8 COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: INTRODUCTION 1 SUBJECT: ADMINISTRATIVE DETAILS 1.1 TOPIC: ADMINISTRATIVE DETAILS 1.1.1 OBJECTIVE (S) To register the participants and to fill any missing information on the application forms. To inform participants about the available facilities both in Nairobi and Kisii. Issue the participants with necessary items Self introduction KEY POINTS LESSON ORGANISATION: Discussion TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Meta card Assignments BASIC METHODICAL REFERENCE TIME REQUIRED: 1½ hrs

Transcript of COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref…ed_emp/@emp_policy/@invest/... · 9 course:...

8

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: INTRODUCTION 1

SUBJECT: ADMINISTRATIVE DETAILS 1.1

TOPIC: ADMINISTRATIVE DETAILS 1.1.1

OB

JEC

TIVE

(S)

• To register the participants and to fill any missing information on the application forms.

• To inform participants about the available facilities both in Nairobi and Kisii.

• Issue the participants with necessary items

• Self introduction

KEY

PO

INTS

LESSON ORGANISATION: Discussion

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Meta card Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 1½ hrs

9

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: INTRODUCTION 1

SUBJECT: OFFICIAL COURSE OPENING 1.2

TOPIC: OFFICIAL COURSE OPENING 1.2.1

OB

JEC

TIVE

(S)

• Getting to know one another.

• Official course opening by MORP&W

• Briefing on course programme and give an indication on intended objective(s)

KEY

PO

INTS

LESSON ORGANISATION: Discussion

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Meta Card Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

10

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: INTRODUCTION 1

SUBJECT: COURSE OBJECTIVE AND EXPECTATIONS 1.3

TOPIC: COURSE OBJECTIVES AND EXPECTATIONS 1.3.1

OB

JEC

TIVE

(S)

• Extract course expectations from the participants

• Sorting out and ranking the course expectations.

• Stating the course objectives.

KEY

PO

INTS

LESSON ORGANISATION: Classroom work and discussion

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Meta Card Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 3 hours

11

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: INTRODUCTION 1

SUBJECT: MEDICAL BRIEFING 1.4

TOPIC: MEDICAL BRIEFING 1.4.1

OB

JEC

TIVE

(S)

• Create an awareness to the participants about common diseases, prevalence areas and their treatment.

KEY

PO

INTS

LESSON ORGANISATION: Lecture and discussion

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Meta cards Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 1 hour

12

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: INTRODUCTION 2

SUBJECT: MANAGERIAL ASPECTS 2.1

TOPIC: HOW PEOPLE LEARN 2.1.1

OB

JEC

TIVE

(S)

• Create an awareness about the learning process by:- i) Defining learning ii) Enumerating effectiveness of learning iii) Defining communications, its process and barriers

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussion and exercises.

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Meta Cards Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 4 hours

13

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING DEVELOPMENT 2

SUBJECT: MANAGERIAL ASPECTS 2.1

TOPIC: PEOPLE MANAGEMENT AND SELF DEVELOPMENT 2.1.2

OB

JEC

TIVE

(S)

• State and explain different levels in leadership.

• State and explain management skills for effective results.

• Identify the process of self-development.

• Explain self-development methods

• Carry out some exercises on self-development

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussion and exercise

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

14

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING DEVELOPMENT 2

SUBJECT: INTRODUCTION TO CONTRACTING 2.2

TOPIC: DELIVERY OPTIONS 2.2.1

OB

JEC

TIVE

(S)

• Identify different methods of execution of Roadworks.

• Explain different delivery option in contracting labour-based Roadworks.

• Outline the training process and its importance in developing contracting.

• Explain contracting background and core issues

• Explain aspects of the enabling environment for contracting development.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussion case studies and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

15

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING DEVELOPMENT 2

SUBJECT: INTRODUCTION TO CONTRACTING 2.2

TOPIC: CONTRACTOR IDENTIFICATION AND SELECTION PROCEDURE

2.2.2

OB

JEC

TIVE

(S)

• State the factors considered in the contractors identification process.

• Explain methods used in selecting the contractors for labour-based contracts.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, case studies, discussion and exercises.

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

16

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING DEVELOPMENT 2

SUBJECT: CONTRACTOR’S ACCESS TO CREDIT/RESOURCES 2.3

TOPIC: CONTRACTOR’S ACCESS CREDIT/RESOURCES 2.3.1

OB

JEC

TIVE

(S)

• Explain how small scale contractors can access to financial credit required to start and develop a viable enterprise.

• Enumerate the available institutions willing to extend credit to small contractors and their terms and conditions.

• Create awareness about the relevance of contract bonds, the risks to contracting agency and ways and means to minimize the risk

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussion and case studies

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

17

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING DEVELOPMENT 2

SUBJECT: RESOURCE MANAGEMENT 2.4

TOPIC: RESOURCE MANAGEMENT 2.4.1

OB

JEC

TIVE

(S)

• Identify the most appropriate arrangement for equipment and tools acquisition.

• Identify correct maintenance procedures for equipment owned.

• Be able to assess various mechanical supports capacities within the private sector.

• Basic principles in Financial Management e.g. principles of equipment costing, bank guarantees.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussion and presentation

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

18

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING DEVELOPMENT 2

SUBJECT: THE CONTRACT 2.5

TOPIC: TYPES OF CONTRACT 2.5.1

OB

JEC

TIVE

(S)

• Define a contract

• State different types of contracts.

• Distinguish the main features of a contract.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussion and presentation

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

19

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING DEVELOPMENT 2

SUBJECT: THE CONTRACT 2.5

TOPIC: CONDITIONS OF CONTRACT 2.5.2

OB

JEC

TIVE

(S)

• Identify standard contract forms used in different countries.

• Identify clauses relevant for site supervision.

• To be able to fill the standard contract forms correctly.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussion

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart and chalkboard Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

20

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING DEVELOPMENT 2

SUBJECT: THE CONTRACT 2.5

TOPIC: PARTIES AND THEIR ROLES IN A CONTRACT 2.5.3

OB

JEC

TIVE

(S)

• Distinguish the different parties in a contract.

• State the roles of each parties.

• State duties and powers of the Engineer.

• State duties and powers of the Engineer’s representative.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussions

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart and chalkboard Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

21

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACT ACTIVITIES-PREPARATIONS 3.1

SUBJECT: ROAD SELECTION AND PRELIMINARY TECHNICAL ASSESSMENT

3.1.1

TOPIC: NETWORK IDENTIFICATION 3.1.1.1

OB

JEC

TIVE

(S)

• Explain various stages considered in selecting a road for labour based contracts.

• State factors considered in selecting a road for labour based contracts

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussion and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 1 hours

22

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES - PREPARATIONS 3.1

SUBJECT: ROAD SELECTION AND PRELIMINARY TECHNICAL ASSESSMENT

3.1.1

TOPIC: ROAD INSPECTION AND INVENTORIES 3.1.1.2

OB

JEC

TIVE

(S)

• Explain various methods of conducting road inspection.

• Explain how the information obtained above can be used in ranking the conditions of the roads.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussion and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip charts Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 1 hour

23

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES-PREPARATIONS 3.1

SUBJECT: ROAD SELECTION AND PRELIMINARY TECHNICAL ASSESSMENT

3.1.1

TOPIC: MAPPING 3.1.1.3

OB

JEC

TIVE

(S)

• Explain how network mapping can be prepared.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussion and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: ½ hour

24

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES-PREPARATIONS 3.1

SUBJECT: ROAD SELECTION AND PRELIMINARY TECHNICAL ASSESSMENT

3.1.1

TOPIC: PRELIMINARY COST ESTIMATES 3.1.1.4

OB

JEC

TIVE

(S)

• Define preliminary cost estimates.

• Explain the methods used to prepare preliminary cost estimates.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussion and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

25

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES-PREPARATIONS 3.1

SUBJECT: ROAD SELECTION AND PRELIMINARY TECHNICAL ASSESSMENT

3.1.1

TOPIC: ROAD SELECTION REPORTS 3.1.1.5

OB

JEC

TIVE

(S)

• Explain the importance of road selection reports.

• Explain what information it should contain and how this can be analyzed.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussion and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

26

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES-PREPARATIONS 3.1

SUBJECT: ROAD SELECTION AND PRELIMINARY TECHNICAL ASSESSMENT

3.1.1

TOPIC: ANNUAL WORK PLANS 3.1.1.6

OB

JEC

TIVE

(S)

• Explain the role of a work plan in the planning process.

• Explain how an annual work plan is prepared.

• State and explain the information contained in the annual work plan

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussion and exercises.

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 1 hour

27

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES-PREPARATIONS 3.1

SUBJECT: FIELD ASSESSMENT AND DESIGN 3.1.2

TOPIC: ROAD ALIGNMENT AND TOPOGRAPHIC SURVEY 3.1.2.1

OB

JEC

TIVE

(S)

• Explain factors considered in choosing road alignment.

• Explain how alignment standards are determined.

• Explain setting out procedures for a road alignment.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

28

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES-PREPARATIONS 3.1

SUBJECT: FIELD ASSESSMENT AND DESIGN 3.1.2

TOPIC: ROAD DESIGN 3.1.2.2

OB

JEC

TIVE

(S)

• Explain the purpose of design in a contract.

• Explain the principles of geometric and structural design.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

29

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES-PREPARATIONS 3.1

SUBJECT: FIELD ASSESSMENT AND DESIGN 3.1.2

TOPIC: CALCULATION OF EARTHWORKS 3.1.2.3

OB

JEC

TIVE

(S)

• Explain different methods used in estimating earthworks.

• Identify the tools used for each method.

• Illustrate the methods using typical examples.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussion and presentation

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 1 hour

30

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES-PREPARATIONS 3.1

SUBJECT: FIELD ASSESSMENT AND DESIGN 3.1.2

TOPIC: DRAINAGE SYSTEMS 3.1.2.4

OB

JEC

TIVE

(S)

• Identify different road drainage systems.

• Explain the factors considered in the design of different drainage structures.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussions and exercises.

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart and chalkboard Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 1 hour

31

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES-PREPARATIONS 3.1

SUBJECT: FIELD ASSESSMENT AND DESIGN 3.1.2

TOPIC: ROAD SURFACING 3.1.2.5

OB

JEC

TIVE

(S)

• Explain the purpose of road surfacing.

• Explain different types of surface treatment.

• Explain the construction procedure for surface dressing.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 1 hour

32

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES-PREPARATIONS 3.1

SUBJECT: FIELD ASSESSMENT AND DESIGN 3.1.2

TOPIC: ENVIRONMENTAL IMPACT 3.1.2.6

OB

JEC

TIVE

(S)

• Explain the need for soil conservation.

• Describe the main causes of soil erosion.

• Explain the effects of soil erosion on the environment.

• Describe soil erosion control measures on road works.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hour

33

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES-PREPARATIONS 3.1

SUBJECT: DRAWINGS AND DOCUMENTS 3.1.3

TOPIC: STANDARD DESIGN DRAWINGS 3.1.3.1

OB

JEC

TIVE

(S)

• Identify and explain the importance of standard design drawings.

• Analyze information on standard design drawings.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart and chalkboard Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hour

34

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES-PREPARATIONS 3.1

SUBJECT: DRAWINGS AND DOCUMENTS 3.1.3

TOPIC: TENDER DRAWINGS 3.1.3.2

OB

JEC

TIVE

(S)

• Explain the importance of tender drawings.

• Explain the use of tender drawings.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart and chalkboard Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 1 hour

35

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES-PREPARATIONS 3.1

SUBJECT: DRAWINGS AND DOCUMENT 3.1.3

TOPIC: BILL OF QUANTITIES 3.1.3.3

OB

JEC

TIVE

(S)

• Define a bill of quantities.

• Explain the objects of Bill of Quantities.

• Explain how bills of quantities are prepared.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart and chalkboard Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

36

COURSE: SUPERVISING LABOUR-BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES-PREPARATIONS 3.1

SUBJECT: DRAWINGS AND DOCUMENT 3.1.3

TOPIC: ENGINEER’S ESTIMATE 3.1.3.4

OB

JEC

TIVE

(S)

• Explain what are engineer’s estimates.

• Be able to carry out Engineer’s estimate.

• Identify the purpose of Engineer’s estimate in Contract Preparation.

KEY

PO

INTS

LESSON ORGANISATION: Lecture, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector Pinwall Flip chart and chalkboard Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

37

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES - PREPARATIONS 3.1

SUBJECT: DRAWINGS AND DOCUMENT 3.1.3

TOPIC: CONDITIONS OF TENDER 3.1.3.5

OB

JEC

TIVE

(S)

• Explain the conditions of tender

• Explain contract data sheets

KEY

PO

INTS

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard, blackboard and flipcharts Assignments

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 1 hour

38

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES – PREPARATIONS 3.1

SUBJECT: DRAWINGS AND DOCUMENTS 3.1.3

TOPIC: SPECIFICATIONS 3.1.3.6

OB

JEC

TIVE

(S)

• Define specifications

• Explain the purpose of specifications in a contract

• Highlight key areas of specifications

KEY

PO

INTS

• Specifications

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard, blackboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

39

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES - TENDER PROCEDURES 3.2

SUBJECT: INVITATION TO TENDER 3.2.1

TOPIC: PRE-QUALIFICATION 3.2.1.1

OB

JEC

TIVE

(S)

• Explain the purpose of pre-qualification in the tendering process

• Explain methods of pre-qualification

KEY

PO

INTS

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 1 hour

40

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES - TENDER PROCEDURES 3.2

SUBJECT: INVITATKION TO TENDER 3.2.1

TOPIC: ADVERTISEMENT 3.2.1.2

OB

JEC

TIVE

(S)

• Explain the purpose of advertisement in the tendering process

• Explain the available methods of advertisement.

KEY

PO

INTS

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard, blackboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: ½ hour

41

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES - TENDER PROCEDURES 3.2

SUBJECT: INVITATION TO TENDER 3.2.1

TOPIC: ISSUE OF TENDER DOCUMENTS 3.2.1.3

OB

JEC

TIVE

(S)

• Explain the process of issuing tender documents

KEY

PO

INTS

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard, blackboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 1 hour

42

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES - TENDER PROCEDURES 3.2

SUBJECT: TENDER PERIOD 3.2.2

TOPIC: PRE-TENDER SITE VISIT 3.2.2.1

OB

JEC

TIVE

(S)

• Explain the importance of pre-tender site visit

• Explain the roles of different parties during the pre-tender site visit.

KEY

PO

INTS

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 1 hour

43

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES - TENDER PROCEDURES 3.2

SUBJECT: TENDER PERIOD 3.2.2

TOPIC: TENDER NOTICES 3.2.2.2

OB

JEC

TIVE

(S)

• Explain the purpose of tender notices.

• Explain the methods of drawing up tender notices.

KEY

PO

INTS

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 1 hour

44

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES - TENDER PROCEDURES 3.2

SUBJECT: TENDER PERIOD 3.2.2

TOPIC: WORK PROGRAMMES 3.2.2.3

OB

JEC

TIVE

(S)

• Explain and analyze the requirements of a work programme.

• Explain the preparation of a work programme.

• Explain the purpose of a work programme in a contract.

KEY

PO

INTS

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 3 hours

45

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES - TENDER PROCEDURES 3.2

SUBJECT: TENDER PERIOD 3.2.2

TOPIC: PRICING 3.2.2.4

OB

JEC

TIVE

(S)

• Explain the factors considered in pricing.

• Explain the principles of pricing.

• Explain how Bill of Quantity items are priced.

KEY

PO

INTS

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard, blackboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

46

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES - TENDER PROCEDURES 3.2

SUBJECT: TENDER PERIOD 3.2.2

TOPIC: SUBMISSION OF TENDER 3.2.2.5

OB

JEC

TIVE

(S)

• Explain the process of tender submission.

KEY

PO

INTS

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard, blackboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: ½ hours

47

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES - TENDER PROCEDURES 3.2

SUBJECT: TENDER EVALUATION AND AWARD 3.2.3

TOPIC: TENDER EVALAUATION AND AWARD 3.2.3.1

OB

JEC

TIVE

(S)

• Explain the procedures of evaluating a tender.

• Explain the procedures of evaluating a contract.

• Explain what an agreed work programme is.

• Explain the process of awarding a contract.

KEY

PO

INTS

- Tender - open, scrutiny, evaluation, approval, clarification,

insurance, securities and bonds. - Notification - Commencement - Ratification

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard, blackboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 4 hours

48

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES – NEGOTIATIONS AND AWARD OF

CONTRACT 3.3

SUBJECT: PLANNING SITE PREPARATION BY CLIENT 3.3.1

TOPIC: SITE PLANNING BY CLIENT 3.3.1.1

OB

JEC

TIVE

(S)

• Explain the role of local authorities

• Explain the process of land compensation

• Explain the purpose of construction drawings

• Explain the effects of existing service infrastructure

• Explain advance payment conditions

KEY

PO

INTS

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard, blackboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

49

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES – NEGOTIATIONS AND AWARD OF

CONTRACTS 3.3

SUBJECT: PLANNING AND SITE PREPARATION BY CLIENTS 3.3.1

TOPIC: ROAD SAFETY 3.3.1.2

OB

JEC

TIVE

(S)

• Identify different types of road signs

• Identify the procedure of installing the road signs in accordance to standards and specifications

• Appreciate the importance of road safety

• Explain the safety requirements on a construction site.

KEY

PO

INTS

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 1hour

50

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES – NEGOTIATIONS AND AWARD OF

CONTRACTS 3.3

SUBJECT: PLANNING AND SITE PREPARATION BY CONTRACTOR 3.3.2

TOPIC: CASHFLOW AND FINANCE 3.3.2.1

OB

JEC

TIVE

(S)

• Define Cash Flow

• Explain the preparation of Cash Flow

• Explain how Cash Flow is related to work programme

KEY

PO

INTS

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard, blackboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 1 hour

51

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES - -NEGOTIATIONS AND AWARD

OF CONTRACTS 3.3

SUBJECT: PLANNING AND SITE PREPARATIONS BY CONTRACTOR 3.3.2

TOPIC: CONTRACTOR’S RESOURCES 3.3.2.2

OB

JEC

TIVE

(S

• Explain how staffing requirements are derived from work programme

• Explain how equipment/tools required are derived from the work programme.

• Explain how material procurement schedule is developed from the work programme

• Explain factors considered in location of camp site layout

• Explain considerations for setting up a site store

KEY

PO

INTS

- Labour, materials, equipments and tools - Camp site - Stores - Security and safety arrangements

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

52

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES - -NEGOTIATIONS AND AWARD

OF CONTRACTS 3.3

SUBJECT: PLANNING AND SITE PREPARATIONS BY CONTRACTOR 3.3.2

TOPIC: PLANNING FOR LABOUR FORCE 3.3.2.3

OB

JEC

TIVE

(S)

• Identify labour requirements

• Prepare labour schedules

KEY

PO

INTS

- Productivity guidelines

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

53

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACTING ACTIVITIES - -NEGOTIATIONS AND AWARD

OF CONTRACTS 3.3

SUBJECT: PLANNING AND SITE PREPARATION BY CONTRACTOR 3.3.2

TOPIC: REPORTING AND MONITORING 3.3.2.4

OB

JEC

TIVE

(S)

• Explain the importance of planning and monitoring system.

• Identify the tools used in monitoring and reporting system.

• Identify the structure followed when reporting.

KEY

PO

INTS

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard, flipcharts and reporting forms Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

54

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACT IMPLEMENTATION 4

SUBJECT: MOBILIZATION 4.1

TOPIC: MOBILIZATION 4.1.1

OB

JEC

TIVE

(S)

• Explain factors to be considered in planning camp site layout.

• Explain the process by which contractor is given possession of a site.

• Identify the procedure followed in labour recruitment.

• State and explain relevant legislation or conventions covering recruitment.

• Explain common labour laws and regulations.

KEY

PO

INTS

- Site camp arrangement - Possession of site - Recruitment procedures

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 4 hours

55

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACT IMPLEMENTATION 4

SUBJECT: CONTRACT SUPERVISION 4.2

TOPIC: WORKS SUPERVISION 4.2.1

OB

JEC

TIVE

(S)

• Identify the requirements for site inspection.

• Explain conditions set for site meetings.

• Identify issues that constitute agenda for site meetings.

• Explain the conditions set out for site instructions and variation orders.

• Identify steps in issuing site instruction

• Identify steps followed in issuing variation orders.

KEY

PO

INTS

- Site inspections - Site meeting - Site instructions and variation orders - Day works

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 6 hours

56

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACT IMPLEMENTATION 4

SUBJECT: CONTRACT SUPERVISION 4.2

TOPIC: WORKS APPROVAL AND PERFORMANCE 4.2.2

OB

JEC

TIVE

(S)

• Identify the steps followed in approving completed works.

• Be able to carry out work measurements.

• Explain the procedure followed in identifying non-performing contractors.

• Identify measures taken in case of non-performance by contractor.

KEY

PO

INTS

- Works approval, quality control tools - Standards and specifications - Workmanship

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 6 hours

57

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACT IMPLEMENATION 4

SUBJECT: CONTRACT SUPERVISION 4.2

TOPIC: SETTLEMENT OF DISPUTES 4.2.3

OB

JEC

TIVE

(S)

• Identify the relevant clauses dealing with disputes.

• Identify sources of disputes.

• Identify the procedure for settling disputes.

• Explain the role of an arbitrator

• Explain the conditions for the choice of an arbitrator.

KEY

PO

INTS

- Clauses - Disputes - Arbitration

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments: Clauses

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

58

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACT IMPLEMENTATION 4

SUBJECT: CONSTRUCTION MANAGEMENT 4.3

TOPIC: CONSTRUCTION MANAGEMENT 4.3.1

OB

JEC

TIVE

(S)

• Explain personnel management procedures.

• Explain equipment management procedures.

• Explain the procedures that are followed when procuring goods.

• Explain measures taken in managing finance.

• Explain the procedures followed in identifying non-performing parties.

KEY

PO

INTS

- Personnel

- Equipment - Procurements - Finance

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

59

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACT IMPLEMENTATION 4

SUBJECT: CONTRACT ADMINISTRATION 4.4

TOPIC: CONTRACT ADMINISTRATION 4.4.1

OB

JEC

TIVE

(S)

• Identify methods of work measurement.

• Prepare interim payment certificates.

• Prepare correctly evaluation claims.

• Raise claims for liquidated damages.

KEY

PO

INTS

- Measurements - Interim certificate - Claims - Liquidated damages

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

60

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: CONTRACT IMPLEMENTATION 4

SUBJECT: DEMOBILIZATION 4.5

TOPIC: DEMOBILIZATION 4.5.1

OB

JEC

TIVE

(S)

• Explain conditions for final works approval.

• Prepare documents for final work completion.

• Prepare and issue work approval certificates.

• Prepare a handing over certificate of works.

• Explain the requirement for handing over of works.

KEY

PO

INTS

- Completion of works - Works approval - Handing over

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

61

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: DEFECTS LIABILITY PERIOD 5

SUBJECT: FINAL DOCUMENTATION 5.1

TOPIC: FINAL DOCUMENTATION 5.1.1

OB

JEC

TIVE

(S)

• To be able to build up various drawings. • To identify various certificates used in a contract. • To fill correctly a final payment certificate.

KEY

PO

INTS

- As built drawings - Payment certificates

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

62

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: DEFECTS LIABILITY PERIOD 5

SUBJECT: MAINTENANCE OF WORKS 5.2

TOPIC: MAINTENANCE OF WORKS 5.2.1

OB

JEC

TIVE

(S)

• Define maintenance of works.

• Explain the importance of maintenance of works.

• Identify possible defects on labour-based works.

• Explain various methods of rectifying the defects.

• Define the maintenance period.

KEY

PO

INTS

- Maintenance of works - Defects - Maintenance period

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

63

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: DEFECTS LIABILITY PERIOD 5

SUBJECT: POST CONSTRUCTION EVALUATION 5.3

TOPIC: POST CONSTRUCTION EVALUATION 5.3.1

OB

JEC

TIVE

(S)

• Review implementation of work programme.

• Carry out cost analysis of the project.

KEY

PO

INTS

- Work programme - Profitability assessment

LESSON ORGANISATION: Lectures, discussions and exercises

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

64

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: PROJECT WORK 6

SUBJECT: PROJECT WORK 6.1

TOPIC: PROJECT WORK 6.1.1

OB

JEC

TIVE

(S)

• Conduct a technical feasibility of a proposed project

• Prepare a preliminary cost estimate of a proposed project

• Conduct a field survey to assess quantities of work for different activities.

• Formulate clauses / conditions required for a particular type of project.

• Build up prices for carrying out different activities and operations.

• Prepare a work programme for different activities and operations for implementing a project.

• Summarize and reflect on the course details learned and tie them together.

KEY

PO

INTS

LESSON ORGANISATION: Groupwork / Individual participation and classwork

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments: Reference library

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours

65

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: TRAINING EVALUATION 7

SUBJECT: EVALUATIONS 7.1

TOPIC: EVALUATIONS 7.1.1

OB

JEC

TIVE

(S)

• Course / facilities evaluations by filling of necessary forms by participants.

• Looking back and comparing of achievements to expectations.

KEY

PO

INTS

LESSON ORGANISATION: Classroom work and open discussions

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 4 hours

66

COURSE: SUPERVISING LABOUR BASED CONTRACTS Ref. No. MODULE: TRAINING EVALUATION 7

SUBJECT: CERTIFICATION AND COURSE CLOSURE 7.2

TOPIC: OFFICIAL COURSE CLOSURE 7.2.1

OB

JEC

TIVE

(S)

• Official closing by representative from Ministry of Roads & Public Works, Kenya KIHBT / KTC AND ILO-ASIST

• Issuing of course certificates.

KEY

PO

INTS

LESSON ORGANISATION: Open discussion

TEACHING AIDS AND OTHER REQUIREMENTS: Overhead projector, pinboard and flipcharts Assignments:

BA

SIC

MET

HO

DIC

AL

REF

EREN

CE

TIME REQUIRED: 2 hours