Confidential Information © 2017 Penta Global Group All...
Transcript of Confidential Information © 2017 Penta Global Group All...
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
INDEX
Penta Global Company Overview
Vision
Quality, Health, Safety & Environment (QHSE) Policy
Safety Statistics & Awards
Quality, Health, Safety & Environment Accreditations
Company Evolution & Key Milestones Achieved
Core Construction Activities
Penta’s Fabrication Facility
Projects Portfolio
References
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
COMPANY OVERVIEW
Penta Global:
• An established International Contractor executing works for the Oil &Gas, Petrochemical,
Fertilizers and Power Sectors. Penta Global also provides project management services
and software to track and manage the piping works.
• Management team with many years of extensive industry experience in Business
Development, Procurement and Execution in the GCC, Africa, SE Asia and India.
• ISO 9001:2008, ISO 14001:2004 and OHSAS 18001:2007 Accredited Company.
• Specialists in mobilising highly skilled/trained, professional and safety conscious teams to
undertake Projects.
• Approved with major EPC Contractors as well as National and International Oil Companies
as a Construction Contractor.
• A company built on reputation, commitment and high standards.
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
OVERVIEW CLIENTS
MAJOR EPC CUSTOMERS
APPROVALS WITH NOC’S & IOC’S
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
OVERVIEW OFFICE LOCATIONS
Penta Global Inc. Br
PO Box: 40051, Ajman Freezone
Ajman, United Arab Emirates
Penta Global Engineering Construction Co. LLC
Addax Tower, Office 4803/04/05 Al Reem
Island, P.O. Box 47858, Abu Dhabi, UAE
Penta Global Engineering Company LLC
ICAD III, Mussafah, PO Box. 8276
Abu Dhabi, United Arab Emirates
Penta Contractors Private Ltd
Manik Ratna Building , Office A 203
Saru Section Road
Jamnagar 361008, India
PGE Construction Sdn. Bhd.
Unit A-23A-10, Level 23A
Menara UOA Bangsar (Tower A)
5 Jalan Bangsar Utama 1, 59000 Kuala
Lumpur, Malaysia
Penta Construction LLC.
PO Box. 186, P.C. 102 Qurum
Office 104, 1st Floor
Makatabi Al Wattaya Building
Sultanate of Oman
Penta Global Kuwait Office
Ahmadi East Block 6 Building 96
P.O.Box.9315 Ahmadi, Kuwait
PT. Penta Global Kontraktor
Jl Landasan, Block B10, LT 6 Unit B
Kem Tower, Gunung Sahari Selatan
Jakarta, Indonesia
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
VISION
Our vision is to be a Company providing best in
class services in Engineering, Procurement,
Construction and Project Management for
Customers who value timely, professionally
executed Projects that are delivered to the
highest quality and safety standards.
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
CORE VALUES
We have a responsibility to ensure that all of our staff and employees represent the Company in a proper
manor with integrity, honesty and fairness to our Customers, Partners, Subcontractors and all Individuals
that we engage with on a professional level in line with our documented Code of Business Conduct and
Ethics.
We take every measure to ensure that our people are kept safe from harm and are comfortable in the
knowledge that we value their safety above all else. Our ultimate aim is to provide them with the right
working environment to remain Healthy, efficient and productive.
We strive to deliver the highest quality of services to our clients. Our customers depend on us to the job
right the first time and it is our duty to ensure that their trust is warranted.
We actively encourage career development throughout all facets of our business. Our people are the key
to our success today and tomorrow and their development and welfare is important to us.
As a growing Business it is important that we evolve, diversify and broaden our horizons and experiences
through innovative thinking, embracing technology, new processes that can enhance our service offering.
ETHICAL BUSINESS PRACTISES
HEALTH SAFETY & THE ENVIRONMENT
QUALITY
PEOPLE
EVOLVE & INNOVATE
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
• Penta Global’s Core Activities are Management of Construction service and undertaking
construction work for our client in the field of Oil, Gas, Petrochemical, Power and other
Industrial Sectors.
• Our long-term success depends on our ability to continuously improve our service delivery while
protecting our people and the environment in which we work.
• We Believe that Quality, Health, Safety and Environment is the responsibility of each and every
employee and is of utmost significance for the company.
• Our Quality, Health, Safety and Environmental Management system embodies the prime
objective of customer satisfaction by ensuring the organizational, commercial and technical
activities are planned, managed and supervised to full fill contractual requirement.
• We deliver our HSE responsibilities and ensure our employees are equipped and trained to
achieve our goal of Zero incidents, injuries and illnesses.
QHSE POLICY
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
• We continuously seek to reduce the Environmental footprint of our operations and related
activities by disposing wastes safely and responsibly after taking measures to reuse & recycle.
Also minimize emissions, discharges and waste generation to environment and commit to
prevention of pollution.
• To Assess all operational activities and potential changes, to identify significant Hazards or
Environmental impacts and to implement appropriate measures to ensure that exposure to such
risk are maintained to minimum as reasonably practicable and to strive to prevent the
occurrence of accident or exposures, that could harm or damage , to individuals including the
public or the Environment.
• Further, we also ensure that we are fully aware of statutory and regulatory requirements, needs
of our customers and strive to exceed their expectations.
• “We Cultivate Teamwork and Encourage Employee Participation in Striving for Continual
Improvement of Quality, Health, Safety and Environmental system.”
• “The QHSE policy will be integrated at all levels of our company and is the responsibility of
management with the active support of all our staff.“
“Quality and Safety are our values, not our Priorities – Priorities change but values don’t”
QHSE POLICY
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
PAST 5 YEARS HSE STATISTICS
Year 2012 2013 2014 2015 2016
Worked Man-hours 2,216,500 3,332,289 3,513,337 7,163,473 8,669,741
Fatalities 0 0 0 0 0
Lost Time Injuries 0 0 0 0 0
Restricted Work Cases 0 0 0 2 0
Medical Treatments 0 0 0 2 0
First Aids 9 02 29 35 17
Near Misses 18 22 14 11 19
Environmental Damages 0 0 0 0 0
Frequency Rate 0 0 0 0 0
Severity Rate 0 0 0 0 0
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
2017 HSE STATISTICS
1st JAN’2017 TO 30th SEPTEMBER’2017
FATALITY
03
RWC 15 MTC
31 FAC 165
LTI
03
Frequency Rate (FR)= 0 FAT - 00
LTI - 00
LWC - 00
FAC - 17
EI - 00
Near Miss Incidents - 5
LTI x 200,000
Man-hours Lost Days x 200,000
Man-hours
Severity Rate (SR)= 0
SEPTEMBER’2017
KPI ITEM HO &
Workshop
PROJECT SITES
UAE India Kuwait
KPI-1 No. of Fatality 0 0 0 0
KPI-2 No. of Lost Time Injury 0 0 0 0
KPI-3 No. of Lost Work day Case 0 0 0 0
KPI-4 No. of First Aid Case 0 0 0 0
KPI-5 No. of Environmental Incident 0 0 0 0
KPI-6 No. of Road Traffic Accident 0 0 0 0
KPI-7 No. of Near-miss Incident 0 0 0 0
KPI-8 No. of Occupational Violence 0 0 0 0
KPI-9 Man-Hours Worked 125,913 5,400 296,672 273,914
KPI-10 Year to Date 1,106,829 502,810 2,084,707 1,756,274
TOTAL MAN-HOURS WORKED
(For this Month) 701,899
TOTAL MAN-HOURS WORKED (Year to Date)
5,450,620
RTA - 00
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
SAFETY AWARDS
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
QA/QC AND ENVIRONMENT, HEALTH &
SAFETY ACCREDITATIONS - MIDDLE EAST
ISO 9001:2008
ISO 14001:2004
OHSAS 18001:2007
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
COMPANY EVOLUTION &
KEY MILESTONES ACHIEVED
Milestones
Q2 2007 - Year of establishment. Established in the UAE to initially provide Project Management and Field Engineering services for
Major EPC Projects.
Q3 2008 - First breakthrough for field fabrication work with JGC-KBR for the Pearl GTL project in Qatar.
Q1 2011 - Set up the permanent fabrication facility in ICAD III Abu Dhabi.
Q1 2011 - Commenced the fabrication work for Petrofac GS JV for the GASCO NGL 4th Train project.
Q2 2011 - Major breakthrough in securing the Mechanical Field Fabrication and Erection works on the GASCO IGD Habshan 5 Project.
Q2 2012 - Set up Penta Contractors in India and secured work from Reliance for the Jamnagar Refinery.
Q3 2013 - JGC-Technimont JV awarded the shutdown and maintenance work on IGD Habshan 5 project.
Q3 2013 - Set up the Malaysian entity – PGE Constructions Sdn Bhd. JGC awarded in Dec 2013, the mechanical works package on the
prestigious Petronas LNG Train 9 project .
Q3 2014 - Petrofac DSME awards mechanical works package for off module piping and transportable skids for the prestigious ZADCO
UZ750 EPC2 Project.
Q4 2015 – Tata Projects awards total mechanical package for brownfield works (structural/piping/equipment) at Ruwais Refinery.
Q1 2016 – Petrofac International awards civil, mechanical, electrical and instrumentation (CMEI) works for the KOC Manifold Group
Trunk Line Project, North Kuwait. Penta’s scope is MEI and local Consortium Partner O&G is doing the civil.
Q1 2016 – Penta Construction LLC established in Oman. Petrofac Dailem JV award mechanical works for the ORPIC Sohar Refinery
Expansion Project.
Q1 2017 – Established Kuwait branch, awarded the MEI scope for the process and utilities area on the KOC GC29 Projects by Petrofac.
Q2 2017 – Established Indonesian subsidiary in Jakarta and pre-qualified for the Thangguh LNG Project.
Future Plans - include to target Projects in Indonesia and Mozambique in addition to the UAE, Kuwait, Oman, India and Malaysia.
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
CORE CONSTRUCTION
ACTIVITIES
Penta Global is a Mechanical Electrical and Instrumentation (MEI) Contractor that has the ability and resources to undertake the
following works and services:
Structural – fabrication & erection
Tank Fabrication
Piping – fabrication & erection
Equipment Erection – rotary & static installation
Electrical and Instrumentation installation
Pre-commissioning assistance
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
CORE ACTIVITIES ENGINEERING
AND CONSTRUCTION MANAGEMENT
Penta has the capability to provide an integrated project
management services using our in house solution “ProTrack”:
Field engineering services
Document & drawing control
Work order planning & fabrication control
Material management & control
Fabrication, erection and revision control
Welding inspection & quality control
Test pack clearance & system handover
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
PROTRACK SYSTEM
ProTrack
DRAWING AND DOCUMENT CONTROL
SPOOL AND REVISION CONTROL
MATERIAL MANAGEMENT
SPOOL FABRICATION
WELDING & NDT
SPOOL PAINTING
SPOOL MOVEMENT AND
ERECTION
PIPE SUPPORT (FABRICATION PAINTING AND
ERECTION)
TESTPACKS, PUNCH
CLEARANCE, HANDOVER
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
PENTA’S FABRICATION FACILITY
Penta’s Facility is strategically located in ICAD-III, Mussafah, Abu Dhabi on a 86,000
Square Meter Plot.
Fully Equipped State of the Art Fabrication Facility with a total built up area of
8,442 Square Meter. 3 Fabrication Shops, Twin NDE Bunkers & 2 Paint Shops (1 with
Autoblast).
Installed capacity to produce approx. 70,000 Inch Dia of pipe spools and approx. 200
Tons of associated structural supports per month.
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
ABU DHABI FACILITY LAYOUT
PLOT
SIZE
86,000 SQM
BUILT UP
AREA
8,442 SQM
NEAREST
PORTS
MUSSAFAH PORT – 15 KM
ABU DHABI PORT – 23 KM
ABU DHABI AIRPORT – 30 KM
WORKERS DINING FACILITIES
MAIN OFFICE
MAIN ENTRANCE
FABRICATION SHOPS
PAINT SHOPS
NDT BUNKERS
FITTINGS STORAGE
AREA
PIPE MATERIAL
STORAGE AREA
FINISHED SPOOL
DISPATCH AREA
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
FABRICATION
PROJECTS
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
FABRICATION PROJECTS
NO. PROJECT NAME CLIENT COMPANY COUNTRY SCOPE OF WORKS ROLE IN
PROJECT
START
YEAR
FINISH
YEAR STATUS
1
SHAHEEN
ALUMINA
REFINERY
PROJECT
BECHTEL PETROFAC
JV EMIRATES GLOBAL ALUMINIUM ABU DHABI
FABRICATION, TESTING AND
PAINTING OF 43 TANKS.
INCLUDING FABRICATION
DRAWINGS AND MATERIAL
PROCUREMENT.
SUBCONTR
ACTOR MAY-17 DEC-17 ON GOING
2
SHAHEEN
ALUMINA
REFINERY
PROJECT
BECHTEL PETROFAC
JV EMIRATES GLOBAL ALUMINIUM ABU DHABI
PIPING SPOOLS FABRICATION
AND PAINTING WORKS CS, SS.
PIPING FABRICATION 350,000
INCH DIA, PAINTING 45,000
SQM.
SUBCONTR
ACTOR APR-16 SEP-17 ON GOING
3
NEW GATHERING
CENTRE, GC-29
IN NORTH
KUWAIT
PROJECT
PETROFAC
INTERNATIONAL KUWAIT OIL COMPANY ABU DHABI
PIPING SPOOLS FABRICATION
AND PAINTING WORKS.
PIPING FABRICATION 149,624
INCH DIA, PAINTING 36,467
SQM. CS, SS, DSS, SDSS
SUBCONTR
ACTOR MAR-16 MAR-17 COMPLETED
4
SAFE ROUTING
OF SAFETY
VALVE
DISCHARGE AT
ABUDHABI
REFINERY
TATA PROJECTS LTD TAKREER ABU DHABI PIPING SPOOLS FABRICATION,
PAINTING 16,140 INCH DIA
SUBCONTR
ACTOR OCT-16 APR-17 COMPLETED
5
UPPER ZAKUM
UZ-750 EPC2 -
ISLANDS
SURFACE
FACILITIES
PETROFAC EMIRATES
& DSME ZADCO ABU DHABI
PIPING FABRICATION AND
PAINTING WORKS ALLOY,
CUNI,SS,CS,LTCS, CLAD 342,567
INCH DIA, PAINTING 49,525
SQ.M & PIPING SUPPORT
FABRICATION 350 MT.,SKID
FABRICATION - 63 NOS
SUBCONTR
ACTOR MAR-15 JUL-17 ON GOING
6
J3 -
FABRICATION OF
SPOOLS &
STRUCTURE
FABRICATION
RELIANCE
INDUSTRIES LTD RELIANCE INDIA
PIPING FABRICATION 790,000 ID
IBR & NIBR CS,AS,SS,& LTCS &
STRUCTURE FABRICATION -
4000MT
CONTRACT
OR FEB-14 JUN-17 ON GOING
7
UPPER ZAKUM
UZ-750 EPC2 -
ISLANDS
SURFACE
FACILITIES
GULF PIPING
COMPANY ZADCO ABU DHABI
CLADDED PIPE SPOOLS
FABRICATION OF 33,000 INCH
DIA AND PAINTING WORK
SUBCONTR
ACTOR JUL-15 MAR-16 COMPLETED
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
FABRICATION PROJECTS
NO. PROJECT NAME CLIENT COMPANY COUNTRY SCOPE OF WORKS ROLE IN
PROJECT
START
YEAR
FINISH
YEAR STATUS
8
JI-2020-ALRAR
PROJECT
PETROFAC SONATRACH ABU DHABI
PIPING FABRICATION 164, 568
INCH DIA & PAINTING 25,678 SQ
MTR
SUBCONTR
ACTOR NOV-14 JUN-15 COMPLETED
9
BADRA OIL
FIELD
DEVELOPMENT
PROJECT CPF
PHASE 1
PETROFAC FZE GAZPROM ABU DHABI
FAST TRACK FABRICATION OF
167,240 INCH DIA OF
SS/ALLOY/LTCS/CS (INCLUDING
GALV/NACE) PIPING SPOOLS
WITH NDE, BLASTING AND
PAINTING
SUB
CONTRACT
OR
OCT-12 NOV-13 COMPLETED
10
SOUTH
YOLOTEN GAS
DEVELOPMENT
PROJECT
PETROFAC FZE TURKMEN GAS ABU DHABI
FAST TRACK FABRICATION OF
70,000 INCH DIA OF LTCS
PIPING & 90,000 INCH DIA OF
CS JACKETED PIPING
TOTALLING 160,000 INCH DIA
SUB
CONTRACT
OR
NOV-11 OCT-12 COMPLETED
11 4TH NGL TRAIN
PROJECT
PETROFAC
EMIRATES GASCO ABU DHABI
FABRICATION, BLASTING AND
PAINTING OF 260,000 INCH DIA
CS/LTCS/SS PIPING AND 850
TONNES OF ASSOCIATED
SUPPORTS
SUB
CONTRACT
OR
APR-11 OCT-12 COMPLETED
12
PEARL GTL
PROJECT, RAS
LAFFAN, QATAR
CONSOLIDATED
CONTRACTORS
INTERNATIONAL CO
SHELL/QATAR PETROLEUM QATAR
FABRICTION OF 300,000 INCH
DIA OF CARBON STEEL AND S S
PIPING
SPOOLS FOR THE GTL AND
UTILITY PLANTS
SUB
CONTRACT
OR
AUG-08 NOV-09 COMPLETED
13
FABRICATION
OF 4G TUBULAR
TOWER TOP
PLATFORM
RELIANCE
INDUSTRIES LTD RELIANCE INDIA
FABRICATION OF 4G TUBULAR
TOWER TOP PLATFORMER-
1500EA
CONTRACT
OR JUL-13 MAR-14 COMPLETED
14
DAHEJ -
STRUCTURAL
FABRICATION
AT SFS
RELIANCE
INDUSTRIES LTD RELIANCE INDIA
STEEL STRUCURAL
FABRICATION-1955MT (LIKE
LIGHT STEEL ,MEDIUM STEEL,
HEAVY STEEL WITH BOX BUILD
UP STR.FAB) AT SFS
CONTRACT
OR NOV-12 OCT-13 COMPLETED
15
SILVASA -
SALMORGHI
STEEL
STRUCTURE
RELIANCE
INDUSTRIES LTD RELIANCE INDIA
STEEL STRUCURAL
FABRICATION-1374MT (LIKE
LIGHT STEEL ,MEDIUM STEEL,
HEAVY STEEL STR.FAB)
CONTRACT
OR MAY-12 JAN-13 COMPLETED
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
CONSTRUCTION
PROJECTS
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
CONSTRUCTION PROJECTS
NO. PROJECT NAME CLIENT COMPANY COUNTRY SCOPE OF WORKS ROLE IN
PROJECT
START
YEAR
FINISH
YEAR STATUS
1
BeAAT
EXPANSION
PROJECT
INTECSA INDUSTRIAL TAKREER ABU DHABI
MECHANICAL, ELECTRICAL &
INSTRUMENTATION INSTALLATION
WORKS.
SUBCONTR
ACTO NOV-17 APR-19 ON GOING
2
MGT (MANIFOLD
GROUP
TRUNKLINE)
SYSTEM FOR
GCS 29, 30 & 31
PETROFAC
INTERNATIONAL KUWAIT OIL COMPANY KUWAIT
MECHANICAL, ELECTRICAL &
INSTRUMENTATION INSTALLATION
WORKS.
SUBCONTR
ACTOR MAY-16 JUL-17 ON GOING
3
SOHAR
REFINERY
EXPANSION
PROJECT,OMAN
PETROFAC DAILEM
JV ORPIC OMAN
ERECTION OF STEEL STRUCTURES,PIPING
AND EQUIPMENT
SUBCONTR
ACTOR MAR-16 MAY-17 COMPLETED
4
NEW
GATHERING
CENTRE, GC-29
PROJECT.
PETROFAC
INTERNATIONAL KUWAIT OIL COMPANY KUWAIT
PIPING ERECTION WORKS,ELECTRICAL &
INSTRUMENTATION WORKS
SUBCONTR
ACTOR FEB-17 JUN-17 ON GOING
5
SAFE ROUTING
OF SAFETY
VALVE
DISCHARGE AT
RUWAIS & ABU
DHABI REFINERY
TATA PROJECTS
LTD. TAKREER ABU DHABI
REPLACEMNET OF KNOCK OUT DRUM
,STRUCTURE ERECTION,REPLACEMNET
OF SAFETY VALVES & FLARE TIP
REPLACEMENT WORKS. PIPING PRE-
FABRICATION& ERECTION -38,000 INCH
DIA,STRUCTURE ERECTION -600 TON,
SUBCONTR
ACTOR JAN-16 JUN-17 ON GOING
6
TIE-IN OF 12
WELLS TO THE
GATHERING
SYSTEM
PROJECT.
CONSOLIDATED
CONTRACTORS
INTERNATIONAL CO
AL HOSN ABU DHABI CADDED PIPING FABRICATION 6905 ID,
ERECTION AND PAINTING WORKS
SUBCONTR
ACTOR DEC-14 APR-15 COMPLETED
7
SHAH GAS
DEVELOPMENT
U&O PKG 4
SAMSUNG
ENGINEERING AL HOSN ABU DHABI
SITE ERECTION OF 35,000 INCH DIA CS
UTILITY PIPING, 12,500 INCH DIA CRA,
SS, ALLOY AND ASSOCIATED SUPPORTS
SUBCONTR
ACTOR FEB-13 NOV-13 COMPLETED
8
IGD - HABSHAN
5 PROCESS
PLANT
KHARAFI NATIONAL GASCO ABU DHABI
FABRICATION AND ERECTION OF OF
231,000 INCH DIA OF PIPING. CS, SS AND
AS. 174 KM STEAM TRACING. 191.5
TONNES OF SUPPORTS.
SUBCONTR
ACTOR JUN-11 MAR-13 COMPLETED
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
CONSTRUCTION PROJECTS
NO. PROJECT NAME CLIENT COMPANY COUNTRY SCOPE OF WORKS ROLE IN
PROJECT
START
YEAR
FINISH
YEAR STATUS
9
PREPHERAL
ROAD EXTN.
PROJECT. 061
DUBAI CIVIL
AVIATION/TRISTAR
TRANSPORT &
CONTRACTING, ABU
DHABI
DUBAI CIVIL AVIATION DUBAI
120 KM SERVICE PIPE LINE INCLUDING
GRP, ASBESTOS CEMENT,
CARBON STEEL PIPES
(CONSTRUCTION MANAGEMENT)
SUBCONTR
ACTOR JAN-09 JAN-10 COMPLETED
10
BURJ DUBAI
LAKE WATER
FILTERATION
SYSTEM
EMAAR, UAE/VEOLIA
WATER SOLUTION
EMIRATES LLC, DUBAI,
UAE
EMAAR, UAE DUBAI
DESIGN AND FABRICTION OF PIPE
SUPPORTS & ERECTION OF 4 NOS
WATER FILTERATION PLANTS
COMPLETE WITH PIPING WORKS
SUBCONTR
ACTOR SEP-08 MAR-09 COMPLETED
11
DISTRICT
COOLING PLANT
- 3
EMAAR, UAE/DISTRICT
COOLING PLANT - 3 EMAAR, UAE DUBAI
INSTALLATION OF 80,000 INCH DIA
OF CHILLED WATER PIPELINE TO API
STANDARD
SUBCONTR
ACTOR FEB-08 MAY-09 COMPLETED
12 LNG TRAIN 9
PROJECT
PETRONAS/JGC(JAPAN
GAS CORPORATION) PETRONAS MALAYSIA
FILED ERECTION OF 185,000 ID
PIPING,340 TONS OF PIPE
SUPPORTS,20000 M3 OF
SCAFFOLDING
SUBCONTR
ACTOR MAY-14 JUN-16 COMPLETED
13 IDC PHASE - 2
PROJECT.
RELIANCE INDUSTRIES
LTD RELIANCE INDIA
STRL & PIPING FABRIACATION AND
ERECTION 220KV ELECTRICAL CABLE
TRENCH - STRUCTURE WORK
CONTRACT
OR JAN-15 DEC-15 COMPLETED
14
MECHANICAL
WORKS FOR
GAGWA
PROJECT
RELIANCE INDUSTRIES
LTD RELIANCE INDIA
MECHANICAL WORKS FOR WTF AT
GAGWA,PIPING,STRUCTURE,EQUIPME
NT FABRICATION & ERECTION
CONTRACT
OR JAN-15 JAN-16 COMPLETED
15
MECHANICAL
WORKS FOR IDC
JAMNAGAR
RELIANCE INDUSTRIES
LTD RELIANCE INDIA
FABRICATION AND ERECTION OF 200
TONNES STRUCTURAL STEEL AND
75000 ID WITH EEQUIPMENT
ERECTION ,PAINTING ,BLASTING &
MISCELLANEOUS WORK
CONTRACT
OR MAR-13 APR-14 COMPLETED
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
SHUTDOWN & MAINTENANCE /
BROWN FIELD
PROJECTS
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
SHUTDOWN & MAINTENANCE
BROWN FIELD PROJECTS
NO. PROJECT NAME CLIENT COMPANY COUNTRY SCOPE OF WORKS ROLE IN
PROJECT
START
YEAR
FINISH
YEAR STATUS
1
SAFE ROUTING
OF SAFETY
VALVE
DISCHARGE AT
RUWAIS & ABU
DHABI REFINERY
TAKREER/TATA
PROJECTS LTD. TAKREER ABU DHABI
REPLACEMNET OF KNOCK OUT
DRUM ,STRUCTURE & PIPING
ERECTION,REPLACEMNET OF
SAFETY VALVES & FLARE TIP
REPLACEMENT WORKS.
SUBCONTR
ACTOR OCT-16 AUG-17 ON GOING
2
IGD - HABSHAN
5 PROCESS
PLANT
GASCO/JGC -
TECNIMONT JOINT
VENTURE
GASCO ABU DHABI
WARRANTY& MAINTENANCE
WORKS OF GAS PROCESSING
AND SULFUR RECOVERY PLANT.
TOTAL SMP WORKS.
SUBCONTR
ACTOR OCT-13 APR-15 COMPLETED
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
PROJECTS OVERVIEW
KUWAIT OIL COMPANY – MANIFOLD GROUP TRUNKLINE
KUWAIT OIL COMPANY – NEW GAS GATHERING CENTRE 29
SCOPE SUMMARY
MECHANICAL ELECTRICAL & INSTRUMENTATION WORKS FOR
MAIN AND SUB-GROUP MANIFOLDS
CHALLENGES
• MOBILISATION OF EXPAT WORKFORCE/VISA MANAGEMENT
• LOGISTICS OF MANPOWER MOVEMENT FROM
ACCOMODATION (30KM) TO SITE AND WORKING WITHIN
PERMIT TO WORK SYSTEM IN HIGH SECURITY AREA
• PLANNING AND MANAGEMENT OF RESOURCES TO
MAXIMISE PRODUCTIVITY , PARTICULARLY DURING
SUMMER MONTHS AND HOLY MONTH OF RAMADAN
SCOPE SUMMARY
MECHANICAL ELECTRICAL & INSTRUMENTATION WORKS FOR
PROCESS AREA AND UTILITIES/OFFSITES AREA
CHALLENGES
• MOBILISATION OF EXPAT WORKFORCE ON SHORT NOTICE
• LOGISTICS OF MANPOWER MOVEMENT FROM
ACCOMODATION (30KM) TO SITE AND WORKING WITHIN
PERMIT TO WORK SYSTEM IN HIGH SECURITY AREA
• PLANNING AND MANAGEMENT OF RESOURCES TO
MAXIMISE PRODUCTIVITY , PARTICULARLY DURING
SUMMER MONTHS AND HOLY MONTH OF RAMADAN
• INTERFACING WITH OTHER CONTRACTORS
DURATION: JULY 2016 – DECEMBER 2017 (ONGOING PROJECT)
WORK VOLUMES;
- STEEL STRUCTURE ERECTION 1,454 MT - EQUIPMENT 2,144 MT
- PIPING ERECTION 27,766 ID, 33,996 IM - ELECTRICAL CABLE 213 KM
- TELECOM CABLE 31 KM - INSTRUMENT CABLE 176 KM
DURATION: JANUARY 2017 – DECEMBER 2017 (ONGOING PROJECT)
WORK VOLUMES;
- STRUCTURE SUPPORT ERECTION 173 MT - FABRICATED PIPE 160,000 ID
- PIPING ERECTION 60,780 ID, 474,325 IM - ELECTRICAL CABLE 35 KM
- TELECOM CABLE 145 KM - INSTRUMENT CABLE 38 KM
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
PROJECT OVERVIEW
RELIANCE – JAMNAGAR REFINERY EXPANSION PHASE III
TAKREER – RUWAIS AND ABU DHABI REFINERY BROWN FIELD
SCOPE
STRUCTURAL, MECHANICAL, PIPING ERECTION AND
MODIFICATION WORKS PRE/DURING/POST SHUTDOWN
CHALLENGES
• ADHERING TO STRINGENT HSE REQUIREMENTS WITHIN
BROWFIELD ENVIRONMENT
• FLARE TIP REPLACEMENT AND ASSOCIATED PIPING WORKS
EXECUTED DURING SHUTDOWN AND COMPLETED AHEAD
OF SCHEDULE
• MANAGING MULTIPLE LOCATIONS AT RUWAIS REFINERY
(CDU, KOD AND SPHERES) AS WELL AS SIMILAR WORKS AT
ABU DHABI REFINERY 100KM AWAY, SIMILTANEOUSLY
SCOPE
MECHANICAL FABRICATION/ERECTION OF STRUCTURAL,
PIPING AS WELL AS EQUIPMENT/ MODULES
CHALLENGES
• MANAGING A 2,000 MAN WORK FORCE ACROSS MULTIPLE
LOCATIONS/PACKAGES WITHIN THE PROJECT
• PENTA ENTERED THE PROJECT AS A FOREIGN
CONTRACTOR - IMPLEMENTING OUR EXPERIENCE OF
INTERNATIONAL EHSMS AND QUALITY STANDARDS WAS A
CHALLENGE BUT ADDED REAL VALUE TO THE PROJECT
• WORKING WITHIN AN AGGRESSIVE SCHEDULE FOR
VARIOUS ELEMENTS OF THE PROJECT
DURATION: DECEMBER 2014 – DECEMBER 2017 (ONGOING PROJECT)
WORK VOLUMES;
- STEEL STRUCTURE ERECTION 11,500 MT - FABRICATED PIPE 650,000 ID
- PIPING ERECTION 150,000 ID, 550,000 IM - EQUIPMENT 750 MT
DURATION: FEBRUARY 2016 – AUGUST 2017 (ONGOING PROJECT)
WORK VOLUMES;
- STEEL STRUCTURE ERECTION 811 MT - FABRICATED PIPE 46,000 ID
- PIPING ERECTION 118,000 ID - EQUIPMENT ERECTION 50 MT
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
PROJECT OVERVIEW
PETRONAS - MALAYSIA LNG TRAIN 9
SCOPE SUMMARY
MECHANICAL ERECTION WORKS WITHIN THE COLD END
PROCESS AREA
CHALLENGES
• MOBILISATION AND MANAGEMENT OF MULTINATIONAL
WORKFORCE MALAYSIAN, INDONESION, PHILIPINNES,
INDIAN
• EXECUTION OF WORKS WITHIN THE MOST COMPLEX
PROCESS AREA OF THE PLANT
• STRINGENT EHS REQUIREMENTS DUE TO PROXIMITY TO
EXISTING FACILITIES - RECEIVED SAFE CONTRACTOR OF
THE YEAR AWARD 2016
DURATION: MARCH 2014 – APRIL 2016 (COMPLETED PROJECT)
WORK VOLUMES;
- STEEL STRUCTURE ERECTION 220 MT - FABRICATED PIPE 27,000 ID
- PIPING ERECTION 118,000 ID
GASCO – INTERGRATED GAS DEVELOPMENT HABSHAN 5
SCOPE
MECHANICAL PIPING FABRICATION AND ERECTION,
INSTALLATION OF SUPPORTS AND HEAT TRACING WORKS
CHALLENGES
• MANAGING A 1,860 MAN WORK FORCE ACROSS MULTIPLE
LOCATIONS.
• LOGISTICS OF MANPOWER MOVEMENT FROM
ACCOMODATION (15 KM) TO SITE AND WORKING WITHIN
PERMIT TO WORK SYSTEM IN HIGH SECURITY AREA
• PLANNING AND MANAGEMENT OF RESOURCES TO
MAXIMISE PRODUCTIVITY , PARTICULARLY DURING
SUMMER MONTHS AND HOLY MONTH OF RAMADAN
DURATION: MARCH 2014 – APRIL 2016 (COMPLETED PROJECT)
WORK VOLUMES;
- STEEL STRUCTURE ERECTION 564 MT - FABRICATED PIPE 99,000 ID
- PIPING ERECTION 231,000 ID - HEAT TRACING 160 KM
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
PROJECT OVERVIEW
ZADCO – UPPER ZAKUM UZ750 PHASE II
EMIRATES GLOBAL ALUMINIUM – AL TAWEELAH ALUMINA
SCOPE
FABRICATION TESTING AND PAINTING OF SPOOLS AND 43
CAUSTIC STORAGE TANKS – INCLUDING FABRICATION
DRAWING PREPARATION AND TANK MATERIAL PROCUREMENT
CHALLENGES
• FABRICATION OF CS, SS, DUPLEX AND SUPER DUPLEX
SPOOLS
• INCREASE IN SCOPE OF 65% BASED ON PERFORMANCE IN
THE PROJECT AND MAINTAINING BEST PRODUCTIVITY AND
QUALITY STANDARDS
• ADDITIONALLY AWARDED 43 CS TANKS TO BE FABRICATED
WITHIN 8 MONTHS INCLUSSIVE OF MATERIAL SUPPLY
SCOPE
MECHANICAL PIPING AND PIPING SUPPORT PRE-
FABRICATION, AS WELL AS PROCESS SKIDS MEI WORKS
CHALLENGES
• MANAGING MULTIPLE METERLURGIES INCLUDING CS, SS,
DSS, CLAD, CuNi, TITANIUM
• EXTREMELY COMPLICATED MULTI-AXIS/DIRECTIONAL
SPOOLS
• MAINTAINING QUAILITY REPAIR RATES OF LESS THAN 1% -
HIGHLY APPRECIATED BY THE CLIENT
• ADJUSTING TO CLIENT SCOPE INCREASE OF 40% WHILST
MAINTAINING PROJECT SCHEDULE
DURATION: MAY 2017 – DECEMBER 2017 (ONGOING PROJECT)
WORK VOLUMES;
- TANKS 1,143 MT - FABRICATED PIPE 565,000 ID
DURATION: MARCH 2015 – SEPTEMBER 2017 (ONGOING PROJECT)
WORK VOLUMES;
- SUPPORTS FABRICATED 415 MT - FABRICATED PIPE 340,000 ID
- PIPING ERECTION 118,000 ID - PROCESS SKIDS 85 NOS
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
REFERENCES
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
SAMSUNG ENGINEERING
APPRECIATION LETTER &
CLIENT SATISFACTION SURVEY
IGD HABSHN 5 PIPING ERECTION
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
JGC TECHNIMONT
APPRECIATION LETTER
IGD HABSHN 5 PIPING ERECTION
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
PETROFAC GS JV
APPRECIATION LETTER
GASCO 4TH NGL TRAIN PROJECT
Confidential Information © 2017 Penta Global Group All Rights Reserved www.penta-global.com
JGC PETRONAS LNG TRAIN 9 PROJECT
APPRECIATION LETTER & CLIENT
SATISFACTION SURVEY