CP144260 Campus Utility System

14
CP144260 CAMPUS UTILITY SYSTEM Pre-Submittal Conference August 26, 2011

description

CP144260 Campus Utility System. Pre-Submittal ConferenceAugust 26, 2011. Overview. Introductory Remarks / Submittal Requirements Program Goals Planning Goals Construction Goals Questions and Answers Facility Tour. Introductions Submittal Requirements. - PowerPoint PPT Presentation

Transcript of CP144260 Campus Utility System

Page 1: CP144260 Campus Utility System

CP144260CAMPUS UTILITY SYSTEMPre-Submittal Conference August 26, 2011

Page 2: CP144260 Campus Utility System

OVERVIEW Introductory Remarks / Submittal

Requirements Program Goals Planning Goals Construction Goals Questions and Answers Facility Tour

Page 3: CP144260 Campus Utility System

INTRODUCTIONSSUBMITTAL REQUIREMENTSKatherine A. Dunklau, Construction Phase Manager

Page 4: CP144260 Campus Utility System

PROJECT TEAM (TO DATE)

Page 5: CP144260 Campus Utility System

CM/GC RFQ SUBMITTAL Two Step Process

Prequalification Submittal Direct, Concise, Organized

Short list – interviews and fee proposal Fee Proposal – one copy, sealed

Minimum Requirements

Addenda

Page 6: CP144260 Campus Utility System

PROGRAM GOALSEd Barton, Lutz Daily & BrainBryan Birosak, Director, Power House

Page 7: CP144260 Campus Utility System

PROJECT SCOPEMulti-phase project Renovations to

existing plant (WDEP)

New energy plant (EDEP)

CW distribution at Kittredge

New/renovations to existing distribution system

Page 8: CP144260 Campus Utility System

PLANNING GOALSPhil Simpson, Planning Phase Manager

Page 9: CP144260 Campus Utility System

PLANNING PHASE RESPONSIBILITIES Design

responsibilities Manage Schematic

Design & Design Development

Secure entitlements related to design

Ensure programmatic objectives & entitlements are met

Construction responsibilities Exterior material

approvals Quality assurance

for stonework Quality assurance

for landscape & site features

Communication interface

Page 10: CP144260 Campus Utility System

IMPORTANT ITEMS FROM A CM/GC

Transparency Partnering session Open detail in

estimates Advising the design

team between formal reviews

Constructability Review Are we realistic?

Construction Mitigation Interface &

communication planning

Sexual Harassment policies

Staging requirements Landscape

preservation & restoration

Sustainability practices

Page 11: CP144260 Campus Utility System

CONSTRUCTION GOALSKatherine A. Dunklau, Construction Phase Manager

Page 12: CP144260 Campus Utility System

PRELIMINARY SCHEDULE

Kittredge Distribution

WDEP (Renovations to Existing)

EDEP (New Plant)

Campus Distribution

0 5 10 15 20 25 30 35 40

DesignConstruction

Page 14: CP144260 Campus Utility System

SITE WALKDistribution Pathway – Phil Simpson

WDEP – Bryan Birosak