Team 12 – Cycle B Galveston Hurricane of 1900 EDTC 6341.63 November 13, 2011.
County: Field: Well:...
Transcript of County: Field: Well:...
Run 1
Run 2
Run 3@
@@
@ @ @ @
Witnessed B
yR
ecorded By
LocationU
nit Num
berT
ime
Logger On B
ottomT
ime
Circulation S
topped M
aximum
Recorded T
emperatures
RM
F @
MR
TR
M @
MR
TR
MC
Source R
MF
RM
C @
Measured T
emperature
RM
F @
Measured T
emperature
RM
@ M
easured Tem
peratureS
ource Of S
ample
PH
Fluid Loss
Viscosity
Density
MUD Type F
luid In Hole
Bit S
izeC
asing Schlum
bergerC
asing Driller S
ize @ D
epthT
op Log IntervalB
ottom Log Interval
Schlum
berger Depth
Depth D
rillerR
un Num
berLogging D
ate
@
402.00 ft
386.00 ft
402.00 ft
above Perm
. Datum
QU
AD
NE
W Y
OR
K
@
@ @ @ @
DA
N C
OLLIN
ST
IM Z
OT
AR
AB
RA
DF
OR
D3039
17:0031−
Aug−
2011
68 degF68
@5.617
68 @
7.490C
ALC
ULA
TE
DC
ALC
ULA
TE
D77 degF
@10.035 ohm
.m77 degF
@5.017 ohm
.m77 degF
@6.690 ohm
.mM
EA
SU
RE
D
9.3 lbm/gal
FR
ES
H W
AT
ER
BA
SE
D M
UD
12.250 in602 ft
603 ft@
13.375 in602 ft1482 ft1500 ft1528 ft1 31−
Aug−
2011
Witnessed B
yR
ecorded By
LocationU
nit Num
berT
ime
Logger On B
ottomT
ime
Circulation S
topped M
aximum
Recorded T
emperatures
RM
F @
MR
TR
M @
MR
TR
MC
Source R
MF
RM
C @
Measured T
emperature
RM
F @
Measured T
emperature
RM
@ M
easured Tem
peratureS
ource Of S
ample
PH
Fluid Loss
Viscosity
Density
MUD Type F
luid In Hole
Bit S
izeC
asing Schlum
bergerC
asing Driller S
ize @ D
epthT
op Log IntervalB
ottom Log Interval
Schlum
berger Depth
Depth D
rillerR
un Num
berLogging D
ate
402.00 ftD
.F.
386.00 ftG
.L.
402.00 ftK
.B.
KE
LLY B
US
HIN
GD
rilling Measured F
rom:
above Perm
. Datum
16.00 ftK
ELLY
BU
SH
ING
Log Measured F
rom:
CLA
RK
ST
OW
NT
ownship
Section
Elev.:
386.00 ftG
RO
UN
D LE
VE
LP
ermanent D
atum:
Elev.:
31−087−
27016−00−
00A
PI S
erial No.
County:
Field:
Location:
Well:
Company:
ROCKLAND
WILDCAT
LAT: 41.1039
NYSTA TANDEM LOT 1
SANDIA TECHNOLOGIES, LLC
LOCATION
LAT
: 41.1039
LON
G: −
74.027
4 AR
M C
ALIP
ER
LOG
PO
WE
RE
D P
OS
ITIO
NIN
G C
ALIP
ER
− P
PC
NE
W Y
OR
KR
OC
KLA
ND
WILD
CA
TN
YS
TA
TA
ND
EM
LOT
1
SA
ND
IA T
EC
HN
OLO
GIE
S, LLC
State:
County:
Field:
Well:
Com
pany:
Depth Control Remarks
1. ALL SCHLUMBERGER DEPTH CONTROL POLICIES FOLLOWED2. IDW USED AS PRIMARY DEPTH DEVICE3. Z−CHART USED AS SECONDARY DEPTH DEVICE4. 5. 6.
Stretch Correction:Tool Zero Check At Surface: 0.50 FT
RUN4: MSCT RUN5: MDT RUN6: CBL/VDL−USITRUN1: PEX−AIT RUN2: CMR−ECS−HNGS RUN3: PPC−SSCAN−FMI
ALL WELLSITE DATA, PERMIT, MUD REPORT, SOP PROVIDED BY CLIENTTOOLS RUN AS PER TOOL SKETCH, W/BOWSPRING & STANDOFFS ON AIT
THANK YOU FOR CHOOSING SCHLUMBERGERREMARKS: RUN NUMBER 1 REMARKS: RUN NUMBER 2
CBL/VDL−USITOS5: OS5:MDT−MSCTOS4: OS4:PPC−SSCAN−FMIOS3: OS3:CMR−ECS−HNGSOS2: OS2:PEX−AITOS1: OS1:
OTHER SERVICES1 OTHER SERVICES2
DISCLAIMERTHE USE OF AND RELIANCE UPON THIS RECORDED−DATA BY THE HEREIN NAMED COMPANY (AND ANY OF ITSAFFILIATES, PARTNERS, REPRESENTATIVES, AGENTS, CONSULTANTS AND EMPLOYEES) IS SUBJECT TO THE TERMSAND CONDITIONS AGREED UPON BETWEEN SCHLUMBERGER AND THE COMPANY, INCLUDING: (a) RESTRICTIONS ONUSE OF THE RECORDED−DATA; (b) DISCLAIMERS AND WAIVERS OF WARRANTIES AND REPRESENTATIONS REGARDINGCOMPANY’S USE OF AND RELIANCE UPON THE RECORDED−DATA; AND (c) CUSTOMER’S FULL AND SOLE RESPONSIBILITYFOR ANY INFERENCE DRAWN OR DECISION MADE IN CONNECTION WITH THE USE OF THIS RECORDED−DATA.
DEPTH SUMMARY LISTING
Depth System Equipment
Depth Control Parameters
Date Created: 31−AUG−2011 1:45:23
Depth Measuring Device
Type: IDW−BSerial Number: 2828Calibration Date: 1−JAN−2011Calibrator Serial Number: 33Calibration Cable Type: 7−39P LXSWheel Correction 1: −5Wheel Correction 2: −4
Tension Device
Type: CMTD−B/ASerial Number: 2929Calibration Date: 2−AUG−2011Calibrator Serial Number: 1095Number of Calibration Points: 10Calibration RMS: 45Calibration Peak Error: 71
Logging Cable
Type: 7−39P LXSSerial Number: 3039Length: 13300 FT
Conveyance Method: WirelineRig Type: LAND
Log Sequence: First Log In the Well
Rig Up Length At Surface:Rig Up Length At Bottom:Rig Up Length Correction:Stretch Correction:
Run 3
Run 4
@@
@ @ @ @
51.2MAXS−B MASS−BAMAXS−BA
72.2MAPC−B MAPC−BAECH−SFMAMS−BA 8235
78.7PPC2 PPC2−BPPC_CAL_STD
85.2EDTC−B EDTH−BEDTC−BEDTG−A/B
LEH−QT
56.8MAMS−PS
72.2PPC_Cartr
77.6Calipers
78.7EDTCB Ele TelStatus
EFTB DIAG 79.8Gamma Ray 81.7CTEM 85.2Mud Tempe
MDSB_EDTC
RUN 1 RUN 2
SLB CREW: THIMLAR / CANNON
CMR TUNED @ 1184’RUN1 LOGGED AT: REPEAT & MAIN @ 1600’/HR3 MAX TEMP THERMOMETERS RUN IN HEAD, PER RUN, MAX TEMP FROM HTEM.GEO REQUESTED MATR = SANDSTONE / MDEN = 2.65 G/CC
RUN4: MSCT RUN5: MDT RUN6: CBL/VDL−USIT
STOP STOPSTART STARTLOGGED INTERVAL LOGGED INTERVAL0 ftFLUID LEVEL: FLUID LEVEL:
19C0−187PROGRAM VERSION: PROGRAM VERSION:AXPS−00185SERVICE ORDER #: SERVICE ORDER #:
RUN 1 RUN 2EQUIPMENT DESCRIPTION
DOWNHOLE EQUIPMENT
88.1LEH−QT LEH−QT MDSB_EDTC
SURFACE EQUIPMENTWITM (EDTS)−A
OP System Version: 19C0−187
FBST−B 19C0−187 PPC1 19C0−187MAXS−B 19C0−187 MAPC−B 19C0−187PPC2 19C0−187 EDTC−B 19C0−187
Integrated Hole/Cement Volume Summary Hole Volume = 106.68 F3
Cement Volume = 46.04 F3 (assuming 9.63 IN casing O.D.)
Computed from 1500.0 FT to 1380.5 FT using data channel(s) CRD1_PPC1 CRD2_PPC1 CRD3_PPC1 CRD4_PPC1
Output DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_084PUP FN:127 PRODUCER 31−Aug−2011 22:40 1500.0 FT 82.5 FT
RTB FMI_CAL_MAXS_MAPC_084PUP FN:128 PRODUCER 31−Aug−2011 22:40 1500.0 FT 82.5 FT
PPC1 Radius 3 (CRD3_PPC1)(IN)2 12
PPC1 Radius 4 (CRD4_PPC1)(IN)2 12
PPC1 Hole Diameter 1 (HD1_PPC1)(IN)6 16
PPC1 Hole Diameter 2 (HD2_PPC1)(IN)6 16
Tension (TENS)(LBF)10000 0
Cable
Tool/Tot.Drag
From D3Tto STIA
PIP SUMMARY
Integrated Hole Volume Minor Pip Every 10 F3Integrated Hole Volume Major Pip Every 100 F3
Integrated Cement Volume Minor Pip Every 10 F3Integrated Cement Volume Major Pip Every 100 F3
Time Mark Every 60 S
Company: SANDIA TECHNOLOGIES, LLC Well: NYSTA TANDEM LOT 1
Input DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT
ALL LENGTHS IN FEETMEASUREMENTS RELATIVE TO TOOL ZERO
MAXIMUM STRING DIAMETER 5.00 IN
24.4FBST−B ECH−MRAFBCC−AAH−185FBSH−AGPIC−FFBSC−BFBSS−B
30.9PPC1 PPC1−BPPC_CAL_STD
TOOL ZERO0.0Tension DHRU
HV DF ACCZ 1.3FBCC FBSC
PADS
24.4PPC_Cartr
29.8Calipers
30.9MAXS−PS
200
Bit Size (BS)(IN)6 16
PPC1 Radius 1 (CRD1_PPC1)(IN)2 12
PPC1 Radius 2 (CRD2_PPC1)(IN)2 12
PPC1 Ellipse Hole Diameter 1 (EHD1_PPC1)
(IN)6 16
PPC1 Ellipse Hole Diameter 2 (EHD2_PPC1)
(IN)6 16
PPC1 Relative Bearing (RB_PPC1)(DEG)0 360
StuckStretch(STIT)
(F)0 50
CableDrag
From STIAto STIT
100
PPC1
400
300
700
500
600
900
800
1100
1000
1300
1200
Parameters
DLIS Name Description ValuePPC1: Powered Positioning Device/Caliper 1
Bit Size (BS)(IN)6 16
PPC1 Radius 1 (CRD1_PPC1)(IN)2 12
PPC1 Radius 2 (CRD2_PPC1)(IN)2 12
PPC1 Radius 3 (CRD3_PPC1)(IN)2 12
PPC1 Radius 4 (CRD4_PPC1)(IN)2 12
PPC1 Ellipse Hole Diameter 1 (EHD1_PPC1)
(IN)6 16
PPC1 Ellipse Hole Diameter 2 (EHD2_PPC1)
(IN)6 16
PPC1 Hole Diameter 1 (HD1_PPC1)(IN)6 16
PPC1 Hole Diameter 2 (HD2_PPC1)(IN)6 16
PPC1 Relative Bearing (RB_PPC1)(DEG)0 360
StuckStretch(STIT)
(F)0 50
Tension (TENS)(LBF)10000 0
CableDrag
From STIAto STIT
Tool/Tot.Drag
From D3Tto STIA
PIP SUMMARY
Integrated Hole Volume Minor Pip Every 10 F3Integrated Hole Volume Major Pip Every 100 F3
Integrated Cement Volume Minor Pip Every 10 F3Integrated Cement Volume Major Pip Every 100 F3
Time Mark Every 60 S
1500
1400
OP System Version: 19C0−187
FBST−B 19C0−187 PPC1 19C0−187MAXS−B 19C0−187 MAPC−B 19C0−187PPC2 19C0−187 EDTC−B 19C0−187
Integrated Hole/Cement Volume Summary Hole Volume = 106.68 F3
Cement Volume = 46.04 F3 (assuming 9.63 IN casing O.D.)
Computed from 1500.0 FT to 1380.5 FT using data channel(s) CRD1_PPC1 CRD2_PPC1 CRD3_PPC1 CRD4_PPC1
Input DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT
Output DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_081PUP FN:123 PRODUCER 31−Aug−2011 22:21 1500.0 FT 82.5 FT
RTB FMI_CAL_MAXS_MAPC_081PUP FN:124 PRODUCER 31−Aug−2011 22:21 1500.0 FT 82.5 FT
Company: SANDIA TECHNOLOGIES, LLC Well: NYSTA TANDEM LOT 1
Output DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_084PUP FN:127 PRODUCER 31−Aug−2011 22:40
RTB FMI_CAL_MAXS_MAPC_084PUP FN:128 PRODUCER 31−Aug−2011 22:40
PIP SUMMARY
Integrated Hole Volume Minor Pip Every 10 F3Integrated Hole Volume Major Pip Every 100 F3
Integrated Cement Volume Minor Pip Every 10 F3
OP System Version: 19C0−187
FBST−B 19C0−187 PPC1 19C0−187MAXS−B 19C0−187 MAPC−B 19C0−187PPC2 19C0−187 EDTC−B 19C0−187
Format: PPC1_Logging Vertical Scale: 5" per 100’ Graphics File Created: 31−Aug−2011 22:40
PPC1: Powered Positioning Device/Caliper 1PPC1 Caliper Type CAL_STD
CLBD_PPC PPC Calibration data selection ROMMAPC−B: Multimode Array Sonic Power Cartridge
BS Bit Size 12.250 INPPC2: Powered Positioning Device/Caliper 2
PPC2 Caliper Type CAL_STDCLBD_PPC PPC Calibration data selection ROM
DIP: Dip ComputationDIP Tool FBST
DIR: Directional Survey ComputationSPVD TVD of Starting Point 1499.87 FTTIMD Along−hole depth of Tie−in Point 650 FTTIVD TVD of Tie−in Point 650 FT
STI: Stuck Tool IndicatorLBFR Trigger for MAXIS First Reading Label TDLSTKT STI Stuck Threshold 2.5 FTTDD Total Depth − Driller 1528.00 FTTDL Total Depth − Logger 1500.00 FT
HOLEV: Integrated Hole/Cement VolumeFCD Future Casing (Outer) Diameter 9.625 INHVCS Integrated Hole Volume Caliper Selection AUTOMATIC
System and MiscellaneousDO Depth Offset for Playback 0.0 FTPP Playback Processing OFFTD Total Depth 1500 FT
Input DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT
Output DLIS Files
200
Bit Size (BS)(IN)24 4
Bit Size (BS)(IN)4 24
Bit Size (BS)(IN)24 4
PPC1 Tool Center 1 (ETC1_PPC1)
(IN)−10 10
PPC1 Tool Center 2 (ETC2_PPC1)
(IN)−10 10
PPC1 Ellipse Hole Diameter 1(EHD1_PPC1)
(IN)24 4
PPC1 Ellipse Hole Diameter 2(EHD2_PPC1)
(IN)4 24
PPC1 Hole Diameter 1 (HD1_PPC1)
(IN)24 4
PPC1 Hole Diameter 2 (HD2_PPC1)
(IN)4 24
PPC1 Relative Bearing (RB_PPC1)(DEG)0 360
StuckStretch(STIT)
(F)0 50
Tension (TENS)(LBF)10000 0
CableDrag
From D4Tto STIT
FormationFrom F2 to EHD1_PPC1
FormationFrom EHD2_PPC1 to F3
HD differenceFrom EHD1_PPC1 to HD1_
PPC1
HD differenceFrom HD2_PPC1 to EHD2_
PPC1
Tool/Tot.Drag
From D4Tto STIA
Integrated Cement Volume Minor Pip Every 10 F3Integrated Cement Volume Major Pip Every 100 F3
Integrated Transit Time Minor Pip Every 1 MSIntegrated Transit Time Major Pip Every 10 MS
Time Mark Every 60 S
100
PPC 1
400
300
600
500
800
700
1000
1100
900
1300
1100
1200
Bit Size (BS)(IN)24 4
Bit Size (BS)(IN)4 24
Bit Size (BS)(IN)24 4
PPC1 Tool Center 1 (ETC1_PPC1)
(IN)−10 10
PPC1 Tool Center 2 (ETC2_PPC1)
(IN)−10 10
PPC1 Ellipse Hole Diameter 1(EHD1_PPC1)
(IN)24 4
PPC1 Ellipse Hole Diameter 2(EHD2_PPC1)
(IN)4 24
PPC1 Hole Diameter 1 (HD1_PPC1)
PPC1 Hole Diameter 2 (HD2_PPC1)
PPC1 Relative Bearing (RB_PPC1)
StuckStretch(STIT)
(F)0 50
CableDrag
From D4Tto STIT
Tool/Tot.Drag
From D4T
1500
1400
Company: SANDIA TECHNOLOGIES, LLC Well: NYSTA TANDEM LOT 1
Input DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT
Output DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_081PUP FN:123 PRODUCER 31−Aug−2011 22:21
RTB FMI_CAL_MAXS_MAPC_081PUP FN:124 PRODUCER 31−Aug−2011 22:21
OP System Version: 19C0−187
FBST−B 19C0−187 PPC1 19C0−187MAXS−B 19C0−187 MAPC−B 19C0−187PPC2 19C0−187 EDTC−B 19C0−187
Format: PPC1_HoleDiameter Vertical Scale: 5" per 100’ Graphics File Created: 31−Aug−2011 22:21
TIVD TVD of Tie−in Point 650 FTSTI: Stuck Tool Indicator
LBFR Trigger for MAXIS First Reading Label TDLSTKT STI Stuck Threshold 2.5 FTTDD Total Depth − Driller 1528.00 FTTDL Total Depth − Logger 1500.00 FT
HOLEV: Integrated Hole/Cement VolumeFCD Future Casing (Outer) Diameter 9.625 INHVCS Integrated Hole Volume Caliper Selection AUTOMATIC
System and MiscellaneousDO Depth Offset for Playback 0.0 FTPP Playback Processing OFFTD Total Depth 1500 FT
Input DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT
Parameters
DLIS Name Description ValuePPC1: Powered Positioning Device/Caliper 1
PPC1 Caliper Type CAL_STDCLBD_PPC PPC Calibration data selection ROM
MAPC−B: Multimode Array Sonic Power CartridgeBS Bit Size 12.250 INITTS Integrated Transit Time Source DTCO
PPC2: Powered Positioning Device/Caliper 2PPC2 Caliper Type CAL_STD
CLBD_PPC PPC Calibration data selection ROMDIP: Dip Computation
DIP Tool FBSTDIR: Directional Survey Computation
SPVD TVD of Starting Point 1499.87 FTTIMD Along−hole depth of Tie−in Point 650 FTTIVD TVD of Tie−in Point 650 FT
STI: Stuck Tool Indicator
PPC1)(IN)24 4
PPC1)(IN)4 24
PPC1)(DEG)0 360
Tension (TENS)(LBF)10000 0
FormationFrom F2 to EHD1_PPC1
FormationFrom EHD2_PPC1 to F3
HD differenceFrom EHD1_PPC1 to HD1_
PPC1
HD differenceFrom HD2_PPC1 to EHD2_
PPC1
DragFrom D4T
to STIA
PIP SUMMARY
Integrated Hole Volume Minor Pip Every 10 F3Integrated Hole Volume Major Pip Every 100 F3
Integrated Cement Volume Minor Pip Every 10 F3Integrated Cement Volume Major Pip Every 100 F3
Integrated Transit Time Minor Pip Every 1 MSIntegrated Transit Time Major Pip Every 10 MS
Time Mark Every 60 S
Bit Size (BS)(IN)6 16
PPC2 Radius 1 (CRD1_PPC2)(IN)2 12
PPC2 Radius 2 (CRD2_PPC2)(IN)2 12
PPC2 Ellipse Hole Diameter 1 (EHD1_PPC2)
(IN)6 16
PPC2 Ellipse Hole Diameter 2 (EHD2_PPC2)
(IN)6 16
PPC2 Relative Bearing (RB_PPC2)(DEG)0 360
StuckStretch(STIT)
(F)0 50
CableDrag
From STIAto STIT
100
PPC2
OP System Version: 19C0−187
FBST−B 19C0−187 PPC1 19C0−187MAXS−B 19C0−187 MAPC−B 19C0−187PPC2 19C0−187 EDTC−B 19C0−187
Integrated Hole/Cement Volume Summary Hole Volume = 106.68 F3
Cement Volume = 46.04 F3 (assuming 9.63 IN casing O.D.)
Computed from 1500.0 FT to 1380.5 FT using data channel(s) CRD1_PPC1 CRD2_PPC1 CRD3_PPC1 CRD4_PPC1
DEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT
Output DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_084PUP FN:127 PRODUCER 31−Aug−2011 22:40 1500.0 FT 82.5 FT
RTB FMI_CAL_MAXS_MAPC_084PUP FN:128 PRODUCER 31−Aug−2011 22:40 1500.0 FT 82.5 FT
PPC2 Radius 3 (CRD3_PPC2)(IN)2 12
PPC2 Radius 4 (CRD4_PPC2)(IN)2 12
PPC2 Ellipse Hole Diameter 2 (EHD2_
PPC2 Hole Diameter 1 (HD1_PPC2)(IN)6 16
PPC2 Hole Diameter 2 (HD2_PPC2)(IN)6 16
Tension (TENS)(LBF)10000 0
Cable
Tool/Tot.Drag
From D3Tto STIA
PIP SUMMARY
Integrated Hole Volume Minor Pip Every 10 F3Integrated Hole Volume Major Pip Every 100 F3
Integrated Cement Volume Minor Pip Every 10 F3Integrated Cement Volume Major Pip Every 100 F3
Time Mark Every 60 S
300
200
500
600
400
800
700
1000
900
1200
1100
1400
1300
OP System Version: 19C0−187
FBST−B 19C0−187 PPC1 19C0−187MAXS−B 19C0−187 MAPC−B 19C0−187PPC2 19C0−187 EDTC−B 19C0−187
Format: PPC2_Logging Vertical Scale: 5" per 100’ Graphics File Created: 31−Aug−2011 22:40
PPC1: Powered Positioning Device/Caliper 1PPC1 Caliper Type CAL_STD
CLBD_PPC PPC Calibration data selection ROMMAPC−B: Multimode Array Sonic Power Cartridge
BS Bit Size 12.250 INPPC2: Powered Positioning Device/Caliper 2
PPC2 Caliper Type CAL_STDCLBD_PPC PPC Calibration data selection ROM
DIP: Dip ComputationDIP Tool FBST
DIR: Directional Survey ComputationSPVD TVD of Starting Point 1499.87 FTTIMD Along−hole depth of Tie−in Point 650 FTTIVD TVD of Tie−in Point 650 FT
STI: Stuck Tool IndicatorLBFR Trigger for MAXIS First Reading Label TDLSTKT STI Stuck Threshold 2.5 FTTDD Total Depth − Driller 1528.00 FTTDL Total Depth − Logger 1500.00 FT
HOLEV: Integrated Hole/Cement VolumeFCD Future Casing (Outer) Diameter 9.625 INHVCS Integrated Hole Volume Caliper Selection AUTOMATIC
System and MiscellaneousDO Depth Offset for Playback 0.0 FTPP Playback Processing OFFTD Total Depth 1500 FT
Input DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT
Output DLIS Files
Parameters
DLIS Name Description ValuePPC1: Powered Positioning Device/Caliper 1
Bit Size (BS)(IN)6 16
PPC2 Radius 1 (CRD1_PPC2)(IN)2 12
PPC2 Radius 2 (CRD2_PPC2)(IN)2 12
PPC2 Radius 3 (CRD3_PPC2)(IN)2 12
PPC2 Radius 4 (CRD4_PPC2)(IN)2 12
PPC2 Ellipse Hole Diameter 1 (EHD1_PPC2)
(IN)6 16
PPC2 Ellipse Hole Diameter 2 (EHD2_PPC2)
(IN)6 16
PPC2 Hole Diameter 1 (HD1_PPC2)(IN)6 16
PPC2 Hole Diameter 2 (HD2_PPC2)(IN)6 16
PPC2 Relative Bearing (RB_PPC2)(DEG)0 360
StuckStretch(STIT)
(F)0 50
Tension (TENS)(LBF)10000 0
CableDrag
From STIAto STIT
Tool/Tot.Drag
From D3Tto STIA
PIP SUMMARY
Integrated Hole Volume Minor Pip Every 10 F3Integrated Hole Volume Major Pip Every 100 F3
Integrated Cement Volume Minor Pip Every 10 F3Integrated Cement Volume Major Pip Every 100 F3
Time Mark Every 60 S
1500
Bit Size (BS)(IN)24 4
Bit Size (BS)(IN)4 24
Bit Size (BS)(IN)24 4
PPC2 Tool Center 1 (ETC1_PPC2)
(IN)−10 10
PPC2 Tool Center 2 (ETC2_PPC2)
(IN)−10 10
PPC2 Ellipse Hole Diameter 1(EHD1_PPC2)
(IN)24 4
PPC2 Ellipse Hole Diameter 2(EHD2_PPC2)
(IN)4 24
PPC2 Hole Diameter 1 (HD1_PPC2)
(IN)24 4
PPC2 Hole Diameter 2 (HD2_PPC2)
(IN)4 24
PPC2 Relative Bearing (RB_PPC2)(DEG)0 360
StuckStretch(STIT)
(F)0 50
Tension (TENS)(LBF)10000 0
CableDrag
From D4Tto STIT
FormationFrom F2 to EHD1_PPC2
FormationFrom EHD2_PPC2 to F3
HD differenceFrom EHD1_PPC2 to HD1_
PPC2
HD differenceFrom HD2_PPC2 to EHD2_
PPC2
Tool/Tot.Drag
From D4Tto STIA
Integrated Cement Volume Minor Pip Every 10 F3Integrated Cement Volume Major Pip Every 100 F3
Integrated Transit Time Minor Pip Every 1 MSIntegrated Transit Time Major Pip Every 10 MS
Time Mark Every 60 S
100
PPC 2
OP System Version: 19C0−187
FBST−B 19C0−187 PPC1 19C0−187MAXS−B 19C0−187 MAPC−B 19C0−187PPC2 19C0−187 EDTC−B 19C0−187
Integrated Hole/Cement Volume Summary Hole Volume = 106.68 F3
Cement Volume = 46.04 F3 (assuming 9.63 IN casing O.D.)
Computed from 1500.0 FT to 1380.5 FT using data channel(s) CRD1_PPC1 CRD2_PPC1 CRD3_PPC1 CRD4_PPC1
Input DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT
Output DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_081PUP FN:123 PRODUCER 31−Aug−2011 22:21 1500.0 FT 82.5 FT
RTB FMI_CAL_MAXS_MAPC_081PUP FN:124 PRODUCER 31−Aug−2011 22:21 1500.0 FT 82.5 FT
Company: SANDIA TECHNOLOGIES, LLC Well: NYSTA TANDEM LOT 1
Output DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_084PUP FN:127 PRODUCER 31−Aug−2011 22:40
RTB FMI_CAL_MAXS_MAPC_084PUP FN:128 PRODUCER 31−Aug−2011 22:40
PIP SUMMARY
Integrated Hole Volume Minor Pip Every 10 F3Integrated Hole Volume Major Pip Every 100 F3
Integrated Cement Volume Minor Pip Every 10 F3
300
200
500
400
700
600
900
800
1100
1200
1100
1000
1400
1300
Parameters
DLIS Name Description ValuePPC1: Powered Positioning Device/Caliper 1
PPC1 Caliper Type CAL_STDCLBD_PPC PPC Calibration data selection ROM
MAPC−B: Multimode Array Sonic Power CartridgeBS Bit Size 12.250 INITTS Integrated Transit Time Source DTCO
PPC2: Powered Positioning Device/Caliper 2PPC2 Caliper Type CAL_STD
CLBD_PPC PPC Calibration data selection ROMDIP: Dip Computation
DIP Tool FBSTDIR: Directional Survey Computation
SPVD TVD of Starting Point 1499.87 FTTIMD Along−hole depth of Tie−in Point 650 FTTIVD TVD of Tie−in Point 650 FT
PPC2)(IN)24 4
PPC2)(IN)4 24
PPC2)(DEG)0 360
Tension (TENS)(LBF)10000 0
FormationFrom F2 to EHD1_PPC2
FormationFrom EHD2_PPC2 to F3
HD differenceFrom EHD1_PPC2 to HD1_
PPC2
HD differenceFrom HD2_PPC2 to EHD2_
PPC2
DragFrom D4T
to STIA
PIP SUMMARY
Integrated Hole Volume Minor Pip Every 10 F3Integrated Hole Volume Major Pip Every 100 F3
Integrated Cement Volume Minor Pip Every 10 F3Integrated Cement Volume Major Pip Every 100 F3
Integrated Transit Time Minor Pip Every 1 MSIntegrated Transit Time Major Pip Every 10 MS
Time Mark Every 60 S
Bit Size (BS)(IN)24 4
Bit Size (BS)(IN)4 24
Bit Size (BS)(IN)24 4
PPC2 Tool Center 1 (ETC1_PPC2)
(IN)−10 10
PPC2 Tool Center 2 (ETC2_PPC2)
(IN)−10 10
PPC2 Ellipse Hole Diameter 1(EHD1_PPC2)
(IN)24 4
PPC2 Ellipse Hole Diameter 2(EHD2_PPC2)
(IN)4 24
PPC2 Hole Diameter 1 (HD1_PPC2)
PPC2 Hole Diameter 2 (HD2_PPC2)
PPC2 Relative Bearing (RB_PPC2)
StuckStretch(STIT)
(F)0 50
CableDrag
From D4Tto STIT
Tool/Tot.Drag
From D4T
1500
POWERED POSITIONING CALIPER − PPC4 ARM CALIPER LOG
Field:County:State:
WILDCATROCKLANDNEW YORK
Input DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_074PUP FN:110 PRODUCER 31−Aug−2011 20:42 1500.0 FT 82.5 FT
Output DLIS FilesDEFAULT FMI_CAL_MAXS_MAPC_081PUP FN:123 PRODUCER 31−Aug−2011 22:21
RTB FMI_CAL_MAXS_MAPC_081PUP FN:124 PRODUCER 31−Aug−2011 22:21
OP System Version: 19C0−187
FBST−B 19C0−187 PPC1 19C0−187MAXS−B 19C0−187 MAPC−B 19C0−187PPC2 19C0−187 EDTC−B 19C0−187
Format: PPC2_HoleDiameter Vertical Scale: 5" per 100’ Graphics File Created: 31−Aug−2011 22:21
TIVD TVD of Tie−in Point 650 FTSTI: Stuck Tool Indicator
LBFR Trigger for MAXIS First Reading Label TDLSTKT STI Stuck Threshold 2.5 FTTDD Total Depth − Driller 1528.00 FTTDL Total Depth − Logger 1500.00 FT
HOLEV: Integrated Hole/Cement VolumeFCD Future Casing (Outer) Diameter 9.625 INHVCS Integrated Hole Volume Caliper Selection AUTOMATIC
System and MiscellaneousDO Depth Offset for Playback 0.0 FTPP Playback Processing OFFTD Total Depth 1500 FT
Company:
Well:Field:
SANDIA TECHNOLOGIES, LLC
NYSTA TANDEM LOT 1WILDCAT