Confidential Information © 2017 Penta Global Group All...

36
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

Transcript of Confidential Information © 2017 Penta Global Group All...

Page 1: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

Page 2: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

INDEX

Penta Global Company Overview

Vision

Quality, Health, Safety & Environment (QHSE) Policy

Safety Statistics & Awards

Quality, Health, Safety & Environment Accreditations

Company Evolution & Key Milestones Achieved

Core Construction Activities

Penta’s Fabrication Facility

Projects Portfolio

References

Page 3: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

COMPANY OVERVIEW

Penta Global:

• An established International Contractor executing works for the Oil &Gas, Petrochemical,

Fertilizers and Power Sectors. Penta Global also provides project management services

and software to track and manage the piping works.

• Management team with many years of extensive industry experience in Business

Development, Procurement and Execution in the GCC, Africa, SE Asia and India.

• ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 Accredited Company.

• Specialists in mobilising highly skilled/trained, professional and safety conscious teams to

undertake Projects.

• Approved with major EPC Contractors as well as National and International Oil Companies

as a Construction Contractor.

• A company built on reputation, commitment and high standards.

Page 4: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

OVERVIEW CLIENTS

MAJOR EPC CUSTOMERS

APPROVALS WITH NOC’S & IOC’S

Page 5: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

OVERVIEW OFFICE LOCATIONS

Penta Global Inc. Br

PO Box: 40051, Ajman Freezone

Ajman, United Arab Emirates

Penta Global Engineering Construction Co. LLC

Addax Tower, Office 4803/04/05 Al Reem

Island, P.O. Box 47858, Abu Dhabi, UAE

Penta Global Engineering Company LLC

ICAD III, Mussafah, PO Box. 8276

Abu Dhabi, United Arab Emirates

Penta Contractors Private Ltd

Manik Ratna Building , Office A 203

Saru Section Road

Jamnagar 361008, India

PGE Construction Sdn. Bhd.

Unit A-23A-10, Level 23A

Menara UOA Bangsar (Tower A)

5 Jalan Bangsar Utama 1, 59000 Kuala

Lumpur, Malaysia

Penta Construction LLC.

PO Box. 186, P.C. 102 Qurum

Office 104, 1st Floor

Makatabi Al Wattaya Building

Sultanate of Oman

Penta Global Kuwait Office

Ahmadi East Block 6 Building 96

P.O.Box.9315 Ahmadi, Kuwait

PT. Penta Global Kontraktor

Jl Landasan, Block B10, LT 6 Unit B

Kem Tower, Gunung Sahari Selatan

Jakarta, Indonesia

Page 6: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

VISION

Our vision is to be a Company providing best in

class services in Engineering, Procurement,

Construction and Project Management for

Customers who value timely, professionally

executed Projects that are delivered to the

highest quality and safety standards.

Page 7: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

CORE VALUES

We have a responsibility to ensure that all of our staff and employees represent the Company in a proper

manor with integrity, honesty and fairness to our Customers, Partners, Subcontractors and all Individuals

that we engage with on a professional level in line with our documented Code of Business Conduct and

Ethics.

We take every measure to ensure that our people are kept safe from harm and are comfortable in the

knowledge that we value their safety above all else. Our ultimate aim is to provide them with the right

working environment to remain Healthy, efficient and productive.

We strive to deliver the highest quality of services to our clients. Our customers depend on us to the job

right the first time and it is our duty to ensure that their trust is warranted.

We actively encourage career development throughout all facets of our business. Our people are the key

to our success today and tomorrow and their development and welfare is important to us.

As a growing Business it is important that we evolve, diversify and broaden our horizons and experiences

through innovative thinking, embracing technology, new processes that can enhance our service offering.

ETHICAL BUSINESS PRACTISES

HEALTH SAFETY & THE ENVIRONMENT

QUALITY

PEOPLE

EVOLVE & INNOVATE

Page 8: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

• Penta Global’s Core Activities are Management of Construction service and undertaking

construction work for our client in the field of Oil, Gas, Petrochemical, Power and other

Industrial Sectors.

• Our long-term success depends on our ability to continuously improve our service delivery while

protecting our people and the environment in which we work.

• We Believe that Quality, Health, Safety and Environment is the responsibility of each and every

employee and is of utmost significance for the company.

• Our Quality, Health, Safety and Environmental Management system embodies the prime

objective of customer satisfaction by ensuring the organizational, commercial and technical

activities are planned, managed and supervised to full fill contractual requirement.

• We deliver our HSE responsibilities and ensure our employees are equipped and trained to

achieve our goal of Zero incidents, injuries and illnesses.

QHSE POLICY

Page 9: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

• We continuously seek to reduce the Environmental footprint of our operations and related

activities by disposing wastes safely and responsibly after taking measures to reuse & recycle.

Also minimize emissions, discharges and waste generation to environment and commit to

prevention of pollution.

• To Assess all operational activities and potential changes, to identify significant Hazards or

Environmental impacts and to implement appropriate measures to ensure that exposure to such

risk are maintained to minimum as reasonably practicable and to strive to prevent the

occurrence of accident or exposures, that could harm or damage , to individuals including the

public or the Environment.

• Further, we also ensure that we are fully aware of statutory and regulatory requirements, needs

of our customers and strive to exceed their expectations.

• “We Cultivate Teamwork and Encourage Employee Participation in Striving for Continual

Improvement of Quality, Health, Safety and Environmental system.”

• “The QHSE policy will be integrated at all levels of our company and is the responsibility of

management with the active support of all our staff.“

“Quality and Safety are our values, not our Priorities – Priorities change but values don’t”

QHSE POLICY

Page 10: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

PAST 5 YEARS HSE STATISTICS

Year 2012 2013 2014 2015 2016

Worked Man-hours 2,216,500 3,332,289 3,513,337 7,163,473 8,669,741

Fatalities 0 0 0 0 0

Lost Time Injuries 0 0 0 0 0

Restricted Work Cases 0 0 0 2 0

Medical Treatments 0 0 0 2 0

First Aids 9 02 29 35 17

Near Misses 18 22 14 11 19

Environmental Damages 0 0 0 0 0

Frequency Rate 0 0 0 0 0

Severity Rate 0 0 0 0 0

Page 11: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

2017 HSE STATISTICS

1st JAN’2017 TO 30th SEPTEMBER’2017

FATALITY

03

RWC 15 MTC

31 FAC 165

LTI

03

Frequency Rate (FR)= 0 FAT - 00

LTI - 00

LWC - 00

FAC - 17

EI - 00

Near Miss Incidents - 5

LTI x 200,000

Man-hours Lost Days x 200,000

Man-hours

Severity Rate (SR)= 0

SEPTEMBER’2017

KPI ITEM HO &

Workshop

PROJECT SITES

UAE India Kuwait

KPI-1 No. of Fatality 0 0 0 0

KPI-2 No. of Lost Time Injury 0 0 0 0

KPI-3 No. of Lost Work day Case 0 0 0 0

KPI-4 No. of First Aid Case 0 0 0 0

KPI-5 No. of Environmental Incident 0 0 0 0

KPI-6 No. of Road Traffic Accident 0 0 0 0

KPI-7 No. of Near-miss Incident 0 0 0 0

KPI-8 No. of Occupational Violence 0 0 0 0

KPI-9 Man-Hours Worked 125,913 5,400 296,672 273,914

KPI-10 Year to Date 1,106,829 502,810 2,084,707 1,756,274

TOTAL MAN-HOURS WORKED

(For this Month) 701,899

TOTAL MAN-HOURS WORKED (Year to Date)

5,450,620

RTA - 00

Page 12: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

SAFETY AWARDS

Page 13: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

QA/QC AND ENVIRONMENT, HEALTH &

SAFETY ACCREDITATIONS - MIDDLE EAST

ISO 9001:2008

ISO 14001:2004

OHSAS 18001:2007

Page 14: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

COMPANY EVOLUTION &

KEY MILESTONES ACHIEVED

Milestones

Q2 2007 - Year of establishment. Established in the UAE to initially provide Project Management and Field Engineering services for

Major EPC Projects.

Q3 2008 - First breakthrough for field fabrication work with JGC-KBR for the Pearl GTL project in Qatar.

Q1 2011 - Set up the permanent fabrication facility in ICAD III Abu Dhabi.

Q1 2011 - Commenced the fabrication work for Petrofac GS JV for the GASCO NGL 4th Train project.

Q2 2011 - Major breakthrough in securing the Mechanical Field Fabrication and Erection works on the GASCO IGD Habshan 5 Project.

Q2 2012 - Set up Penta Contractors in India and secured work from Reliance for the Jamnagar Refinery.

Q3 2013 - JGC-Technimont JV awarded the shutdown and maintenance work on IGD Habshan 5 project.

Q3 2013 - Set up the Malaysian entity – PGE Constructions Sdn Bhd. JGC awarded in Dec 2013, the mechanical works package on the

prestigious Petronas LNG Train 9 project .

Q3 2014 - Petrofac DSME awards mechanical works package for off module piping and transportable skids for the prestigious ZADCO

UZ750 EPC2 Project.

Q4 2015 – Tata Projects awards total mechanical package for brownfield works (structural/piping/equipment) at Ruwais Refinery.

Q1 2016 – Petrofac International awards civil, mechanical, electrical and instrumentation (CMEI) works for the KOC Manifold Group

Trunk Line Project, North Kuwait. Penta’s scope is MEI and local Consortium Partner O&G is doing the civil.

Q1 2016 – Penta Construction LLC established in Oman. Petrofac Dailem JV award mechanical works for the ORPIC Sohar Refinery

Expansion Project.

Q1 2017 – Established Kuwait branch, awarded the MEI scope for the process and utilities area on the KOC GC29 Projects by Petrofac.

Q2 2017 – Established Indonesian subsidiary in Jakarta and pre-qualified for the Thangguh LNG Project.

Future Plans - include to target Projects in Indonesia and Mozambique in addition to the UAE, Kuwait, Oman, India and Malaysia.

Page 15: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

CORE CONSTRUCTION

ACTIVITIES

Penta Global is a Mechanical Electrical and Instrumentation (MEI) Contractor that has the ability and resources to undertake the

following works and services:

Structural – fabrication & erection

Tank Fabrication

Piping – fabrication & erection

Equipment Erection – rotary & static installation

Electrical and Instrumentation installation

Pre-commissioning assistance

Page 16: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

CORE ACTIVITIES ENGINEERING

AND CONSTRUCTION MANAGEMENT

Penta has the capability to provide an integrated project

management services using our in house solution “ProTrack”:

Field engineering services

Document & drawing control

Work order planning & fabrication control

Material management & control

Fabrication, erection and revision control

Welding inspection & quality control

Test pack clearance & system handover

Page 17: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

PROTRACK SYSTEM

ProTrack

DRAWING AND DOCUMENT CONTROL

SPOOL AND REVISION CONTROL

MATERIAL MANAGEMENT

SPOOL FABRICATION

WELDING & NDT

SPOOL PAINTING

SPOOL MOVEMENT AND

ERECTION

PIPE SUPPORT (FABRICATION PAINTING AND

ERECTION)

TESTPACKS, PUNCH

CLEARANCE, HANDOVER

Page 18: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

PENTA’S FABRICATION FACILITY

Penta’s Facility is strategically located in ICAD-III, Mussafah, Abu Dhabi on a 86,000

Square Meter Plot.

Fully Equipped State of the Art Fabrication Facility with a total built up area of

8,442 Square Meter. 3 Fabrication Shops, Twin NDE Bunkers & 2 Paint Shops (1 with

Autoblast).

Installed capacity to produce approx. 70,000 Inch Dia of pipe spools and approx. 200

Tons of associated structural supports per month.

Page 19: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

ABU DHABI FACILITY LAYOUT

PLOT

SIZE

86,000 SQM

BUILT UP

AREA

8,442 SQM

NEAREST

PORTS

MUSSAFAH PORT – 15 KM

ABU DHABI PORT – 23 KM

ABU DHABI AIRPORT – 30 KM

WORKERS DINING FACILITIES

MAIN OFFICE

MAIN ENTRANCE

FABRICATION SHOPS

PAINT SHOPS

NDT BUNKERS

FITTINGS STORAGE

AREA

PIPE MATERIAL

STORAGE AREA

FINISHED SPOOL

DISPATCH AREA

Page 20: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

FABRICATION

PROJECTS

Page 21: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

FABRICATION PROJECTS

NO. PROJECT NAME CLIENT COMPANY COUNTRY SCOPE OF WORKS ROLE IN

PROJECT

START

YEAR

FINISH

YEAR STATUS

1

SHAHEEN

ALUMINA

REFINERY

PROJECT

BECHTEL PETROFAC

JV EMIRATES GLOBAL ALUMINIUM ABU DHABI

FABRICATION, TESTING AND

PAINTING OF 43 TANKS.

INCLUDING FABRICATION

DRAWINGS AND MATERIAL

PROCUREMENT.

SUBCONTR

ACTOR MAY-17 DEC-17 ON GOING

2

SHAHEEN

ALUMINA

REFINERY

PROJECT

BECHTEL PETROFAC

JV EMIRATES GLOBAL ALUMINIUM ABU DHABI

PIPING SPOOLS FABRICATION

AND PAINTING WORKS CS, SS.

PIPING FABRICATION 350,000

INCH DIA, PAINTING 45,000

SQM.

SUBCONTR

ACTOR APR-16 SEP-17 ON GOING

3

NEW GATHERING

CENTRE, GC-29

IN NORTH

KUWAIT

PROJECT

PETROFAC

INTERNATIONAL KUWAIT OIL COMPANY ABU DHABI

PIPING SPOOLS FABRICATION

AND PAINTING WORKS.

PIPING FABRICATION 149,624

INCH DIA, PAINTING 36,467

SQM. CS, SS, DSS, SDSS

SUBCONTR

ACTOR MAR-16 MAR-17 COMPLETED

4

SAFE ROUTING

OF SAFETY

VALVE

DISCHARGE AT

ABUDHABI

REFINERY

TATA PROJECTS LTD TAKREER ABU DHABI PIPING SPOOLS FABRICATION,

PAINTING 16,140 INCH DIA

SUBCONTR

ACTOR OCT-16 APR-17 COMPLETED

5

UPPER ZAKUM

UZ-750 EPC2 -

ISLANDS

SURFACE

FACILITIES

PETROFAC EMIRATES

& DSME ZADCO ABU DHABI

PIPING FABRICATION AND

PAINTING WORKS ALLOY,

CUNI,SS,CS,LTCS, CLAD 342,567

INCH DIA, PAINTING 49,525

SQ.M & PIPING SUPPORT

FABRICATION 350 MT.,SKID

FABRICATION - 63 NOS

SUBCONTR

ACTOR MAR-15 JUL-17 ON GOING

6

J3 -

FABRICATION OF

SPOOLS &

STRUCTURE

FABRICATION

RELIANCE

INDUSTRIES LTD RELIANCE INDIA

PIPING FABRICATION 790,000 ID

IBR & NIBR CS,AS,SS,& LTCS &

STRUCTURE FABRICATION -

4000MT

CONTRACT

OR FEB-14 JUN-17 ON GOING

7

UPPER ZAKUM

UZ-750 EPC2 -

ISLANDS

SURFACE

FACILITIES

GULF PIPING

COMPANY ZADCO ABU DHABI

CLADDED PIPE SPOOLS

FABRICATION OF 33,000 INCH

DIA AND PAINTING WORK

SUBCONTR

ACTOR JUL-15 MAR-16 COMPLETED

Page 22: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

FABRICATION PROJECTS

NO. PROJECT NAME CLIENT COMPANY COUNTRY SCOPE OF WORKS ROLE IN

PROJECT

START

YEAR

FINISH

YEAR STATUS

8

JI-2020-ALRAR

PROJECT

PETROFAC SONATRACH ABU DHABI

PIPING FABRICATION 164, 568

INCH DIA & PAINTING 25,678 SQ

MTR

SUBCONTR

ACTOR NOV-14 JUN-15 COMPLETED

9

BADRA OIL

FIELD

DEVELOPMENT

PROJECT CPF

PHASE 1

PETROFAC FZE GAZPROM ABU DHABI

FAST TRACK FABRICATION OF

167,240 INCH DIA OF

SS/ALLOY/LTCS/CS (INCLUDING

GALV/NACE) PIPING SPOOLS

WITH NDE, BLASTING AND

PAINTING

SUB

CONTRACT

OR

OCT-12 NOV-13 COMPLETED

10

SOUTH

YOLOTEN GAS

DEVELOPMENT

PROJECT

PETROFAC FZE TURKMEN GAS ABU DHABI

FAST TRACK FABRICATION OF

70,000 INCH DIA OF LTCS

PIPING & 90,000 INCH DIA OF

CS JACKETED PIPING

TOTALLING 160,000 INCH DIA

SUB

CONTRACT

OR

NOV-11 OCT-12 COMPLETED

11 4TH NGL TRAIN

PROJECT

PETROFAC

EMIRATES GASCO ABU DHABI

FABRICATION, BLASTING AND

PAINTING OF 260,000 INCH DIA

CS/LTCS/SS PIPING AND 850

TONNES OF ASSOCIATED

SUPPORTS

SUB

CONTRACT

OR

APR-11 OCT-12 COMPLETED

12

PEARL GTL

PROJECT, RAS

LAFFAN, QATAR

CONSOLIDATED

CONTRACTORS

INTERNATIONAL CO

SHELL/QATAR PETROLEUM QATAR

FABRICTION OF 300,000 INCH

DIA OF CARBON STEEL AND S S

PIPING

SPOOLS FOR THE GTL AND

UTILITY PLANTS

SUB

CONTRACT

OR

AUG-08 NOV-09 COMPLETED

13

FABRICATION

OF 4G TUBULAR

TOWER TOP

PLATFORM

RELIANCE

INDUSTRIES LTD RELIANCE INDIA

FABRICATION OF 4G TUBULAR

TOWER TOP PLATFORMER-

1500EA

CONTRACT

OR JUL-13 MAR-14 COMPLETED

14

DAHEJ -

STRUCTURAL

FABRICATION

AT SFS

RELIANCE

INDUSTRIES LTD RELIANCE INDIA

STEEL STRUCURAL

FABRICATION-1955MT (LIKE

LIGHT STEEL ,MEDIUM STEEL,

HEAVY STEEL WITH BOX BUILD

UP STR.FAB) AT SFS

CONTRACT

OR NOV-12 OCT-13 COMPLETED

15

SILVASA -

SALMORGHI

STEEL

STRUCTURE

RELIANCE

INDUSTRIES LTD RELIANCE INDIA

STEEL STRUCURAL

FABRICATION-1374MT (LIKE

LIGHT STEEL ,MEDIUM STEEL,

HEAVY STEEL STR.FAB)

CONTRACT

OR MAY-12 JAN-13 COMPLETED

Page 23: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

CONSTRUCTION

PROJECTS

Page 24: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

CONSTRUCTION PROJECTS

NO. PROJECT NAME CLIENT COMPANY COUNTRY SCOPE OF WORKS ROLE IN

PROJECT

START

YEAR

FINISH

YEAR STATUS

1

BeAAT

EXPANSION

PROJECT

INTECSA INDUSTRIAL TAKREER ABU DHABI

MECHANICAL, ELECTRICAL &

INSTRUMENTATION INSTALLATION

WORKS.

SUBCONTR

ACTO NOV-17 APR-19 ON GOING

2

MGT (MANIFOLD

GROUP

TRUNKLINE)

SYSTEM FOR

GCS 29, 30 & 31

PETROFAC

INTERNATIONAL KUWAIT OIL COMPANY KUWAIT

MECHANICAL, ELECTRICAL &

INSTRUMENTATION INSTALLATION

WORKS.

SUBCONTR

ACTOR MAY-16 JUL-17 ON GOING

3

SOHAR

REFINERY

EXPANSION

PROJECT,OMAN

PETROFAC DAILEM

JV ORPIC OMAN

ERECTION OF STEEL STRUCTURES,PIPING

AND EQUIPMENT

SUBCONTR

ACTOR MAR-16 MAY-17 COMPLETED

4

NEW

GATHERING

CENTRE, GC-29

PROJECT.

PETROFAC

INTERNATIONAL KUWAIT OIL COMPANY KUWAIT

PIPING ERECTION WORKS,ELECTRICAL &

INSTRUMENTATION WORKS

SUBCONTR

ACTOR FEB-17 JUN-17 ON GOING

5

SAFE ROUTING

OF SAFETY

VALVE

DISCHARGE AT

RUWAIS & ABU

DHABI REFINERY

TATA PROJECTS

LTD. TAKREER ABU DHABI

REPLACEMNET OF KNOCK OUT DRUM

,STRUCTURE ERECTION,REPLACEMNET

OF SAFETY VALVES & FLARE TIP

REPLACEMENT WORKS. PIPING PRE-

FABRICATION& ERECTION -38,000 INCH

DIA,STRUCTURE ERECTION -600 TON,

SUBCONTR

ACTOR JAN-16 JUN-17 ON GOING

6

TIE-IN OF 12

WELLS TO THE

GATHERING

SYSTEM

PROJECT.

CONSOLIDATED

CONTRACTORS

INTERNATIONAL CO

AL HOSN ABU DHABI CADDED PIPING FABRICATION 6905 ID,

ERECTION AND PAINTING WORKS

SUBCONTR

ACTOR DEC-14 APR-15 COMPLETED

7

SHAH GAS

DEVELOPMENT

U&O PKG 4

SAMSUNG

ENGINEERING AL HOSN ABU DHABI

SITE ERECTION OF 35,000 INCH DIA CS

UTILITY PIPING, 12,500 INCH DIA CRA,

SS, ALLOY AND ASSOCIATED SUPPORTS

SUBCONTR

ACTOR FEB-13 NOV-13 COMPLETED

8

IGD - HABSHAN

5 PROCESS

PLANT

KHARAFI NATIONAL GASCO ABU DHABI

FABRICATION AND ERECTION OF OF

231,000 INCH DIA OF PIPING. CS, SS AND

AS. 174 KM STEAM TRACING. 191.5

TONNES OF SUPPORTS.

SUBCONTR

ACTOR JUN-11 MAR-13 COMPLETED

Page 25: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

CONSTRUCTION PROJECTS

NO. PROJECT NAME CLIENT COMPANY COUNTRY SCOPE OF WORKS ROLE IN

PROJECT

START

YEAR

FINISH

YEAR STATUS

9

PREPHERAL

ROAD EXTN.

PROJECT. 061

DUBAI CIVIL

AVIATION/TRISTAR

TRANSPORT &

CONTRACTING, ABU

DHABI

DUBAI CIVIL AVIATION DUBAI

120 KM SERVICE PIPE LINE INCLUDING

GRP, ASBESTOS CEMENT,

CARBON STEEL PIPES

(CONSTRUCTION MANAGEMENT)

SUBCONTR

ACTOR JAN-09 JAN-10 COMPLETED

10

BURJ DUBAI

LAKE WATER

FILTERATION

SYSTEM

EMAAR, UAE/VEOLIA

WATER SOLUTION

EMIRATES LLC, DUBAI,

UAE

EMAAR, UAE DUBAI

DESIGN AND FABRICTION OF PIPE

SUPPORTS & ERECTION OF 4 NOS

WATER FILTERATION PLANTS

COMPLETE WITH PIPING WORKS

SUBCONTR

ACTOR SEP-08 MAR-09 COMPLETED

11

DISTRICT

COOLING PLANT

- 3

EMAAR, UAE/DISTRICT

COOLING PLANT - 3 EMAAR, UAE DUBAI

INSTALLATION OF 80,000 INCH DIA

OF CHILLED WATER PIPELINE TO API

STANDARD

SUBCONTR

ACTOR FEB-08 MAY-09 COMPLETED

12 LNG TRAIN 9

PROJECT

PETRONAS/JGC(JAPAN

GAS CORPORATION) PETRONAS MALAYSIA

FILED ERECTION OF 185,000 ID

PIPING,340 TONS OF PIPE

SUPPORTS,20000 M3 OF

SCAFFOLDING

SUBCONTR

ACTOR MAY-14 JUN-16 COMPLETED

13 IDC PHASE - 2

PROJECT.

RELIANCE INDUSTRIES

LTD RELIANCE INDIA

STRL & PIPING FABRIACATION AND

ERECTION 220KV ELECTRICAL CABLE

TRENCH - STRUCTURE WORK

CONTRACT

OR JAN-15 DEC-15 COMPLETED

14

MECHANICAL

WORKS FOR

GAGWA

PROJECT

RELIANCE INDUSTRIES

LTD RELIANCE INDIA

MECHANICAL WORKS FOR WTF AT

GAGWA,PIPING,STRUCTURE,EQUIPME

NT FABRICATION & ERECTION

CONTRACT

OR JAN-15 JAN-16 COMPLETED

15

MECHANICAL

WORKS FOR IDC

JAMNAGAR

RELIANCE INDUSTRIES

LTD RELIANCE INDIA

FABRICATION AND ERECTION OF 200

TONNES STRUCTURAL STEEL AND

75000 ID WITH EEQUIPMENT

ERECTION ,PAINTING ,BLASTING &

MISCELLANEOUS WORK

CONTRACT

OR MAR-13 APR-14 COMPLETED

Page 26: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

SHUTDOWN & MAINTENANCE /

BROWN FIELD

PROJECTS

Page 27: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

SHUTDOWN & MAINTENANCE

BROWN FIELD PROJECTS

NO. PROJECT NAME CLIENT COMPANY COUNTRY SCOPE OF WORKS ROLE IN

PROJECT

START

YEAR

FINISH

YEAR STATUS

1

SAFE ROUTING

OF SAFETY

VALVE

DISCHARGE AT

RUWAIS & ABU

DHABI REFINERY

TAKREER/TATA

PROJECTS LTD. TAKREER ABU DHABI

REPLACEMNET OF KNOCK OUT

DRUM ,STRUCTURE & PIPING

ERECTION,REPLACEMNET OF

SAFETY VALVES & FLARE TIP

REPLACEMENT WORKS.

SUBCONTR

ACTOR OCT-16 AUG-17 ON GOING

2

IGD - HABSHAN

5 PROCESS

PLANT

GASCO/JGC -

TECNIMONT JOINT

VENTURE

GASCO ABU DHABI

WARRANTY& MAINTENANCE

WORKS OF GAS PROCESSING

AND SULFUR RECOVERY PLANT.

TOTAL SMP WORKS.

SUBCONTR

ACTOR OCT-13 APR-15 COMPLETED

Page 28: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

PROJECTS OVERVIEW

KUWAIT OIL COMPANY – MANIFOLD GROUP TRUNKLINE

KUWAIT OIL COMPANY – NEW GAS GATHERING CENTRE 29

SCOPE SUMMARY

MECHANICAL ELECTRICAL & INSTRUMENTATION WORKS FOR

MAIN AND SUB-GROUP MANIFOLDS

CHALLENGES

• MOBILISATION OF EXPAT WORKFORCE/VISA MANAGEMENT

• LOGISTICS OF MANPOWER MOVEMENT FROM

ACCOMODATION (30KM) TO SITE AND WORKING WITHIN

PERMIT TO WORK SYSTEM IN HIGH SECURITY AREA

• PLANNING AND MANAGEMENT OF RESOURCES TO

MAXIMISE PRODUCTIVITY , PARTICULARLY DURING

SUMMER MONTHS AND HOLY MONTH OF RAMADAN

SCOPE SUMMARY

MECHANICAL ELECTRICAL & INSTRUMENTATION WORKS FOR

PROCESS AREA AND UTILITIES/OFFSITES AREA

CHALLENGES

• MOBILISATION OF EXPAT WORKFORCE ON SHORT NOTICE

• LOGISTICS OF MANPOWER MOVEMENT FROM

ACCOMODATION (30KM) TO SITE AND WORKING WITHIN

PERMIT TO WORK SYSTEM IN HIGH SECURITY AREA

• PLANNING AND MANAGEMENT OF RESOURCES TO

MAXIMISE PRODUCTIVITY , PARTICULARLY DURING

SUMMER MONTHS AND HOLY MONTH OF RAMADAN

• INTERFACING WITH OTHER CONTRACTORS

DURATION: JULY 2016 – DECEMBER 2017 (ONGOING PROJECT)

WORK VOLUMES;

- STEEL STRUCTURE ERECTION 1,454 MT - EQUIPMENT 2,144 MT

- PIPING ERECTION 27,766 ID, 33,996 IM - ELECTRICAL CABLE 213 KM

- TELECOM CABLE 31 KM - INSTRUMENT CABLE 176 KM

DURATION: JANUARY 2017 – DECEMBER 2017 (ONGOING PROJECT)

WORK VOLUMES;

- STRUCTURE SUPPORT ERECTION 173 MT - FABRICATED PIPE 160,000 ID

- PIPING ERECTION 60,780 ID, 474,325 IM - ELECTRICAL CABLE 35 KM

- TELECOM CABLE 145 KM - INSTRUMENT CABLE 38 KM

Page 29: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

PROJECT OVERVIEW

RELIANCE – JAMNAGAR REFINERY EXPANSION PHASE III

TAKREER – RUWAIS AND ABU DHABI REFINERY BROWN FIELD

SCOPE

STRUCTURAL, MECHANICAL, PIPING ERECTION AND

MODIFICATION WORKS PRE/DURING/POST SHUTDOWN

CHALLENGES

• ADHERING TO STRINGENT HSE REQUIREMENTS WITHIN

BROWFIELD ENVIRONMENT

• FLARE TIP REPLACEMENT AND ASSOCIATED PIPING WORKS

EXECUTED DURING SHUTDOWN AND COMPLETED AHEAD

OF SCHEDULE

• MANAGING MULTIPLE LOCATIONS AT RUWAIS REFINERY

(CDU, KOD AND SPHERES) AS WELL AS SIMILAR WORKS AT

ABU DHABI REFINERY 100KM AWAY, SIMILTANEOUSLY

SCOPE

MECHANICAL FABRICATION/ERECTION OF STRUCTURAL,

PIPING AS WELL AS EQUIPMENT/ MODULES

CHALLENGES

• MANAGING A 2,000 MAN WORK FORCE ACROSS MULTIPLE

LOCATIONS/PACKAGES WITHIN THE PROJECT

• PENTA ENTERED THE PROJECT AS A FOREIGN

CONTRACTOR - IMPLEMENTING OUR EXPERIENCE OF

INTERNATIONAL EHSMS AND QUALITY STANDARDS WAS A

CHALLENGE BUT ADDED REAL VALUE TO THE PROJECT

• WORKING WITHIN AN AGGRESSIVE SCHEDULE FOR

VARIOUS ELEMENTS OF THE PROJECT

DURATION: DECEMBER 2014 – DECEMBER 2017 (ONGOING PROJECT)

WORK VOLUMES;

- STEEL STRUCTURE ERECTION 11,500 MT - FABRICATED PIPE 650,000 ID

- PIPING ERECTION 150,000 ID, 550,000 IM - EQUIPMENT 750 MT

DURATION: FEBRUARY 2016 – AUGUST 2017 (ONGOING PROJECT)

WORK VOLUMES;

- STEEL STRUCTURE ERECTION 811 MT - FABRICATED PIPE 46,000 ID

- PIPING ERECTION 118,000 ID - EQUIPMENT ERECTION 50 MT

Page 30: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

PROJECT OVERVIEW

PETRONAS - MALAYSIA LNG TRAIN 9

SCOPE SUMMARY

MECHANICAL ERECTION WORKS WITHIN THE COLD END

PROCESS AREA

CHALLENGES

• MOBILISATION AND MANAGEMENT OF MULTINATIONAL

WORKFORCE MALAYSIAN, INDONESION, PHILIPINNES,

INDIAN

• EXECUTION OF WORKS WITHIN THE MOST COMPLEX

PROCESS AREA OF THE PLANT

• STRINGENT EHS REQUIREMENTS DUE TO PROXIMITY TO

EXISTING FACILITIES - RECEIVED SAFE CONTRACTOR OF

THE YEAR AWARD 2016

DURATION: MARCH 2014 – APRIL 2016 (COMPLETED PROJECT)

WORK VOLUMES;

- STEEL STRUCTURE ERECTION 220 MT - FABRICATED PIPE 27,000 ID

- PIPING ERECTION 118,000 ID

GASCO – INTERGRATED GAS DEVELOPMENT HABSHAN 5

SCOPE

MECHANICAL PIPING FABRICATION AND ERECTION,

INSTALLATION OF SUPPORTS AND HEAT TRACING WORKS

CHALLENGES

• MANAGING A 1,860 MAN WORK FORCE ACROSS MULTIPLE

LOCATIONS.

• LOGISTICS OF MANPOWER MOVEMENT FROM

ACCOMODATION (15 KM) TO SITE AND WORKING WITHIN

PERMIT TO WORK SYSTEM IN HIGH SECURITY AREA

• PLANNING AND MANAGEMENT OF RESOURCES TO

MAXIMISE PRODUCTIVITY , PARTICULARLY DURING

SUMMER MONTHS AND HOLY MONTH OF RAMADAN

DURATION: MARCH 2014 – APRIL 2016 (COMPLETED PROJECT)

WORK VOLUMES;

- STEEL STRUCTURE ERECTION 564 MT - FABRICATED PIPE 99,000 ID

- PIPING ERECTION 231,000 ID - HEAT TRACING 160 KM

Page 31: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

PROJECT OVERVIEW

ZADCO – UPPER ZAKUM UZ750 PHASE II

EMIRATES GLOBAL ALUMINIUM – AL TAWEELAH ALUMINA

SCOPE

FABRICATION TESTING AND PAINTING OF SPOOLS AND 43

CAUSTIC STORAGE TANKS – INCLUDING FABRICATION

DRAWING PREPARATION AND TANK MATERIAL PROCUREMENT

CHALLENGES

• FABRICATION OF CS, SS, DUPLEX AND SUPER DUPLEX

SPOOLS

• INCREASE IN SCOPE OF 65% BASED ON PERFORMANCE IN

THE PROJECT AND MAINTAINING BEST PRODUCTIVITY AND

QUALITY STANDARDS

• ADDITIONALLY AWARDED 43 CS TANKS TO BE FABRICATED

WITHIN 8 MONTHS INCLUSSIVE OF MATERIAL SUPPLY

SCOPE

MECHANICAL PIPING AND PIPING SUPPORT PRE-

FABRICATION, AS WELL AS PROCESS SKIDS MEI WORKS

CHALLENGES

• MANAGING MULTIPLE METERLURGIES INCLUDING CS, SS,

DSS, CLAD, CuNi, TITANIUM

• EXTREMELY COMPLICATED MULTI-AXIS/DIRECTIONAL

SPOOLS

• MAINTAINING QUAILITY REPAIR RATES OF LESS THAN 1% -

HIGHLY APPRECIATED BY THE CLIENT

• ADJUSTING TO CLIENT SCOPE INCREASE OF 40% WHILST

MAINTAINING PROJECT SCHEDULE

DURATION: MAY 2017 – DECEMBER 2017 (ONGOING PROJECT)

WORK VOLUMES;

- TANKS 1,143 MT - FABRICATED PIPE 565,000 ID

DURATION: MARCH 2015 – SEPTEMBER 2017 (ONGOING PROJECT)

WORK VOLUMES;

- SUPPORTS FABRICATED 415 MT - FABRICATED PIPE 340,000 ID

- PIPING ERECTION 118,000 ID - PROCESS SKIDS 85 NOS

Page 32: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

REFERENCES

Page 33: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

SAMSUNG ENGINEERING

APPRECIATION LETTER &

CLIENT SATISFACTION SURVEY

IGD HABSHN 5 PIPING ERECTION

Page 34: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

JGC TECHNIMONT

APPRECIATION LETTER

IGD HABSHN 5 PIPING ERECTION

Page 35: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

PETROFAC GS JV

APPRECIATION LETTER

GASCO 4TH NGL TRAIN PROJECT

Page 36: Confidential Information © 2017 Penta Global Group All …penta-global.com/download.aspx?file=cms/uploadedfiles/Homepage/2... · Confidential Information © 2017 Penta Global Group

Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com

JGC PETRONAS LNG TRAIN 9 PROJECT

APPRECIATION LETTER & CLIENT

SATISFACTION SURVEY