Cover Page
1
Checked: Approved by: Name: Name: Job Title: Job Title: Signature: Signature: Date: Date: Date: A.MOK 6TH OF OCTOBER LOB PLANT DOCUMENT TITLE: SUCTION HEATER SPECIFICATION DATA SHEET Author: Status Approved By Checked by M.MON S.A 1 4/23/2015 Issued for design Rev No Date Issued by DOCUMENT NUMBER: EPCM15021-MEC-DD-17006 CLIENT CONTRACT NUMBER: N/A Name: Signature: A.Elmokadem CLIENT: SHELL LUBRICANTS EGYPT Piping Engineer Project coordinator Project Manager Job Title: S.A.Rahman M.A.Moneim Client Approval Code : Project Title Page 1 of 9 Project Number EPCM15021 6TH OF OCTOBER LOBP PLANT EPCM:
-
Upload
elmokadem-einstein -
Category
Documents
-
view
7 -
download
0
description
suction heater cover
Transcript of Cover Page
![Page 1: Cover Page](https://reader035.fdocuments.net/reader035/viewer/2022071708/563db8f7550346aa9a98ade8/html5/thumbnails/1.jpg)
Checked: Approved by:
Name: Name:
Job Title: Job Title:
Signature: Signature:
Date: Date: Date:
A.MOK
6TH OF OCTOBER LOB PLANT
DOCUMENT TITLE: SUCTION HEATER SPECIFICATION DATA SHEET
Author:
StatusApproved
By
Checked
by
M.MONS.A1 4/23/2015 Issued for design
Rev No DateIssued
by
DOCUMENT NUMBER: EPCM15021-MEC-DD-17006
CLIENT CONTRACT NUMBER: N/A
Name:
Signature:
A.Elmokadem
CLIENT: SHELL LUBRICANTS EGYPT
Piping Engineer Project coordinator Project Manager
Job Title:
S.A.Rahman M.A.Moneim
Client Approval Code :
Project TitlePage
1 of 9
Project Number
EPCM150216TH OF OCTOBER
LOBP PLANT
EPCM: