Cover Page

1
Checked: Approved by: Name: Name: Job Title: Job Title: Signature: Signature: Date: Date: Date: A.MOK 6TH OF OCTOBER LOB PLANT DOCUMENT TITLE: SUCTION HEATER SPECIFICATION DATA SHEET Author: Status Approved By Checked by M.MON S.A 1 4/23/2015 Issued for design Rev No Date Issued by DOCUMENT NUMBER: EPCM15021-MEC-DD-17006 CLIENT CONTRACT NUMBER: N/A Name: Signature: A.Elmokadem CLIENT: SHELL LUBRICANTS EGYPT Piping Engineer Project coordinator Project Manager Job Title: S.A.Rahman M.A.Moneim Client Approval Code : Project Title Page 1 of 9 Project Number EPCM15021 6TH OF OCTOBER LOBP PLANT EPCM:

description

suction heater cover

Transcript of Cover Page

Page 1: Cover Page

Checked: Approved by:

Name: Name:

Job Title: Job Title:

Signature: Signature:

Date: Date: Date:

A.MOK

6TH OF OCTOBER LOB PLANT

DOCUMENT TITLE: SUCTION HEATER SPECIFICATION DATA SHEET

Author:

StatusApproved

By

Checked

by

M.MONS.A1 4/23/2015 Issued for design

Rev No DateIssued

by

DOCUMENT NUMBER: EPCM15021-MEC-DD-17006

CLIENT CONTRACT NUMBER: N/A

Name:

Signature:

A.Elmokadem

CLIENT: SHELL LUBRICANTS EGYPT

Piping Engineer Project coordinator Project Manager

Job Title:

S.A.Rahman M.A.Moneim

Client Approval Code :

Project TitlePage

1 of 9

Project Number

EPCM150216TH OF OCTOBER

LOBP PLANT

EPCM: