Corporate ppt
Transcript of Corporate ppt
www.company.com
EMPLOYEE ORIENTATION
www.company.com
COMPANY BACKGROUND
www.company.com
WHO ARE WE?
GTI was formed to serve the growing demand of building technical services in the country.
GTI specializes on safety, convenience, efficiency and the satisfaction of building residents and owners for a worry free building operation.
• GTI is composed of an experienced and well equipped team,continuously searching for applicable technologies through regular seminars and training both here and abroad.
www.company.com
WHAT WE OFFER?
Supply of labor, parts and materials for various building, electrical & mechanical requirements such as but not limited to:
• Fire Detection & Alarm System• Elevator and Escalator
www.company.com
WHAT WE OFFER?Design, Modification, Installation, Fabrication and Construction,Operation and Maintenance for the following residential, industrial and commercial application : •Fire Detection & Alarm System•Elevator and Escalator
•Building Life & Safety Systems Integration•CCTV,•Elevator automatic homing •Pressurization fan•BMS
www.company.com
THE OFFICERS
Ernan G. San Juan President
Eugene B. Santiago Asst. VP- Operation
Neoli Mae L. Kho Sr. Asst. VP- Finance and Administration
Jessie P. Medallo Asst. VP- Finance and Administration
www.company.com
ACCOMPLISHED PROJECTS
www.company.com
LIFT PROJECTS
A. LIFT
TWO WORLD SQUARE WORLD FINANCE PLAZA
www.company.com
1800 EASTWOOD AVENUE EL JARDIN DEL PRESIDENTE 2
LIFT PROJECTS
www.company.com
One Campus Place
Commerce and Industry Plaza
Mckinley Garden Villas 2
The Woodridge Residences
8 Upper Mckinley
One Central Park
Eastwood Parkview Mall
El Jardine del Presidente 2
The Cambridge Village and Parking Bldg.
City Place Binondo
OTHER LIFT PROJECTS
www.company.com
OTHER LIFT PROJECTS
Bellagio Retail
Newport Office Bldg.
E-Commerce Plaza
IBM Plaza
Eastwood Parkview 1
Eastwood Parkview 2
Numancia Residences
Binondo Medical Center
The Salcedo Park
Greenbelt Chancellor
One Beverly Place
www.company.com
FDAS PROJECTS
E-COMMERCE PLAZA MANHATTAN PARKWAY
www.company.com
FDAS PROJECTS
MARRIOTT HOTEL CAMBRIDGE VILLAGE
www.company.com
OTHER FDAS PROJECTS
Richmonde Hotel
Eastwood Parkview Residences
El Jardine del Presidente
Two World Square
One Campus Place
Forbeswood Center
Mother and Child Hospital
The Cambridge Village
Marriott Hotel
Airforce General Hospital
www.company.com
POLICIES AND PROCEDURES
www.company.com
OFFICIAL WORK SCHEDULE Monday to Friday 8: 30 am to 5: 30 pm
Coffee Break 15 minutes am and pm
Lunch Break 12:00 nn to 1:00 pm (weekdays)
Saturday 8:30 am to 12:30 pm
www.company.com
ATTENDANCE AND PUNCTUALITY
TARDINESS
• Reporting late for work at the prescribed official time.
• No grace period. One minute late is one minute deduction.
• Tardiness of 1 ½ hrs beyond the start of the regular working hours or a time-in of 10:01 am shall already be considered as half day.
www.company.com
EXCESSIVE TARDINESS
• Two hundred sixty minutes (260) minutes or more in one month.
• More than seven (7) times in one month.
ATTENDANCE AND PUNCTUALITY
www.company.com
VIOLATIONS AND SANCTIONS
– Violations within a 12-month period1 2 3 4
5
Excessive Tardiness VW WW 3S 5SD
Legend:VW Verbal warning WW Written warning 3S 3 days suspension5S 5 days suspensionD Dismissal
www.company.com
UNDERTIME• Leaving the office at 3:31pm onwards.
• With proper authorization from Immediate Superior and Department Head.
• Unauthorized undertime will be subject to disciplinary action.
• All undertimes incurred shall be deducted from the salary of employee.
www.company.com
ABSENCES• AUTHORIZED AND EXCUSED LEAVES
(PROPER PROCEDURE)With approval of the immediate superior & department heads or up to be considered official & for it to be chargeable to the Vacation/Sick Leave credits of the employee.VL and expected absence should be approved by his/her immediate superior at least two (2) days before the date of absence.SL or urgent/emergency reasons, immediate superior or department head must be informed not later than 9:00Am that day.
www.company.com
ABSENCESUNAUTHORIZED AND UNEXCUSED LEAVES
When proper procedure is not observed.Fails to work immediately after the expiration of approved leave unless due to legitimate and compelling reasons.
Types:Simple Case of Absence- 1-2 daysExcessive absence-3-5 daysAbandonment of work – more than 5 days or if there is a Clear indiaction of not returning to work.
www.company.com
ABSENCES
Types of Unauthorized and Unexcused Leave:
Simple Case of Absence: 1-2 days
Excessive absence: 3-5 days
Abandonment of work: more than 5 days or if there is a clear indication of not returning to work.
www.company.com
ABSENCES
– Violations within a 12-month period1 2 3 4
5
Schedule of Penalties
Simple Case of Absence WW 3S 5S DExcessive Absence 5S DAbandonment of work D
Legend:VW Verbal warning WW Written warning 3S 3 days suspension5S 5 days suspensionD Dismissal
www.company.com
OVERTIME