Construction Methods of Metro Lines

28
2011.05.12. 1 Adrienn LEPEL BUTE Department of Construction Technology and Management 2010-09-22 Introduction

description

hbj

Transcript of Construction Methods of Metro Lines

Page 1: Construction Methods of Metro Lines

2011.05.12.

1

Adrienn LEPEL – BUTE Department of Construction Technology and Management

2010-09-22

Introduction

Page 2: Construction Methods of Metro Lines

2011.05.12.

2

Planning The selection of the route

The selection of the construction methods Geotechnical investigation Investigating soil structure, soil strength,

permeability, ground water condition etc. Staking out of the construction (layout) Using coordinate system or reference system

Tools: tape measure, theodolite, electronic distance measurement devices, GPS…

Page 3: Construction Methods of Metro Lines

2011.05.12.

3

Construction of the Tunnel Cut-and-cover methods

Mining methods

Special methods

Construction of the Stations Cut-and-cover methods

Mining methods

Other methods

Other connecting operations Solidifying the soil

Water removal works

Construction of the Tunnel

Cut-and-cover methods Bottom-up methods (with different ground support methods)

Top-down method (Milan-method)

Mining methods Belgian method

German method

New Austrian method (NÖT)

Tunnel Boring Machines (shields)

Special methods Caisson

Page 4: Construction Methods of Metro Lines

2011.05.12.

4

Construction of the Tunnel

Cut-and-cover methods Bottom-up methods (with different ground support methods)

Top-down method (Milan-method)

Mining methods Belgian method

German method

New Austrian method (NÖT)

Tunnel Boring Machines (shields)

Special methods Caisson

One One and a half Two Two and a half

Levels of cut-and-cover tunnels

Page 5: Construction Methods of Metro Lines

2011.05.12.

5

Construction of the Tunnel

Cut-and-cover methods Bottom-up methods (with different ground support methods)

Top-down method (Milan-method)

Mining methods Belgian method

German method

New Austrian method (NÖT)

Tunnel Boring Machines (shields)

Special methods Caisson

Ground support

Sloped trench (a)

Partly sloped (b)

Sheet pile wall (c, d)

Steel and timber bracing (soldier piles)(e)

Slurry-wall (f)

Pile wall (f)

With propping or tie-back

Page 6: Construction Methods of Metro Lines

2011.05.12.

6

Ground support

Pile wall

Budovatelu station, Prague

Construction of the Tunnel

Cut-and-cover methods Bottom-up methods (with different ground support methods)

Top-down method (Milan-method)

Mining methods Belgian method

German method

New Austrian method (NÖT)

Tunnel Boring Machines (shields)

Special methods Caisson

Page 7: Construction Methods of Metro Lines

2011.05.12.

7

Page 8: Construction Methods of Metro Lines

2011.05.12.

8

Page 9: Construction Methods of Metro Lines

2011.05.12.

9

Page 10: Construction Methods of Metro Lines

2011.05.12.

10

Construction of the Tunnel

Cut-and-cover methods Bottom-up methods (with different ground support methods)

Top-down method (Milan-method)

Mining methods Belgian method

German method

New Austrian method (NÖT)

Tunnel Boring Machines (shields)

Special methods Caisson

Page 11: Construction Methods of Metro Lines

2011.05.12.

11

Construction of Fort George Tunnel

Construction of the Tunnel

Cut-and-cover methods Bottom-up methods (with different ground support methods)

Top-down method (Milan-method)

Mining methods Belgian method

German method

New Austrian method (NÖT)

Tunnel Boring Machines (shields)

Special methods Caisson

Page 12: Construction Methods of Metro Lines

2011.05.12.

12

The Belgian method (proportions in m)

Construction of the Tunnel

Cut-and-cover methods Bottom-up methods (with different ground support methods)

Top-down method (Milan-method)

Mining methods Belgian method

German method

New Austrian method (NÖT)

Tunnel Boring Machines (shields)

Special methods Caisson

Page 13: Construction Methods of Metro Lines

2011.05.12.

13

The German method (proportions in m)

Construction of the Tunnel

Cut-and-cover methods Bottom-up methods (with different ground support methods)

Top-down method (Milan-method)

Mining methods Belgian method

German method

New Austrian method (NÖT)

Tunnel Boring Machines (shields)

Special methods Caisson

Page 14: Construction Methods of Metro Lines

2011.05.12.

14

The New Austrian method

Construction of the Tunnel

Cut-and-cover methods Bottom-up methods (with different ground support methods)

Top-down method (Milan-method)

Mining methods Belgian method

German method

New Austrian method (NÖT)

Tunnel Boring Machines (shields)

Special methods Caisson

Page 15: Construction Methods of Metro Lines

2011.05.12.

15

Tunnelling shield at the Thames Tunnel, London

Schematic diagram of an EPB shield

Page 16: Construction Methods of Metro Lines

2011.05.12.

16

The shields in Antwerp and Hamburg

Page 17: Construction Methods of Metro Lines

2011.05.12.

17

TBM, Budapest1. Rock environement2. Cutting wheel3. Supporting earth mass4. Watertight steel separator wall5. Hydraulic pressing jacks6. Earth mass screw conveyor7. Segment erector8. Segment ring

Page 18: Construction Methods of Metro Lines

2011.05.12.

18

Prefabricatedreinforced concretesegments of the tube

The construction of Metro line 2, Budapest

The construction of the subway at the Navy Yard, Washington DC

Page 19: Construction Methods of Metro Lines

2011.05.12.

19

Construction of the Tunnel

Cut-and-cover methods Bottom-up methods (with different ground support methods)

Top-down method (Milan-method)

Mining methods Belgian method

German method

New Austrian method (NÖT)

Tunnel Boring Machines (shields)

Special methods Caisson

Construction of a four track tunnel in Stockholm

Page 20: Construction Methods of Metro Lines

2011.05.12.

20

Caisson Cutting edge types Creating an underground

station

Construction of the Stations

Cut-and-cover methods Bottom-up methods (with different ground support methods)

Top-down method (Milan-method)

Mining methods One Vault method

Three Vault method

Five(six) –tunnel method

Special methods Caisson

Page 21: Construction Methods of Metro Lines

2011.05.12.

21

Construction of the Stations

Cut-and-cover methods Bottom-up methods (with different ground support methods)

Top-down method (Milan-method)

Mining methods One Vault method

Three Vault method

Five(six) –tunnel method

Special methods Caisson

Page 22: Construction Methods of Metro Lines

2011.05.12.

22

Equipment of constructionBaross tér

Tétényi út

Móricz Zsigmond körtér

Page 23: Construction Methods of Metro Lines

2011.05.12.

23

Tétényi út

Bocskai út

TBM arrives toRákóczi tér

Page 24: Construction Methods of Metro Lines

2011.05.12.

24

Construction of the Stations

Cut-and-cover methods Bottom-up methods (with different ground support methods)

Top-down method (Milan-method)

Mining methods One Vault method

Three Vault method

Five(six) –tunnel method

Special methods Caisson

Construction of the Stations

Cut-and-cover methods Bottom-up methods (with different ground support methods)

Top-down method (Milan-method)

Mining methods One Vault method

Three Vault method

Five(six) –tunnel method

Special methods Caisson

Page 25: Construction Methods of Metro Lines

2011.05.12.

25

Construction of the Stations

Cut-and-cover methods Bottom-up methods (with different ground support methods)

Top-down method (Milan-method)

Mining methods One Vault method

Three Vault method

Five(six) –tunnel method

Special methods Caisson

Page 26: Construction Methods of Metro Lines

2011.05.12.

26

Construction of the Stations

Cut-and-cover methods Bottom-up methods (with different ground support methods)

Top-down method (Milan-method)

Mining methods One Vault method

Three Vault method

Five(six) –tunnel method

Special methods Caisson

Page 27: Construction Methods of Metro Lines

2011.05.12.

27

Other connecting operations

Solidifying the soil Freezing the soil

Grouting methods

Water removal works Drainage

Sinking groundwater level

Watertight working pit

Wall Wall

Workingpit

AnchoringSolidified soil Solidified

soil

Other connecting operations

Solidifying the soil Freezing the soil

Grouting methods

Water removal works Drainage

Sinking groundwater level

Watertight working pit

Sheet pile wall

Workingpit

AnchoringSolidified soil

Slurry wallGroundwater level

Well Planned object

Page 28: Construction Methods of Metro Lines

2011.05.12.

28

http://www.nycsubway.org/articles/irtbook_index.html http://science.howstuffworks.com/engineering/structural/tunnel.htm http://www.vivanext.com/gallery_subways http://en.wikipedia.org/wiki/Tunnel http://www.metro4.hu/hogyanepul.php