CONSTRUCTION SITE VISIT 1 - 08/06/2015 Next meeting: 08/12/2015 8:30 AM
ARCHIREPORT
Le Gacel 35410 ST AUBIN DU PAVAIL
0223256198
0660244107
Villa Martin
M. Martin
10 Avenue des Champs-Élysées 75000 Paris
+33 2 23 25 61 98
Description:
Realization of a wooden skeleton house
P PRESENT A ABSENT E EXCUSED N ABSENT NOT EXCUSED S SUMMONED AT THE NEXT MEETING N NUMBER OF ABSENCES
PROJECT MANAGEMENT / PROJECT OWNERSHIP Phone E-mail S N
Chloé Moreau (ArchiReport) Marketing [email protected] N 1
COMPANIES Phone E-mail S N
Julien Cotteaux ArchiReport +33 6 50 07 79 82 [email protected] P
Morgan Bigot ArchiReport +33 6 60 24 41 07 [email protected] P
Simon Bos ArchiReport +33 6 78 47 97 31 [email protected] A
Arnaud Rocuet ArchiReport [email protected] E
SIGNATURES
Julien Cotteaux(ArchiReport)
Morgan Bigot(ArchiReport)
Simon Bos (ArchiReport) Arnaud Rocuet(ArchiReport)
Chloé Moreau(ArchiReport)
CALENDAR
Project start: 08/06/2015 Project end: 06/03/2016
DESCRIPTION
Validation phase of the wooden skeleton
DISTRIBUTION OF WORKS BY ACTOR Works / Sub-works Date work starts Date work ends Progress
Simon Bos (ArchiReport) Carpentry 10/06/2015 10/06/2016 0%
Arnaud Rocuet (ArchiReport) Structural work 07/06/2015 04/06/2016 8%
DASHBOARD In progress Pending Closed
General remarks 1 0 0
ArchiReport ( Julien Cotteaux) 0 1 0
1 Structural work 1 0 0
2 Carpentry 1 1 0
1/2
GENERAL REMARKS
Opened on the 8/6/15, to do before the 9/13/15 1.1
Be careful not to damage the patio while moving the construction equipment
ARCHIREPORT (JULIEN COTTEAUX)
Opened on the 8/6/15, pending since the 8/6/15 1.3
The section of that beam is not correct. It must be 175x263mm
1 STRUCTURAL WORK
Attached stakeholders: ArchiReport (Arnaud Rocuet)
Opened on the 11/4/16 1.4
See picture attached
2 CARPENTRY
Attached stakeholders: ArchiReport (Simon Bos)
Opened on the 8/6/15 1.2
A wood reinforcement beam is missing at the entry of that room
Opened on the 8/6/15, pending since the 8/6/15 1.3
Notify to the remark 1.3, ArchiReport ( Julien Cotteaux)Attached stakeholders (1): ArchiReport ( Julien Cotteaux)
2/2
SCHEDULE
Years
Month
Weeks
07 08 09 10 11
2015
12 01 02 03 04 05 06 07 08
2016
09
1 Structural work 8 %
1.1 Foundations 3 %
1.2 Skeleton 100 %
2 Carpentry 0 %
202.90 5.70
203.27
203.63
204.32
8.78 7.12 4.52
20.42
3.96
2.94
6.89
3.59
3.31
FACADE SUD
2.75
3.04
1.11
6.89
3.59
3.31
284.04
20
506.40
20
205.94 2.66
20
20.42
FACADE NORD
PIGNON EST
CF INOXBARDAGE BOIS
BARDAGE BOIS
+4.00
+6.93
+2.79
+5.72 EGOUT
EGOUT
FAITAGE
FAITAGETOITURE ZINC NATUREL
pente 20%
TOITURE ZINC NATURELpente 20%
DESCENTE EP ZINC
DESCENTE EP ZINC
-0.20
2.75
2.94
3.96
2.94
80 5.65 3.00
9.45
5.68
6.89
PENTE A 7%
PENTE A 7%
3.59
3.31
PIGNON OUEST
ECHELLE 1/100
1.1
P 73/204
5.17
801.
807
2.50
615.
41
4.0631
4.23
3240 2.15
81.
3660 2.15
1.78
60 2.15
5180
980 2.15
2.11
9.45
P 73
/204
BEC
P 73
/204
P 73
/204
PL1.15 m²
PL1.18 m²
3.36 1.801.05 3.18 84 1.80
1.05 842
2.802.15
262.802.15
22.90
20.61
9.59
20.15
24
9.22
14
P 73
/204
SdB3.90 m²
1.457
3.14 957
1.167
90Dressing3.74 m²
Chambre 112.50 m²
1.00
760
13
770
27
33
72.
107
947
1.75
Buanderie4.58 m²
Dgt1.86 m²
3.30
3.40
851.
0184
60
60 85 2.0217
4
952.
35
80
24
433.502.20
32
502.01 90
2.15 3.465
6.33 2.66
dgt6.75 m²
Garage25.49 m²
1.97 m²WC
Salon32.67 m²
BUREAU13.25 m²
CO
UP
E B
B'
CO
UP
E B
B'
CO
UP
E A
A'
CO
UP
E A
A'
Cuisine11.29 m²
ECHELLE 1/75
RDCMR ET ME COTTEAUX
1.2