmental Assessment (only applies to new

infrastructure )

Focus on minimizing impact to residents, keeping the community informed and managing/being responsive to issues as they arise.

Construction

Work with municipal partners/community to inform the details of the project, address design concerns and build momentum.

Design & Procurement

Page 26: CREATING CONNECTIONS IN THE TOWN OF INNISFIL · METROLINX PRESENTATION TO INNISFIL TOWN COUNCIL . GRIDLOCK COSTS OUR ECONONY . Residents could spend 109 . minutes per day in traffic