Connecting up cities and powering up the engines of growth...

2
To North Wales To East Midlands Stockport Macclesfield Stoke-on-Trent Crewe Crewe Parkway To Preston and Scotland West Yorks Leeds Manchester Liverpool Birmingham Consultaon route/ Crewe scheme Longer Later More expensive Negave economic impact More environmental impact Out of town Stoke Route Shorter Sooner Cheaper Significant posive economic impact Less environmental impact City centre HS2 Staon Connecting up cities and powering up the engines of growth and prosperity 2026 London to Manchester Stoke Route = 1hour 20mins Crewe Parkway Route = 1 hour 34 mins 2033 Full Consultation Route = 1hour 20mins. THE COSTS THE TIMES 2026 Stoke Route = £3.4bn Crewe Parkway scheme= £5.4bn 2033 Stoke Route Ultimate = £7.1bn Consultation Route= £8.4bn Includes the only major city between Birmingham and Manchester Supercharges a fast growing city with hundreds of hectares of development ready land Connects up more cities – the engines of growth multiplying the benefits Direct HS2 services to 8 million people seven years earlier City centre stations generate more growth than town parkways Less expensive tunnelling and cuttings Recycles existing brownfield rail corridor Shorter route Much less expensive demolition and compensation Avoids the complexity of remodelling one of the most complex rail junctions in Europe Less construction disruption. More for less and earlier HS2 trains direct to Macclesfield and Stockport, Manchester and all other HS2 destinations by 2026 – seven years early Direct HS2 services to West Yorkshire - HS3 ready Journey times same or better than Crewe More direct services to more places - less changing New station is direct city centre to city centre connected – not parkway The Better connection to growth The Cheaper connection for the nation The Faster connection to cities The Stoke Route is the full HS2 deal for less cost to the taxpayer The Stoke Route is faster – delivering more connections to more people earlier.

Transcript of Connecting up cities and powering up the engines of growth...

Page 1: Connecting up cities and powering up the engines of growth ...webapps.stoke.gov.uk/uploadedfiles/HS2-leaflet-V40.pdfConnecting up cities and powering up the engines of growth and prosperity

ToNorth Wales

ToEast Midlands

Stockport

Macclesfield

Stoke-on-TrentCrewe

Crewe Parkway

To Prestonand Scotland West

Yorks LeedsManchesterLiverpool

Birmingham

Consulta�on route/Crewe schemeLongerLaterMore expensiveNega�ve economic impactMore environmental impactOut of town

Stoke RouteShorterSoonerCheaperSignificant posi�ve economic impactLess environmental impactCity centre

HS2 Sta�on

Connecting up cities and powering up the engines of growth and prosperity

2026 London to Manchester Stoke Route = 1hour 20mins

Crewe Parkway Route = 1 hour 34 mins

2033 Full Consultation Route = 1hour 20mins.

THE COSTS

THE TIMES

2026 Stoke Route = £3.4bn Crewe Parkway scheme= £5.4bn

2033 Stoke Route Ultimate = £7.1bn Consultation Route= £8.4bn

• Includes the only major city between Birmingham and Manchester

• Supercharges a fast growing city with hundreds of hectares of development ready land

• Connects up more cities – the engines of growth multiplying the benefits

• Direct HS2 services to 8 million people seven years earlier

• City centre stations generate more growth than town parkways

• Less expensive tunnelling and cuttings• Recycles existing brownfield rail corridor• Shorter route • Much less expensive demolition

and compensation• Avoids the complexity of remodelling one

of the most complex rail junctions in Europe• Less construction disruption. • More for less and earlier

• HS2 trains direct to Macclesfield and Stockport, Manchester and all other HS2 destinations by 2026 – seven years early

• Direct HS2 services to West Yorkshire - HS3 ready

• Journey times same or better than Crewe• More direct services to more places -

less changing• New station is direct city centre to city centre

connected – not parkway

The Better connection to growth The Cheaper connection for the nation The Faster connection to cities

The Stoke Route is the full HS2 deal for less cost to the taxpayer

The Stoke Route is faster – delivering more connections to more people earlier.

Page 2: Connecting up cities and powering up the engines of growth ...webapps.stoke.gov.uk/uploadedfiles/HS2-leaflet-V40.pdfConnecting up cities and powering up the engines of growth and prosperity

To find out more contact: John Betty - Director of PlaceE: [email protected] T: 01782 236426

Stoke-on-Trent – the HS2 Renaissance Ready City

• HS2 ready - the third fastest growing city economy in the UK, at the heart of the national transport network

• A city with energy and drive - developing the UK’s largest deep geothermal district heating system – powering up business and homes alike

• A city ready to grow – absorbing a town the size of Milton Keynes on shovel ready brownfield development land

• Business backs the Stoke Route – the LEP and the Chamber of Commerce

• A true University City - Keele and Staffordshire Universities back the bid

• A city fast becoming a world centre of advanced materials technology

HS2 THE STOKE ROUTE:THE SMART WAY TO THE NORTH

Better, cheaper, faster, greener

• Deletes 27kms of high impact railway through rural greenfields

• Uses existing urban brownfield rail corridors • Maximises economic growth through city

brownfield development • Urban railway will be quieter than the

existing line • Avoids sprawl in rural Staffordshire and

South Cheshire• Dramatically reduces need for deep cuttings• Minimises property impacts• Maximises public health benefits by

spreading prosperity

The Greener way to connect cities

The Stoke Route is all about connecting cities so reduces the impact of HS2 on open countryside and greenbelt

NEWCASTLE TOWN CENTRE

HS2 STATION QUARTER

ETRURIA VALLEYENTERPRISE AREA STOKE-ON-TRENT

CITY CENTRE

UNIVERSITY QUARTER

HS2 Station at the centre of city development